CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO : INSTALACION DE CANCHA DEPORTIVA DE GRASS SINTETICO EN LA LOCALIDAD DE CCANTUPATA, DISTRITO DE SANTA MARIA DE CHICMO - PROVINCIA DE ANDAHUAYLAS - APURIMAC

ENTIDAD : MUNICIPALIDAD DISTRITAL DE SANTA MARIA DE CHICMO


DISTRITO : SANTA MARIA DE CHICMO
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC
AÑO 01
ITEM DESCRIPCCION UND. METRADO PRECIO S/. PARCIAL S/. MES 01 MES 02 MES 03
METRADO S/. % METRADO S/. % METRADO S/. %
01 TRABAJOS PRELIMINARES S/ 2,716.66 S/ 2,716.66 100.00%

01.01 ALMACEN OFICINA Y CASETA DE GUARDIANIA mes 3.00 S/ 200.00 S/ 600.00 3 S/ 600.00 100.00%
01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40M X 3.60M und 1 S/ 847.46 S/ 847.46 1 S/ 847.46 100.00%
01.03 CERCADO PERIMETRICO CON ARPILLERA m 190 S/ 6.68 S/ 1,269.20 190 S/ 1,269.20 100.00%
02 OBRAS PRELIMINARES S/ 6,092.50 S/ 6,092.50 100.00%
02.01 TRAZO Y REPLANTEO INICAL m2 1750 S/ 1.84 S/ 3,220.00 1750 S/ 3,220.00 100.00%
02.02 LIMPIEZA DEL TERRENO MANUAL m2 1750 S/ 0.27 S/ 472.50 1750 S/ 472.50 100.00%
02.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb 1 S/ 2,400.00 S/ 2,400.00 1 S/ 2,400.00 100.00%
03 AREA DEPORTIVA CON GRASS SINTETICO S/ 103,837.81 S/ 3,666.06 3.53% S/ 100,171.75 96.47%
03.01 OBRAS PRELIMINARES S/ 1,248.26 S/ 1,248.26 100.00%
03.01.01 TRAZO Y REPLANTEO INICAL m2 678.4 S/ 1.84 S/ 1,248.26 678.4 S/ 1,248.26 100.00%
03.02 MOVIMIENTO DE TIERRAS S/ 24,219.81 S/ 2,777.36 11.47% S/ 21,442.45 88.53%
03.02.01 EXCAVACION DE TERRENO CON MAQUINARIA m3 203.52 S/ 14.24 S/ 2,898.12 195.039648876 S/ 2,777.36 95.83% S/ 8.48 S/ 120.76 4.17%
03.02.02 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO m3 223.87 S/ 39.52 S/ 8,847.34 223.87 S/ 8,847.34 100.00%
03.02.03 RELLENO Y COMPACTADO CON ARENA FINA m3 67.84 S/ 121.06 S/ 8,212.71 67.84 S/ 8,212.71 100.00%
03.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA m3 244.22 S/ 17.45 S/ 4,261.64 244.22 S/ 4,261.64 100.00%
03.03 OBRAS DE CONCRETO SIMPLE S/ 3,042.46 S/ 3,042.46 100.00%
03.03.01 CONCRETO CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGONm3 6.65 S/ 235.65 S/ 1,567.07 6.65 S/ 1,567.07 100.00%
03.03.02 CONCRETO f'c=175 kg/cm2 PARA SOBRECIMIENTO m3 2.12 S/ 457.24 S/ 969.35 2.12 S/ 969.35 100.00%
03.03.03 ENCOFRADO Y DESENCOFRADO m2 21.2 S/ 23.87 S/ 506.04 21.2 S/ 506.04 100.00%
03.04 REVOQUES Y ENLUCIDOS S/ 644.90 S/ 644.90 100.00%
03.04.01 TARRAJEO EN MURO EXTERIOR MEZCLA 1:5, E=1.50CM m2 31.8 S/ 20.28 S/ 644.90 31.8 S/ 644.90 100.00%
03.05 PINTURAS S/ 222.92 S/ 222.92 100.00%
03.05.01 PINTURA EN MUROS EXTERIORES AL LATEX m2 31.8 S/ 7.01 S/ 222.92 31.8 S/ 222.92 100.00%
03.06 EQUIPAMIENTO DE LOSA DEPORTIVA S/ 74,459.46 S/ 74,459.46 100.00%
03.06.01 INSTALACION DE GRASS SINTETICO m2 734.58 S/ 94.76 S/ 69,608.80 734.58 S/ 69,608.80 100.00%
03.06.02 REDES PERIMETRALES PARA CAMPO DEPORTIVO DE GRASS SINTETICOm2 1505.67 S/ 2.67 S/ 4,020.14 1505.67 S/ 4,020.14 100.00%
03.06.03 REDES DE ARCO INC. INSTALACION und 2 S/ 33.90 S/ 67.80 2 S/ 67.80 100.00%
03.06.04 ARCO DE FUTBOL INC. PINTURA E INSTALACION und 2 S/ 381.36 S/ 762.72 2 S/ 762.72 100.00%
04 TRIBUNA DE CONCRETO CICLOPEO S/ 65,301.98 S/ 4,448.83 6.81% S/ 57,319.52 87.78% S/ 3,533.63 5.41%
04.01 OBRAS PRELIMINARES S/ 207.99 S/ 207.99 100.00%
04.01.01 TRAZO Y REPLANTEO INICAL m2 113.04 S/ 1.84 S/ 207.99 113.04 S/ 207.99 100.00%
04.02 MOVIMIENTO DE TIERRAS S/ 2,770.15 S/ 2,049.57 73.99% S/ 720.58 26.01%
04.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 66.11 S/ 20.34 S/ 1,344.68 66.11 S/ 1,344.68 100.00%
04.02.02 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO m3 27.65 S/ 39.52 S/ 1,092.73 27.65 S/ 1,092.73 100.00%
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 46.15 S/ 7.21 S/ 332.74 18.5909298551 S/ 134.04 40.28% S/ 198.70 59.72%
04.03 OBRAS DE CONCRETO SIMPLE S/ 26,599.52 S/ 2,251.18 8.46% S/ 24,348.34 91.54%
04.03.01 SOLADO DE CONCRETO f'c=100 Kg/cm2 e=4" m2 143.76 S/ 38.79 S/ 5,576.45 143.76 S/ 5,576.45 100.00%
04.03.02 CONCRETO CICLOPEO F'C=140KG/CM2 +60%PG, 6" MAX m3 101.74 S/ 167.23 S/ 17,013.98 13.4615800183 S/ 2,251.18 13.23% 88.2784199817 S/ 14,762.80 86.77%
04.03.03 ENCOFRADO Y DESENCOFRADO m2 163.28 S/ 23.87 S/ 3,897.49 163.28 S/ 3,897.49 100.00%
04.03.04 JUNTA DE DILATACION CON TECNOPOR E= 1" m 4.8 S/ 23.25 S/ 111.60 4.8 S/ 111.60 100.00%
04.04 OBRAS DE CONCRETO ARMADO S/ 25,752.42 S/ 25,752.42 100.00%
04.04.01 ZAPATAS S/ 8,801.60 S/ 8,801.60 100.00%
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
PROYECTO : INSTALACION DE CANCHA DEPORTIVA DE GRASS SINTETICO EN LA LOCALIDAD DE CCANTUPATA, DISTRITO DE SANTA MARIA DE CHICMO - PROVINCIA DE ANDAHUAYLAS - APURIMAC

ENTIDAD : MUNICIPALIDAD DISTRITAL DE SANTA MARIA DE CHICMO


DISTRITO : SANTA MARIA DE CHICMO
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC
AÑO 01
ITEM DESCRIPCCION UND. METRADO PRECIO S/. PARCIAL S/. MES 01 MES 02 MES 03
METRADO S/. % METRADO S/. % METRADO S/. %
04.04.01.01 CONCRETO F'C=210 KG/CM2 m3 18.43 S/ 368.13 S/ 6,784.64 18.43 S/ 6,784.64 100.00%
04.04.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 429.14 S/ 4.70 S/ 2,016.96 429.14 S/ 2,016.96 100.00%
04.04.02 COLUMNAS S/ 16,950.82 S/ 16,950.82 100.00%
04.04.02.01 CONCRETO F'C=210 KG/CM2 m3 15.74 S/ 368.13 S/ 5,794.37 15.74 S/ 5,794.37 100.00%
04.04.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1574.12 S/ 4.70 S/ 7,398.36 1574.12 S/ 7,398.36 100.00%
04.04.02.03 ENCOFRADO Y DESENCOFRADO m2 157.44 S/ 23.87 S/ 3,758.09 157.44 S/ 3,758.09 100.00%
04.05 REVOQUES Y ENLUCIDOS S/ 8,827.64 S/ 5,294.01 59.97% S/ 3,533.63 40.03%
04.05.01 TARRAJEO EN TRIBUNA MEZCLA 1:5, E=1.50CM 270.04 S/ 20.28 S/ 5,476.41 270.04 S/ 5,476.41 100.00%
04.05.02 TARRAJEO COLUMNAS MEZCLA 1:5, E=1.50CM m2 140.16 S/ 23.91 S/ 3,351.23 81.2537619919 S/ 1,942.78 57.97% 58.9062380081 S/ 1,408.45 42.03%
04.06 PINTURAS S/ 1,144.26 S/ 1,144.26 100.00%
04.06.01 PINTURA DE COLUMNAS AL LATEX m2 117.12 S/ 9.77 S/ 1,144.26 117.12 S/ 1,144.26 100.00%
05 PISOS Y PAVIMENTOS S/ 577.92 S/ 577.92 100.00%
05.01 OBRAS PRELIMINARES S/ 25.06 S/ 25.06 100.00%
05.01.01 TRAZO Y REPLANTEO INICAL m2 13.62 S/ 1.84 S/ 25.06 13.62 S/ 25.06 100.00%
05.02 MOVIMIENTO DE TIERRAS S/ 39.41 S/ 39.41 100.00%
05.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 1.36 S/ 20.34 S/ 27.66 1.36 S/ 27.66 100.00%
05.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 1.63 S/ 7.21 S/ 11.75 1.63 S/ 11.75 100.00%
05.03 OBRAS DE CONCRETO SIMPLE S/ 513.45 S/ 513.45 100.00%
05.03.01 CONCRETO f'c=175 kg/cm2 EN VEREDA m3 1.36 S/ 348.93 S/ 474.54 1.36 S/ 474.54 100.00%
05.03.02 ENCOFRADO Y DESENCOFRADO m2 1.63 S/ 23.87 S/ 38.91 1.63 S/ 38.91 100.00%
06 CERCO PERIMETRICO S/ 33,529.98 S/ 3,325.20 9.92% S/ 7,640.01 22.79% S/ 22,564.77 67.30%
06.01 OBRAS PRELIMINARES S/ 115.26 S/ 115.26 100.00%
06.01.01 TRAZO Y REPLANTEO INICAL m2 62.64 S/ 1.84 S/ 115.26 62.64 S/ 115.26 100.00%
06.02 MOVIMIENTO DE TIERRAS S/ 741.29 S/ 741.29 100.00%
06.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 25.57 S/ 20.34 S/ 520.09 25.57 S/ 520.09 100.00%
06.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 30.68 S/ 7.21 S/ 221.20 30.68 S/ 221.20 100.00%
06.03 OBRAS DE CONCRETO SIMPLE S/ 6,130.93 S/ 2,704.99 44.12% S/ 3,425.94 55.88%
06.03.01 CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3 24.54 S/ 13.04 S/ 320.00 24.54 S/ 320.00 100.00%
06.03.02 CONCRETO PARA SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 9.38 S/ 280.31 S/ 2,629.31 9.38 S/ 2,629.31 100.00%
06.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 125.01 S/ 23.87 S/ 2,983.99 125.01 S/ 2,983.99 100.00%
06.03.04 JUNTA DE DILATACION CON TECNOPOR E= 1" m 8.5 S/ 23.25 S/ 197.63 8.5 S/ 197.63 100.00%
06.04 OBRAS DE CONCRETO ARMADO S/ 2,025.10 S/ 2,025.10 100.00%
06.04.01 ZAPATAS S/ 329.47 S/ 329.47 100.00%
06.04.01.01 CONCRETO F'C=210 KG/CM2 m3 0.77 S/ 368.13 S/ 283.46 0.77 S/ 283.46 100.00%
06.04.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 9.79 S/ 4.70 S/ 46.01 9.79 S/ 46.01 100.00%
06.04.02 COLUMNAS S/ 576.20 S/ 576.20 100.00%
06.04.02.01 CONCRETO F'C=210 KG/CM2 m3 0.33 S/ 368.13 S/ 121.48 0.33 S/ 121.48 100.00%
06.04.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 70.34 S/ 4.70 S/ 330.60 70.34 S/ 330.60 100.00%
06.04.02.03 ENCOFRADO Y DESENCOFRADO m2 5.2 S/ 23.87 S/ 124.12 5.2 S/ 124.12 100.00%
06.04.03 VIGAS S/ 286.10 S/ 286.10 100.00%
06.04.03.01 CONCRETO F'C=210 KG/CM2 m3 0.23 S/ 368.13 S/ 84.67 0.23 S/ 84.67 100.00%
06.04.03.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 37.12 S/ 4.70 S/ 174.46 37.12 S/ 174.46 100.00%
06.04.03.03 ENCOFRADO Y DESENCOFRADO m2 1.13 S/ 23.87 S/ 26.97 1.13 S/ 26.97 100.00%
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
PROYECTO : INSTALACION DE CANCHA DEPORTIVA DE GRASS SINTETICO EN LA LOCALIDAD DE CCANTUPATA, DISTRITO DE SANTA MARIA DE CHICMO - PROVINCIA DE ANDAHUAYLAS - APURIMAC

ENTIDAD : MUNICIPALIDAD DISTRITAL DE SANTA MARIA DE CHICMO


DISTRITO : SANTA MARIA DE CHICMO
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC
AÑO 01
ITEM DESCRIPCCION UND. METRADO PRECIO S/. PARCIAL S/. MES 01 MES 02 MES 03
METRADO S/. % METRADO S/. % METRADO S/. %
06.04.04 LOSAS ALIGERADAS S/ 833.33 S/ 833.33 100.00%
06.04.04.01 CONCRETO F'C=210 KG/CM2 m3 0.81 S/ 368.13 S/ 298.19 0.81 S/ 298.19 100.00%
06.04.04.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 44.5 S/ 4.70 S/ 209.15 44.5 S/ 209.15 100.00%
06.04.04.03 ENCOFRADO Y DESENCOFRADO m2 8.73 S/ 23.87 S/ 208.39 8.73 S/ 208.39 100.00%
06.04.04.04 LADRILLO DE TECHO DE ARCILLA DE 15X30X30 CM PARA TECHO ALIG und 33.6 S/ 3.50 S/ 117.60 33.6 S/ 117.60 100.00%
06.05 ALBAÑILERIA S/ 208.33 S/ 208.33 100.00%
06.05.01 MUROS DE LADRILLO KK ARCILLA SOGA M:1:5 E:1.5CM m2 5.88 S/ 35.43 S/ 208.33 5.88 S/ 208.33 100.00%
06.06 REVOQUES Y ENLUCIDOS S/ 3,729.92 S/ 1,980.64 53.10% S/ 1,749.28 46.90%
06.06.01 TARRAJEO COLUMNAS MEZCLA 1:5, E=1.50CM m2 5.2 S/ 23.91 S/ 124.33 5.2 S/ 124.33 100.00%
06.06.02 TARRAJEO EN MURO EXTERIOR MEZCLA 1:5, E=1.50CM m2 165.16 S/ 20.28 S/ 3,349.44 78.9034661317 S/ 1,600.16 47.77% 86.2565338683 S/ 1,749.28 52.23%
06.06.03 TARRAJEO DE CIELORASO MEZCLA 1:5, E=1.50CM m2 10.62 S/ 24.12 S/ 256.15 10.62 S/ 256.15 100.00%
06.07 PINTURAS S/ 1,317.53 S/ 1,317.53 100.00%
06.07.01 PINTURA DE COLUMNAS AL LATEX m2 5.2 S/ 9.77 S/ 50.80 5.2 S/ 50.80 100.00%
06.07.02 PINTURA EN MUROS EXTERIORES AL LATEX m2 165.16 S/ 7.01 S/ 1,157.77 165.16 S/ 1,157.77 100.00%
06.07.03 PINTURA EN CIELORASOS CON LATEX (2 MANOS) m2 10.62 S/ 10.26 S/ 108.96 10.62 S/ 108.96 100.00%
06.08 CARPINTERIA METALICA S/ 19,261.62 S/ 19,261.62 100.00%
06.08.01 PUERTA METALICA INCLUYE PINTURA E INSTALACION und 1 S/ 720.34 S/ 720.34 1 S/ 720.34 100.00%
06.08.02 CERCO DE MALLA N° 10 DE F°G° 1 1/2" X 1 1/2" Y TUB. 2" DE F°G° (INC. m 162.06 S/ 114.41 S/ 18,541.28 162.06 S/ 18,541.28 100.00%
07 ESTRUCTURA METALICA PARA SOPORTE DE LA COBERTURA S/ 113,270.73 S/ 29,155.77 25.74% S/ 77,923.21 68.79% S/ 6,191.75 5.47%
07.01 ESTRUCTURA METALICA S/ 105,685.38 S/ 27,760.77 26.27% S/ 77,923.21 73.73% S/ 1.40 0.00%
07.01.01 ESTRUCTURA METALICA PARA VIGAS PRINCIPALES TIPO I m 180 S/ 130.82 S/ 23,547.60 180 S/ 23,547.60 100.00%
07.01.02 ESTRUCTURA METALICA PARA VIGAS TIPO 2 m 87 S/ 55.67 S/ 4,843.29 87 S/ 4,843.29 100.00%
07.01.03 CORREAS METALICAS m 855 S/ 16.14 S/ 13,799.70 855 S/ 13,799.70 100.00%
07.01.04 SOPORTE Y BASE PARA ANCLAJE DE VIGA und 12 S/ 191.59 S/ 2,299.08 12 S/ 2,299.08 100.00%
07.01.05 COBERTURA CON CALAMINON TIPO TRAPAZOIDAL CURVO m2 1257.36 S/ 48.67 S/ 61,195.71 1257.36 S/ 61,195.71 100.00%
07.02 INSTALACIONES ELECTRICAS S/ 7,585.35 S/ 7,585.35 100.00%
07.02.01 TABLEROS ELECTRICOS S/ 47.41 S/ 47.41 100.00%
07.02.01.01 TABLERO DISTRIBUCION CAJA METALICA CON 10 POLOS pza 1 S/ 47.41 S/ 47.41 1 S/ 47.41 100.00%
07.02.02 INTERRUPTORES TERMOMAGNETICOS S/ 69.84 S/ 69.84 100.00%
07.02.02.01 INTERRUPTOR MONOFASICO 2 X 20 AMP pza 2 S/ 23.28 S/ 46.56 2 S/ 46.56 100.00%
07.02.02.02 INTERRUPTOR MONOFASICO 2 X 30 AMP pza 1 S/ 23.28 S/ 23.28 1 S/ 23.28 100.00%
07.02.03 CABLES Y CONDUCTORES S/ 2,394.00 S/ 2,394.00 100.00%
07.02.03.01 CABLE VULCANIZADO N° 10 m 380 S/ 6.30 S/ 2,394.00 380 S/ 2,394.00 100.00%
07.02.04 CONDUCTOS S/ 1,219.80 S/ 1,219.80 100.00%
07.02.04.01 TUBERIA PVC-SAP ELECTRICA DE 80 mm m 190 S/ 6.42 S/ 1,219.80 190 S/ 1,219.80 100.00%
07.02.05 ARTEFACTOS DE ILUMINACION S/ 3,854.30 S/ 3,854.30 100.00%
07.02.05.01 ARTEFACTO ADOSADO EN TECHO REFLECTOR LED 300W pza 10 S/ 385.43 S/ 3,854.30 10 S/ 3,854.30 100.00%
08 SERVICIOS HIGENICOS Y VESTIDORES S/ 28,105.22 S/ 28,105.22 100.00%
08.01 OBRAS PRELIMINARES S/ 41.50 S/ 41.50 100.00%
08.01.01 TRAZO Y REPLANTEO INICAL m2 19.67 S/ 1.84 S/ 36.19 19.67 S/ 36.19 100.00%
08.01.02 LIMPIEZA DEL TERRENO MANUAL m2 19.67 S/ 0.27 S/ 5.31 19.67 S/ 5.31 100.00%
08.02 MOVIMIENTO DE TIERRAS S/ 300.41 S/ 300.41 100.00%
08.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 11.48 S/ 20.34 S/ 233.50 11.48 S/ 233.50 100.00%
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
PROYECTO : INSTALACION DE CANCHA DEPORTIVA DE GRASS SINTETICO EN LA LOCALIDAD DE CCANTUPATA, DISTRITO DE SANTA MARIA DE CHICMO - PROVINCIA DE ANDAHUAYLAS - APURIMAC

ENTIDAD : MUNICIPALIDAD DISTRITAL DE SANTA MARIA DE CHICMO


DISTRITO : SANTA MARIA DE CHICMO
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC
AÑO 01
ITEM DESCRIPCCION UND. METRADO PRECIO S/. PARCIAL S/. MES 01 MES 02 MES 03
METRADO S/. % METRADO S/. % METRADO S/. %
08.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 4.51 S/ 11.63 S/ 52.45 4.51 S/ 52.45 100.00%
08.03 OBRAS DE CONCRETO SIMPLE S/ 1,874.04 S/ 1,874.04 100.00%
08.03.01 SOLADO DE CONCRETO f'c=100 Kg/cm2 e=2" m2 15.72 S/ 38.79 S/ 609.78 15.72 S/ 609.78 100.00%
08.03.02 CONCRETO 1:10 + 30% P.G. PARA CIMIENTO CORRIDO m3 3.89 S/ 235.65 S/ 916.68 3.89 S/ 916.68 100.00%
08.03.03 CONCRETO PARA SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 1.24 S/ 280.31 S/ 347.58 1.24 S/ 347.58 100.00%
08.04 OBRAS DE CONCRETO ARMADO S/ 8,394.59 S/ 6,817.81 81.22% S/ 1,576.78 18.78%
08.04.01 ZAPATAS S/ 1,159.54 S/ 1,159.54 100.00%
08.04.01.01 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 58.73 S/ 4.70 S/ 276.03 58.73 S/ 276.03 100.00%
08.04.01.02 CONCRETO F'C=210 KG/CM2 m3 2.4 S/ 368.13 S/ 883.51 2.4 S/ 883.51 100.00%
08.04.02 COLUMNAS S/ 1,901.73 S/ 1,901.73 100.00%
08.04.02.01 ENCOFRADO Y DESENCOFRADO m2 18.6 S/ 25.96 S/ 482.86 18.6 S/ 482.86 100.00%
08.04.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 211.03 S/ 4.70 S/ 991.84 211.03 S/ 991.84 100.00%
08.04.02.03 CONCRETO F'C=210 KG/CM2 m3 1.16 S/ 368.13 S/ 427.03 1.16 S/ 427.03 100.00%
08.04.03 VIGAS S/ 2,537.28 S/ 2,537.28 100.00%
08.04.03.01 ENCOFRADO Y DESENCOFRADO m2 20.9 S/ 23.87 S/ 498.88 20.9 S/ 498.88 100.00%
08.04.03.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 171.31 S/ 4.70 S/ 805.16 171.31 S/ 805.16 100.00%
08.04.03.03 CONCRETO F'C=210 KG/CM2 m3 3.35 S/ 368.13 S/ 1,233.24 3.35 S/ 1,233.24 100.00%
08.04.04 LOSAS ALIGERADAS S/ 2,796.04 S/ 1,219.26 43.61% S/ 1,576.78 56.39%
08.04.04.01 CONCRETO F'C=210 KG/CM2 m3 1.56 S/ 368.13 S/ 574.28 1.56 S/ 574.28 100.00%
08.04.04.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 211.03 S/ 4.70 S/ 991.84 211.03 S/ 991.84 100.00%
08.04.04.03 ENCOFRADO Y DESENCOFRADO m2 33.58 S/ 23.87 S/ 801.55 33.58 S/ 801.55 100.00%
08.04.04.04 LADRILLO DE TECHO DE ARCILLA DE 15X30X30 CM PARA TECHO ALIG und 122.39 S/ 3.50 S/ 428.37 119.344321264 S/ 417.71 97.51% 3.0456787357 S/ 10.66 2.49%
08.05 ALBAÑILERIA S/ 1,998.96 S/ 1,998.96 100.00%
08.05.01 MUROS DE LADRILLO KK ARCILLA SOGA M:1:5 E:1.5CM m2 56.42 S/ 35.43 S/ 1,998.96 56.42 S/ 1,998.96 100.00%
08.06 REVOQUES Y ENLUCIDOS S/ 4,069.97 S/ 4,069.97 100.00%
08.06.01 TARRAJEO EN MURO INTERIOR MEZCLA 1:5, E=1.50CM m2 77.74 S/ 19.40 S/ 1,508.16 77.74 S/ 1,508.16 100.00%
08.06.02 TARRAJEO EN MURO EXTERIOR MEZCLA 1:5, E=1.50CM m2 35.1 S/ 20.28 S/ 711.83 35.1 S/ 711.83 100.00%
08.06.03 TARRAJEO COLUMNAS MEZCLA 1:5, E=1.50CM m2 7.67 S/ 23.91 S/ 183.39 7.67 S/ 183.39 100.00%
08.06.04 TARRAJEO DE VIGAS MEZCLA 1:5, E=1.50CM m2 20.9 S/ 29.26 S/ 611.53 20.9 S/ 611.53 100.00%
08.06.05 TARRAJEO DE CIELORASO MEZCLA 1:5, E=1.50CM m2 33.58 S/ 24.12 S/ 809.95 33.58 S/ 809.95 100.00%
08.06.06 VESTIDURA DE DERRAMES CON MORTERO 1:5 m 25.4 S/ 9.65 S/ 245.11 25.4 S/ 245.11 100.00%
08.07 PISOS Y PAVIMENTOS S/ 1,214.98 S/ 1,101.01 90.62% S/ 113.97 9.38%
08.07.01 FALSO PISO DE 4" DE CONCRETO 1:10 m2 15.73 S/ 28.81 S/ 453.18 15.73 S/ 453.18 100.00%
08.07.02 PISO CERAMICO 30 X 30 SERIE ECONOMICA m2 15.73 S/ 48.43 S/ 761.80 13.3766945392 S/ 647.83 85.04% 2.3533054608 S/ 113.97 14.96%
08.08 ZOCALOS Y CONTRAZOCALOS S/ 1,402.34 S/ 1,402.34 100.00%
08.08.01 ZOCALO DE CERAMICA 20 X 30CM SERIE ECONOMICO m2 40.98 S/ 34.22 S/ 1,402.34 40.98 S/ 1,402.34 100.00%
08.09 CARPINTERIA DE MADERA S/ 2,022.70 S/ 2,022.70 100.00%
08.09.01 PUERTAS DE MADERA INC. INSTALACION und 5 S/ 404.54 S/ 2,022.70 5 S/ 2,022.70 100.00%
08.10 CARPINTERIA METALICA S/ 75.71 S/ 75.71 100.00%
08.10.01 VENTANA METALICA INC. INSTALACION m2 2.8 S/ 27.04 S/ 75.71 2.8 S/ 75.71 100.00%
08.11 VIDRIOS S/ 160.30 S/ 160.30 100.00%
08.11.01 VIDRIO SEMIDOBLE INCOLORO CRUDO p2 29.74 S/ 5.39 S/ 160.30 29.74 S/ 160.30 100.00%
08.12 CERRAJERIA S/ 203.20 S/ 203.20 100.00%
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
PROYECTO : INSTALACION DE CANCHA DEPORTIVA DE GRASS SINTETICO EN LA LOCALIDAD DE CCANTUPATA, DISTRITO DE SANTA MARIA DE CHICMO - PROVINCIA DE ANDAHUAYLAS - APURIMAC

ENTIDAD : MUNICIPALIDAD DISTRITAL DE SANTA MARIA DE CHICMO


DISTRITO : SANTA MARIA DE CHICMO
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC
AÑO 01
ITEM DESCRIPCCION UND. METRADO PRECIO S/. PARCIAL S/. MES 01 MES 02 MES 03
METRADO S/. % METRADO S/. % METRADO S/. %
08.12.01 CERRADURA DE 3 GOLPES PARA PUERTA und 5 S/ 32.78 S/ 163.90 5 S/ 163.90 100.00%
08.12.02 BISAGRA CAPUCHINA DE 4" X4" und 15 S/ 2.62 S/ 39.30 15 S/ 39.30 100.00%
08.13 PINTURAS S/ 1,535.63 S/ 1,535.63 100.00%
08.13.01 PINTURA EN MUROS INTERIORES AL LATEX m2 77.74 S/ 6.89 S/ 535.63 77.74 S/ 535.63 100.00%
08.13.02 PINTURA EN MUROS EXTERIORES AL LATEX m2 31.85 S/ 7.01 S/ 223.27 31.85 S/ 223.27 100.00%
08.13.03 PINTURA DE COLUMNAS AL LATEX m2 7.67 S/ 9.77 S/ 74.94 7.67 S/ 74.94 100.00%
08.13.04 PINTURA DE VIGAS AL LATEX m2 20.9 S/ 8.72 S/ 182.25 20.9 S/ 182.25 100.00%
08.13.05 PINTURA EN CIELORASOS CON LATEX (2 MANOS) m2 33.58 S/ 10.26 S/ 344.53 33.58 S/ 344.53 100.00%
08.13.06 PINTURA EN DERRAMES AL LATEX m 25.4 S/ 6.89 S/ 175.01 25.4 S/ 175.01 100.00%
08.14 INSTALACIONES ELECTRICAS S/ 1,650.29 S/ 119.15 7.22% S/ 1,531.14 92.78%
08.14.01 SALIDAS PARA ALUMBRADO S/ 202.56 S/ 119.15 58.82% S/ 83.41 41.18%
08.14.01.01 SALIDA DE TECHO C/PVC SAP 20 MM (TW 2.5 MM2) pto 8 S/ 25.32 S/ 202.56 4.7057661927 S/ 119.15 58.82% 3.2942338073 S/ 83.41 41.18%
08.14.02 SALIDAS PARA INTERRUPTORES S/ 67.66 S/ 67.66 100.00%
08.14.02.01 INTERRUPTOR UNIPOLAR SIMPLE C/PVC SAP 20MM (2.5 MM2) pto 5 S/ 11.02 S/ 55.10 5 S/ 55.10 100.00%
08.14.02.02 INTERRUPTOR UNIPOLAR DOBLE C/PVC SAP 20MM (2.5 MM2) pto 1 S/ 12.56 S/ 12.56 1 S/ 12.56 100.00%
08.14.03 SALIDAS PARA TOMACORRIENTES S/ 20.72 S/ 20.72
08.14.03.01 TOMACORRIENTE BIPOLAR DOBLE C/TIERRA pto 2 S/ 10.36 S/ 20.72 S/ 20.72
08.14.04 INTERRUPTORES TERMOMAGNETICOS S/ 23.28 S/ 23.28 100.00%
08.14.04.01 INTERRUPTOR MONOFASICO 2 X 20 AMP pza 1 S/ 23.28 S/ 23.28 1 S/ 23.28 100.00%
08.14.05 CABLES Y CONDUCTORES S/ 335.50 S/ 335.50 100.00%
08.14.05.01 CABLE THW #12 m 110 S/ 3.05 S/ 335.50 110 S/ 335.50 100.00%
08.14.06 CONDUCTOS S/ 231.12 S/ 231.12 100.00%
08.14.06.01 TUBERIA PVC-SAP ELECTRICA DE 20 mm m 36 S/ 6.42 S/ 231.12 36 S/ 231.12 100.00%
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
PROYECTO : INSTALACION DE CANCHA DEPORTIVA DE GRASS SINTETICO EN LA LOCALIDAD DE CCANTUPATA, DISTRITO DE SANTA MARIA DE CHICMO - PROVINCIA DE ANDAHUAYLAS - APURIMAC

ENTIDAD : MUNICIPALIDAD DISTRITAL DE SANTA MARIA DE CHICMO


DISTRITO : SANTA MARIA DE CHICMO
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC
AÑO 01
ITEM DESCRIPCCION UND. METRADO PRECIO S/. PARCIAL S/. MES 01 MES 02 MES 03
METRADO S/. % METRADO S/. % METRADO S/. %
08.14.07 ARTEFACTOS DE ILUMINACION S/ 189.76 S/ 189.76 100.00%
08.14.07.01 FOCOS LED DE 18 W und 8 S/ 23.72 S/ 189.76 8 S/ 189.76 100.00%
08.14.08 VARIOS S/ 579.69 S/ 579.69
08.14.08.01 MEDIDOR MONOFASICO und 1 S/ 107.59 S/ 107.59 S/ 107.59
08.14.08.02 POZO DE TIERRA und 1 S/ 472.10 S/ 472.10 S/ 472.10
08.15 INSTALACIONES SANITARIAS S/ 3,175.06 S/ 3,175.06 100.00%
08.15.01 SISTEMA DE DESAGUE S/ 1,485.65 S/ 1,485.65 100.00%
08.15.01.01 SALIDAS DE DESAGUE Y VENTILACION S/ 442.58 S/ 442.58 100.00%
08.15.01.01.01 SALIDA DE PVC SAL PARA VENTILACION 2" pto 3 S/ 14.31 S/ 187.04 S/ 187.04
08.15.01.01.02 SALIDA DE PVC SAL PARA DESAGUE DE 2" pto 4 S/ 46.76 S/ 187.04 4 S/ 187.04 100.00%
08.15.01.01.03 SALIDA DE PVC SAL PARA DESAGUE DE 4" pto 3 S/ 70.87 S/ 212.61 3 S/ 212.61 100.00%
08.15.01.02 REDES DE DISTRIBUCION DE DESAGUE S/ 581.28 S/ 581.28 100.00%
08.15.01.02.01 TUBERIA PVC SAL 4" DESAGUE m 24 S/ 14.35 S/ 344.40 24 S/ 344.40 100.00%
08.15.01.02.02 TUBERIA PVC SAL 2" DESAGUE m 21 S/ 11.28 S/ 236.88 21 S/ 236.88 100.00%
08.15.01.03 ADITAMENTOS VARIOS S/ 81.79 S/ 81.79 100.00%
08.15.01.03.01 REGISTRO DE BRONCE 4" und 1 S/ 11.63 S/ 11.63 1 S/ 11.63 100.00%
08.15.01.03.02 SUMIDERO DE BRONCE ROSCADO 2" und 8 S/ 8.77 S/ 70.16 8 S/ 70.16 100.00%
08.15.01.04 VARIOS S/ 380.00 S/ 380.00
08.15.01.04.01 CAJA DE REGISTRO DE DESAGUE 12"X24" und 2 S/ 190.00 S/ 380.00 S/ 380.00
08.15.02 SISTEMA DE AGUA FRIA S/ 1,689.41 S/ 1,689.41 100.00%
08.15.02.01 SALIDAS DE AGUA FRIA S/ 275.64 S/ 275.64 100.00%
08.15.02.01.01 SALIDA AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 4 S/ 68.91 S/ 275.64 4 S/ 275.64 100.00%
08.15.02.02 REDES DE DISTRIBUCION DE AGUA FRIA S/ 263.25 S/ 263.25 100.00%
08.15.02.02.01 TUBERIA PVC C-10 DE ½" LINEA DE ALIMENTACION m 39 S/ 6.75 S/ 263.25 39 S/ 263.25 100.00%
08.15.02.03 LLAVES Y VALVULAS S/ 233.76 S/ 233.76 100.00%
08.15.02.03.01 VALVULA COMPUERTA DE 1/2" und 3 S/ 77.92 S/ 233.76 3 S/ 233.76 100.00%
08.15.02.04 APARATOS Y ACCESORIOS SANITARIOS S/ 866.62 S/ 866.62 100.00%
08.15.02.04.01 APARATOS SANITARIOS S/ 812.52 S/ 812.52 100.00%
08.15.02.04.01.01 INODORO TANQUE ALTO BLANCO CON ACCESORIOS pza 2 S/ 321.77 S/ 643.54 2 S/ 643.54 100.00%
08.15.02.04.01.02 LAVATORIO BLANCO CON ACCESORIOS pza 2 S/ 84.49 S/ 168.98 2 S/ 168.98 100.00%
08.15.02.04.02 ACCESORIOS SANITARIOS S/ 54.10 S/ 54.10 100.00%
08.15.02.04.02.01 DUCHA CROMADA und 2 S/ 27.05 S/ 54.10 2 S/ 54.10 100.00%
08.15.02.05 VARIOS S/ 50.14 S/ 50.14 100.00%
08.15.02.05.01 CAJA NICHO PARA VALVULAS INCLUYE TAPA und 1 S/ 50.14 S/ 50.14 1 S/ 50.14 100.00%
09 SISTEMA DE AGUA PLUVIAL S/ 5,237.94 S/ 5,237.94 100.00%
09.01 CANALETA DE PLANCHA GALVANIZADA INC. ACCESORIOS DE FIJACIÓN m 77.2 S/ 50.00 S/ 3,860.00 77.2 S/ 3,860.00 100.00%
09.02 SUMINISTRO Y COLOCACION DE BAJANTES m 98.04 S/ 8.42 S/ 825.50 98.04 S/ 825.50 100.00%
09.03 ABRAZADERA DE FO. GDO. DE 4" und 12 S/ 10.94 S/ 131.28 12 S/ 131.28 100.00%
09.04 CONCRETO PARA COLUMNETAS f'c=175 kg/cm2 (0.15X0.15X2.5M) und 4 S/ 105.29 S/ 421.16 4 S/ 421.16 100.00%
10 FLETE S/ 2,500.00 S/ 2,500.00 100.00%
10.01 FLETE TERRESTRE A OBRA glb 1 S/ 2,500.00 S/ 2,500.00 1 S/ 2,500.00 100.00%
11 VARIOS S/ 3,442.61 S/ 2,936.25 85.29% S/ 506.36 14.71%
11.01 EQUIPOS DE PROTECCION PERSONAL S/ 2,936.25 S/ 2,936.25 100.00%
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
PROYECTO : INSTALACION DE CANCHA DEPORTIVA DE GRASS SINTETICO EN LA LOCALIDAD DE CCANTUPATA, DISTRITO DE SANTA MARIA DE CHICMO - PROVINCIA DE ANDAHUAYLAS - APURIMAC

ENTIDAD : MUNICIPALIDAD DISTRITAL DE SANTA MARIA DE CHICMO


DISTRITO : SANTA MARIA DE CHICMO
PROVINCIA : ANDAHUAYLAS
REGION : APURIMAC
AÑO 01
ITEM DESCRIPCCION UND. METRADO PRECIO S/. PARCIAL S/. MES 01 MES 02 MES 03
METRADO S/. % METRADO S/. % METRADO S/. %
11.01.01 EPP PARA PEONES und 15 S/ 117.45 S/ 1,761.75 15 S/ 1,761.75 100.00%
11.01.02 EPP PARA OFICIALES und 5 S/ 117.45 S/ 587.25 5 S/ 587.25 100.00%
11.01.03 EPP PARA OPERARIOS und 5 S/ 117.45 S/ 587.25 5 S/ 587.25 100.00%
11.02 VARIOS S/ 506.36 S/ 506.36 100.00%
11.02.01 SUMINISTRO E INSTALACION DE PLACA RECORDATORIA DE METAL Y VI und 1 S/ 506.36 S/ 506.36 1 S/ 506.36 100.00%

COSTO DIRECTO (CD) S/ 364,613.35 S/ 79,858.35 21.90% S/ 146,548.80 40.19% S/ 138,206.20 37.90%
GASTOS GENERALES (GG) S/ 37,004.80 S/ 8,104.87 21.90% S/ 14,873.31 40.19% S/ 14,026.62 37.90%
UTILIDAD (U) S/ 36,461.34 S/ 7,985.84 21.90% S/ 14,654.88 40.19% S/ 13,820.62 37.90%
SUB TOTAL (CD+GG+U) S/ 438,079.49 S/ 95,949.05 21.90% S/ 176,077.00 40.19% S/ 166,053.44 37.90%
IGV (18%) S/ 78,854.31 S/ 17,270.83 21.90% S/ 31,693.86 40.19% S/ 29,889.62 37.90%
SUPERVISION (4%) (S) S/ 16,453.80 S/ 3,603.74 21.90% S/ 6,613.26 40.19% S/ 6,236.79 37.90%
EXPEDIENTE TECNICO (ET) S/ 15,000.00 S/ 15,000.00 100.00% S/ - 0.00% S/ - 0.00%
LIQUIDACION DE OBRA (LO) S/ 4,000.00 S/ - 0.00% S/ - 0.00% S/ 4,000.00 100.00%
PRESUPUESTO TOTAL (ST+IGV+S+ES/ 552,387.60 S/ 131,823.63 23.86% S/ 214,384.12 38.81% S/ 206,179.85 37.33%
% AVANCE DE OBRA 100.00% 23.86% 38.81% 37.33%
% AVANCE DE OBRA ACUM. 100.00% 23.86% 62.67% 100.00%
2716.66
600.00
847.46
1269.20
5165.00
2292.50
472.50
2400.00
3666.06 100062.75
888.70
888.70
2777.36 21693.01
2777.36 120.76
9097.90
8212.71
4261.64
3042.46
1567.07
969.35
506.04
644.90
644.90
222.92
222.92
74459.46
69608.80
4020.14
67.80
762.72
4448.83 32018.68 3533.63
148.08
148.08
2049.57 151.91
1094.70
820.83
134.04 151.91
2251.18 18660.29
17013.98
2251.18 1646.31
11263.70
8072.91
6784.64
1288.27
3190.79
1200.10
1211.57
779.12
1942.78 3533.63
1942.78 3533.63
1354.57
17.84
17.84
39.41
27.66
11.75
1297.32
1270.11
27.21
5018.45 7640.01 22564.77
86.59
86.59
774.09
543.08
231.01
4157.77 3425.94
309.57
3405.77
3848.20 20.17
2025.10
329.47
283.46
46.01
576.20
121.48
330.60
124.12
286.10
84.67
174.46
26.97
833.33
298.19
209.15
208.39
117.60
208.33
208.33
1980.64 1924.91
124.33
1600.16 1924.91
256.15
1378.24
50.80
1218.48
108.96
19261.62
720.34
18541.28
11698.60 77923.21 6191.75
11698.60 77923.21 1.40
11698.60 -1.49
4960.57
14477.89
9966.12
48520.12 1.40
6190.35
47.41
47.41
69.84
46.56
23.28
1480.50
1480.50
738.30
738.30
3854.30
3854.30
9142.49 12686.44 5629.33
31.08
25.77
5.31
300.41
233.50
52.45
14.46
1874.04
609.78
916.68
347.58
6817.81 1576.78
1159.54
276.03
883.51
1901.73
482.86
991.84
427.03
2537.28
498.88
805.16
1233.24
1219.26 1576.78
574.28
991.84
801.55
417.71 10.66
1947.94
1947.94
4039.89
1447.05
742.86
183.39
611.53
809.95
245.11
1101.01 113.97
453.18
647.83 113.97
1827.35
1827.35
2022.70
2022.70
35.69
35.69
76.54
76.54
203.20
163.90
39.30
1349.88
305.02
268.13
74.94
182.25
344.53
175.01
119.15 868.13
119.15 83.41
119.15 83.41
67.66
55.10
12.56
23.28
23.28
305.00
305.00
199.02
199.02
189.76
189.76
3152.69
1002.19
470.52
187.04
283.48
409.08
172.20
236.88
122.59
34.89
87.70
2150.50
275.64
275.64
263.25
263.25
311.68
311.68
1299.93
1218.78
965.31
253.47
81.15
81.15
5363.90
3860.00
951.46
131.28
421.16
2500.00
2500.00
2936.25 0.00 506.36
2936.25 0.00
1761.75
587.25
587.25 0.00
506.36
506.36