Reference: TP/TED/CBPM/MASTERSHEET/SS/3.5/SS/RFI SS & CB/3.5.1.

11

REQUEST FOR INSPECTION


Submitted Date: 05.12.2019
Project Type 132/11KV □ 400/132KV □ Others (Specify): ______________________________________
Substation/
Contract No. DS-233/1A JABLPUMP Section: Civil
Circuit
GREEN
Main Contractor Danway Consultant Sub-Contractor SANDS
ENERGY
RFI Serial No & Rev. 57-Rev-0 Proposed Date 07.12.19 Proposed time 3.00 Pm
Checklist Ref
ITP Ref. No. ITP-Civil-016 NA Location Site
No.

DRAWINGS / DOCUMENTS / APPROVALS REFERENCE: Nature of work:


DEWA-Spec- 1.5.3.1.0.01-Rev-16
□ Site Work □ Material □ Installation □
Others
Specify:
ATTACHMENTS: Nature of scope:

1. CL-Civil- 16 Civil □ MEP □ Electrical □ FPS □


2. ITP-Civil-016/3.10 Others
3. DS-233/1A/JABLPUMP/C/15/691 Specify:

DESCRIPTION OF WORK/S:
Working pile concreting and removal of casing.
Pile No :-

DEWA/ CONSULTANT COMMENTS:

FINAL INSPECTION RESULTS: CONTRACTOR’S INTERNAL INSPECTION COMPLETED: YES NO

Approved Elec/LSP
Approved with comments (Re-Inspection required) HVAC
Not Approved / Rejected FPS
Time start: MEP
DURATION OF INSPECTION
Time end: Civil

□ Use / See the back of this page for additional comments.


Involved Subcontractor Main Contractor Consultant DEWA
Name: Mr.Suresh Arun Kandi Mr. Fiorald liko Mr. Sirajudeen
Chinnathambi
Signature:

Date:

©Transmission Engineering Department -2015 Page 1 of 1 Issue1 Rev0