1/14/2020 BNC: Beeah/Masdar - Sharjah Multi Fuel Waste-to-Energy (WTE) Plant

Beeah/Masdar - Sharjah Multi Fuel Waste-to-Energy (WTE) Plant


Overview
Bee’ah’s Waste Management Center (WMC), Al Saj’ah industrial area , Sharjah , United Arab
Emirates
BNC Project No : PRJAE1498582

Project Sector : Utilities

Project Industry : Plant

Project Type : Electricity / Power Plant

Stage : Under Construction

Completion % : 76%

Est. Project Value : $ 220.0 million

Est. Value Spent  : US $ 158.8 million

Last Updated : Aug 7, 2019

Created On : Jul 23, 2015

The project is now being tracked at a low frequency as the key company information has been listed and the
project has passed the 50% completion mark.

Description

The project involves the construction of a waste-to-energy plant in Bee’ah’s waste management centre in
Sharjah, UAE. The facility will incinerate up to 37.5 tonnes of municipal solid waste (MSW) per hour to
generate 30 megawatts (MW) of energy and will have the capacity to divert as much as 300,000 tonnes of
solid waste from landfill each year. The facility is being managed by Emirates Waste to Energy Company, a
50:50 joint venture formed by Masdar and Bee’ah in 2017.

The plant will be located adjacent to Beeah’s existing Material Recovery Facility in Sharjah, where the
emirate’s waste is collected, sorted, recycled and, where necessary, sent to landfills. Upon completion, it
will be the world's largest advanced thermal energy-from-waste facility. Sharjah WTE plant is expected to
supply electricity to 28,000 households, while diverting 300,000t of residual waste a year from UAE’s
landfills, over an estimated operational life of 30 years.

The waste-to-energy process converts the waste into produced heat which is then used to drive an
electrical turbine. The net electrical power produced will be up to 30 MW which will be supplied directly to
the Sharjah electricity grid. The flue gas of waste processing will be environmentally treated before being
released into the atmosphere. 

The plant will be linked to Beeah’s auxiliary waste-to-energy project, which will eventually produce a total
of 90MW and will be supplied to the Sharjah electricity grid. The project will help Sharjah reach its “zero
waste-to-landfill” target by 2020 – and the UAE deliver on its 2021 goal of diverting 75% of solid waste
from landfills.  The new plant has also been designed to meet the strictest environmental standards,
complying with the European Union’s Best Available Techniques, widely recognized as the global
standard. 

Project News and Updates

https://air.bncnetwork.net/project_detail/BeeahMasdar_Sharjah_Multi_Fuel_WastetoEnergy_WTE_Plant/OTg1ODI 1/5
1/14/2020 BNC: Beeah/Masdar - Sharjah Multi Fuel Waste-to-Energy (WTE) Plant

Date Type Added By News & Updates


Beeah/Masdar - Sharjah Multi Fuel Waste-to-Energy (WTE) Plant
Bee’ah’s Waste Management Center (WMC),Sources
Al Saj’ah industrial
closely area
associated with, Sharjah
the project, United
have Arab
confirmed that Capital Engineering Consultancy is the
Emirates
Aug 7, 2019 note System lead and MEP consultant for the facility buildings on
the project. The facility buildings are currently in the
design stage.

Masdar (Abu Dhabi Future Energy Company) and


environmental management company Bee’ah have held
the piling ceremony for Waste-to-Energy (WTE) Facility
in Sharjah. The plant is expected to become operational
by Q3 2021 and will treat more than 300,000 tonnes of
municipal solid waste a year and have a capacity of
around 30 megawatts (MW).

May 28, 2019 note System The Facility is being managed by Emirates Waste to
Energy Company, a joint venture formed by Masdar
and Bee’ah in 2017. French engineering company
Constructions Industrielles de la Méditerranée (CNIM)
was appointed in May 2017 to design, build and
operate the facility and the plant’s waste supply
agreement and power purchasing agreement was
signed with Sharjah Electricity and Water Authority in
2017. 

Schedules

Note: The construction industry is very dynamic and project schedules are subject to constant change. The
schedule listed here is estimated based on feedback received by us when the project was last updated.

May 2017 Main Contractor Award Date Estimated

Aug 2021 Completion Date Estimated

Companies (10)

Owner(s) (4)
Beeah (Sharjah Enviromental Abu Dhabi Future Energy Co.
Company) (Sharjah) (Masdar)
Location : Sharjah, United Arab Emirates Location : Abu Dhabi, United Arab
Role : Master Developer Emirates
Type : Owner Role : Master Developer
: Mohammed Nayeem Quraishi Type : Owner
Contacts
(Project Director) : Steven Follows (Project
Contacts
https://air.bncnetwork.net/project_detail/BeeahMasdar_Sharjah_Multi_Fuel_WastetoEnergy_WTE_Plant/OTg1ODI 2/5
1/14/2020 BNC: Beeah/Masdar - Sharjah Multi Fuel Waste-to-Energy (WTE) Plant
Contacts
Office No. : +971-6-5729000 Coordinator)
Website : www.beeah.ae Office No. : +971-2-6533333
Beeah/Masdar
Note : In a-partnership
SharjahwithMulti
Abu Fuel Waste-to-Energy
Website (WTE) Plant
: www.masdar.ae
Dhabi Future Energy
Bee’ah’s Waste Management Co.(WMC), Al Note
Center : In area
Saj’ah industrial a partnership
, Sharjahwith Beeah Arab
, United
(Masdar) (Sharjah Environmental
Emirates
Company)

Sharjah Electricity & Water Constructions Industrielles De


Authority (General Directorate La Mediterranee (CNIM) - La
of Water)(SEWA) Seyne-Sur-Mer
Location : Sharjah, United Arab Emirates Location : Toulon, France
Role : Government Role : Operator
Type : Owner Type : Owner
Office No. : +971-6-5288888 : Irene Humphrey (Contracts
Contacts
Website : www.sewa.gov.ae Manager)
Scope : Plant's waste supply Office No. : +33-4-94103000
agreement (WSA) and power Website : www.cnim.com
purchasing agreement (PPA).

Consultant(s) (4)
Ramboll Middle East Limited - Capital Engineering Consultancy
Dubai Status : Won
Status : Won Location : Sharjah, United Arab Emirates
Location : Dubai, United Arab Emirates Role : Lead
Role : Program Manager Type : Consultant
Type : Consultant : Egor Sirotsin (Project
Contacts
Office No. : +971-4-3343616 Manager)
Website : www.ramboll-mea.com Office No. : +971-6-5536806
Scope : Advisor for the planning and Website : www.capitalengineeringconsul
implementation of the project tancy.com
Awarded Date: April 4, 2019
Scope : For the facility buildings.

Constructions Industrielles De Capital Engineering Consultancy


La Mediterranee (CNIM) - La Status : Won
Seyne-Sur-Mer Location : Sharjah, United Arab Emirates
Status : Won Role : MEP
Location : Toulon, France Type : Consultant
Role : FEED : Egor Sirotsin (Project
Contacts
Type : Consultant Manager)
: Jean Paul R. (Design Office No. : +971-6-5536806
Department) Website : www.capitalengineeringconsul
Contacts
Irene Humphrey (Contracts tancy.com
Manager) Awarded Date: April 4, 2019
Office No. : +33-4-94103000 Scope : For the facility buildings.
Website : www.cnim.com
Awarded Date: July 11, 2017

Contractor(s) (1)

 Other Contractors Awarded (1)


https://air.bncnetwork.net/project_detail/BeeahMasdar_Sharjah_Multi_Fuel_WastetoEnergy_WTE_Plant/OTg1ODI 3/5
1/14/2020 BNC: Beeah/Masdar - Sharjah Multi Fuel Waste-to-Energy (WTE) Plant
 Other Contractors - Awarded (1)

Constructions Industrielles De
Beeah/Masdar - Sharjah Multi Fuel Waste-to-Energy (WTE) Plant
La Mediterranee (CNIM) - La
Bee’ah’s Waste Management Center (WMC), Al Saj’ah industrial area , Sharjah , United Arab
Seyne-Sur-Mer
Emirates
Status : Won
Location : Toulon, France
Role : EPC
Type : Contractor
: Irene Humphrey (Contracts
Manager)
Contacts
Jean-Michel Gomez (Project
Director)
Office No. : +33-4-94103000
Website : www.cnim.com
Awarded Date: May 15, 2017
Awarded : $200.00 million
Value
Scope : Design-build-operate (DBO)
agreement
Note : Construction works are
handled from Sharjah site
office

Financial Institution(s) (4)

Abu Dhabi Commercial Bank Sumitomo Mitsui Banking


(ADCB) (Sharjah) Corporation (Dubai)
Location : Sharjah, United Arab Emirates Location : Dubai, United Arab Emirates
Role : Bank Role : Bank
Type : Financial Institution Type : Financial Institution
Office No. : +971-6-5737000 Office No. : +971-4-4288000
Website : www.adcb.com Website : www.smbc.co.jp

Standard Chartered Bank Abu Dhabi Fund for


Location : Dubai, United Arab Emirates Development (ADFD)
Role : Bank Location : Abu Dhabi, United Arab
Type : Financial Institution Emirates
Office No. : +971-4-3520455 Role : Finance Company
Website : www.sc.com/ae Type : Financial Institution
Office No. : +971-2-6677100
Website : www.adfd.ae
Scope : USD 33 million (Dh121 million)
concessionary loan

Estimated Percentage Completion

https://air.bncnetwork.net/project_detail/BeeahMasdar_Sharjah_Multi_Fuel_WastetoEnergy_WTE_Plant/OTg1ODI 4/5
1/14/2020 BNC: Beeah/Masdar - Sharjah Multi Fuel Waste-to-Energy (WTE) Plant

Beeah/Masdar - Sharjah Multi Fuel Waste-to-Energy (WTE) Plant


Monthly
Bee’ah’s Waste Management Center (WMC), Al Saj’ah industrial area , Sharjah , United Arab
8.07 M 3.99 %
Emirates
6.05 M 2.99 %
USD

4.04 M 2.00 %

2.02 M 1.00 %

0.00 M 0.00 %
17

17

18

18

18

19

19

19

20

20

20

21

21
20

20

20

20

20

20

20

20

20

20

20

20

20
ay

ay

ay

ay

ay
Ja

Ja

Ja

Ja
Se

Se

Se

Se
M

M
Estimated US $ Spend Monthly % Construction

Estimated Spend Forecast

Cumulative
198.89 M 100 %

159.11 M 80 %

119.33 M 60 %
USD

79.56 M 40 %

39.78 M 20 %

0.00 M 0%
Au 017

N 017

Fe 17

M 018

Au 18

N 018

Fe 18

ay 9
Au 19

N 019

Fe 19

M 020

Au 020

ov 0
Fe 20

M 021

Au 21

21
1

2
20

20

20

20

20

20

20

20

20

20
2

2
ay

g
ov

b
ay

g
ov

g
ov

b
ay

b
ay

g
M

Estimated US $ Spend Cumulative % Construction

 Completed
 Forecasted
 Completed
 Forecasted
The monthly and cumulative “estimated percentage completion and spend” graphs are calculated using a series of algorithms
that have been specifically developed for each project type, in consultation with leading engineering consultants and
contractors. Due to the specific and unique considerations on a project and the dynamic nature of construction the above
graphs may at times vary from the actual progress at the site.