Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
DURATION OF CO-location:
X Permanent Temporary
From (Delivery Date):
To (Removal Date):
Reason for Co-location: Requesting for co-location of 0.6 m solid parabolic antenna and radio indoor unit. Radio is HUAWEI RTN905 IP PDH 15GHz radio
TX=
RX=
A. CABIN
1. Space
P
Yes No
2. Feeder Porthole
Yes No
P
3. Dehydrator Outlet
Yes X No
B. POWER
P
Requested Power Rating : 15 W Current Rating : 10 A (Breaker)
Voltage Rating : -48 Vdc AC or DC
P
Voltage Rating : AC
C. TOWER SPACE
Antenna Directed To: Antenna Type Antenna Diameter Antenna Centerline Azimuth from
(m) (m) Magnetic North
ATLAS FERTILIZER CORP Solid Parabolic 0.6 27m 171.21º
Note: Please submit tower lay-out indicating the existing and proposed location of antenna to be installed.
E. OTHERS
ATTACHMENT:
Photos, Site Data Form, Frequency Application Form
APPROVALS
PLANNING AND ENGINEERING
Core Network Engineering Transmission Engineering
NETWORK OPERATIONS
SFN / FACILITIES OPERATIONS NSA / NSS / BSS CTN / FOBN
(Signature over Printed Name) (Signature over Printed Name) (Signature over Printed Name)
FREQUENCY MANAGEMENT DIVISION
NATIONAL TELECOMMUNICATIONS COMMISSION
Quezon City
STATION A STATION B
Location:ATLAS FERTILIZER CORP Location:BAUANG2 BTS
Atlas Fertilizer Calumbaya Bauang La Union Central West (Pob.), Bauang, La Unio
OTHER PARTICULARS
Note :
This form shall be filled up and submitted together with : Network Diagram, Path Profile Map and Location Map
NCY MANAGEMENT DIVISION
ECOMMUNICATIONS COMMISSION
Quezon City
RS OF PROPOSED STATIONS
Longitude: 120.3294722
Latitude: 16.52677778
13m
FX/CP
24 hrs.
ATLAS FERTILIZER CORP
OTHER PARTICULARS
ed together with : Network Diagram, Path Profile Map and Location Map
SURVEY COMPLETION REPORT
WO
Customer Name ATLAS FERTILIZER CORP BTS/Node
Customer Address Atlas Fertilizer Calumbaya Bauang La Union BAUANG2 BTS
Contact Person Imee Corpuz
Contact Number 0905 836 8087
SURVEY DETAILS
SITE A (CUSTOMER) SITE B (BAUANG2 BTS)
Lattitude 16° 30' 54.48" N 16° 31' 36.4" N
Longitude 120° 19' 52.86" E 120° 19' 46.1" E
Distance 1.31km 1.31km
Bearing 351.21 ° 171.21 °
Antenna Height 8m 42m
Power Supply Voltage AC 220 DC AC 220 DC
5FT POLEMAST WITH GUYING,
Type of Structure (Opt 1) 7IN. INCLINED TUBULAR
PYRAMID BASE
5FT POLEMAST WITH GUYING,
Type of Structure (Opt 2) PYRAMID BASE
Cable Length 50m 50m
Date Completed
BILL OF MATERIALS
CLIENT BAUANG2 BTS
1 Grounding Rod Heliax Cable
2 Grounding Solderless Grounding Cable
3 Grounding Clamp
4 Grounding Cable
5 PVC Pipe
6 PVC Elbow
7 PVC Clamp
8 Grounding Cable
9 Cable Clip
10 Vulcaseal 75ml
11 IF Cable
12
13
14
15
2. Accessibility of Site
2.1 Road Description
Is the site accessible by truck or crane? YES NO
Name of main access road to the site Manila North RD RH7
Approximate distance from truck stop to the main road of site 10 m.
Alley to site: Normal Width 3 m. Narrowes 3 m. Road surface CONCRETE m.
EXISTING MICROWAVE
Type Diameter (meters) Height (meters) Azimuth
ANTENNA DIRECTION
LEG B PARABOLIC 0.6 39m N/A
MICROWAVE ANTENNA
FACING ATLAS FERTILIZER CORP
PROPOSAL
Antenna Height (m) 27m
Antenna Diameter (m) 0.6m
True Azimuth 171.21 deg
Tower Leg LEG B
4. Access Information
4.1 Existing Equipment Type
Indoor &
Vendor Equipment Model
Indoor Outdoor IBS Outdoor
G900 HUAWEI
G1800 HUAWEI
U900 HUAWEI
U2100 HUAWEI
5. POWER INFORMATION
ECB Information
Line Voltage: V Frequency: Hz Power Type:
Cable Size: AWG
Circuit Breaker Rating: Amperes
MDP Information
Main Circuit Breaker Rating: Amperes Cable Size: AWG
Cable
Load No Load Description CB Rating Cable Size Remarks
Length
Total AC Load
B1c. Diesel Generator
AC out DG Type:
Actual DG output voltage: L1-L2 V L2-L3 V L3-L1 V
ATS on site?
If Yes, Brand Rating Amperes No. of Poles
MTS on site?
If Yes, Brand Rating Amperes No. of Poles
B1d. Cooling System
Cooling Type:
For Aircon System,
Aircon Configuration:
ACU System
Aircon Type:
Working? YES NO
Capacity: HP
Room temperature: 27 Celsius
FMS Control Panel Comm Port:
7.00 A
37.0 A
12 V
100 AH
AH
al DC Load
FIER MODULES
GLOBE MODERNIZATION PROJECT
Technical Site Survey Report
Site Name: BAUANG2 BTS Site Type: THREE-LEGGED
Date Survey: 19-Apr-18
1.00 A
37.2 A
12 V
100 AH
AH
al DC Load
FIER MODULES
GLOBE MODERNIZATION PROJECT
Technical Site Survey Report
Site Name: BAUANG2 BTS Site Type: THREE-LEGGED
Date Survey: 19-Apr-18
1.00 A
37.3 A
12 V
100 AH
AH
al DC Load
FIER MODULES
9. Site Pictures
9.1 Panoramic View
0º 30º
90º 120º
7
180º 210º
270º 300º
N/A N/A N
N/A N/A N
8
PANNEL ANTENNA PANNEL ANTENNA PANNE
N/A N/A N
N/A N
9.3 Pictures of Existing Transport Equipment (Datacom and Optical Equipment and IDU)
N/A N/A
9
N/A N/A
N/A N
N
/
A
10
PICTURE A PICTURE B PIC
N/A N/A
N/A N/A N
11
N/A N/A
N/A N/A N
NOT NOT N
AVAILABLE AVAILABLE AVAI
0º 60º
12
NOT NOT N
AVAILABLE AVAILABLE AVAI
180º 240º
N/A
N/A
13
EXISTING RECTIFIER RECTIFIER MODULES ACTUA
N/A
N/A
14
N/A
N/A
15
BATTERY BANK SYSTEM1 BRAND / MODEL
N/A N/A N
16
9.14 Proposed Antenna Location
17
60º
150º
18
240º
330º
N/A
PANNEL ANTENNA
N/A
19
PANNEL ANTENNA
N/A
PANNEL ANTENNA
N/A
MICROWAVE ANTENNA
N/A
20
N/A
N/A
21
PICTURE C
N/A
N/A
22
N/A
Road Access
N/A
NOT
AVAILABLE
120º
23
NOT
AVAILABLE
300º
ACTUAL READING
N/A
24
ACTUAL READING
N/A
ACTUAL READING
25
N/A
BRAND / MODEL
BRAND / MODEL
26
BRAND / MODEL
N/A
ACU BRAND
27
28
Path Profile
14
15
10. Layout
10.1 Floor Plan Layout
15
LEGEND:
POWER
GRND
IF CABLE
16
17
18