MEJORAMIENTO DEL JR.

ICA NUEVA
01 CALZADA VEHICULAR JR. ICA NUEVA
01.01 OBRAS PROVISIONALES
01.01.01 ALMACEN Y CASETA DE GUARDIANIA MES 6.00
01.01.02 SEÑALES PARA DESVIO DE TRANSITO UND 5.00
01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y GLB 1.00
01.01.04 CARTEL DE IDENTIFICACION DE OBRA DE 3.60x8.50 UND 1.00
01.02 TRABAJOS PRELIMINARES
01.02.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 3,139.64
01.02.02 TRAZO, NIVELES Y REPLANTEO DURANTE LA EJECU M2 3,139.64
01.02.03 LIMPIEZA INICIAL DE OBRA M2 3,139.64
01.03 MOVIMIENTO DE TIERRAS
01.03.01 ESCARIFICADO, PERFILADO Y COMPACTADO A NIVE M2 3,139.64
01.03.02 CORTE DE TERRENO A NIVEL DE SUBRASANTE M3 666.80
01.03.03 CORTE DE TERRENO A NIVEL DE MEJORAMIENTO M3 1,533.84
01.03.04 EXCAVACIÓN MANUAL M3 154.04
01.03.05 EXCAVACION MANUAL PARA CUNETA M3 47.83
01.03.06 EXCAVACION MANUAL PARA BADEN M3 43.16
01.03.07 EXCAVACION MANUAL PARA BOCACALLE M3 97.07
01.03.08 ELIMINACION DE MATERIAL EXCEDENTE
01.03.08.01 ACARREO DE MATERIAL EXCEDENTE M3 427.62
01.03.08.02 CARGUIO DE MATERIAL EXCEDENTE M3 3,178.42
01.03.08.03 TRANSPORTE DE MATERIAL EXCEDENTE M3 3,178.42
01.04 OBRAS DE CONCRETO SIMPLE
01.04.01 DRENAJE
01.04.01.01 DRENAJE CUNETA ENCOFRADO Y DESENCOFRADO M2 45.06
01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 M3 44.24
01.04.02 BADENES
01.04.02.01 COMPACTACION DE BASE PARA BADEN M2 55.65
01.04.02.02 BADEN ENCOFRADO Y DESENCOFRADO M2 25.61
01.04.02.03 BADEN DE CONCRETO F'C=210KG/CM2 M3 11.13
01.04.03 BOCACALLE
01.04.03.01 COMPACTACION DE BASE PARA BOCACALLE M2 33.30
01.04.03.02 BOCACALLE ENCOFRADO Y DESENCOFRADO M2 23.06
01.04.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 M3 24.41
01.04.04 JUNTAS
01.04.04.01 RELLENO DE JUNTAS ASFÁLTICAS ML 115.65
01.05 PAVIMENTACION FLEXIBLE
01.05.01 MEJORAMIENTO DE SUB RASANTE
01.05.01.01 MAT. P/MEJ. DE SUB-RASANTE PUESTO EN OBRA M3 1,602.99
01.05.01.02 EXTENDIDO, RIEGO Y COMPACTADO DE MAT. P/MEJ M2 3,139.64
01.05.02 SUB BASE GRANULAR
01.05.02.01 MATERIAL P/SUB BASE PUESTO EN OBRA M3 627.93
01.05.02.02 EXTENDIDO, RIEGO Y COMPACTADO DE SUB BASE E M2 3,139.64
01.05.03 BASE GRANULAR
01.05.03.01 MATERIAL P/BASE PUESTO EN OBRA M3 444.29
01.05.03.02 EXTENDIDO, RIEGO Y COMPACTADO DE BASE E=0.1 M2 2,563.48
01.05.04 PAVIMENTO FLEXIBLE (E=2")
01.05.04.01 IMPRIMACIÓN ASFALTICA M2 2,722.81
01.05.04.02 CARPETA ASFALTICA EN CALIENTE e=2" M2 2,722.81
01.06 SEÑALIZACION
01.06.01 SEÑALIZACION HORIZONTAL
01.06.01.01 PINTURA LINEAL EN SARDINEL M 677.35
01.06.01.02 PINTURA ZONAL - CRUCE PEATONAL M2 154.00
01.06.01.03 PINTURA EN PAVIMENTO LINEA DISCONTINUA M 332.05
01.06.01.04 PINTURA DE SIMBOLOS - FLECHAS M2 14.64
01.06.02 SEÑALIZACION VERTICAL
01.06.02.01 SEÑAL INFORMATIVA UND 2.00
01.07 RECONEXIONES DE INSTALACIONES SANITARIAS
01.07.01 RECONEXION DE PUNTOS DE AGUA UND 51.00
01.07.02 RECONEXION DE CAJAS DOMICILIARIAS DE AGUA P UND 51.00
01.07.03 RECONEXION DE PUNTOS DE DESAGUE UND 51.00
01.07.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE UND 51.00
01.07.05 ENCIMADO DE BUZONES UND 4.00
01.08 IMPACTO AMBIENTAL
01.08.01 MITIGACION DE IMPACTO AMBIENTAL JR. ICA NUEVA GLB 1.00
01.09 REUBICACION DE POSTES
01.09.01 ALINEAMIENTO DE POSTES DE FLUIDO ELECTRICO GLB 3.00
01.09.02 REUBICACION DE POSTES DE TELEFONIA GLB 2.00
01.10 VARIOS
01.10.01 LIMPIEZA FINAL DE OBRA M2 3,139.64
01.10.02 PLACA RECORDATORIA UND 2.00
02 ACERA PEATONAL - JR. ICA NUEVA
02.01 TRABAJOS PRELIMINARES
02.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 1,026.52
02.01.02 TRAZO, NIVELES Y REPLANTEO DURANTE LA EJEC M2 1,026.52
02.01.03 LIMPIEZA INICIAL DE OBRA M2 1,026.52
02.01.04 DEMOLICION DE VEREDAS EXISTENTES M3 13.46
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL PARA VEREDAS M3 179.84
02.02.02 EXCAVACION MANUAL PARA SARDINEL M3 60.23
02.02.03 EXCAVACION MASIVA PARA MURO DE CONTENCIÓN M3 35.95
02.02.04 ELIMINACION DE MAT. EXCEDENTE
02.02.04.01 ACARREO DE MATERIAL EXCEDENTE M3 363.87
02.02.04.02 CARGUIO DE MATERIAL EXCEDENTE M3 363.87
02.02.04.03 TRANSPORTE DE MATERIAL EXCEDENTE M3 363.87
02.03 SARDINEL DE CONFINAMIENTO EN ACERA
02.03.01 ENCOFRADO Y DESENCOFRADO EN SARDINEL M2 298.43
02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL M3 61.46
02.04 ACERA PEATONAL
02.04.01 REFINE, NIVELACION Y COMPACTACION P/VEREDAS M2 899.18
02.04.02 MATERIAL P/BASE DE VEREDAS M3 89.92
02.04.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 27.81
02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 M3 89.92
02.05 RAMPAS
02.05.01 ENCOFRADO Y DESENCOFRADO DE RAMPAS M2 16.57
02.05.02 RAMPAS DE CONCRETO F'C= 175 KG/CM2 M3 5.18
02.06 MURO DE CONTENCION
02.06.01 EXPLANACIONES
02.06.01.01 REFINE Y NIVELACION Y COMPACTACIÓN DE FONDO M2 24.79
02.06.02 OBRAS DE CONCRETO SIMPLE
02.06.02.01 SOLADO DE CONCRETO E=4" M2 24.79
02.06.03 OBRAS DE CONCRETO ARMADO
02.06.03.01 ENCOFRADO Y DESENCOFRADO PARA MURO DE CO M2 60.43
02.06.03.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 EN KG 223.08
02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTE M3 8.11
02.06.04 JUNTAS
02.06.04.01 RELLENO DE JUNTAS CON ASFALTO M 6.20
02.06.05 TARRAJEO Y ACABADOS
02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION M2 34.94
02.07 JUNTAS
02.07.01 RELLENO DE JUNTAS ASFALTICAS ML 1,412.77
02.08 COLOCACION DE TACHOS ECOLOGICOS
02.08.01 SUMINISTRO E INSTALACION DE TACHOS ECOLOGI UND 4.00
02.09 OTROS
02.09.01 LIMPIEZA FINAL DE OBRA M2 1,026.52
MEJORAMIENTO DEL JR. LAS DALIAS
03 CALZADA VEHICULAR JR. LAS DALIAS
03.01 OBRAS PROVISIONALES
03.01.01 ALMACEN Y CASETA DE GUARDIANIA MES 6.00
03.01.02 SEÑALES PARA DESVIO DE TRANSITO UND 2.00
03.02 TRABAJOS PRELIMINARES
03.02.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 446.85
03.02.02 TRAZO, NIVELES Y REPLANTEO DURANTE LA EJECU M2 446.85
03.02.03 LIMPIEZA INICIAL DE OBRA M2 446.85
03.03 MOVIMIENTO DE TIERRAS
03.03.01 ESCARIFICADO, PERFILADO Y COMPACTADO A NIVE M2 446.85
03.03.02 CORTE DE TERRENO A NIVEL DE SUBRASANTE M3 114.79
03.03.03 CORTE DE TERRENO A NIVEL DE MEJORAMIENTO M3 67.03
03.03.04 EXCAVACIÓN MANUAL M3 12.73
03.03.05 EXCAVACION MANUAL PARA CUNETA M3 10.80
03.03.06 ELIMINACION DE MATERIAL EXCEDENTE
03.03.06.01 ACARREO DE MATERIAL EXCEDENTE M3 29.41
03.03.06.02 CARGUIO DE MATERIAL EXCEDENTE M3 256.68
03.03.06.03 TRANSPORTE DE MATERIAL EXCEDENTE M3 256.68
03.04 OBRAS DE CONCRETO SIMPLE
03.04.01 DRENAJE
03.04.01.01 DRENAJE CUNETA ENCOFRADO Y DESENCOFRADO M2 10.23
03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 M3 9.99
03.04.02 JUNTAS
03.04.02.01 RELLENO DE JUNTAS ASFÁLTICAS ML 20.68
03.04.03 PAVIMENTACIÓN FLEXIBLE
03.04.03.01 MEJORAMIENTO DE SUB RASANTE
03.04.03.01 MAT. P/MEJ. DE SUB-RASANTE PUESTO EN OBRA M3 67.03
03.04.03.01 EXTENDIDO, RIEGO Y COMPACTADO DE MAT. P/MEJ M2 446.85
03.04.03.02 SUB BASE GRANULAR
03.04.03.02 MATERIAL P/SUB BASE PUESTO EN OBRA M3 89.37
03.04.03.02 EXTENDIDO, RIEGO Y COMPACTADO DE SUB BASE E M2 446.85
03.04.03.03 BASE GRANULAR
03.04.03.03 MATERIAL P/BASE PUESTO EN OBRA M3 67.03
03.04.03.03 EXTENDIDO, RIEGO Y COMPACTADO DE BASE E=0.1 M2 446.85
03.04.03.04 PAVIMENTO FLEXIBLE (E=2")
03.04.03.04 IMPRIMACIÓN ASFALTICA M2 392.83
03.04.03.04 CARPETA ASFALTICA EN CALIENTE e=2" M2 392.83
03.05 SEÑALIZACION
03.05.01 SEÑALIZACION HORIZONTAL
03.05.01.01 PINTURA LINEAL EN SARDINEL M 129.70
03.05.01.02 PINTURA ZONAL - CRUCE PEATONAL M2 36.00
03.05.01.03 PINTURA EN PAVIMENTO LINEA DISCONTINUA M 63.36
03.05.01.04 PINTURA DE SIMBOLOS - FLECHAS M2 1.78
03.05.02 SEÑALIZACION VERTICAL
03.05.02.01 SEÑAL INFORMATIVA UND 1.00
03.06 RECONEXIONES DE INSTALACIONES SANITARIAS
03.06.01 RECONEXION DE PUNTOS DE AGUA UND 16.00
03.06.02 RECONEXION DE CAJAS DOMICILIARIAS DE AGUA P UND 16.00
03.06.03 RECONEXION DE PUNTOS DE DESAGUE UND 16.00
03.06.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE UND 16.00
03.07 IMPACTO AMBIENTAL
03.07.01 MITIGACION DE IMPACTO AMBIENTAL JR. DALIAS GLB 1.00
03.08 VARIOS
03.08.01 ENCIMADO DE BUZONES UND 1.00
03.08.02 LIMPIEZA FINAL DE OBRA M2 446.85
04 ACERA PEATONAL - JR. LAS DALIAS
04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 191.44
04.01.02 TRAZO, NIVELES Y REPLANTEO DURANTE LA EJEC M2 191.44
04.01.03 LIMPIEZA INICIAL DE OBRA M2 191.44
04.01.04 DEMOLICION DE VEREDAS EXISTENTES M3 3.25
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL PARA VEREDAS M3 34.21
04.02.02 EXCAVACION MANUAL PARA SARDINEL M3 12.18
04.02.03 ELIMINACION DE MAT. EXCEDENTE
04.02.03.01 ACARREO DE MATERIAL EXCEDENTE M3 62.54
04.02.03.02 CARGUIO DE MATERIAL EXCEDENTE M3 62.54
04.02.03.03 TRANSPORTE DE MATERIAL EXCEDENTE M3 62.54
04.03 SARDINEL DE CONFINAMIENTO EN ACERA
04.03.01 ENCOFRADO Y DESENCOFRADO EN SARDINEL M2 58.40
04.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ELEVADO M3 12.18
04.04 ACERA PEATONAL
04.04.01 REFINE, NIVELACION Y COMPACTACION P/VEREDAS M2 171.05
04.04.02 MATERIAL P/BASE DE VEREDAS M3 17.11
04.04.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 6.08
04.04.04 VEREDA CONCRETO F'C=175 KG/CM2 M3 17.11
04.05 RAMPAS
04.05.01 ENCOFRADO Y DESENCOFRADO DE RAMPAS M2 1.51
04.05.02 RAMPAS DE CONCRETO F'C= 175 KG/CM2 M3 0.47
04.06 JUNTAS
04.06.01 RELLENO DE JUNTAS ASFALTICAS ML 272.54
04.07 COLOCACION DE TACHOS ECOLOGICOS
04.07.01 SUMINISTRO E INSTALACION DE TACHOS ECOLOGI UND 1.00
04.08 VARIOS
04.08.01 LIMPIEZA FINAL DE OBRA M2 191.44
MEJORAMIENTO DEL JR. LOS ALISOS
05 CIRCULACION VEHICULAR
05.01 PAVIMENTACIÓN FLEXIBLE
05.01.01 PAVIMENTO FLEXIBLE
05.01.01.01 IMPRIMACION ASFALTICA m2 1,236.34
05.01.01.02 CARPETA ASFALTICA EN CALIENTE DE 2" m2 1,236.34
05.02 SEÑALIZACION
05.02.01 SEÑALIZACION HORIZONTAL
05.02.01.01 PINTURA LINEAL EN SARDINEL m 362.76
05.02.01.02 PINTURA ZONAL - CRUCE PEATONAL m2 72.00
05.02.01.03 PINTURA EN PAVIMENTO LINEA DISCONTINUA m 153.22
05.02.01.04 PINTURA DE SIMBOLOS - FLECHAS m2 8.51
05.02.02 SEÑALIZACION VERTICAL
05.02.02.01 SEÑAL INFORMATIVA u 2.00
05.03 IMPACTO AMBIENTAL
05.03.01 MITIGACION DE IMPACTO AMBIENTAL glb 1.00
05.04 REUBICACIÓN DE POSTES
05.04.01 ALINEAMIENTO DE POSTES DE FLUIDO ELECTRI u 1.00
05.05 VARIOS
05.05.01 LIMPIEZA FINAL DE OBRA m2 1,521.60
06 ACERA PEATONAL
06.01 COLOCACION DE TACHOS ECOLOGICOS
06.01.01 SUMINISTRO E INSTALACION DE TACHOS ECOL u 3.00
06.02 VARIOS
06.02.01 LIMPIEZA FINAL DE OBRA m2 530.86
MEJORAMIMEJORAMIENTO DEL JR. LOS CARDOS
07 CIRCULACION VEHICULAR
07.01 TRABAJOS PRELIMINARES
07.01.01 TRAZO, NIVELES Y REPLANTEO DURANTE LA E m2 75.20
07.02 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION MANUAL PARA BOCACALLE m3 17.50
07.03 OBRAS DE CONCRETO SIMPLE
07.03.01 BOCACALLE
07.03.01.01 BOCACALLE ENCOFRADO Y DESENCOFRADO m2 5.98
07.03.01.02 BOCACALLE CONCRETO f'c=210 kg/cm2 m3 6.49
07.04 JUNTAS
07.04.01 RELLENO DE JUNTAS ASFALTICAS m 6.62
07.05 PAVIMENTACIÓN FLEXIBLE
07.05.01 PAVIMENTO FLEXIBLE
07.05.01.01 IMPRIMACION ASFALTICA m2 946.69
07.05.01.02 CARPETA ASFALTICA EN CALIENTE DE 2" m2 946.69
07.06 SEÑALIZACION
07.06.01 SEÑALIZACION HORIZONTAL
07.06.01.01 PINTURA LINEAL EN SARDINEL m 247.15
07.06.01.02 PINTURA ZONAL - CRUCE PEATONAL m2 44.00
07.06.01.03 PINTURA EN PAVIMENTO LINEA DISCONTINUA m 115.45
07.06.01.04 PINTURA DE SIMBOLOS - FLECHAS m2 2.38
07.06.02 SEÑALIZACION VERTICAL
07.06.02.01 SEÑAL INFORMATIVA u 2.00
07.07 VARIOS
07.07.01 LIMPIEZA FINAL DE OBRA m2 1,121.35
08 ACERA PEATONAL
08.01 TRABAJOS PRELIMINARES
08.01.01 TRAZO, NIVELES Y REPLANTEO DURANTE LA E m2 35.22
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION MANUAL PARA VEREDAS m3 4.68
08.02.02 ELIMINACION DE MATERIAL EXCEDENTE
08.02.02.01 ACARREO DE MATERIAL EXCEDENTE m3 6.24
08.02.02.02 CARGUIO DE MATERIAL EXCEDENTE m3 15.41
08.02.02.03 TRANSPORTE DE MATERIAL EXCEDENTE m3 15.41
08.03 ACERA PEATONAL
08.03.01 REFINE, NIVELACION Y COMPACTACION P/VERE m2 9.67
08.03.02 MATERIAL P/BASE DE VEREDAS m3 0.97
08.03.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 0.12
08.03.04 VEREDA CONCRETO f'c=175 kg/cm2 m3 2.29
08.04 RAMPAS
08.04.01 ENCOFRADO Y DESENCOFRADO DE RAMPAS m2 4.52
08.04.02 RAMPAS DE CONCRETO f'c= 175 kg/cm2 m3 0.94
08.05 JUNTAS
08.05.01 RELLENO DE JUNTAS ASFALTICAS m 10.00
08.06 COLOCACION DE TACHOS ECOLOGICOS
08.06.01 SUMINISTRO E INSTALACION DE TACHOS ECOL u 2.00
08.07 VARIOS
08.07.01 LIMPIEZA FINAL DE OBRA m2 208.47
MEJORAM MEJORAMIENTO DEL PROLONGACIÓN PIURA
09 CIRCULACION VEHICULAR
09.01 PAVIMENTACIÓN FLEXIBLE
09.01.01 PAVIMENTO FLEXIBLE
09.01.01.01 IMPRIMACION ASFALTICA m2 1,306.92
09.01.01.02 CARPETA ASFALTICA EN CALIENTE DE 2" m2 1,306.92
09.02 SEÑALIZACION
09.02.01 SEÑALIZACION HORIZONTAL
09.02.01.01 PINTURA LINEAL EN SARDINEL m 313.16
09.02.01.02 PINTURA ZONAL - CRUCE PEATONAL m2 66.00
09.02.01.03 PINTURA EN PAVIMENTO LINEA DISCONTINUA m 159.38
09.02.01.04 PINTURA DE SIMBOLOS - FLECHAS m2 7.14
09.02.02 SEÑALIZACION VERTICAL
09.02.02.01 SEÑAL INFORMATIVA u 2.00
09.03 IMPACTO AMBIENTAL
09.03.01 MITIGACION DE IMPACTO AMBIENTAL glb 1.00
09.04 VARIOS
09.04.01 LIMPIEZA FINAL DE OBRA m2 1,443.55
10 ACERA PEATONAL
10.01 MOVIMIENTO DE TIERRAS
10.01.01 ELIMINACION DE MATERIAL EXCEDENTE
10.01.01.01 CARGUIO DE MATERIAL EXCEDENTE m3 28.11
10.01.01.02 TRANSPORTE DE MATERIAL EXCEDENTE m3 28.11
10.02 COLOCACION DE TACHOS ECOLOGICOS
10.02.01 SUMINISTRO E INSTALACION DE TACHOS ECOL u 2.00
10.03 VARIOS
10.03.01 LIMPIEZA FINAL DE OBRA m2 466.90
MEJORAMIMEJORAMIENTO DEL JR. LAS RETAMAS
11 CIRCULACION VEHICULAR
11.01 OBRAS PROVICIONALES
11.01.01 ALMACEN Y CASETA DE GUARDIANIA mes 1.00
11.02 TRABAJOS PRELIMINARES
11.02.01 TRAZO, NIVELES Y REPLANTEO DURANTE LA E m2 713.14
11.03 MOVIMIENTO DE TIERRAS
11.03.01 EXCAVACION MANUAL PARA CUNETAS m3 31.85
11.03.02 ELIMINACION DE MATERIAL EXCEDENTE
11.03.02.01 ACARREO DE MATERIAL EXCEDENTE m3 39.82
11.03.02.02 CARGUIO DE MATERIAL EXCEDENTE m3 39.82
11.03.02.03 TRANSPORTE DE MATERIAL EXCEDENTE m3 39.82
11.04 OBRAS DE CONCRETO SIMPLE
11.04.01 DRENAJE
11.04.01.01 DRENAJE CUNETA ENCOFRADO Y DESENCOF m2 29.82
11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 m3 29.46
11.05 JUNTAS
11.05.01 RELLENO DE JUNTAS ASFALTICAS m 80.66
11.06 PAVIMENTACIÓN FLEXIBLE
11.06.01 BASE GRANULAR
11.06.01.01 MATERIAL P/BASE PUESTO EN OBRA m3 387.83
11.06.01.02 EXTENDIDO, RIEGO Y COMPACTADO DE BASE m2 1,683.00
11.06.02 PAVIMENTO FLEXIBLE
11.06.02.01 IMPRIMACION ASFALTICA m2 1,523.74
11.06.02.02 CARPETA ASFALTICA EN CALIENTE DE 2" m2 1,523.74
11.07 SEÑALIZACION
11.07.01 SEÑALIZACION HORIZONTAL
11.07.01.01 PINTURA LINEAL EN SARDINEL m 395.27
11.07.01.02 PINTURA ZONAL - CRUCE PEATONAL m2 56.00
11.07.01.03 PINTURA EN PAVIMENTO LINEA DISCONTINUA m 180.17
11.07.01.04 PINTURA DE SIMBOLOS - FLECHAS m2 5.12
11.07.02 SEÑALIZACION VERTICAL
11.07.02.01 SEÑAL INFORMATIVA u 1.00
CONTROL CUADERNO DE OBRA

PROGRAMADO
ITEM PARTIDAS METRADOS
UNID ADICIONAL DEDUCTIVO CANT.
MEJORAMIENTO DEL JR. ICA NUEVA YA VALORIZADO
01 CALZADA VEHICULAR JR. ICA NUEVA
01.01 TRABAJOS PRELIMINARES
01.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 42.32 5.84 42.32
01.01.02 TRAZO, NIVELES Y REPLANTEO DURANTE LA EJECU M2 42.32 42.32
01.01.03 LIMPIEZA INICIAL DE OBRA M2 42.32 5.84 42.32
01.02 MOVIMIENTO DE TIERRAS -
01.02.01 ESCARIFICADO, PERFILADO Y COMPACTADO A NIVE M2 42.32 5.84 42.32
01.02.02 CORTE DE TERRENO A NIVEL DE SUBRASANTE M3 2.52 2.34 2.52
01.02.03 CORTE DE TERRENO A NIVEL DE MEJORAMIENTO M3 0.95 0.88 0.95
01.02.04 EXCAVACIÓN MANUAL M3 0.07 0.06 0.07
01.02.05 EXCAVACION MANUAL PARA CUNETA M3 1.26 1.26
01.02.06 EXCAVACION MANUAL PARA BADEN M3 7.88 7.88
01.02.07 EXCAVACION MANUAL PARA BOCACALLE M3 11.93 11.93
01.02.08 ELIMINACION DE MATERIAL EXCEDENTE -
01.02.08.01 ACARREO DE MATERIAL EXCEDENTE M3 26.42 2.56 26.42
01.02.08.02 CARGUIO DE MATERIAL EXCEDENTE M3 30.75 6.57 30.75
01.02.08.03 TRANSPORTE DE MATERIAL EXCEDENTE M3 30.75 6.57 30.75
01.03 OBRAS DE CONCRETO SIMPLE -
01.03.01 DRENAJE -
01.03.01.01 DRENAJE CUNETA ENCOFRADO Y DESENCOFRADO M2 1.21 1.21
01.03.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 M3 1.10 1.10
01.03.02 BADENES -
01.03.02.01 COMPACTACION DE BASE PARA BADEN M2 14.32 14.32
01.03.02.02 BADEN ENCOFRADO Y DESENCOFRADO M2 7.37 7.37
01.03.02.03 BADEN DE CONCRETO F'C=210KG/CM2 M3 2.86 2.86
01.03.03 BOCACALLE -
01.03.03.01 COMPACTACION DE BASE PARA BOCACALLE M2 21.69 21.69
01.03.03.02 BOCACALLE ENCOFRADO Y DESENCOFRADO M2 6.17 6.17
01.03.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 M3 4.34 4.34
01.03.04 JUNTAS -
01.03.04.01 RELLENO DE JUNTAS ASFÁLTICAS ML 10.78 10.78
01.04 PAVIMENTACION RIGIDA -
01.04.01 MEJORAMIENTO DE SUB RASANTE -
01.04.01.01 MAT. P/MEJ. DE SUB-RASANTE PUESTO EN OBRA M3 6.35 6.35
01.04.01.02 EXTENDIDO, RIEGO Y COMPACTADO DE MAT. P/MEJ M2 42.32 5.84 42.32
01.04.02 BASE GRANULAR -
01.04.02.01 MATERIAL P/BASE PUESTO EN OBRA m3 636.39 636.39
01.04.02.02 EXTENDIDO, RIEGO Y COMPACTADO DE BASE m2 3,181.96 3,181.96
01.04.03 PAVIMENTO RIGIDO -
01.04.03.01 ENCOFRADO Y DESENCOFRADO DE LOSA m2 515.73 515.73
01.04.03.02 ACERO TRANSVERSAL PARA PASADORES O D kg 1,313.53 1,313.53
01.04.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO kg 1,171.35 1,171.35
01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA m3 546.19 546.19
01.05 SEÑALIZACION -
01.05.01 SEÑALIZACION HORIZONTAL -
01.05.01.01 PINTURA LINEAL EN SARDINEL M 22.78 22.78
1.06 VARIOS -
01.06.01 LIMPIEZA FINAL DE OBRA M2 42.32 42.32
02 ACERA PEATONAL - JR. ICA NUEVA -
02.01 TRABAJOS PRELIMINARES -
02.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 43.53 35.21 43.53
02.01.02 TRAZO, NIVELES Y REPLANTEO DURANTE LA EJEC M2 43.53 43.53
02.01.03 LIMPIEZA INICIAL DE OBRA M2 43.53 35.21 43.53
02.02 MOVIMIENTO DE TIERRAS -
02.02.01 EXCAVACION MANUAL PARA VEREDAS M3 8.02 5.84 8.02
02.02.02 EXCAVACION MANUAL PARA SARDINEL M3 2.05 0.23 2.05
02.02.04 ELIMINACION DE MAT. EXCEDENTE -
02.02.04.01 ACARREO DE MATERIAL EXCEDENTE M3 12.59 10.56 12.59
02.02.04.02 CARGUIO DE MATERIAL EXCEDENTE M3 12.59 10.56 12.59
02.02.04.03 TRANSPORTE DE MATERIAL EXCEDENTE M3 12.59 10.56 12.59
02.03 SARDINEL DE CONFINAMIENTO EN ACERA -
02.03.01 ENCOFRADO Y DESENCOFRADO EN SARDINEL M2 9.83 6.56 9.83
02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL M3 2.05 2.05
02.04 ACERA PEATONAL -
02.04.01 REFINE, NIVELACION Y COMPACTACION P/VEREDAS M2 40.11 20.00 40.11
02.04.02 MATERIAL P/BASE DE VEREDAS M3 4.01 4.01
02.04.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 1.22 1.22
02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 M3 4.01 4.01
02.05 RAMPAS -
02.05.01 ENCOFRADO Y DESENCOFRADO DE RAMPAS M2 0.75 0.75
02.05.02 RAMPAS DE CONCRETO F'C= 175 KG/CM2 M3 0.24 0.24
2.06 JUNTAS -
02.06.01 RELLENO DE JUNTAS ASFALTICAS ML 15.75 15.75
2.07 COLOCACION DE TACHOS ECOLOGICOS -
02.07.01 SUMINISTRO E INSTALACION DE TACHOS ECOLOGI UND 1.00 1.00
2.08 OTROS -
02.08.01 LIMPIEZA FINAL DE OBRA M2 43.53 43.53
MEJORAMIENTO DEL JR. LAS DALIAS
03 CALZADA VEHICULAR JR. LAS DALIAS
3.01 PAVIMENTACIÓN RIGIDA
03.01.01 BASE GRANULAR
03.01.01.01 MATERIAL P/BASE PUESTO EN OBRA m3 89.37 89.37
03.01.01.02 EXTENDIDO, RIEGO Y COMPACTADO DE BASE m2 446.85 446.85
03.01.02 PAVIMENTO RIGIDO -
03.01.02.01 ENCOFRADO Y DESENCOFRADO DE LOSA m2 66.54 66.54
03.01.02.02 ACERO TRANSVERSAL PARA PASADORES O D kg 189.73 189.73
03.01.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO kg 73.67 73.67
03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA m3 78.57 78.57
9076.23 177.07 9076.23
8.4389343

SALDOS
ACUM OCT NOV DIC J V S
C/ ADIC.
3 4 5

- 42.32 36.48 5.84 - 36.48


- 42.32 42.32 - - 42.32
- 42.32 36.48 5.84 - 36.48
- - -
- 42.32 42.32 - - 42.32
- 2.52 2.52 - - 2.52
- 0.95 0.95 - - 0.95
- 0.07 0.07 - - 0.07
- 1.26 - 1.26 -
- 7.88 - 7.88 -
- 11.93 - 11.93 -
- - -
- 26.42 - - 26.42
- 30.75 - - 30.75
- 30.75 - - 30.75
- - -
- - -
- 1.21 - 1.21 -
- 1.10 - 1.10 -
- - -
- 14.32 - 14.32 -
- 7.37 - 7.37 -
- 2.86 - 2.86 -
- - -
- 21.69 - 21.69 -
- 6.17 - 6.17 -
- 4.34 - 4.34 -
- - -
- 10.78 - - 10.78
- - -
- - -
6.35 - - - -
- 42.32 42.32 - - 42.32
- - -
- 636.39 636.39 - - 238.65 238.65 119.99
- 3,181.96 3,181.96 - - 1193.24 1193.24 600.00
- - -
- 515.73 13.65 320.81 181.26
- 1,313.53 116.81 753.84 442.88
- 1,171.35 104.17 672.24 394.94
- 546.19 48.57 313.64 183.98
- - -
- - -
- 22.78 - - 22.78
- - -
- 42.32 - - 42.32
- - -
- - -
- 43.53 8.32 35.21 -
- 43.53 43.53 - -
- 43.53 8.32 35.21 -
- - -
- 8.02 2.18 5.84 -
- 2.05 1.82 0.23 -
- - -
- 12.59 - - 12.59
- 12.59 - - 12.59
- 12.59 - - 12.59
- - -
- 9.83 0.32 - 9.51
- 2.05 0.10 - 1.95
- - -
- 40.11 20.11 20.00 -
- 4.01 4.01 - -
- 1.22 1.22 - -
- 4.01 4.01 - -
- -
- 0.75 0.75 - -
- 0.24 0.24 - -
- - -
- 15.75 - - 15.75
- - -
1.00 - - - -
- - -
- 43.53 - - 43.53
- -
- -
- -
- -
- 89.37 89.37 - - 89.37
- 446.85 446.85 - - 446.85
- - -
- 66.54 - 66.54 -
- 189.73 - 189.73 -
- 73.67 - 73.67 -
- 78.57 - 78.57 -
7.35 9068.88 4936.16 2657.35 1475.37
OC
L M X J V S D L M
7 8 9 10 11 12 13 14 15
8.32
43.53
8.32

2.18
1.82

0.32
0.10

20.11
4.01
1.22
4.01

0.75
OCTUBRE
X J V S D L M X J
16 17 18 19 20 21 22 23 24

39.11
195.49

6.83 6.83
15.42 12.16 21.49 15.42
13.75 10.84 19.17 13.75
6.41 5.06 8.94 6.41

0.24
V S D L M X J V S D
25 26 27 28 29 30 31 1 2 3

5.84

5.84

15.93
9.34 9.34 6.08 15.42 12.16 12.16
8.33 13.75 13.75 10.84 10.84
3.88 6.41 6.41 5.06

35.21

35.21
L M X J V S D L
4 5 6 7 8 9 10 11

6.83 6.83 11.38 11.38 11.38 13.65


6.08 12.16 12.16 12.16 12.16 36.48
5.42 10.84 10.84 10.84 10.84 32.53
3.88 5.81 7.58 6.41 4.30 15.17
NOVIEMBRE
M X J V S D L M
12 13 14 15 16 17 18 19

0.42 0.84
2.63 5.25
3.98 7.95

0.40 0.81
0.37 0.73

4.77 9.55
2.46 4.91
0.95 1.91

7.23 14.46
2.06 4.11
1.45 2.89

13.65 18.20 18.20 20.48 15.93 20.48 6.83


36.48 48.63 48.63 54.71 42.56 54.71 18.24
32.53 43.37 43.37 48.79 37.95 48.79 16.26
15.17 20.22 20.22 22.75 17.70 22.75 7.58

14.26
40.66
15.79
16.74
X J V S D L M X
20 21 22 23 24 25 26 27

11.38 20.48 22.75 22.75


30.40 54.71 60.79 60.79
27.11 48.79 54.21 54.21
12.64 22.75 25.28 25.28

5.84
0.23

20.00

15.84 15.84 15.84 2.70 2.05


45.17 45.17 45.17 6.55 7.00
17.54 17.54 17.54 2.80 2.46
18.60 18.60 18.60 1.50 4.53
J V S D L M X J V
28 29 30 1 2 3 4 5 6

20.48 20.48 11.38 22.75 20.48 18.20 18.20 9.10


54.71 54.71 30.40 60.79 54.71 48.63 48.63 24.32
48.79 48.79 27.11 54.21 48.79 43.37 43.37 21.69
22.75 22.75 12.64 25.28 22.75 20.22 20.22 10.11
DICIEMBR
S D L M X J V S D
7 8 9 10 11 12 13 14 15

26.42

9.10 9.10 9.10 9.10 19.18 13.65 21.99


24.32 24.32 24.32 24.32 51.71 36.48 17.32
21.69 21.69 21.69 21.69 46.09 32.53 15.45
10.11 10.11 10.11 10.11 16.46 11.67 7.02

12.59
DICIEMBRE
L M X J V S D L M
16 17 18 19 20 21 22 23 24

2.00 2.00 2.00 2.00 2.78

1.30
3.00
2.70
1.35

20.00 22.32

12.59
12.59

4.76 4.76
0.98 0.98

3.00 3.00 3.00 3.00 3.00 0.75

20.00 23.53
X J V S D L M
25 26 27 28 29 30 31

30.75
30.75
22.78
0.11 CAJA PREFABRICADA
ARENA GRUESA
FC 175 FC 210
0.60 0.64
ENTRADA PARTIDA
FECHA SALIDA SALDO PRESUPUESTA DESCRIPCION NOMBRES Y APELLIDOS
CANTIDAD NºPCSA RIA
CORTE
2/12/2019 269.99 269.99 NEA
2/25/2018 1.29 268.70 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
2/26/2018 0.81 267.89 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
2/26/2018 1.21 266.68 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
2/27/2018 1.21 265.47 02.04.05 VEREDA CONCRETO f'c=175 kg/cm3 ICA NUEVA
3/6/2019 1.78 263.69 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/6/2019 2.66 261.03 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/7/2019 1.61 259.41 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/7/2019 2.42 256.99 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/8/2019 1.13 255.86 02.04.04 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/8/2019 1.70 254.16 02.04.05 VEREDA CONCRETO f'c=175 kg/cm3 ICA NUEVA
3/11/2019 0.14 254.02 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 DALIAS
3/11/2019 1.45 252.57 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/11/2019 2.18 250.39 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/12/2019 1.61 248.78 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/12/2019 2.42 246.35 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/13/2019 0.40 245.95 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/13/2019 0.54 245.41 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/13/2019 1.13 244.28 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/13/2019 1.70 242.58 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/14/2019 1.61 240.97 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/14/2019 2.42 238.54 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/15/2019 1.29 237.25 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/15/2019 1.94 235.31 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/16/2019 0.14 235.17 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
3/16/2019 0.14 235.03 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 DALIAS
3/18/2019 1.78 233.26 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/18/2019 2.96 230.30 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/19/2019 1.61 228.68 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/19/2019 2.69 225.99 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/20/2019 1.13 224.86 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/20/2019 1.51 223.35 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/21/2019 60.00 283.35
3/21/2019 0.48 282.87 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/21/2019 0.62 282.25 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/22/2019 1.18 281.07 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/22/2019 1.51 279.57 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/23/2019 8.00 287.57
3/29/2019 1.29 286.28 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/29/2019 1.94 284.34 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/29/2019 60.00 344.34
3/30/2019 72.00 200.00 416.34
4/1/2019 0.97 415.37 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/1/2019 1.45 413.92 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/2/2019 0.97 412.95 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/2/2019 1.45 411.49 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/4/2019 1.45 410.04 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/4/2019 2.18 407.86 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/4/2019 0.55 407.31 03.06.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/5/2019 0.55 406.76 03.06.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/6/2019 0.55 406.21 03.06.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/6/2019 0.20 406.01 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
4/8/2019 0.55 405.46 03.06.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/8/2019 0.26 405.21 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCIÓN ICA NUEVA
4/9/2019 0.55 404.66 03.06.05 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/10/2019 0.55 404.11 03.06.06 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/11/2019 0.55 403.56 03.06.07 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/11/2019 0.38 403.18 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/11/2019 0.50 402.68 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCIÓN ICA NUEVA
4/12/2019 0.33 402.35 03.06.08 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/12/2019 0.81 401.54 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/12/2019 1.21 400.33 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/13/2019 0.22 400.11 03.06.08 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/13/2019 0.55 399.56 03.06.09 RECONEXION DE CAJA DE REGISTRO DE DESAGUE DALIAS
4/15/2019 0.55 399.01 03.06.08 RECONEXION DE CAJA DE REGISTRO DE DESAGUE DALIAS
4/15/2019 1.91 397.09 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/16/2019 0.33 396.76 03.06.08 RECONEXION DE CAJA DE REGISTRO DE DESAGUE DALIAS
4/16/2019 1.91 394.85 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/17/2019 0.33 394.52 03.06.08 RECONEXION DE CAJA DE REGISTRO DE DESAGUE DALIAS
4/17/2019 2.55 391.96 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/20/2019 0.55 391.41 03.06.08 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/20/2019 1.28 390.14 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/22/2019 1.95 388.19 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm3 RETAMAS
4/23/2019 1.95 386.24 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm4 RETAMAS
4/24/2019 1.95 384.29 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm5 RETAMAS
4/25/2019 1.13 383.16 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/25/2019 1.70 381.46 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/25/2019 0.88 380.58 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm5 RETAMAS
4/26/2019 1.45 379.12 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/26/2019 2.18 376.95 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/26/2019 0.33 376.62 03.06.08 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/27/2019 0.33 376.29 03.06.08 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/27/2019 0.93 375.36 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm5 RETAMAS
4/29/2019 1.29 374.07 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/29/2019 1.94 372.13 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/29/2019 0.28 371.85 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
4/30/2019 1.29 370.56 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/30/2019 1.94 368.62 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/30/2019 0.16 368.46 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
5/2/2019 0.65 367.81 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/2/2019 0.97 366.84 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/2/2019 0.14 366.70 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
5/3/2049 0.65 366.05 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/3/2019 0.97 365.09 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/3/2019 0.14 364.94 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
5/6/2019 0.48 364.46 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/6/2019 0.97 363.49 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/7/2019 0.65 362.84 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/7/2019 0.97 361.87 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/8/2019 0.48 361.39 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/8/2019 0.73 360.66 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/9/2019 0.48 360.18 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/9/2019 0.73 359.45 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA

7/11/2019 0.97 358.48 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/11/2019 1.45 357.03 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/12/2019 0.20 356.83 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/13/2019 0.97 355.86 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/13/2019 1.45 354.41 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/15/2019 0.97 353.44 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/15/2019 0.72 352.72 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/15/2019 0.56 352.16 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CON ICA NUEVA
7/16/2019 0.74 351.43 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/16/2019 0.33 351.10 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/18/2019 0.33 350.77 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/18/2019 0.53 350.24 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CON ICA NUEVA
7/19/2019 0.33 349.91 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/19/2019 0.53 349.38 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CON ICA NUEVA
7/20/2019 0.53 348.86 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CON ICA NUEVA
7/22/2019 0.90 347.96 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/22/2019 0.03 347.93 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/22/2019 0.53 347.40 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CON ICA NUEVA
7/23/2019 0.90 346.50 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/23/2019 0.03 346.47 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/23/2019 0.53 345.95 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CON ICA NUEVA
7/24/2019 0.90 345.05 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/25/2019 0.90 344.15 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/26/2019 0.90 343.26 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/30/2019 0.04 343.22 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/31/2019 0.26 342.96 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CON ICA NUEVA

8/2/2019 0.87 342.09 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
8/3/2019 0.54 341.55 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
8/26/2019 1.87 339.68 AUTORIZACION DE SUPERVISION PARA EJECUTAR BOCACALLE RETAMAS
8/26/2019 0.30 339.38 12.02.01 CONCRETO f'c=175 kg/cm2 EN SARDINEL RETAMAS

9/18/2019 44.00 295.38 05.01.01.02 CARPETA ASFALTICA EN CALIENTE DE 2" ALISOS


9/18/2019 80.00 215.38 05.01.01.03 CARPETA ASFALTICA EN CALIENTE DE 2" RETAMAS
9/19/2019 100.00 100.00 315.38
9/19/2019 29.20 286.18 05.01.01.04 CARPETA ASFALTICA EN CALIENTE DE 2" ALISOS
9/19/2019 37.40 248.78 05.01.01.05 CARPETA ASFALTICA EN CALIENTE DE 2" CARDOS
9/19/2019 76.78 172.00 05.01.01.06 CARPETA ASFALTICA EN CALIENTE DE 2" PIURA
9/20/2019 15.00 157.00 05.01.01.07 CARPETA ASFALTICA EN CALIENTE DE 2" CARDOS
Declarado saldo 157.00

10/10/2019 0.05 156.95 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
10/12/2019 2.11 154.84 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
10/19/2019 0.13 154.72 02.05.02 RAMPAS DE CONCRETO F'C= 175 KG/CM2 ICA NUEVA
10/21/2019 15.00 169.72
10/21/2019 3.38 166.34 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/21/2019 0.32 166.03 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/22/2019 15.00 181.03
10/22/2019 2.66 178.36 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/22/2019 0.21 178.15 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/23/2019 30.00 208.15
10/23/2019 4.71 203.45 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/23/2019 0.42 203.02 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/24/2019 15.00 90.00 218.02
10/24/2019 3.38 214.65 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/24/2019 0.32 214.33 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/25/2019 214.33
10/25/2019 2.04 212.29 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/25/2019 0.21 212.08 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/28/2019 3.38 208.70 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/28/2019 0.21 208.49 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/29/2019 3.38 205.12 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/29/2019 0.21 204.91 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/31/2019 2.66 202.20 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/31/2019 0.21 201.99 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA

11/4/2019 2.24 199.75 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/4/2019 0.23 199.52 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/5/2019 3.35 196.17 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/5/2019 0.23 195.94 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/7/2019 60.00 60.00 - 255.94
11/7/2019 4.37 251.57 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/7/2019 0.35 251.22 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/8/2019 3.70 247.52 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/8/2019 0.35 247.17 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/9/2019 2.48 244.69 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/9/2019 0.23 244.46 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/11/2019 8.75 235.71 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/11/2019 0.69 235.02 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/12/2019 0.22 234.80 01.03.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/12/2019 0.57 234.23 01.03.02.03 BADEN DE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/12/2019 0.87 233.36 01.03.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/12/2019 9.13 224.23 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/12/2019 0.72 223.51 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/13/2019 12.17 211.34 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/13/2019 0.96 210.38 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/14/2019 0.44 209.94 01.03.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/14/2019 1.15 208.79 01.03.02.03 BADEN DE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/14/2019 1.74 207.05 01.03.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/14/2019 12.17 194.88 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/14/2019 0.96 193.92 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/15/2019 13.69 180.23 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/15/2019 1.08 179.15 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/16/2019 10.65 168.50 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/16/2019 0.84 167.66 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/18/2019 13.69 153.97 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/18/2019 1.08 152.89 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/19/2019 4.56 148.33 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/19/2019 10.07 138.26 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/19/2019 0.84 137.42 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/19/2019 1.29 136.13 03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 DALIAS
11/20/2019 11.19 124.94 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/20/2019 0.18 124.76 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/20/2019 1.79 122.97 01.04.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/20/2019 1.43 121.54 03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 DALIAS
11/21/2019 11.19 110.35 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/21/2019 1.43 108.92 03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 DALIAS
11/22/2019 15.00 - 123.92
11/22/2019 11.19 112.73 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/22/2019 1.43 111.30 03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 DALIAS
11/23/2019 45.00 - 156.30
11/23/2019 7.61 148.69 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/23/2019 0.90 147.79 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/23/2019 0.60 147.19 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/25/2019 11.41 135.78 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/25/2019 2.27 133.51 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/25/2019 0.36 133.15 03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 DALIAS
11/25/2019 0.37 132.78 04.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ELEVADO DALIAS
11/26/2019 30.00 - 162.78
11/26/2019 12.68 150.10 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/26/2019 1.90 148.20 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/27/2019 30.00 - 178.20
11/27/2019 12.68 165.52 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/27/2019 1.00 164.52 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/28/2019 11.41 153.11 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/28/2019 0.90 152.21 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/28/2019 2.68 149.53 01.04.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/29/2019 11.41 138.12 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/29/2019 1.00 137.12 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/30/2019 6.34 130.78 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/30/2019 0.90 129.88 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
-
12/2/2019 12.68 117.20 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/2/2019 0.45 116.75 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/2/2019 7.45 109.30 USADO PARA CURADO DE CONCRETO PARA ARROCERAS
12/3/2019 11.41 97.89 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/3/2019 0.45 97.44 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/4/2019 15.00 - 112.44
12/4/2019 15.00 - 127.44
12/4/2019 10.14 117.30 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/4/2019 0.45 116.85 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/4/2019 8.05 108.80 USADO PARA CURADO DE CONCRETO PARA ARROCERAS
12/5/2019 15.00 - 123.80
12/5/2019 15.00 - 138.80
12/5/2019 15.00 - 153.80
12/5/2019 10.14 143.66 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/5/2019 0.35 143.31 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/6/2019 5.07 138.24 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/6/2019 0.25 137.99 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/6/2019 7.96 130.03 USADO PARA CURADO DE CONCRETO PARA ARROCERAS
12/7/2019 5.07 124.96 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/7/2019 0.50 124.46 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/9/2019 5.07 119.39 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/9/2019 0.25 119.14 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/9/2019 6.95 112.19 USADO PARA CURADO DE CONCRETO PARA ARROCERAS
12/10/2019 5.07 107.12 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/10/2019 0.25 106.87 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/11/2019 5.07 101.80 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/11/2019 0.10 101.70 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/12/2019 8.26 93.44 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/12/2019 0.97 92.47 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/12/2019 6.98 85.49 USADO PARA CURADO DE CONCRETO PARA ARROCERAS
12/13/2019 5.85 79.64 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/13/2019 1.08 78.56 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/13/2019 2.78 75.78 01.04.02.03 BADEN DE CONCRETO F'C=210KG/CM2 ICA NUEVA
12/13/2019 1.39 74.39 01.04.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 ICA NUEVA
12/14/2019 3.52 70.87 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/14/2019 0.44 70.43 01.07.05 ENCIMADO DE BUZONES ICA NUEVA
12/14/2019 0.11 70.32 03.08.01 ENCIMADO DE BUZONES DALIAS
12/16/2019 5.39 64.93 USADO PARA CURADO DE CONCRETO PARA ARROCERAS

12/18/2019 0.51 64.42 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
12/18/2019 0.13 64.29 02.05.02 RAMPAS DE CONCRETO F'C= 175 KG/CM2 ICA NUEVA
12/19/2019 0.68 63.62 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/19/2019 0.51 63.10 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
12/19/2019 0.11 63.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA

330.00

PIEDRA CHANCADA 1/2


FC 175 FC 210
0.56
ENTRADA PARTIDA
FECHA SALIDA SALDO PRESUPUESTA DESCRIPCION NOMBRES Y APELLIDOS
CANTIDAD NºPCSA RIA
CORTE
120/02/2019 SALDO 2018 220.82
2/25/2018 1.21 219.61 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
2/26/2018 0.75 218.86 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
2/26/2018 1.13 217.73 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
2/27/2018 1.13 216.60 02.04.05 VEREDA CONCRETO f'c=175 kg/cm3 ICA NUEVA
3/6/2019 1.66 214.94 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/6/2019 2.49 212.45 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/7/2019 1.51 210.94 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/7/2019 2.26 208.68 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/8/2019 1.05 207.63 02.04.04 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/8/2019 1.58 206.05 02.04.05 VEREDA CONCRETO f'c=175 kg/cm3 ICA NUEVA
3/11/2019 0.13 205.92 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 DALIAS
3/11/2019 1.36 204.56 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/11/2019 2.03 202.53 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/12/2019 1.51 201.02 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/12/2019 2.26 198.76 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/13/2019 0.38 198.38 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/13/2019 0.51 197.87 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/13/2019 1.05 196.82 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/13/2019 1.58 195.24 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/14/2019 1.51 193.73 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/14/2019 2.26 191.47 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/15/2019 1.21 190.26 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/15/2019 1.81 188.45 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/16/2019 0.13 188.32 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
3/16/2019 0.13 188.19 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 DALIAS
3/18/2019 1.66 186.53 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/18/2019 2.76 183.77 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/19/2019 1.51 182.26 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/19/2019 2.51 179.75 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/20/2019 1.05 178.70 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/20/2019 1.41 177.29 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/21/2019 0.45 176.84 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/21/2019 0.58 176.26 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/22/2019 1.10 175.16 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/22/2019 1.41 173.75 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/29/2019 1.21 172.54 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/29/2019 1.81 170.73 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/1/2019 0.90 169.83 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/1/2019 1.36 168.47 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/2/2019 0.90 167.57 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/2/2019 1.36 166.21 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/4/2019 1.36 164.85 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/4/2019 2.03 162.82 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/6/2019 0.20 162.62 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
4/8/2019 0.26 162.36 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENC ICA NUEVA
4/11/2019 0.35 162.01 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/11/2019 0.51 161.50 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENC ICA NUEVA
4/12/2019 0.75 160.75 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/12/2019 1.13 159.62 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/15/2019 1.95 157.67 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/16/2019 1.95 155.72 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/17/2019 2.60 153.12 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/20/2019 1.30 151.82 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/22/2019 1.99 149.83 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm3 RETAMAS
4/23/2019 1.99 147.84 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm4 RETAMAS
4/24/2019 1.99 145.85 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm5 RETAMAS
4/25/2019 1.05 144.80 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/25/2019 1.58 143.22 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/25/2019 0.90 142.32 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm5 RETAMAS
4/26/2019 1.36 140.96 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/26/2019 2.03 138.93 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/27/2019 0.94 137.99 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm5 RETAMAS
4/29/2019 1.21 136.78 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/29/2019 1.81 134.97 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/29/2019 0.26 134.71 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
4/30/2019 1.21 133.50 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/30/2019 1.81 131.69 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/30/2019 0.15 131.54 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
5/2/2019 0.60 130.94 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/2/2019 0.90 130.04 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/2/2019 0.13 129.91 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
5/3/2049 0.60 129.31 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/3/2019 0.90 128.41 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/3/2019 0.13 128.28 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
5/6/2019 0.45 127.83 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/6/2019 0.90 126.93 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/7/2019 0.60 126.33 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/7/2019 0.90 125.43 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/8/2019 0.45 124.98 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/8/2019 0.68 124.30 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/9/2019 0.45 123.85 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/9/2019 0.68 123.17 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
-
7/11/2019 0.90 122.27 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/11/2019 1.36 120.91 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/12/2019 0.20 120.71 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/13/2019 0.90 119.81 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/13/2019 1.36 118.45 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/15/2019 0.90 117.55 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/15/2019 0.67 116.88 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/15/2019 0.57 116.31 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/16/2019 0.69 115.62 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/16/2019 0.33 115.29 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/16/2019 5.82 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/18/2019 0.33 114.96 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/18/2019 0.54 114.42 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/18/2019 5.82 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/19/2019 0.33 114.09 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/19/2019 0.54 113.55 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/19/2019 5.82 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/20/2019 0.54 113.01 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/22/2019 0.84 112.17 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/22/2019 0.03 112.14 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/22/2019 0.54 111.60 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/23/2019 0.84 110.76 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/23/2019 0.03 110.73 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/23/2019 0.54 110.19 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/23/2019 4.00 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/24/2019 0.84 109.35 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/24/2019 4.00 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/25/2019 0.84 108.51 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/26/2019 0.84 107.67 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/30/2019 0.04 107.63 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/30/2019 4.00 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/31/2019 0.26 107.37 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/31/2019 5.47 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
-
8/2/2019 0.84 106.53 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
8/3/2019 0.50 106.03 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
8/26/2019 1.91 104.12 AUTORIZACION DE SUPERVISION PARA EJECUTAR BOCACALLE RETAMAS
8/26/2019 0.28 103.84 12.02.01 CONCRETO f'c=175 kg/cm2 EN SARDINEL RETAMAS
-
9/18/2019 13.00 90.84 05.01.01.02 CARPETA ASFALTICA EN CALIENTE DE 2" ALISOS
9/18/2019 25.00 65.84 11.06.02.02 CARPETA ASFALTICA EN CALIENTE DE 2" RETAMAS
9/19/2019 10.00 55.84 05.01.01.02 CARPETA ASFALTICA EN CALIENTE DE 2" ALISOS
9/19/2019 13.00 42.84 07.05.01.02 CARPETA ASFALTICA EN CALIENTE DE 2" CARDOS
9/19/2019 22.00 20.84 09.01.01.02 CARPETA ASFALTICA EN CALIENTE DE 2" PIURA
9/20/2019 3.00 17.84 07.05.01.02 CARPETA ASFALTICA EN CALIENTE DE 2" CARDOS
-
10/10/2019 15.00 - 32.84
10/10/2019 0.05 32.79 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
10/12/2019 2.14 30.65 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
10/14/2019 - DECLARADO COMO SALDO NEA
10/19/2019 0.13 30.52 02.05.02 RAMPAS DE CONCRETO F'C= 175 KG/CM2 ICA NUEVA
10/21/2019 3.46 27.06 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/21/2019 0.32 26.74 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/22/2019 2.73 24.01 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/22/2019 0.22 23.79 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/23/2019 4.82 18.97 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/23/2019 0.43 18.54 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/24/2019 3.54 15.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA

PIEDRA CHANCADA 3/4


FC 175 FC 210
0.56 0.59
ENTRADA PARTIDA
FECHA SALIDA SALDO PRESUPUESTA DESCRIPCION NOMBRES Y APELLIDOS
CANTIDAD NºPCSA RIA
CORTE
10/21/2019 15.00 15.00
10/24/2019 0.32 14.68 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/25/2019 2.09 12.59 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/25/2019 0.22 12.37 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/26/2019 15.00 - 27.37
10/28/2019 3.46 23.91 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/28/2019 0.22 23.69 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/29/2019 3.46 20.23 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/29/2019 0.22 20.01 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/30/2019 15.00 - 35.01
10/31/2019 2.73 32.28 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/31/2019 0.22 32.08 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
-
11/4/2019 1.99 30.09 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/4/2019 0.21 29.88 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/5/2019 2.99 26.89 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/5/2019 0.21 26.68 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/6/2019 30.00 - 56.68
11/7/2019 3.89 52.79 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/7/2019 0.31 52.48 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/8/2019 3.29 49.19 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/8/2019 0.31 48.88 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/9/2019 2.21 46.67 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/9/2019 0.21 46.46 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/11/2019 7.79 38.67 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/11/2019 0.62 38.05 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/12/2019 15.00 - 53.05
11/12/2019 0.19 52.86 01.03.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/12/2019 0.49 52.37 01.03.02.03 BADEN DE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/12/2019 0.74 51.63 01.03.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/12/2019 7.79 43.84 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/12/2019 0.62 43.22 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/13/2019 10.38 32.84 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/13/2019 0.82 32.02 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/14/2019 0.38 31.64 01.03.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/14/2019 0.98 30.66 01.03.02.03 BADEN DE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/14/2019 1.49 29.17 01.03.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/14/2019 10.38 18.79 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/14/2019 0.82 17.97 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/15/2019 15.00 - 32.97
11/15/2019 11.68 21.29 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/15/2019 0.92 20.37 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/16/2019 9.09 11.28 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/16/2019 0.72 10.56 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/18/2019 30.00 - 40.56
11/18/2019 11.68 28.88 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/18/2019 0.92 27.96 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/19/2019 3.89 24.07 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/19/2019 8.60 15.47 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/19/2019 0.72 14.75 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/19/2019 1.10 13.65 03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 DALIAS
11/20/2019 30.00 - 43.65
11/20/2019 9.55 34.10 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/20/2019 0.15 33.95 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/20/2019 1.53 32.42 01.04.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/20/2019 1.22 31.21 03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 DALIAS
11/21/2019 15.00 - 46.21
11/21/2019 9.55 36.66 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/21/2019 1.22 35.44 03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 DALIAS
11/22/2019 15.00 - 50.44
11/22/2019 9.55 40.89 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/22/2019 1.22 39.67 03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 DALIAS
11/23/2019 30.00 - 69.67
11/23/2019 6.49 63.18 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/23/2019 0.77 62.41 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/23/2019 0.51 61.90 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/25/2019 30.00 - 91.90
11/25/2019 11.68 80.22 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/25/2019 2.32 77.90 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/25/2019 0.37 77.53 03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 DALIAS
11/25/2019 0.38 77.15 04.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ELEVADO DALIAS
11/26/2019 12.98 64.17 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/26/2019 1.95 62.22 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/27/2019 12.98 49.24 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/27/2019 1.03 48.21 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/28/2019 11.68 36.53 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/28/2019 0.92 35.61 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/28/2019 2.75 32.86 01.04.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/29/2019 30.00 - 62.86
11/29/2019 11.68 51.18 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/29/2019 1.03 50.15 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/30/2019 6.49 43.66 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/30/2019 0.92 42.74 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
-
12/2/2019 12.98 29.76 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/2/2019 0.46 29.30 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/2/2019 15.00 - 44.30
12/3/2019 15.00 - 59.30
12/3/2019 15.00 - 74.30
12/3/2019 11.68 62.62 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/3/2019 0.46 62.16 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/4/2019 10.38 51.78 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/4/2019 0.46 51.32 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/5/2019 15.00 - 66.32
12/5/2019 15.00 - 81.32
12/5/2019 5.00 - 86.32
12/5/2019 10.38 75.94 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/5/2019 0.36 75.58 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/6/2019 5.19 70.39 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/6/2019 0.26 70.13 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/7/2019 5.19 64.94 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/7/2019 0.51 64.43 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/9/2019 5.19 59.24 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/9/2019 0.26 58.98 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/10/2019 5.19 53.79 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/10/2019 0.26 53.53 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/11/2019 5.19 48.34 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/11/2019 0.10 48.24 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/11/2019 15.87 32.37 RIPIADO DE ACCESOS POR LLUVIAS CON MAQUINARIA ALQUILADA
12/12/2019 8.45 23.92 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/12/2019 1.00 22.92 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/13/2019 5.99 16.93 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/13/2019 1.10 15.83 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/13/2019 2.85 12.98 01.04.02.03 BADEN DE CONCRETO F'C=210KG/CM2 ICA NUEVA
12/13/2019 1.42 11.56 01.04.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 ICA NUEVA
12/14/2019 3.61 7.95 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/14/2019 0.56 7.39 01.07.05 ENCIMADO DE BUZONES ICA NUEVA
12/14/2019 0.14 7.25 03.08.01 ENCIMADO DE BUZONES DALIAS
- - -
12/18/2019 0.52 6.73 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
12/18/2019 0.13 6.60 02.05.02 RAMPAS DE CONCRETO F'C= 175 KG/CM2 ICA NUEVA
12/19/2019 0.69 5.91 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/19/2019 0.52 5.39 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
12/19/2019 0.11 5.28 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/26/2019 5.28 - RIPIADO DE ACCESOS POR LLUVIAS manualmente

365.00

RC250 0.003 Nos repaldamos de Francisca a Calle


ARENA FINA
FC 175 FC 210
0.07 0.07
ENTRADA PARTIDA
FECHA SALIDA SALDO PRESUPUESTA DESCRIPCION NOMBRES Y APELLIDOS
CANTIDAD NºPCSA RIA
CORTE
10.93 10.93
2/25/2018 0.15 10.77 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
2/26/2018 0.10 10.68 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
2/26/2018 0.14 10.53 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
2/27/2018 0.14 10.39 02.04.05 VEREDA CONCRETO f'c=175 kg/cm3 ICA NUEVA
3/6/2019 0.21 10.18 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/6/2019 0.32 9.86 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/7/2019 0.19 9.67 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/7/2019 0.29 9.38 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/8/2019 0.13 9.25 02.04.04 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/8/2019 0.20 9.05 02.04.05 VEREDA CONCRETO f'c=175 kg/cm3 ICA NUEVA
3/11/2019 0.02 9.03 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 DALIAS
3/11/2019 0.17 8.86 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/11/2019 0.26 8.60 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/12/2019 0.19 8.41 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/12/2019 0.29 8.12 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/13/2019 0.05 8.07 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/13/2019 0.06 8.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/13/2019 0.13 7.87 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/13/2019 0.20 7.67 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/14/2019 0.19 7.48 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/14/2019 0.29 7.19 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/15/2019 0.15 7.04 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/15/2019 0.23 6.81 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/16/2019 0.02 6.79 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
3/16/2019 0.02 6.77 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 DALIAS
3/18/2019 0.21 6.56 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/18/2019 0.35 6.21 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/19/2019 0.19 6.02 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/19/2019 0.32 5.70 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/20/2019 0.13 10.25 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/20/2019 0.18 10.08 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/21/2019 0.06 10.02 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/21/2019 0.07 9.94 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/22/2019 0.14 9.80 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/22/2019 0.18 9.62 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/29/2019 0.15 9.47 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/29/2019 0.23 9.24 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/30/2019 15.00 24.24
4/1/2019 0.12 24.12 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/1/2019 0.17 23.95 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/2/2019 0.12 23.83 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/2/2019 0.17 23.65 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/4/2019 0.17 23.48 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/4/2019 0.26 23.22 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/8/2019 0.03 23.19 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENC ICA NUEVA
4/11/2019 0.05 23.14 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/11/2019 0.07 23.07 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENC ICA NUEVA
4/12/2019 0.10 22.97 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/12/2019 0.15 22.82 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/15/2019 0.26 22.56 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/16/2019 0.26 22.30 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/17/2019 0.34 21.96 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/20/2019 0.17 21.79 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/22/2019 0.26 21.52 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm3 RETAMAS
4/23/2019 0.26 21.26 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm4 RETAMAS
4/24/2019 0.26 21.00 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm5 RETAMAS
4/25/2019 0.13 20.86 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/25/2019 0.20 20.66 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/25/2019 0.12 20.54 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm5 RETAMAS
4/26/2019 0.17 20.37 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/26/2019 0.26 20.11 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/27/2019 0.12 19.99 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm5 RETAMAS
4/29/2019 0.15 19.84 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/29/2019 0.23 19.61 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/29/2019 0.03 19.57 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
4/30/2019 0.15 19.42 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/30/2019 0.23 19.19 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/30/2019 0.02 19.17 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
5/2/2019 0.08 19.09 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/2/2019 0.12 18.98 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/2/2019 0.02 18.96 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
5/3/2049 0.08 18.88 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/3/2019 0.12 18.77 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/3/2019 0.02 18.75 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
5/6/2019 0.06 18.69 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/6/2019 0.12 18.58 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/7/2019 0.08 18.50 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/7/2019 0.12 18.39 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/8/2019 0.06 18.33 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/8/2019 0.08 18.25 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/9/2019 0.06 18.19 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/9/2019 0.08 18.11 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA

7/11/2019 0.12 18.00 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/11/2019 0.17 17.83 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/13/2019 0.12 17.71 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/13/2019 0.17 17.54 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/15/2019 0.12 17.42 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/15/2019 0.09 17.34 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/15/2019 0.08 17.26 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/16/2019 0.09 17.17 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/16/2019 0.09 17.08 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/18/2019 0.07 17.01 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/18/2019 0.09 16.92 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/19/2019 0.07 16.85 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/19/2019 0.09 16.75 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/20/2019 0.07 16.68 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/22/2019 0.11 16.58 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/22/2019 0.07 16.50 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/23/2019 0.11 16.40 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/23/2019 0.07 16.33 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/23/2019 0.06 16.26 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/24/2019 0.11 16.16 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/24/2019 0.06 16.09 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/25/2019 0.11 15.99 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/26/2019 0.11 15.88 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/30/2019 0.06 15.82 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/31/2019 0.03 15.78 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/31/2019 0.09 15.69 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA

8/1/2019 0.02 15.68 02.06.04.01 RELLENO DE JUNTAS CON ASFALTO ICA N UEVA
8/1/2019 1.00 14.68 02.07.01 RELLENO DE JUNTAS ASFALTICAS ICA N UEVA
8/2/2019 0.02 14.66 02.06.04.01 RELLENO DE JUNTAS CON ASFALTO ICA N UEVA
8/2/2019 0.10 14.56 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
8/2/2019 1.00 13.56 02.07.01 RELLENO DE JUNTAS ASFALTICAS ICA N UEVA
8/3/2019 0.06 13.50 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
8/5/2019 1.00 12.50 02.07.01 RELLENO DE JUNTAS ASFALTICAS ICA N UEVA
8/5/2019 1.00 11.50 02.07.01 RELLENO DE JUNTAS ASFALTICAS RETAMAS
8/6/2019 1.00 10.50 02.07.01 RELLENO DE JUNTAS ASFALTICAS ICA N UEVA
8/6/2019 1.00 9.50 02.07.01 RELLENO DE JUNTAS ASFALTICAS RETAMAS
8/7/2019 1.00 8.50 02.07.01 RELLENO DE JUNTAS ASFALTICAS ICA N UEVA
8/7/2019 1.00 7.50 02.07.01 RELLENO DE JUNTAS ASFALTICAS RETAMAS
8/8/2019 0.50 7.00 02.07.01 RELLENO DE JUNTAS ASFALTICAS ICA N UEVA
8/9/2019 0.40 6.60 02.07.01 RELLENO DE JUNTAS ASFALTICAS RETAMAS
8/9/2019 1.00 5.60 RELLENO DE JUNTAS ASFALTICAS DALIAS
8/9/2019 0.03 5.57 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA
8/26/2019 0.25 5.32 AUTORIZACION DE SUPERVISION PARA EJECUTAR BOCACALLE RETAMAS
8/26/2019 0.04 5.28 12.02.01 CONCRETO f'c=175 kg/cm2 EN SARDINEL RETAMAS
8/26/2019 0.40 4.88 11.05.01 RELLENO DE JUNTAS ASFALTICAS RETAMAS
8/26/2019 0.25 4.63 12.03.01 RELLENO DE JUNTAS ASFALTICAS RETAMAS

9/18/2019 0.72 3.91 05.01.01.02 CARPETA ASFALTICA EN CALIENTE DE 2" ALISOS


9/18/2019 1.32 2.59 11.06.02.02 CARPETA ASFALTICA EN CALIENTE DE 2" RETAMAS
9/19/2019 0.48 2.11 05.01.01.02 CARPETA ASFALTICA EN CALIENTE DE 2" ALISOS
9/19/2019 0.62 1.50 07.05.01.02 CARPETA ASFALTICA EN CALIENTE DE 2" CARDOS
9/19/2019 1.26 0.23 09.01.01.02 CARPETA ASFALTICA EN CALIENTE DE 2" PIURA
9/20/2019 0.25 - 0.01 07.05.01.02 CARPETA ASFALTICA EN CALIENTE DE 2" CARDOS

11/20/2019 15.00 14.99

12/5/2019 15.00 29.99

12/16/2019 0.11 29.88 01.03.04.01 RELLENO DE JUNTAS ASFÁLTICAS ICA NUEVA ADICIONAL
12/16/2019 0.16 29.72 02.06.01 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA ADICIONAL
12/16/2019 1.09 28.63 01.04.04.01 RELLENO DE JUNTAS ASFÁLTICAS ICA NUEVA
12/16/2019 0.54 28.09 02.07.01 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA
12/17/2019 0.11 27.98 01.03.04.01 RELLENO DE JUNTAS ASFÁLTICAS ICA NUEVA ADICIONAL
12/17/2019 0.16 27.82 02.06.01 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA ADICIONAL
12/17/2019 1.09 26.73 01.04.04.01 RELLENO DE JUNTAS ASFÁLTICAS ICA NUEVA
12/17/2019 0.54 26.19 02.07.01 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA
12/18/2019 0.11 26.08 01.03.04.01 RELLENO DE JUNTAS ASFÁLTICAS ICA NUEVA ADICIONAL
12/18/2019 0.16 25.92 02.06.01 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA ADICIONAL
12/18/2019 1.09 24.83 01.04.04.01 RELLENO DE JUNTAS ASFÁLTICAS ICA NUEVA
12/18/2019 0.54 24.29 02.07.01 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA
12/19/2019 0.11 24.18 01.03.04.01 RELLENO DE JUNTAS ASFÁLTICAS ICA NUEVA ADICIONAL
12/19/2019 0.16 24.02 02.06.01 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA ADICIONAL
12/19/2019 1.09 22.93 01.04.04.01 RELLENO DE JUNTAS ASFÁLTICAS ICA NUEVA
12/19/2019 0.54 22.39 02.07.01 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA
12/20/2019 0.15 22.24 01.03.04.01 RELLENO DE JUNTAS ASFÁLTICAS ICA NUEVA ADICIONAL
12/20/2019 0.16 22.08 02.06.01 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA ADICIONAL
12/20/2019 0.62 21.46 01.04.04.01 RELLENO DE JUNTAS ASFÁLTICAS ICA NUEVA
12/20/2019 0.54 20.92 02.07.01 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA
12/20/2019 0.54 20.38 03.04.02.01 RELLENO DE JUNTAS ASFÁLTICAS DALIAS
12/21/2019 0.04 20.34 02.06.01 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA ADICIONAL
12/21/2019 0.54 19.80 01.04.04.01 RELLENO DE JUNTAS ASFÁLTICAS ICA NUEVA
12/21/2019 0.38 19.42 02.07.01 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA
12/21/2019 0.58 18.84 03.04.02.01 RELLENO DE JUNTAS ASFÁLTICAS DALIAS
12/23/2019 - 18.84 02.07.01 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA
12/23/2019 1.63 17.21 04.06.01 RELLENO DE JUNTAS ASFALTICAS DALIAS
12/23/2019 - 17.21 01.04.04.01 RELLENO DE JUNTAS ASFÁLTICAS ICA NUEVA
12/24/2019 - 17.21 01.04.04.01 RELLENO DE JUNTAS ASFÁLTICAS ICA NUEVA
12/24/2019 - 17.21 02.07.01 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA
12/24/2019 1.63 15.58 04.06.01 RELLENO DE JUNTAS ASFALTICAS DALIAS
12/26/2019 - 15.58 01.04.04.01 RELLENO DE JUNTAS ASFÁLTICAS ICA NUEVA
12/26/2019 - 15.58 02.07.01 RELLENO DE JUNTAS ASFALTICAS ICA NUEVA
12/26/2019 0.58 15.00 04.06.01 RELLENO DE JUNTAS ASFALTICAS DALIAS

TOTAL

0.71 CAJA PREFABRICADA


CEMENTO
FC 175 FC 210
7.90 8.92
PARTIDA
FECHA ENTRADA SALIDA SALDO PRESUPUESTA DESCRIPCION NOMBRES Y APELLIDOS
RIA
CANTIDAD NºPCSA
CORTE
2/12/2019 570.00 570.00 HABIA SALDO 2018
2/26/2019 345.00 345.00
2/25/2018 17.00 553.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
2/26/2018 11.00 542.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
2/26/2018 16.00 526.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
2/27/2018 16.00 510.00 02.04.05 VEREDA CONCRETO f'c=175 kg/cm3 ICA NUEVA
3/6/2019 25.00 485.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/6/2019 36.00 449.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/7/2019 21.00 428.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/7/2019 32.00 396.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/8/2019 15.00 381.00 02.04.04 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/8/2019 22.00 359.00 02.04.05 VEREDA CONCRETO f'c=175 kg/cm3 ICA NUEVA
3/11/2019 2.00 357.00 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 DALIAS
3/11/2019 19.00 338.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/11/2019 30.00 308.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/12/2019 22.00 286.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/12/2019 32.00 254.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/13/2019 225.00 254.00
3/13/2019 5.00 249.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL DALIAS
3/13/2019 8.00 241.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 DALIAS
3/13/2019 15.00 226.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/13/2019 22.00 204.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/14/2019 22.00 182.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/14/2019 33.00 149.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/15/2019 17.00 132.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/15/2019 26.00 106.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/16/2019 2.00 104.00 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
3/16/2019 2.00 102.00 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 DALIAS
3/18/2019 24.00 78.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/18/2019 39.00 39.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/19/2019 200.00 200.00 239.00
3/19/2019 21.00 218.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/19/2019 36.00 182.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/20/2019 15.00 167.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/20/2019 20.00 147.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/21/2019 7.00 140.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/21/2019 9.00 131.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/22/2019 16.00 115.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/22/2019 20.00 95.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
3/23/2019 1,000.00 1,095.00
3/29/2019 17.00 1,078.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
3/29/2019 26.00 1,052.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/1/2019 70.00 1,052.00
4/1/2019 13.00 1,039.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/1/2019 19.00 1,020.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/2/2019 13.00 1,007.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/2/2019 20.00 987.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/4/2019 20.00 967.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/4/2019 29.00 938.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/4/2019 4.00 934.00 03.06.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/5/2019 4.00 930.00 03.06.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/5/2019 40.00 930.00
4/6/2019 4.00 926.00 03.06.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/6/2019 2.00 924.00 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
4/8/2019 4.00 920.00 03.06.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/8/2019 4.00 916.00 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENC ICA NUEVA
4/9/2019 4.00 912.00 03.06.05 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/10/2019 4.00 908.00 03.06.06 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/10/2019 890.00 908.00
4/11/2019 4.00 904.00 03.06.07 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/11/2019 5.00 899.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/11/2019 9.00 890.00 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENC ICA NUEVA
4/12/2019 2.00 888.00 03.06.08 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/12/2019 11.00 877.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/12/2019 16.00 861.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/13/2019 4.00 857.00 03.06.09 RECONEXION DE CAJA DE REGISTRO DE DESAGUE DALIAS
4/13/2019 2.00 855.00 03.06.09 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/15/2019 4.00 851.00 03.06.08 RECONEXION DE CAJA DE REGISTRO DE DESAGUE DALIAS
4/15/2019 33.00 818.00 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/16/2019 2.00 816.00 03.06.08 RECONEXION DE CAJA DE REGISTRO DE DESAGUE DALIAS
4/16/2019 33.00 783.00 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/17/2019 3.00 780.00 03.06.08 RECONEXION DE CAJA DE REGISTRO DE DESAGUE DALIAS
4/17/2019 44.00 736.00 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/20/2019 4.00 732.00 03.06.08 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/20/2019 22.00 710.00 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm2 RETAMAS
4/22/2019 34.00 676.00 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm3 RETAMAS
4/23/2019 34.00 642.00 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm4 RETAMAS
4/24/2019 34.00 608.00 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm5 RETAMAS
4/25/2019 19.00 589.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/25/2019 29.00 560.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/25/2019 16.00 544.00 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm5 RETAMAS
4/26/2019 25.00 519.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/26/2019 38.00 481.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/26/2019 2.00 479.00 03.06.08 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/27/2019 2.00 477.00 03.06.08 RECONEXION DE CAJA DE REGISTRO DE DESAGUE ICA NUEVA
4/27/2019 16.00 461.00 11.04.01.02 DRENAJE CUNETA CONCRETO f'c=210 kg/cm5 RETAMAS
4/29/2019 22.00 439.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/29/2019 33.00 406.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/29/2019 5.00 401.00 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
4/30/2019 22.00 379.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
4/30/2019 34.00 345.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
4/30/2019 3.00 342.00 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
5/2/2019 11.00 331.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/2/2019 17.00 314.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/2/2019 2.00 312.00 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
5/3/2049 11.00 301.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/3/2019 17.00 284.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/3/2019 3.00 281.00 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
5/6/2019 9.00 272.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/6/2019 17.00 255.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/7/2019 12.00 243.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/7/2019 17.00 226.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/8/2019 8.00 218.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/8/2019 13.00 205.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA
5/9/2019 9.00 196.00 02.03.02 CONCRETO f'c=175 kg/cm2 EN ARDINEL ICA NUEVA
5/9/2019 13.00 183.00 02.04.04 VEREDA CONCRETO f'c=175 kg/cm2 ICA NUEVA

7/11/2019 8.00 175.00 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/11/2019 11.00 164.00 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/12/2019 1.00 163.00 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/13/2019 8.00 155.00 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/13/2019 11.00 144.00 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/15/2019 10.00 134.00 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/15/2019 6.00 128.00 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/15/2019 6.00 122.00 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/16/2019 6.00 116.00 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
7/16/2019 1.00 115.00 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/16/2019 1.00 114.00 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/18/2019 1.00 113.00 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/18/2019 6.00 107.00 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/18/2019 1.00 106.00 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/19/2019 6.00 100.00 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/19/2019 6.00 94.00 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/19/2019 1.00 93.00 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/20/2019 6.00 87.00 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/22/2019 9.00 78.00 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/22/2019 1.00 77.00 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/22/2019 6.00 71.00 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/23/2019 9.00 62.00 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/23/2019 1.00 61.00 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/23/2019 7.00 54.00 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/23/2019 1.00 53.00 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/24/2019 9.00 44.00 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/24/2019 1.00 43.00 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/25/2019 9.00 34.00 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/26/2019 9.00 25.00 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
7/30/2019 1.00 24.00 02.06.02.01 SOLADO DE CONCRETO E=4" ICA NUEVA
7/30/2019 1.00 23.00 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA
7/31/2019 2.00 21.00 02.06.03.03 CONCRETO F'C=210 KG/CM2 EN MUROS DE CONTENCICA NUEVA
7/31/2019 1.00 20.00 02.06.05.01 TARRAJEO EXTERIOR DE MURO DE CONTENCION ICA NUEVA

8/2/2019 4.00 16.00 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
8/3/2019 2.00 14.00 04.05.02 RAMPA DE CONCRETO f'c= 175 kg/cm2 ICA NUEVA
8/26/2019 12.00 2.00 AUTORIZACION DE SUPERVISION PARA EJECUTAR BOCACALLE RETAMAS
8/26/2019 2.00 - 12.02.01 CONCRETO f'c=175 kg/cm2 EN SARDINEL RETAMAS

9/26/2019 765.00 765.00


9/27/2019 635.00 1,400.00
10/1/2019 775.00 2,175.00
10/2/2019 625.00 2,800.00
10/9/2019 759.00 3,559.00

10/10/2019 4,200.00 3,559.00


10/10/2019 1.00 3,558.00 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
10/11/2019 641.00 - 4,199.00
10/12/2019 34.00 4,165.00 02.04.04 VEREDA CONCRETO F'C=175 KG/CM2 ICA NUEVA
10/19/2019 2.00 4,163.00 02.05.02 RAMPAS DE CONCRETO F'C= 175 KG/CM2 ICA NUEVA
10/21/2019 60.00 4,103.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/21/2019 6.00 4,097.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/22/2019 47.00 4,050.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/22/2019 4.00 4,046.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/23/2019 83.00 3,963.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/23/2019 7.00 3,956.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/24/2019 170.00 4,126.00
10/24/2019 60.00 4,066.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/24/2019 6.00 4,060.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/25/2019 36.00 4,024.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/25/2019 4.00 4,020.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/28/2019 60.00 3,960.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/28/2019 4.00 3,956.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/29/2019 60.00 3,896.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/29/2019 4.00 3,892.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
10/31/2019 47.00 3,845.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
10/31/2019 4.00 3,841.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA

11/4/2019 36.00 3,805.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/4/2019 4.00 3,801.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/5/2019 54.00 3,747.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/5/2019 4.00 3,743.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/7/2019 71.00 3,672.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/7/2019 6.00 3,666.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/8/2019 60.00 3,606.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/8/2019 6.00 3,600.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/9/2019 40.00 3,560.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/9/2019 4.00 3,556.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/11/2019 141.00 3,415.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/11/2019 11.00 3,404.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/12/2019 3.00 3,401.00 01.03.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/12/2019 9.00 3,392.00 01.03.02.03 BADEN DE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/12/2019 13.00 3,379.00 01.03.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/12/2019 141.00 3,238.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/12/2019 11.00 3,227.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/13/2019 188.00 3,039.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/13/2019 15.00 3,024.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/14/2019 770.00 3,794.00
11/14/2019 630.00 4,424.00
11/14/2019 7.00 4,417.00 01.03.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/14/2019 18.00 4,399.00 01.03.02.03 BADEN DE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/14/2019 27.00 4,372.00 01.03.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/14/2019 188.00 4,184.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/14/2019 15.00 4,169.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/15/2019 212.00 3,957.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/15/2019 17.00 3,940.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/16/2019 165.00 3,775.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/16/2019 13.00 3,762.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/18/2019 212.00 3,550.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/18/2019 17.00 3,533.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/19/2019 71.00 3,462.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/19/2019 156.00 3,306.00 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/19/2019 13.00 3,293.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/19/2019 20.00 3,273.00 03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 DALIAS
11/20/2019 173.00 3,100.00 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/20/2019 3.00 3,097.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/20/2019 28.00 3,069.00 01.04.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/20/2019 22.00 3,047.00 03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 DALIAS
11/21/2019 690.00 - 3,737.00
11/21/2019 173.00 3,564.00 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/21/2019 22.00 3,542.00 03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 DALIAS
11/22/2019 173.00 3,369.00 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/22/2019 22.00 3,347.00 03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 DALIAS
11/23/2019 118.00 3,229.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/23/2019 14.00 3,215.00 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/23/2019 9.00 3,206.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/25/2019 212.00 2,994.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/25/2019 42.00 2,952.00 03.01.02.04 CONCRETO F'C=210 KG/CM2 EN LOSA DALIAS
11/25/2019 7.00 2,945.00 03.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 DALIAS
11/25/2019 6.00 2,939.00 04.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ELEVADO DALIAS
11/26/2019 235.00 2,704.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/26/2019 35.00 2,669.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/27/2019 235.00 2,434.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/27/2019 19.00 2,415.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/28/2019 212.00 2,203.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/28/2019 17.00 2,186.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
11/28/2019 50.00 2,136.00 01.04.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 ICA NUEVA
11/29/2019 212.00 1,924.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/29/2019 19.00 1,905.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA

11/30/2019 118.00 1,787.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
11/30/2019 17.00 1,770.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
-
-
12/2/2019 235.00 1,535.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/2/2019 8.00 1,527.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/3/2019 212.00 1,315.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/3/2019 8.00 1,307.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/4/2019 188.00 1,119.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/4/2019 8.00 1,111.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/5/2019 188.00 923.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/5/2019 7.00 916.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/6/2019 94.00 822.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/6/2019 5.00 817.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/7/2019 94.00 723.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/7/2019 9.00 714.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/9/2019 94.00 620.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/9/2019 5.00 615.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/10/2019 94.00 521.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/10/2019 5.00 516.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/11/2019 94.00 422.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/11/2019 2.00 420.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/12/2019 246.00 666.00
12/12/2019 148.00 518.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/12/2019 17.00 501.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/13/2019 104.00 397.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/13/2019 18.00 379.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA
12/13/2019 49.00 330.00 01.04.02.03 BADEN DE CONCRETO F'C=210KG/CM2 ICA NUEVA
12/13/2019 24.00 306.00 01.04.03.03 BOCACALLE CONCRETO F'C=210KG/CM2 ICA NUEVA
12/14/2019 62.00 244.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/14/2019 10.00 234.00 01.07.05 ENCIMADO DE BUZONES ICA NUEVA
12/14/2019 1.00 233.00 03.08.01 ENCIMADO DE BUZONES DALIAS
233.00 - CUNETA POBRE
12/18/2019 7.00 226.00 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
12/18/2019 1.00 225.00 02.05.02 RAMPAS DE CONCRETO F'C= 175 KG/CM2 ICA NUEVA
12/19/2019 11.00 214.00 01.04.03.04 CONCRETO F'C=210 KG/CM2 EN LOSA ICA NUEVA
12/19/2019 7.00 207.00 02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINEL ICA NUEVA
12/19/2019 1.00 206.00 01.04.01.02 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 ICA NUEVA

8,476.00

MATERIAL GRANULAR (CALICHE)

1.30
ENTRADA PARTIDA
FECHA SALIDA SALDO PRESUPUESTA DESCRIPCION NOMBRES Y APELLIDOS
CANTIDAD NºPCSA RIA
CORTE
2/25/2019 45.00 15.00 45.00 02.04.02 MATERIAL P/BAE DE VEREDA ICA NUEVA
2/25/2019 14.06 30.94 02.04.02 MATERIAL P/BAE DE VEREDA ICA NUEVA
2/26/2019 30.00 30.94 02.04.02 MATERIAL P/BAE DE VEREDA ICA NUEVA
2/26/2019 14.06 16.88 02.04.02 MATERIAL P/BAE DE VEREDA ICA NUEVA
2/27/2019 14.06 2.81 02.04.02 MATERIAL P/BAE DE VEREDA ICA NUEVA
2/28/2019 15.00 17.81 02.04.03 MATERIAL P/BAE DE VEREDA ICA NUEVA
2/28/2019 14.06 3.75 02.04.03 MATERIAL P/BAE DE VEREDA ICA NUEVA
3/2/2019 30.00 33.75 02.04.03 MATERIAL P/BAE DE VEREDA ICA NUEVA
3/2/2019 2.50 31.25 02.04.03 MATERIAL P/BAE DE VEREDA ICA NUEVA
3/4/2019 5.63 25.63 02.04.04 MATERIAL P/BAE DE VEREDA DALIAS
3/5/2019 5.00 20.63 02.04.03 MATERIAL P/BAE DE VEREDA ICA NUEVA
3/5/2019 5.63 15.00 02.04.04 MATERIAL P/BAE DE VEREDA DALIAS
3/7/2019 5.63 9.38 02.04.04 MATERIAL P/BAE DE VEREDA DALIAS
3/8/2019 5.00 4.38 02.04.03 MATERIAL P/BAE DE VEREDA ICA NUEVA
3/11/2019 4.31 0.06 02.04.04 MATERIAL P/BAE DE VEREDA DALIAS
3/15/2019 15.00 19.31
3/18/2019 0.20 19.11 02.04.05 MATERIAL P/BAE DE VEREDA DALIAS
3/18/2019 15.00 34.11
3/25/2019 5.63 28.49 02.04.06 MATERIAL P/BAE DE VEREDA ICA NUEVA
3/26/2019 5.63 22.86 02.04.07 MATERIAL P/BAE DE VEREDA ICA NUEVA
4/1/2019 330.00 352.86
4/4/2019 1.88 350.99 02.04.08 MATERIAL P/BAE DE VEREDA ICA NUEVA
4/5/2019 2.53 348.50 02.04.08 MATERIAL P/BAE DE VEREDA ICA NUEVA
4/9/2019 348.50 - MATERIAL P/BASE EN PAVIMENTO RETAMAS
4/10/2019 15.00 15.00
4/10/2019 8.47 6.53 RETAMAS
5/2/2019 1.50 5.03 02.04.08 MATERIAL P/BAE DE VEREDA ICA NUEVA
5/3/2019 1.50 3.53 02.04.08 MATERIAL P/BAE DE VEREDA ICA NUEVA
5/4/2019 1.50 2.03 02.04.08 MATERIAL P/BAE DE VEREDA ICA NUEVA
5/6/2019 2.03 - 02.04.08 MATERIAL P/BAE DE VEREDA ICA NUEVA

7/10/2019 1.52 - 1.52 02.04.08 MATERIAL P/BAE DE VEREDA ICA NUEVA


7/11/2019 1.52 - 3.04 02.04.08 MATERIAL P/BAE DE VEREDA ICA NUEVA
7/12/2019 1.52 - 4.56 02.04.08 MATERIAL P/BAE DE VEREDA ICA NUEVA
7/19/2019 1.88 - 6.43 02.04.08 MATERIAL P/BAE DE VEREDA ICA NUEVA
7/20/2019 1.88 - 8.31 02.04.08 MATERIAL P/BAE DE VEREDA ICA NUEVA

9/23/2019 15.00 15.00


9/23/2019 15.00 30.00
9/25/2019 15.00 45.00
9/25/2019 15.00 60.00
9/26/2019 15.00 75.00
9/26/2019 15.00 90.00
9/26/2019 15.00 105.00
9/26/2019 15.00 120.00

10/3/2019 750.00 870.00


10/3/2019 310.24 559.76 01.05.02.01 MATERIAL P/BASE PUESTO EN OBRA ICA NUEVA
10/4/2019 310.24 249.52 01.05.02.01 MATERIAL P/BASE PUESTO EN OBRA ICA NUEVA
10/5/2019 180.00 429.52
10/5/2019 116.18 313.34 01.05.02.01 MATERIAL P/BASE PUESTO EN OBRA DALIAS
10/5/2019 155.99 157.35 01.05.02.01 MATERIAL P/BASE PUESTO EN OBRA ICA NUEVA
10/5/2019 31.30 126.05 OBSERVACIONES: SE HIZO LA RECONFORMACION DE BASE GRANULAR POR MATERIAL SATURADO POR LLUVIAS.
10/11/2019 5.21 120.84 02.04.02 MATERIAL P/BASE DE VEREDAS ICA NUEVA
10/24/2019 50.84 70.00 01.05.02.01 MATERIAL P/BASE PUESTO EN OBRA ICA NUEVA
PETROLEO BIODIESEL B5

PARTIDA
ENTRADA PRESUPUEST
FECHA SALIDA SALDO ARIA
CANTIDAD NºPCSA
CORTE
2/12/2019 SALDO 2018 332.00
2/28/2019 3.00 329.50
3/4/2019 22.50 307.00
3/5/2019 1.00 306.00
3/5/2019 5.00 301.00
3/5/2019 5.00 296.00
3/8/2019 25.00 271.00
3/8/2019 8.00 263.00
3/11/2019 18.00 245.00
3/11/2019 2.00 243.00
3/13/2019 5.00 238.00
3/13/2019 2.00 236.00
3/14/2019 20.00 216.00
3/15/2019 12.50 203.50
3/15/2019 200 403.50
3/18/2019 1.00 402.50
3/18/2019 1.00 401.50
3/20/2019 6.00 395.50
3/20/2019 5.00 390.50
3/20/2019 3.00 387.50
3/21/2019 40.00 347.50
3/22/2019 40.00 307.50
3/23/2019 20.00 287.50
3/23/2019 17.00 270.50
3/23/2019 17.00 253.50
3/23/2019 17.00 236.50
3/23/2019 23.00 213.50
3/25/2019 4.00 209.50
3/25/2019 5.00 204.50
3/26/2019 39.00 165.50
3/26/2019 20.00 145.50
3/26/2019 20.00 125.50
3/26/2019 15.00 110.50
3/27/2019 405 515.50
3/27/2019 30.00 485.50
3/27/2019 40.00 445.50
3/27/2019 25.00 420.50
3/27/2019 25.00 395.50
3/27/2019 25.00 370.50
3/27/2019 3.00 367.50
3/28/2019 40.00 327.50
3/28/2019 25.00 302.50
3/28/2019 25.00 277.50
3/28/2019 20.00 257.50
3/28/2019 20.00 237.50
3/29/2019 36.00 201.50
3/29/2019 20.00 181.50
3/29/2019 20.00 161.50
3/29/2019 20.00 141.50
3/29/2019 20.00 121.50
3/29/2019 3.00 118.50
3/30/2019 1.00 117.50
4/3/2019 39.00 78.50
4/3/2019 29.00 49.50
4/3/2019 30 79.50
4/4/2019 200 279.50
4/4/2019 10.00 269.50
4/5/2019 3.00 266.50
4/5/2019 3.00 263.50
4/9/2019 40.00 223.50
4/10/2019 5.00 218.50
4/10/2019 25.00 193.50
4/10/2019 12.00 181.50
4/11/2019 5.00 176.50
4/11/2019 11.00 165.50
4/15/2019 5.00 160.50
4/15/2019 5.00 155.50
4/15/2019 1.00 154.50
4/16/2019 2.00 152.50
4/22/2019 3.00 149.50
4/23/2019 5.00 144.50
4/25/2019 5.00 139.50
4/26/2019 1.00 138.50
4/26/2019 3.00 135.50
4/26/2019 10 145.50
4/30/2019 3.00 142.50
5/2/2019 1.00 141.50
5/4/2019 2.00 139.50
5/4/2019 5.00 134.50
5/7/2019 1.00 133.50

7/17/2019 18.00 115.50


7/17/2019 29.00 86.50
7/17/2019 24.00 62.50
7/17/2019 22.00 40.50
7/17/2019 40.50
7/17/2019 100 140.50
7/17/2019 2.00 138.50
7/18/2019 29.00 109.50
7/18/2019 20.00 89.50
7/20/2019 2.00 87.50
7/23/2019 100 187.50
7/24/2019 5.00 182.50
7/26/2019 41.00 141.50
7/31/2019 15.00 126.50
7/31/2019 15.00 111.50
7/31/2019 15.00 96.50

8/1/2019 6.00 90.50


8/1/2019 20.00 70.50
8/1/2019 20.00 50.50
8/1/2019 20.00 30.50
8/1/2019 1.00 29.50
8/2/2019 2.50 27.00
8/2/2019 1.00 26.00
8/3/2019 2.00 24.00
8/6/2019 1.00 23.00
8/6/2019 9.00 14.00
8/6/2019 20 34.00
8/6/2019 20.00 14.00
8/7/2019 280 294.00
8/7/2019 5.00 289.00
8/7/2019 15.00 274.00
8/8/2019 28.00 246.00
8/9/2019 2.50 243.50
8/9/2019 10.00 233.50
8/9/2019 1.00 232.50
8/22/2019 10.00 222.50
8/22/2019 6.00 216.50
8/22/2019 5.00 211.50
8/22/2019 30.00 181.50
8/22/2019 8.00 173.50
8/24/2019 40.00 133.50
8/26/2019 15.00 118.50

9/12/2019 205 323.50


9/16/2019 150.00 173.50
9/17/2019 400 573.50
9/17/2019 450 1,023.50
9/18/2019 350 1,373.50
9/18/2019 30.00 1,343.50
9/18/2019 20.00 1,323.50
9/18/2019 15.00 1,308.50
9/18/2019 5.00 1,303.50
9/18/2019 15.00 1,288.50
9/18/2019 10.00 1,278.50
9/18/2019 10.00 1,268.50
9/18/2019 15.00 1,253.50
9/18/2019 10.00 1,243.50
9/18/2019 4.00 1,239.50
9/18/2019 905.00 334.50
9/19/2019 450 784.50
9/19/2019 20.00 764.50
9/19/2019 17.00 747.50
9/19/2019 36.00 711.50
9/19/2019 20.00 691.50
9/19/2019 20.00 671.50
9/19/2019 10.00 661.50
9/19/2019 15.00 646.50
9/19/2019 15.00 631.50
9/19/2019 10.00 621.50
9/19/2019 15.00 606.50
9/19/2019 300 906.50
9/19/2019 250 1,156.50
9/19/2019 990.00 166.50
9/20/2019 80.00 86.50
9/20/2019 5.00 81.50
9/20/2019 10.00 71.50
9/20/2019 10.00 61.50
9/20/2019 5.00 56.50
9/21/2019 5.00 51.50
9/23/2019 14.00 37.50

10/3/2019 10.00 27.50


10/3/2019 200 227.50
10/3/2019 50.00 177.50
10/4/2019 50.00 127.50
10/4/2019 5.00 122.50
10/5/2019 35.00 87.50
10/5/2019 25.00 62.50
10/6/2019 10.00 52.50
10/17/2019 6.00 46.50
10/17/2019 5.00 41.50
10/18/2019 1.00 40.50
10/18/2019 1.00 39.50
10/21/2019 1.00 38.50
10/22/2019 5.00 33.50
10/22/2019 5.00 28.50
10/22/2019 1.00 27.50
10/24/2019 10.00 17.50
10/24/2019 5.00 12.50
10/25/2019 300 312.50
10/25/2019 3.00 309.50
10/28/2019 16.00 293.50
10/28/2019 1.00 292.50
10/29/2019 1.00 291.50

11/6/2019 10.00 281.50


11/7/2019 2.50 279.00
11/13/2019 1.00 278.00
11/13/2019 1.00 277.00
11/14/2019 1.00 276.00
11/15/2019 1.00 275.00
11/18/2019 1.50 273.50
11/22/2019 1.00 272.50
11/22/2019 1.00 271.50
11/25/2019 1.00 270.50
11/26/2019 1.00 269.50
11/29/2019 1.00 268.50
11/29/2019 1.00 267.50

12/2/2019 1.00 266.50


12/5/2019 1.00 265.50
12/7/2019 1.00 264.50
12/7/2019 1.00 263.50
12/9/2019 1.00 262.50
12/9/2019 1.00 261.50
12/10/2019 1.00 260.50
12/10/2019 1.00 259.50
12/11/2019 1.00 258.50
12/11/2019 1.00 257.50
12/12/2019 1.00 256.50
12/12/2019 1.00 255.50
12/13/2019 5.00 250.50
12/17/2019 5.00 245.50
12/18/2019 2.50 243.00 Camion Nissan Z2H -807
12/18/2019 1.00 242.00 Juntas Asfalticas
12/19/2019 1.00 241.00 Juntas Asfalticas
12/19/2019 0.50 240.50 Juntas Asfalticas
12/20/2019 2.00 238.50 Juntas Asfalticas
12/20/2019 5.00 233.50 Volquete Volvo EGA-648
12/21/2019 1.00 232.50 Juntas Asfalticas
12/23/2019 1.00 231.50 Juntas Asfalticas

CANTIDADES PRECIO COSTO


FECHA
ENTRADA SALIDA SALDO UNITARIO PROMEDIO
1/9/2017 455 455.00 10.15 4618.25
PETROLEO BIODIESEL B5

NOMBRES Y
DESCRIPCION APELLIDOS

PARA CAMIONETA TOYOTA EGW-791, inspeccion y verificacion de obra


Retroexcavadora DREE 310SK, excavacion, acarreo y carguio en vereda
Mantenimiento de tableros
VOLQUETE IVECO EGB-631, PD
VOLQUETE IVECO EGA-648, AR
Retroexcavadora DREE 310SK, excavacion, acarreo y carguio en vereda
VOLQUETE IVECO EGA-648, eliminacion de material 3
VOLQUETE IVECO EGB-631, traslado de material
Cargador frontal CAT 938-6
VOLQUETE IVECO EGB-631, traslado de material
Mantenimiento de tableros
Retroexcavadora DREE 310SK, excavacion, acarreo y carguio en vereda
Retroexcavadora DREE 310SK, excavacion, acarreo y carguio en vereda

Mantenimiento de mezcladora
Mantenimiento de tableros
VOLQUETE IVECO EGA-648, eliminacion de material
VOLQUETE IVECO EGV-595, eliminacion de material
PARA CAMIONETA TOYOTA EGW-791, inspeccion y verificacion de obra
Tractor s/oruga CAT D7 - G, corte de terreno
Tractor s/oruga CAT D7 - G, corte de terreno
Tractor s/oruga CAT D7 - G, corte de terreno
VOLQUETE IVECO EGV-595, eliminacion de material
VOLQUETE IVECO EGV-631, eliminacion de material
VOLQUETE IVECO EGA-648, eliminacion de material
Cargador frontal CAT 938-G
PARA CAMIONETA TOYOTA EGW-791, inspeccion y verificacion de obra
Retroexcavadora DREE 310SK, excavacion, acarreo y carguio en vereda
Cargador frontal CAT 938-G
VOLQUETE IVECO EGV-631, eliminacion de material
VOLQUETE VOLVO EGA-648, eliminacion de material
VOLQUETE IVECO EGV-595, eliminacion de material

Tractor s/oruga CAT D7 - G, corte de terreno


Cargador frontal CAT 938-G
VOLQUETE IVECO EGV-595, eliminacion de material
VOLQUETE VOLVO EGA-648, eliminacion de material
VOLQUETE IVECO EGV-631, eliminacion de material
PARA CAMIONETA TOYOTA EGW-791, inspeccion y verificacion de obra
Cargador frontal CAT 938-G
VOLQUETE VOLVO EGA-648, eliminacion de material
VOLQUETE IVECO EGV-595, eliminacion de material
VOLQUETE IVECO EGV-631, eliminacion de material
Tractor s/oruga CAT D7 - G, corte de terreno
Cargador frontal CAT 938-G
VOLQUETE IVECO EGV-595, eliminacion de material
VOLQUETE VOLVO EGA-648, eliminacion de material
Tractor s/oruga CAT D7 - G, corte de terreno
VOLQUETE IVECO EGV-631, eliminacion de material
PARA CAMIONETA TOYOTA EGW-791, inspeccion y verificacion de obra
Mantenimiento de tableros
Cargador frontal CAT 938-G
VOLQUETE VOLVO EGA-648, eliminacion de material

Retroexcavadora Jhon Deere 310 Sk


Camioneta toyota EgE 791
Camioneta toyota PIG - 459
Motoniveladora CAT 140m
Volquete IVECO EGV -631
Motoniveladora CAT 140m
Rodilloa liso vibratorio Cat 554B
Volquete IVECO EGV -595
Rodilloa liso vibratorio Cat 554B
Volquete IVECO EGV -595
Volquete IVECO EGA - 648
Mantenimiento de maderas panales
Camioneta PIG - 459
Camioneta Toyota Ege -791
Volquete Volvo EGA - 648
Volquete Iveco - 595
Mantenimiento maquinarias livianas
Camioneta toyota EgE 791

Camioneta toyota EgE 791


Mantenimiento maquinarias livianas
Mantenimiento de maderas panales
Volquete Iveco - 595
Mantenimiento maquinarias livianas

Cargador frontal CAT 938-G


Volquete IVECO EGV - 631
Volquete Volvo EGA - 647
Cargador frontal Komatzu WA -180
Cargador frontal Komatzu WA -180

Mantenimiento de maderas panales


Cargador frontal CAT 938-G
Volquete IVECO EGV -631
Mantenimiento de maderas panales

Cargador frontal Komatzu WA -180


Tractor Oruga CAT - 07

Cisterna F-8000
Volquete EGA 647
Volquete EGV 595
Cargador frontal Komatzu WA -180
Sello de juntas
Camion Nissan Z2H-807
Sello de juntas
Sello de juntas
Sello de juntas
Camion Cisterna F-8000

Motoniveladora Komatzu WA-180

Camion Nissan Z2H-807


Motoniveladora Komatzu WA-180
Motoniveladora Komatzu WA-180
Camion Nissan Z2H-807
Rodillo compactador vibratorio liso 3410 HAMM
Sello de juntas
Retroexcavadora Jhon Deere 310SK
Camion Cisterna F-8000
Camion Nissan Z2H-807
Motoniveladora CAT 140M
Rodillo compactador vibratorio liso 3410 HAMM
Camion Imprimador DINA EGC -828
Camion Imprimador DINA EGC -828

Planta de asfalto (calentamiento)

Cargador frontal CAT 938-G


Volquete VOLVO EGL-12
Volquete VOLVO EGA-248
Volquete IVECO EGV-631
Esparcidora VOGELE 1303
Rodillo TANDEM DYNAMAC
Rodillo Neumatico INGRAM
Volquete IVECO EGV-595
Volquete IVECO EGA-647
Lavado de rastrillos
Produccion de mezclas asfalticas

Volquete IVECO EGV-631


Volquete IVECO EGW-473
Cargador frontal CAT 938-G
Volquete VOLVO EGL-12
Esparcidora VOGELE-1303
Rodillo TANDEM DYNAMAC
Rodillo Neumatico INGRAM
Volquete IVECO EGV-595
Volquete VOLVO EGA -648
Volquete VOLVO EGA-647

Produccion de mezcla asfaltica


Produccion de mezcla asfaltica
Rodillo TANDEM DYNAMIC
Rodillo Neumatico INGRAM
Volquete IVECO EGV-595
Esparcidora VOGELE-1303
Esparcidora VOGELE-1303
Cargador frontal Komatzu WA-180

Rodillo liso vibratorio CAT 554B

Motoniveladora CAT 140M


Motoniveladora CAT 140M
Rodillo liso vibratorio CAT 554B
Motoniveladora CAT 140M
Rodillo liso vibratorio CAT 554B
Rodillo liso vibratorio CAT 554B
Cargador Frontal Komatzu WA-180
Volquete IVECO EGV-631
Mantenimeinto de mezcladora tipo tolva
Mantenimiento de tableros
Mezcladora tipo tolva
Volquete VOLVO EGA -648
Volquete VOLVO EGA-647
Mezcladora tipo trompo
Motoniveladora Komatzu GA-511
Camion Nissan Z2H-807

Camion Nissan Z2H-807


Cargador frontal Komatzu WA-180
Mantenimiento de mezcladora /tolva
Mantenimiento de buzones

Camion Nissan Z2H-807


Camion Nissan Z2H-807
Mantenimiento de mezcladora t/trompo
Mantenimiento de mezcladora t/tolva
Mantenimiento de mezcladora t/tolva
Mantenimiento de horma de buzon
Mantenimiento de mezcladora t/tolva
Mantenimiento de mezcladora t/trompo
Mantenimiento de mezcladora t/trompo
Mantenimiento de mezcladora t/trompo
Mantenimiento de mezcladora t/trompo
Mantenimiento de mezcladora t/trompo
Mantenimiento de mezcladora t/trompo

mion Nissan Z2H -807


ntas Asfalticas
ntas Asfalticas
ntas Asfalticas
ntas Asfalticas
lquete Volvo EGA-648
ntas Asfalticas
ntas Asfalticas

IMPORTES
ENTRADA SALIDA SALDO
4618.25 4618.25
GASOLINA DE 90 PLUS

PARTIDA
ENTRADA PRESUPUEST
FECHA SALIDA SALDO ARIA
CANTIDAD NºPCSA
CORTE
2/12/2019 SALDO 2018 3.00
2/20/2018 3.00 -
2/21/2018 6 PRESTAMO 6.00
2/21/2018 2.00 4.00
2/21/2019 1.00 3.00
2/22/2019 1.50 1.50
2/22/2018 0.50 1.00
2/23/2019 1.00 -
2/25/2019 3 PRESTAMO 3.00
2/25/2019 1.00 2.00
2/25/2019 0.50 1.50
2/26/2019 41 42.50
2/26/2019 1.00 41.50
2/26/2019 0.50 41.00
2/26/2019 1.00 40.00
2/26/2019 2.00 38.00
2/27/2019 1.00 37.00
2/27/2019 1.00 36.00
2/27/2019 0.50 35.50
2/27/2019 2.00 33.50
2/28/2019 1.00 32.50
2/28/2019 1.00 31.50
3/1/2019 1.00 30.50
3/2/2019 1.00 29.50
3/2/2019 1.00 28.50
3/4/2019 1.00 27.50
3/4/2019 1.00 26.50
3/4/2019 1.00 25.50
3/4/2019 1.00 24.50
3/5/2019 1.00 23.50
3/5/2019 2.00 21.50
3/5/2019 0.50 21.00
3/6/2019 1.00 20.00
3/6/2019 1.00 19.00
3/7/2019 1.00 18.00
3/7/2019 1.00 17.00
3/8/2019 1.00 16.00
3/8/2019 1.00 15.00
3/9/2019 1.00 14.00
3/11/2019 1.00 13.00
3/11/2019 1.00 12.00
3/12/2019 1.00 11.00
3/13/2019 1.00 10.00
3/14/2019 1.00 9.00
3/14/2019 1.00 8.00
3/15/2019 2.00 6.00
3/15/2019 1.00 5.00
3/16/2019 0.50 4.50
3/18/2019 1.00 3.50
3/18/2019 1.00 2.50
3/18/2019 50 52.50
3/20/2019 1.00 51.50
3/21/2019 1.00 50.50
3/22/2019 1.00 49.50
3/23/2019 1.00 48.50
3/25/2019 1.00 47.50
3/26/2019 1.00 46.50
3/27/2019 2.00 44.50
3/29/2019 1.00 43.50
4/1/2019 1.00 42.50
4/2/2019 1.00 41.50
4/3/2019 1.00 40.50
4/4/2019 1.00 39.50
4/4/2019 50 89.50
4/4/2019 2.00 87.50
4/5/2019 1.00 86.50
4/5/2019 1.00 85.50
4/10/2019 2.00 83.50
4/11/2019 1.00 82.50
4/11/2019 1.00 81.50
4/12/2019 1.00 80.50
4/12/2019 3.00 77.50
4/15/2019 1.00 76.50
4/17/2019 1.00 75.50
4/20/2019 1.00 74.50
4/22/2019 1.00 73.50
4/23/2019 1.00 72.50
4/25/2019 2.00 70.50
4/25/2019 1.00 69.50
4/25/2019 1.00 68.50
4/27/2019 1.00 67.50
4/30/2019 1.00 66.50
4/30/2019 2.00 64.50
5/2/2019 1.00 63.50
5/3/2019 1.00 62.50
5/7/2019 1.00 61.50
5/7/2019 1.00 60.50

7/11/2019 1.00 59.50


7/12/2019 1.00 58.50
7/13/2019 1.00 57.50
7/15/2019 1.00 56.50
7/16/2019 1.00 55.50
7/17/2019 1.00 54.50
7/19/2019 1.00 53.50
7/20/2019 1.00 52.50
7/23/2019 2.00 50.50
7/23/2019 50 100.50
7/23/2019 1.00 99.50

8/1/2019 0.50 99.00


8/6/2019 1.00 98.00
8/7/2019 2.00 96.00
8/9/2019 0.50 95.50
8/22/2019 0.50 95.00
8/22/2019 1.00 94.00
8/23/2019 1.00 93.00
8/26/2019 2.00 91.00

9/17/2019 5.00 86.00


9/18/2019 5.00 81.00
9/19/2019 5.00 76.00
9/20/2019 3.00 73.00
9/25/2019 10 83.00

10/3/2019 50 133.00
10/3/2019 2.00 131.00
10/4/2019 2.00 129.00
10/9/2019 1.00 128.00
10/14/2019 1.00 127.00
10/19/2019 1.00 126.00
10/19/2019 1.00 125.00
10/21/2019 2.00 123.00
10/21/2019 3.00 120.00
10/22/2019 1.00 119.00
10/22/2019 3.00 116.00
10/23/2019 3.00 113.00
10/24/2019 1.00 112.00
10/24/2019 1.00 111.00
10/25/2019 50 161.00
10/25/2019 2.00 159.00
10/25/2019 1.00 158.00
10/28/2019 1.00 157.00
10/29/2019 1.00 156.00
10/31/2019 1.00 155.00

11/4/2019 2.00 153.00


11/4/2019 1.00 152.00
11/4/2019 1.00 151.00
11/5/2019 1.00 150.00
11/5/2019 1.00 149.00
11/6/2019 2.00 147.00
11/7/2019 1.00 146.00
11/7/2019 1.00 145.00
11/8/2019 1.00 144.00
11/8/2019 2.00 142.00
11/8/2019 3.00 139.00
11/9/2019 1.00 138.00
11/9/2019 3.00 135.00
11/9/2019 2.00 133.00
11/11/2019 1.00 132.00
11/11/2019 3.00 129.00
11/12/2019 1.00 128.00
11/12/2019 1.00 127.00
11/12/2019 1.00 126.00
11/12/2019 3.00 123.00
11/12/2019 1.00 122.00
11/13/2019 5.00 117.00
11/13/2019 2.00 115.00
11/13/2019 1.00 114.00
11/13/2019 1.00 113.00
11/14/2019 2.00 111.00
11/14/2019 5.00 106.00
11/14/2019 1.00 105.00
11/14/2019 1.00 104.00
11/15/2019 1.00 103.00
11/15/2019 1.00 102.00
11/15/2019 2.00 100.00
11/15/2019 5.00 95.00
11/16/2019 1.00 94.00
11/16/2019 1.00 93.00
11/16/2019 4.00 89.00
11/16/2019 2.00 87.00
11/18/2019 1.00 86.00
11/18/2019 1.00 85.00
11/18/2019 2.00 83.00
11/18/2019 6.00 77.00
11/19/2019 6.00 71.00
11/19/2019 2.00 69.00
11/19/2019 1.00 68.00
11/19/2019 1.00 67.00
11/20/2019 1.00 66.00
11/20/2019 1.00 65.00
11/20/2019 4.00 61.00
11/20/2019 2.00 59.00
11/21/2019 1.00 58.00
11/21/2019 2.00 56.00
11/21/2019 2.00 54.00
11/21/2019 2.00 52.00
11/22/2019 2.00 50.00
11/22/2019 2.00 48.00
11/23/2019 1.00 47.00
11/23/2019 2.00 45.00
11/23/2019 2.00 43.00
11/25/2019 2.00 41.00
11/25/2019 2.00 39.00
11/26/2019 1.00 38.00
11/26/2019 1.00 37.00
11/27/2019 2.00 35.00
11/27/2019 1.00 34.00
11/27/2019 1.00 33.00
11/28/2019 5.00 28.00
11/28/2019 2.00 26.00
11/29/2019 2.00 24.00
11/30/2019 1.00 23.00
11/30/2019 1.00 22.00

12/2/2019 2.00 20.00


12/2/2019 2.00 18.00
12/3/2019 1.00 17.00
12/3/2019 1.00 16.00
12/4/2019 1.00 15.00
12/4/2019 1.00 14.00
12/4/2019 1.00 13.00
12/5/2019 1.00 12.00
12/5/2019 4.00 8.00
12/7/2019 1.00 7.00
12/7/2019 1.00 6.00
12/9/2019 1.00 5.00
12/9/2019 1.00 4.00
12/10/2019 50 54.00
12/10/2019 1.00 53.00
12/10/2019 1.00 52.00
12/11/2019 1.00 51.00
12/11/2019 5.00 46.00
12/11/2019 1.00 45.00
12/12/2019 1.00 44.00
12/12/2019 5.00 39.00
12/12/2019 1.00 38.00
12/13/2019 3.00 35.00
12/13/2019 1.00 34.00
12/14/2019 1.00 33.00
12/18/2019 2.00 31.00
12/19/2019 1.00 30.00

CANTIDADES PRECIO COSTO


FECHA
ENTRADA SALIDA SALDO UNITARIO PROMEDIO
09/01/2017 70 70.00 11.05 773.5
1/10/2017 1 69.00 11.05 11.05
GASOLINA DE 90 PLUS

DESCRIPCION NOMBRES Y APELLIDOS

PARA CAMIONETA TOYOTA EGW-306,para traslado de maquinarias livianas

PARA CAMIONETA TOYOTA EGW-306,para tralado de orma de bz y zaranda


Para plancha compactadora en refine, nivelacion y compactacion de veredas
Para canguro en refine, nivelacion y compactacion de veredas
Para plancha compactadora en refine, nivelacion y compactacion de veredas
Para canguro en refine, nivelacion y compactacion de veredas

Para mezcladora tipo trompo en concreto cuneta f'c 175kg/cm2


Para canguro en material de veredas

Para mezcladora tipo trompo en concreto vereda y sardinle f'c 175kg/cm2


Para mantenimiento de madera
Para canguro en material de veredas
PARA CAMIONETA TOYOTA EGW-306,para tralado de cobustible
Para canguro en material de veredas
Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2
Para mantenimiento de madera
Para plancha compactadora material de veredas
Para plancha compactadora material de veredas - ganso
Para canguro en material de veredas
Para canguro en material de veredas
Para canguro en material de veredas
Para plancha compactadora material de veredas
Motolineal EGW 086, inspeccion a obra
Para canguro en material de veredas
Para plancha compactadora material de veredas
Para plancha compactadora pato material de veredas
Para mantenimiento de maquinarias livianas
PARA CAMIONETA TOYOTA EGW-306,para traer canguro
Para canguro en material de veredas
Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2
Para canguro en material de veredas
Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2
Para plancha compactadora ganso
Para plancha compactadora ganso
Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2
Para canguro en material de veredas
Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2
Para canguro en material de veredas
Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2
Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2
Para plancha compactadora ganso
Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2
PARA CAMIONETA TOYOTA EGW-306,para traer canguro
Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2

Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2


Para plancha compactadora ganso

Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2


Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2
Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2
Para canguro en material de veredas
Para motobomba de agua
Para canguro en material de veredas
PARA CAMIONETA TOYOTA EGW-306, traslado de materiales
Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2
Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2
Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2
Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2
Para mezcladora tipo trompo en concreto vereda f'c 175kg/cm2

Camioneta toyota EGW - 306


Compactador tipo plancha ganso
Moto lineal EW-806
Camioneta toyota EGW -306
Mezcladora tipo trompo
Compactador tipo plancha - ganso
Mezcladora tipo trompo
Camioneta toyota EGW - 306
Mezcladora tipo trompo
Mezcladora tipo trompo
Mezcladora tipo trompo
Mezcladora tipo trompo
Mezcladora tipo trompo
Camioneta toyota EGW - 306
Compactador tipo plancha - ganso
Mezcladora tipo trompo
Mezcladora tipo trompo
Mezcladora tipo trompo
Camioneta toyota EGW - 306
Apisonador t/canguro n° 01
Mezcladora t/trompo
compactador t/plancha ganso
Mezcladora t/trompo

Mezcladora t/trompo
Mezcladora t/trompo
Apisonador t/canguro n° 01
Mezcladora t/trompo
Mezcladora t/trompo
Apisonador t/canguro n° 01
Mezcladora t/trompo
Mezcladora t/trompo
Camioneta toyota EGW - 306

Apisonador t/canguro n° 01

Camion cisterna F-8000


Camion cisterna F-8000
Mantenimeinto motoniveladora
Camion cisterna F-8000
Camion cisterna F-8000
Compactador tipo plancha - ganso
Compactador tipo plancha - ganso
Camioneta Toyota EGW-306

Camioneta Toyota EGW-306


Camioneta Toyota EGW-306
Camioneta Toyota EGW-306
Camioneta Toyota EGW-306
NO SE REGISTRO EN CUADERNO POR PARALIZACION

Camioneta Toyota EGW-306


Camioneta Toyota EGW-306
Apisonador t/canguro n° 01
Apisonador t/canguro n° 01
Mezcladora tipo trompo
Apisonador tipo canguro
Camioneta Toyota EGW-306
mezcladora tipo tolva
Moto lineal EW-806
Mezcladora tipo tolva
mezcladora tipo tolva
Mezcladroa tipo trompo
Vibrador tipo concreto

Mezcladora de concreto t/tolva


Apisonador t/canguro
Mezcladroa t/trompo
Mezcladroa t/trompo
Mezcladroa t/trompo

Camioneta toyota EGW-306


Mezcladora t/trompo
Vibrador de concreto
Mezcladora t/trompo
Vibrador de concreto
Camioneta toyota EGW-306
Vibrador de concreto
Mezcladora t/trompo
Vibrador de concreto
Camioneta toyota EGW-306
Mezcladora t/tolva
Vibrador de concreto
Mezcladora t/tolva
Camioneta toyota EGW-306
Vibrador de concreto
Mezcladora t/trompo
Vibrador de concreto
Vibrador de concreto
Mezcladora t/trompo
Mezcladora t/tolva
Moto lineal EGW-306
Mezcladora t/tolva
Mezcladora t/trompo
Vibrador de concreto
Vibrador de concreto
Mezcladora t/trompo
Mezcladora t/tolva
Vibrador de concreto
Vibrador de concreto
Vibrador de concreto
Vibrador de concreto
Mezcladora t/trompo
Mezcladora t/tolva
Vibrador de concreto
Vibrador de concreto
Mezcladora t/tolva
Mezcladora t/trompo
Vibrador de concreto
Vibrador de concreto
Mezcladora t/trompo
Mezcladora t/tolva
Mezcladora t/tolva
Mezcladora t/trompo
Vibrador de concreto
Vibrador de concreto
Vibrador de concreto
Vibrador de concreto
Mezcladora t/tolva
Mezcladora t/trompo
Vibrador de concreto
Mezcladora t/trompo
Mezcladora t/trompo
Camioneta toyota EGW-306
Mezcladora t/trompo
Mezcladora t/trompo
Apisonador tipo canguro
Mezcladora t/trompo
Mezcladora t/trompo
Mezcladora t/trompo
Mezcladora t/trompo
Mezcladora t/trompo
Mezcladora t/trompo
Camioneta toyota EGW-306
Mezcladora t/trompo
Mezcladora t/trompo
Mezcladora t/tolva
Mezcladora t/trompo
Mezcladora t/trompo
Mezcladora t/trompo
Mezcladora t/trompo

Mezcladora tipo trompo


Mezcladora tipo trompo
Mezcladora tipo trompo
Mezcladora tipo trompo
Mezcladora tipo trompo
Mezcladora tipo trompo
Vibrador de concreto
Mezcladora tipo tolva
Mezcladora tipo trompo
Mezcladora tipo trompo
Mezcladora tipo trompo
Mezcladora tipo trompo
Mezcladora tipo trompo

Mezcladora tipo trompo


Mezcladora tipo trompo
Mezcladora tipo trompo
Mezcladora tipo tolva
Compactador tipo canguro
Compactador tipo canguro
Compactador tipo plancha
Mezcladora tipo trompo
Mezcladora tipo tolva
Mezcladora tipo trompo
Mezcladora tipo trompo
Mezcladora tipo trompo
Mezcladora tipo trompo

IMPORTES
ENTRADA SALIDA
773.5
11.05
SALDO
773.5
762.45
ASFALTO LIQUIDO RC250

PARTIDA
ENTRADA PRESUPUES
FECHA SALIDA SALDO TARIA
CANTIDAD NºPCSA
8/1/2019 110 110
8/1/2019 10.00 100.00 02.07.01
8/2/2019 10.00 90.00 02.07.02
8/3/2019 10.00 80.00 02.07.03
8/5/2019 10.00 70.00 02.07.05
8/6/2019 10.00 60.00 02.07.06
8/7/2019 10.00 50.00 02.07.07
8/9/2019 5.00 45.00 02.07.08
8/10/2019 6.50 38.50 02.07.09

9/23/2019 90 128.50
ASFALTO LIQUIDO RC250

NOMBRES
DESCRIPCION Y
APELLIDOS

RELLENO DE JUNTAS ASFALTICAS


RELLENO DE JUNTAS ASFALTICAS
RELLENO DE JUNTAS ASFALTICAS
RELLENO DE JUNTAS ASFALTICAS
RELLENO DE JUNTAS ASFALTICAS
RELLENO DE JUNTAS ASFALTICAS
RELLENO DE JUNTAS ASFALTICAS
RELLENO DE JUNTAS ASFALTICAS

CARDOS
ASFALTO LIQUIDO RC250

PARTIDA
ENTRADA PRESUPUES
FECHA SALIDA SALDO TARIA
CANTIDAD NºPCSA
8/1/2019 110 110
8/1/2019 10.00 100.00 02.07.01
8/2/2019 10.00 90.00 02.07.02
8/3/2019 10.00 80.00 02.07.03
8/5/2019 10.00 70.00 02.07.05
8/6/2019 10.00 60.00 02.07.06
8/7/2019 10.00 50.00 02.07.07
8/9/2019 5.00 45.00 02.07.08
8/10/2019 6.50 38.50 02.07.09

9/23/2019 90 128.50
TO LIQUIDO RC250

NOMBRES
DESCRIPCION Y
APELLIDOS

RELLENO DE JUNTAS ASFALTICAS


RELLENO DE JUNTAS ASFALTICAS
RELLENO DE JUNTAS ASFALTICAS
RELLENO DE JUNTAS ASFALTICAS
RELLENO DE JUNTAS ASFALTICAS
RELLENO DE JUNTAS ASFALTICAS
RELLENO DE JUNTAS ASFALTICAS
RELLENO DE JUNTAS ASFALTICAS

CARDOS
CUADRO DE TARJETAS
ING. MAYRA
001 002 003 004 005 006 007 008

011 012 013 014 015 016 017 018

ING. SHEYLLA
021 022 023 024 025 026 027 028

031 032 033 034 035 036 037 038

SR. SURICHAQUI
041 042 043 044 045 046 047 048

SR. DENIS
051 052 053 054 055 056 057 058

SR. JANPI
061 062 063 064 065 066 067 068

SR. PABLO LEON


071 072 073 074 075 076 077 078

SR. JHON
081 082 083 084 085 086 087 088
SR. PASION
091 092 093 094 095 096 097 098

SR. TICSE
101 102 103 104 105 106 107 108

SR. VILA
111 112 113 114 115 116 117 118

SR. DE LA CRUZ
121 122 123 124 125 126 127 128

SR. ORDOÑEZ
131 132 133 134 135 136 137 138

SRA. CHARO
141 142 143 144 145 146 147 148

SRA. VANESSA
151 152 153 154 155 156 157 158

SR. GARCIA
161 162 163 164 165 166 167 168

SR. DAVILO
171 172 173 174 175 176 177 178

SR. FLOR DE MARIA


181 182 183 184 185 186 187 188

SR. VICTORIA
191 192 193 194 195 196 197 198

201 202 203 204 205 206 207 208

211 212 213 214 215 216 217 218

221 222 223 224 225 226 227 228

231 232 233 234 235 236 237 238

241 242 243 244 245 246 247 248

251 252 253 254 255 256 257 258


261 262 263 264 265 266 267 268

271 272 273 274 275 276 277 278

281 282 283 284 285 286 287 288

291 292 293 294 295 296 297 298

SR. BALTAZAR ING. SADITH Y ANGEL ALMAC


301 302 303 304 305 306 307 308

SR. BALTAZAR SR. ARN


311 312 313 314 315 316 317 318

SR. ARNESQUITO ING


321 322 323 324 325 326 327 328

SR. BLADI
331 332 333 334 335 336 337 338

SR. LUIS
341 342 343 344 345 346 347 348

SR. PEREZ
351 352 353 354 355 356 357 358

SR. MUCHA
361 362 363 364 365 366 367 368

371 372 373 374 375 376 377 378

381 382 383 384 385 386 387 388

391 392 393 394 395 396 397 398

401 402 403 404 405 406 407 408

411 412 413 414 415 416 417 418

421 422 423 424 425 426 427 428


431 432 433 434 435 436 437 438

441 442 443 444 445 446 447 448

451 452 453 454 455 456 457 458

461 462 463 464 465 466 467 468

471 472 473 474 475 476 477 478

481 482 483 484 485 486 487 488

491 492 493 494 495 496 497 498


008 009 010

018 019 020

028 029 030

038 039 040

048 049 050

058 059 060

068 069 070

078 079 080

088 089 090


098 099 100

108 109 110

118 119 120

128 129 130

138 139 140

148 149 150

158 159 160

168 169 170


178 179 180

188 189 190

198 199 200

208 209 210

218 219 220

228 229 230

238 239 240

248 249 250

258 259 260


268 269 270

278 279 280

288 289 290

ING. YURI
298 299 300

L ALMACENERO
308 309 310

SR. ARNESQUITO
318 319 320

ING. YURI
328 329 330

SR. LUIS
338 339 340

SR. PEREZ
348 349 350

SR. MUCHA
358 359 360

SR. BLADI
368 369 370

378 379 380

388 389 390

398 399 400

408 409 410

418 419 420

428 429 430


438 439 440

448 449 450

458 459 460

468 469 470

478 479 480

488 489 490

498 499 500


CUADRO RESUMEN
MONTO INC. BENEFICIOS POR
MONTO ACORDE
FECHA QUE SALE N° DE LA MONTO AL MERCADO SIN HORAS, SERIATODO
TRABAJAR EL DIA Y NO POR
FECHA INICIO CUANDO NO HUBO
LA ORDEN DE ORDEN DE S/. IGUAL CONDICION QUE
DE TRABAJO SERVICIO 2690.91/MES BENEFICIOS S/. PERSONAL PARA
SERVICIO UN CONTRATADO. (S/. 2400+ S/.
2400/MES VACIADO DE CONCRETO
295.58) = S/. 2695.58/MES)
Y QUE EL GERENTE DE
OBRAS NO ASIGNABA
PERSONAL MAS DE UN
DESDE FEBRERO 3/7/2019 135 S/5,600 S/4,800 S/5,391.16 MES APOYE COMO
HASTA LA FECHA Y 5/9/2019 353 S/11,200 S/9,600 S/10,782.32 LAMPERO, BUGUERO,
SE CONTINUARÁ
HASTA TERMINAR 8/13/2019 812 S/8,400 S/7,200 S/8,086.74 ACABADOR DE LOSA DE
LA OBRA. CONCRETO,
10/17/2019 1114 S/4,400 S/4,800 S/5,391.16 ENCOFRADOR (ADJUNTO
FOTOGRAFIAS)
11 MESES
TOTAL HASTA LA S/29,600 S/26,400 S/29,651
FECHA

DETALLE DE BENEFICIOS NO
S/2,695.58 REMUNERADOS/ MES
INGRESOS
ESSALUD 166.60
SCTR SALUD 37.57
VAC. TRUNCAS 192
CTS 192
AGUINALDO 400
DESCUENTOS
AFP 292.1
RENTA 4TA 195.5

TOTAL NO
CONSIDERADO EN S/295.58
EL PAGO