Network Technical Group Date Issued (dd-mm-yy): 4/25/2018

Planning and Engineering Target RFS (dd-mm-yy): 5/2/2018

FACILITY CO-LOCATION REQUEST


A. For Radio Room co-location, please submit the following requirements TYPE OF SITE
1. Equipment lay-out of existing and proposed equipment MSC
2. Indoor Cable tray lay-out BSC
B. For Additional Antenna requirement, please submit the following requirements National Core
1. Elevation of Existing tower and loadings and the proposed antenna together with size, azimuth and elev. FOBN
2. Site Development plan of the site BTS
C. For New Radio Room requirement, please submit the following requirements
1. Site Development reflecting the proposed new radio room
2. Outdoor cable ladder
D. For Radio Co-location, please include RSL application or a copy of the NTC license

SITE NAME: BAUANG2 BTS (NL499) FCR No.:

DURATION OF CO-location:

X Permanent Temporary
From (Delivery Date):
To (Removal Date):

Reason for Co-location: Requesting for co-location of 0.6 m solid parabolic antenna and radio indoor unit. Radio is HUAWEI RTN905 IP PDH 15GHz radio
TX=
RX=
A. CABIN

1. Space

P
Yes No

2. Feeder Porthole

Yes No
P
3. Dehydrator Outlet

Yes X No

B. POWER

WNTG to provide Requisitioner to provide

P
Requested Power Rating : 15 W Current Rating : 10 A (Breaker)
Voltage Rating : -48 Vdc AC or DC
P
Voltage Rating : AC

C. TOWER SPACE
Antenna Directed To: Antenna Type Antenna Diameter Antenna Centerline Azimuth from
(m) (m) Magnetic North
ATLAS FERTILIZER CORP Solid Parabolic 0.6 27m 171.21º

Note: Please submit tower lay-out indicating the existing and proposed location of antenna to be installed.

D. No. of Attachments excluding this page copies

E. OTHERS
ATTACHMENT:
Photos, Site Data Form, Frequency Application Form

Prepared by: Noted by: Approved by:

Reinan Javier HP# 0917-5887537 Manuel Cabrera Alexander P. Diamitas


(Signature over Printed Name)/Contact No. (Signature over Printed Name) (Signature over Printed Name)

APPROVALS
PLANNING AND ENGINEERING
Core Network Engineering Transmission Engineering

(Signature over Printed Name)

Access Facilities Engineering - Electrical Access Facilities Engineering - Civil/Structural

(Signature over Printed Name) (Signature over Printed Name)

NETWORK OPERATIONS
SFN / FACILITIES OPERATIONS NSA / NSS / BSS CTN / FOBN

(Signature over Printed Name) (Signature over Printed Name) (Signature over Printed Name)
FREQUENCY MANAGEMENT DIVISION
NATIONAL TELECOMMUNICATIONS COMMISSION
Quezon City

NAME OF APPLICANT : INNOVE COMMUNICATIONS INC. _

PARTICULARS OF PROPOSED STATIONS

STATION A STATION B
Location:ATLAS FERTILIZER CORP Location:BAUANG2 BTS

Atlas Fertilizer Calumbaya Bauang La Union Central West (Pob.), Bauang, La Unio

Coordinates : Longitude: 120.3313496 Coordinates :


Latitude: 16.51513416
Elevation (ASL) : 17m Elevation (ASL) :
Class of Station/Service : FX/CP Class of Station/Service :
Hrs. of Operation : 24 hrs. Hrs. of Operation :
Pts. of Comm./Service Area: BAUANG2 BTS Pts. of Comm./Service Area:

PROPOSED RADIO EQUIPMENT

Make/Model : HUAWEI RTN905 15GHz Radio Make/Model :


Capacity : 16 x E1 Capacity :
Output Power : +20dBm Output Power :
Modulation : 4 QAM Modulation :
Bandwidth & Emission : 3.5 Mhz Bandwidth & Emission :
Frequency Range : 14.4 – 15.40 GHz Frequency Range :

PROPOSED ANTENNA SYSTEM

Type : RFS Parabolic Antenna Type :


Gain (dB) : 36.5 dBi Gain (dB) :
Diameter (m) : 0.6 m Diameter (m) :
Beamwidth : 2.4° Beamwidth :
Azimuth : 351.21° Azimuth :
Elevation Angle : +/- 50° Elevation Angle :
Height AGL (m) : 8m Height AGL (m) :
Feeder Length (m)/Att. (dB) : 50m Feeder Length (m)/Att. (dB) :
Polarization : Vertical Polarization :

OTHER PARTICULARS

Location Code : Location Code :


Tx (Mhz) : Tx (Mhz) :
Rx (Mhz) : Rx (Mhz) :
Call Sign : Call Sign :

Account Number of Applicant :

Note :
This form shall be filled up and submitted together with : Network Diagram, Path Profile Map and Location Map
NCY MANAGEMENT DIVISION
ECOMMUNICATIONS COMMISSION
Quezon City

INNOVE COMMUNICATIONS INC. _

RS OF PROPOSED STATIONS

Central West (Pob.), Bauang, La Union

Longitude: 120.3294722
Latitude: 16.52677778
13m
FX/CP
24 hrs.
ATLAS FERTILIZER CORP

OSED RADIO EQUIPMENT

HUAWEI RTN905 15GHz Radio


16 x E1
+20dBm
4 QAM
3.5 Mhz
14.4 – 15.40 GHz

POSED ANTENNA SYSTEM

RFS Parabolic Antenna


36.5 dBi
0.6 m
2.4°
171.21°
+/- 50°
27m
50m
Vertical

OTHER PARTICULARS

unt Number of Applicant :

ed together with : Network Diagram, Path Profile Map and Location Map
SURVEY COMPLETION REPORT

WO
Customer Name ATLAS FERTILIZER CORP BTS/Node
Customer Address Atlas Fertilizer Calumbaya Bauang La Union BAUANG2 BTS
Contact Person Imee Corpuz
Contact Number 0905 836 8087

SURVEY DETAILS
SITE A (CUSTOMER) SITE B (BAUANG2 BTS)
Lattitude 16° 30' 54.48" N 16° 31' 36.4" N
Longitude 120° 19' 52.86" E 120° 19' 46.1" E
Distance 1.31km 1.31km
Bearing 351.21 ° 171.21 °
Antenna Height 8m 42m
Power Supply Voltage AC 220 DC AC 220 DC
5FT POLEMAST WITH GUYING,
Type of Structure (Opt 1) 7IN. INCLINED TUBULAR
PYRAMID BASE
5FT POLEMAST WITH GUYING,
Type of Structure (Opt 2) PYRAMID BASE
Cable Length 50m 50m
Date Completed
BILL OF MATERIALS
CLIENT BAUANG2 BTS
1 Grounding Rod Heliax Cable
2 Grounding Solderless Grounding Cable
3 Grounding Clamp
4 Grounding Cable
5 PVC Pipe
6 PVC Elbow
7 PVC Clamp
8 Grounding Cable
9 Cable Clip
10 Vulcaseal 75ml
11 IF Cable
12
13
14
15

Outsource Contractor Globe Telecom


Prepared by: M. ARO 25-Apr-18
Print Name/Sign Date Print Name/Sign Date
Reviewed by:
Print Name/Sign Date Print Name/Sign Date
Approved by:
Print Name/Sign Date Print Name/Sign Date
LAST MILEDate
PROJECT
of Survey 19-Apr-18
Site Name BAUANG2 BTS
Subcon Name M R LINK INCORPORATED
PLA ID NL499 Surveyed By M. ARO

1. Basic Information of Site


Site Address Central West (Pob.), Bauang, La Union Area NL
Site Contact Person GT DOPO Contact Number 0917 588 3805
Longitude Latitude
Coordinates 120° 19' 46.1" E 16° 31' 36.4" N Class Type 2
(Degree/Min/Sec) (Degree/Min/Sec)
Type of Site: Greenfield Indoor Outdoor
Rooftop/Building with Elevator Rooftop/Building without Elevator Floor Location
Building Height: m.
Room Type: Renovated Room Concrete Cabin No. of Cabins
Room Access: 24/7 8:00AM - 5:00PM Others (Specify time schedule)
Site Security: Unmanned Manned (Security Guard/Care Taker), Specify Care Taker
Where to secure site key? PAGDALAGAN HUB
For Building site, is work permit required? YES NO
Flood history as inquired from LGU-RRDMC/neighbors/communit 0 m. (with respect to the road)
Site Distance from Coastline N/A km.

2. Accessibility of Site
2.1 Road Description
Is the site accessible by truck or crane? YES NO
Name of main access road to the site Manila North RD RH7
Approximate distance from truck stop to the main road of site 10 m.
Alley to site: Normal Width 3 m. Narrowes 3 m. Road surface CONCRETE m.

2.2 Types of Vehicle Can Pass


Accessibility of Service Vehicle to Site: YES NO
Trailer Truck Four Wheeler Ten Wheeler Tricycle Six Wheeler None (Foot rail)
All types of small vehicles

2.3 Method of Access to Site


Staircase Crane Forklift

2.4 Possible Access Difficulty Description


Is there any possible difficulty or obstacle delivering equipment? YES NO
If yes, kindly provide description and/or suggestion(s)
Equipment Special Hauling Requirement: YES NO
If yes, please specify

3. Detailed Information of Site


3.1 Equipment Room
Ceiling Height: mm. Concrete Floor
Raised Floor Height: mm. No Floor Space for New Equipment
New Equipment Room is Required Existing Equipment Room Space is Available
Replace / Remove Existing Equipment Co-locate to:
Others:

3.2 Tower Information


Greenfield SST Greenfield Monopole Greenfield Guyed Greenfield Water Tank
Greenfield Freestanding Pole Rooftop SST Rooftop Polemount Rooftop Wallmounted
Rooftop Tripod SWAT Lamp post SWAT Watertank SWAT Bachelors Pad
SWAT Palm Tree Others (Please Specify) THREE-LEGGED (INCLINED TUBULAR)

Tower Height 45 m. Pole/Tower Height m. Building Height m.

3.3 Antenna Information


Antenna Blockage? Please Specify NONE
Enough space to install another RF antenna? YES
Any new buildings develop towards the RF antenna? Other? Please Specify NONE
Any other sites within 200m radius (Indicate in the panoramic picture) NONE

Sector 1 Sector 2 Sector 3 Sector 4


EXISTING PANNEL ANTENNA
Actual Actual Actual Actual
Antenna Height (m) 33m, 42m, 43m, 45m 33m, 44m, 45m 33m, 42m, 43m, 45m N/A
Antenna Orientation N/A, N/A, N/A, N/A N/A, N/A, N/A N/A, N/A, N/A, N/A, N/A N/A
Number of Panel Antenna 1, 1, 1, 1 1, 1, 1 1, 1, 1, 2 N/A

EXISTING MICROWAVE
Type Diameter (meters) Height (meters) Azimuth
ANTENNA DIRECTION
LEG B PARABOLIC 0.6 39m N/A

MICROWAVE ANTENNA
FACING ATLAS FERTILIZER CORP
PROPOSAL
Antenna Height (m) 27m
Antenna Diameter (m) 0.6m
True Azimuth 171.21 deg
Tower Leg LEG B

4. Access Information
4.1 Existing Equipment Type

Indoor &
Vendor Equipment Model
Indoor Outdoor IBS Outdoor

G900 HUAWEI

G1800 HUAWEI

U900 HUAWEI

U2100 HUAWEI

4.2 Proposed Cable


Power Cable: Length
Single Length of -48V from IDU to RECTIFIER 10 m.
PGND Cable: Length
Single Length of Grounding Cable from IDU to Grounding Busbar 10 m.
Signal Cable:
CPRI Cable Length
Single Length of CPRI Cable from BBU to RRU N/A m.
Feeder Cable Length
Single Length of 7/8" Feeder Cable from RRU to Antenna N/A m.
Exisiting transmission type: E1 FE Both
FE Cable Length
Single Length of FE Cable LTE N/A m.

5. POWER INFORMATION
ECB Information
Line Voltage: V Frequency: Hz Power Type:
Cable Size: AWG
Circuit Breaker Rating: Amperes

MDP Information
Main Circuit Breaker Rating: Amperes Cable Size: AWG
Cable
Load No Load Description CB Rating Cable Size Remarks
Length

Circuit Breaker Brand/Poles:


ACPDB Panel Load Schedule
Main Circuit Breaker Rating: Amperes Cable Size: AWG
Cable
Load No Load Description CB Rating Cable Size Remarks
Length
1
2
3
4
5
6
7
8
9
10

Total AC Load
B1c. Diesel Generator

DG available on site? YES NO

Fuel cell available on site? YES NO

For sites with DG,


Configuration:
Rated power capacity: KVA
Generator

AC out DG Type:
Actual DG output voltage: L1-L2 V L2-L3 V L3-L1 V
ATS on site?
If Yes, Brand Rating Amperes No. of Poles
MTS on site?
If Yes, Brand Rating Amperes No. of Poles
B1d. Cooling System
Cooling Type:
For Aircon System,
Aircon Configuration:
ACU System

Aircon Type:
Working? YES NO
Capacity: HP
Room temperature: 27 Celsius
FMS Control Panel Comm Port:

Rectifier System 1 Load Breakers/ Fuse


Existing Rectifier (Specify Brand/Name) : ELTEK/FLATPACK
Dimensions of an individual Rectifier Cabinet:(Width X Depth X Height) 600 X 600 X 2000 mm
Maximum Capacity of the Rectifier System: A
Rectifier Module Detail Type and Capacity: A
Number of rectifier modules in use: 8 pcs
Number of defective rectifier modules : 0 pcs
Number of available rectifier module slots: 0 pcs
Actual Current of DC Load(calculate all DC load) 147 Adc
Actual Float Voltage : 53.99 Vdc
Specify the charging current if the batteries are charging at the time of measurement: N/A Adc

Rectifier System 1 Breakers/Fuse


Circuit No. Brand Rating No. of Pole Load Description Status Remarks
UPPER F1 NADER 63 1 BAUANG HSU 16-001 MAIN 1 ON
F2 NADER 63 1 BAUANG HSU 16-001 MAIN 2 ON
F3 NADER 63 1 NO LABEL ON
F4 NADER 63 1 SPAN PROJECT OSN8800 MAIN ON
F5 NADER 63 1 HUAWEI BWS MAIN NE-2131/2132 ON
F6 NADER 63 1 HUAWEI BWS MAIN NE-2133/2134 ON
F7 NADER 50 1 HUAWEI OSN MAIN NE-1304/1305 ON
F8 NADER 50 1 HUAWEI BWS MAIN NE-2032/2033 ON
F9 NADER 63 1 NO LABEL OFF
F10 NADER 63 1 BAUANG HSU 16-001 MAIN 3 ON
F11 NADER 63 1 BAUANG HSU 16-001 MAIN 4 ON
F12 NADER 16 1 ATN950B RDNT ON
F13 NADER 16 1 FMS 48V RECTIFIER OFF
F14 NADER 63 1 BAUANG HSU 16-002 MAIN 1 ON
F15 NADER 63 1 U21/L18 DCDU12B 456 ON
F16 NADER 63 1 BAUANG HSU 16-002 MAIN 2 ON
Circuit No. Brand Rating No. of Pole Load Description Status Remarks
LOWER F1 NADER 80 1 HUAWEI 3G ON
F2 NADER 80 1 HUAWEI 3G ON
F3 NADER 50 1 HUAWEI BWS MAIN ON
F4 NADER 63 1 9-4797 HUAWEI MAIN PWR 1 ON
F5 NADER 63 1 9-4797 HUAWEI MAIN PWR 2 ON
F6 NADER 63 1 BAUANG-HSU16-002-MAIN3 ON
F7 NADER 63 1 BNG-C3-01 SOURCE A1 ON
F8 NADER 63 1 BNG-C3-01 SOURCE A2 ON
F9 NADER 63 1 BNG-C3-01 SOURCE A3 ON
F10 NADER 63 1 BNG-A4-01 SOURCE A ON
F11 NADER 63 1 9-4797 HUAWEI MAIN PWR 1 ON
F12 NADER 63 1 9-4797 HUAWEI MAIN PWR 2 ON
F13 NADER 63 1 BAUANG-HSU16-002-MAIN4 ON
F14 NADER 10 1 T7325 POWER A BAU-ME-01 ON
F15 ABB 63 1 XDM1000 SOURCE A ON
F16 NADER 63 1 BAUANG-HAS_V_001_MAIN1 ON
F17 NADER 63 1 BAUANG-HAS_V_001_MAIN2 ON
F18 NADER 63 1 BAUANG-LSA01-001_MAIN1 ON

Rectifier System 2 Load Breakers/ Fuse


Existing Rectifier (Specify Brand/Name) : ELTEK/FLATPACK
Dimensions of an individual Rectifier Cabinet:(Width X Depth X Height) 600 X 600 X 2000 mm
Maximum Capacity of the Rectifier System: A
Rectifier Module Detail Type and Capacity: A
Number of rectifier modules in use: 8 pcs
Number of defective rectifier modules : 0 pcs
Number of available rectifier module slots: 0 pcs
Actual Current of DC Load(calculate all DC load) 141 Adc
Actual Float Voltage : 53.76 Vdc
Specify the charging current if the batteries are charging at the time of measurement: N/A Adc

Rectifier System 2 Breakers/Fuse


Circuit No. Brand Rating No. of Pole Load Description Status Remarks
UPPER F1 NADER 100 1 SPARE OFF
F2 NADER 80 1 SPARE OFF
F3 NADER 63 1 SPARE OFF
F4 NADER 63 1 NO LABEL ON
F5 NADER 50 1 SPAN PROJECT OSN 8800 T16 RDNT ON
F6 NADER 63 1 HUAWEI BWS RDNT NE-2132/2133 ON
F7 NADER 50 1 HUAWEI BWS RDNT NE-1304/1305 ON
F8 NADER 50 1 HUAWEI BWS RDNT NE-2032/2033 ON
F9 NADER 40 1 PROPOSED INNER CORE OSN 8800 OFF
F10 NADER 32 1 HW WIMAX OFF
F11 NADER 32 1 RESERVED FOR OSN T16 & T32 OFF
F12 NADER 16 1 RESERVED FOR OSN T16 & T32 ON
F13 NADER 16 1 ATN950B MAIN ON
F14 NADER 10 1 RESERVED FOR OSN T32 OFF
F15 NADER 6 1 HUAWEI RTN620 F. SNTIAGOLU OFF
Circuit No. Brand Rating No. of Pole Load Description Status Remarks
LOWER F1 NADER 80 1 HUAWEI E1 900 ON
F2 NADER 80 1 HUAWEI E1 900 ON
F3 NADER 50 1 HUAWEI BWS REDUNDANT ON
F4 NADER 63 1 9-4797 HUAWEI RDNT PWR 1 ON
F5 NADER 63 1 9-4797 HUAWEI RDNT PWR 2 ON
F6 NADER 40 1 SPARE OFF
F7 NADER 63 1 BNG-C3-01 SOURCE B1 ON
F8 NADER 63 1 BNG-C3-01 SOURCE B2 ON
F9 NADER 63 1 BNG-C3-01 SOURCE B3 ON
F10 NADER 63 1 BNG-A4-01 SOURCE B ON
F11 NADER 63 1 9-4974 HUAWEI RDNT PWR 1 ON
F12 NADER 63 1 9-4974 HUAWEI RDNT PWR 2 ON
F13 NADER 16 1 ATN950 RDNT OFF
F14 NADER 10 1 T7325 POWER B ON
F15 ABB 63 1 XDM1000 SOURCE B ON

Rectifier System 3 Load Breakers/ Fuse (FP2)


Existing Rectifier (Specify Brand/Name) : ELTEK/FLATPACK
Dimensions of an individual Rectifier Cabinet:(Width X Depth X Height) 600 X 600 X 2000 mm
Maximum Capacity of the Rectifier System: 300 A
Rectifier Module Detail Type and Capacity: A
Number of rectifier modules in use: 5 pcs
Number of defective rectifier modules : 0 pcs
Number of available rectifier module slots: 3 pcs
Actual Current of DC Load(calculate all DC load) 21 Adc
Actual Float Voltage : 53.56 Vdc
Specify the charging current if the batteries are charging at the time of measurement: N/A Adc

Rectifier System 3 Breakers/Fuse (FP2)


Circuit No. Brand Rating No. of Pole Load Description Status Remarks
F1 NADER 100 1 SPARE OFF
F2 NADER 100 1 SPARE OFF
F3 NADER 80 1 SPARE OFF
F4 NADER 80 1 SPARE OFF
F5 NADER 63 1 BAUANG HSU 16-001 RDNT 1 ON
F6 NADER 63 1 BAUANG HSU 16-001 RDNT 2 ON
F7 NADER 63 1 BAUANG HSU 16-001 RDNT 3 ON
F8 NADER 63 1 BAUANG HSU 16-001 RDNT 4 ON
F9 NADER 63 1 BAUANG HSU 16-002 RDNT 1 ON
F10 NADER 63 1 BAUANG HSU 16-002 RDNT 2 ON
F11 NADER 63 1 BAUANG HSU 16-002 RDNT 3 ON
F12 NADER 63 1 BAUANG HSU 16-002 RDNT 4 ON
F13 NADER 63 1 BAUANG HSA V 001 RDNT 1 ON
F14 NADER 63 1 BAUANG HSA V 001 RDNT 2 ON
F15 NADER 63 1 BAUANG LSA01 001 RDNT 1 ON
F16 NADER 32 1 SPARE OFF
F17 NADER 63 1 SPARE OFF
F18 NADER 63 1 SPARE OFF
F19 NADER 16 1 SPARE OFF
F20 NADER 16 1 SPARE OFF
F21 NADER 16 1 SPARE OFF
F22 NADER 16 1 SPARE OFF
F23 NADER 16 1 SPARE OFF
F24 NADER 16 1 SPARE OFF
F25 NADER 10 1 SPARE OFF
F26 NADER 10 1 SPARE OFF
F27 NADER 10 1 SPARE OFF
F28 NADER 10 1 SPARE OFF
F29 NADER 10 1 SPARE OFF
F30 NADER 10 1 PROPOSED TAPPING PT OFF FAC ATLAS FERTILIZER CORP

5.3 Battery System Details


Rectifier System 1 Battery System Details
Battery Cell Type: 12V Cell 2V Cell
Battery Location: Inside Rectifier Cabinet Outside Rectifier Cabinet

Circuit No. Description Status / Remarks


1 Type and Capacity (Ah) 12V 100A
2 Brand OLONG
3 Out Factory Date NOT AVAILABLE
4 Start Service Date NOT AVAILABLE
5 Number of Strings 4 BANK / 4 GROUPS
6 Power Cable Size (mm²)
7 Installation Date NOT AVAILABLE

Battery Appearance (Detailed Description, take photos for Documentation Purposes)


Is there any mark of bumped, broken or crazed? Yes No
Is there any mark of acid leakage? Yes No
Is there any signs of bumps, break or acid? Yes No

Rectifier System 2 Battery System Details


Battery Cell Type: 12V Cell 2V Cell
Battery Location: Inside Rectifier Cabinet Outside Rectifier Cabinet

Circuit No. Description Status / Remarks


1 Type and Capacity (Ah) 12V 100A
2 Brand OLONG
3 Out Factory Date NOT AVAILABLE
4 Start Service Date NOT AVAILABLE
5 Number of Strings 4 BANK / 4 GROUPS
6 Power Cable Size (mm²)
7 Installation Date NOT AVAILABLE

Battery Appearance (Detailed Description, take photos for Documentation Purposes)


Is there any mark of bumped, broken or crazed? Yes No
Is there any mark of acid leakage? Yes No
Is there any signs of bumps, break or acid? Yes No

Rectifier System 3 Battery System Details


Battery Cell Type: 12V Cell 2V Cell
Battery Location: Inside Rectifier Cabinet Outside Rectifier Cabinet

Circuit No. Description Status / Remarks


1 Type and Capacity (Ah) 12V 100A
2 Brand LEOCH
3 Out Factory Date NOT AVAILABLE
4 Start Service Date NOT AVAILABLE
5 Number of Strings 4 BANK / 4 GROUPS
6 Power Cable Size (mm²)
7 Installation Date NOT AVAILABLE

Battery Appearance (Detailed Description, take photos for Documentation Purposes)


Is there any mark of bumped, broken or crazed? Yes No
Is there any mark of acid leakage? Yes No
Is there any signs of bumps, break or acid? Yes No

6. Facility - Civil Work


6.1 Basic Information
Equipment Base Pad Exisiting basepad available Yes No
RRU Pole Exisiting RRU Pole available Yes No
Site Location Situation Flat Ground Rolling terrain
REMARKS:

6.2 Antenna Proposed Solution


Use Spare Bracket Extension Bracket using Existing Pole Install New Pole Wall Mounted

6.3 Microwave Proposed Solution


Wall Mounted Existing Pole Tower Leg

7. Existing Datacom Information


Existing Equipment Type:
CX600-X2 CX600-X8 MICROWAVE

8. Auxiliary Equipment Information


8.1 Busbar Vacant Slot
Grounding Busbar: (Indoor)
Without Available Holes With Available Holes
Number of Holes 48 pcs Hole diameter: 10 mm No. of Busbar: 3
Grounding Busbar: (Outdoor)
Without Available Holes With Available Holes

Number of Holes 10 pcs Hole diameter: 10 mm No. of Busbar: 1 Stolen

8.2 Feeder Window Information


Existing Feeder Window Available Existing Feeder Window Not Available
Available Holes: 10 Outdoor Cable Ladder Height mm
Outdoor Cable Ladder Width mm
GLOBE MODERNIZATION PROJECT
Technical Site Survey Report
Site Name: BAUANG2 BTS Site Type: THREE-LEGGED
Date Survey: 19-Apr-18

PROPOSED POWER SUFFICIENCY REPORT


1) PROPOSED RECTIFIER MODULE BRAND HUAWEI
2) NO. OF PROPOSED RECT. MODULES INSTALLED / OPERATIONAL 8 8
3) PRESENT LOAD READING 147.00 A
4) RECTIFIER MODULE RATING (WATTS / AMPS) 2000 W 37.0 A
5) BATTERY BRAND / VOLTAGE PER CELL OLONG 12 V
6) NUMBER OF BATTERIES / AMPEREHOUR 16 units 100 AH

Proposed Additional Load - Huawei RTN905 IDU = 2A


Actual Capacity : 8 x 37.0 A = 296 A
Backup Battery Capacity : 1 string @ 48 volts of 100 Ampere-Hour
Number of Batteries x 12 V ÷ 48 volts = strings x 100 AH
16 x 12 ÷ 48 = 4 Site Namex 100 AH
= 4 Site Namex 100 AH = 400 AH
Computation:
296.4 A Actual Capacity
- 40.0 A - 10% Charging Current for 4 PLA ID
- 147.0 A - Present Load
- 37.0 A - N + 1 Redundant Module
72.3 Amps DC Power Deficit
- 2.0 A - Proposed Additional Load
70.3 Amps TOTAL POWER DEFICIT
Ø Backup Time Computation:
Proposed Additional Load For Globe MWR Last Mile Project = Total DC Load
147.0 A + 2 A = 149.0 A
Backup battery capacity ÷ Total DC Load = Backup Time
400 Amps-Hr ÷ 149.0 A = 2.684564 PICTURE C
Ø Additional modules:
Total DC Power Deficit ÷ Module Rating = Additional Modules
70.3 Amps ÷ 37.0 A = 1.8979450 » -2 RECTIFIER MODULES
Additional Battery:
Required Back Up Time X Total DC Load
Battery Capacity
4 H. X 122 A
= 4 Batteries = 1 String
100AH
REMARKS:
UAWEI

7.00 A
37.0 A
12 V
100 AH

AH

al DC Load

FIER MODULES
GLOBE MODERNIZATION PROJECT
Technical Site Survey Report
Site Name: BAUANG2 BTS Site Type: THREE-LEGGED
Date Survey: 19-Apr-18

PROPOSED POWER SUFFICIENCY REPORT


1) PROPOSED RECTIFIER MODULE BRAND HUAWEI
2) NO. OF PROPOSED RECT. MODULES INSTALLED / OPERATIONAL 8 8
3) PRESENT LOAD READING 141.00 A
4) RECTIFIER MODULE RATING (WATTS / AMPS) 2000 W 37.2 A
5) BATTERY BRAND / VOLTAGE PER CELL OLONG 12 V
6) NUMBER OF BATTERIES / AMPEREHOUR 16 units 100 AH

Proposed Additional Load - Huawei RTN905 IDU = 2A


Actual Capacity : 8 x 37.2 A = 298 A
Backup Battery Capacity : 1 string @ 48 volts of 100 Ampere-Hour
Number of Batteries x 12 V ÷ 48 volts = strings x 100 AH
16 x 12 ÷ 48 = 4 Site Namex 100 AH
= 4 Site Namex 100 AH = 400 AH
Computation:
297.6 A Actual Capacity
- 40.0 A - 10% Charging Current for 4 PLA ID
- 141.0 A - Present Load
- 37.2 A - N + 1 Redundant Module
79.4 Amps DC Power Deficit
- 2.0 A - Proposed Additional Load
77.4 Amps TOTAL POWER DEFICIT
Ø Backup Time Computation:
Proposed Additional Load For Globe MWR Last Mile Project = Total DC Load
141.0 A + 2 A = 143.0 A
Backup battery capacity ÷ Total DC Load = Backup Time
400 Amps-Hr ÷ 143.0 A = 2.797203 PICTURE C
Ø Additional modules:
Total DC Power Deficit ÷ Module Rating = Additional Modules
77.4 Amps ÷ 37.2 A = 2.0809600 » -3 RECTIFIER MODULES
Additional Battery:
Required Back Up Time X Total DC Load
Battery Capacity
4 H. X 122 A
= 4 Batteries = 1 String
100AH
REMARKS:
UAWEI

1.00 A
37.2 A
12 V
100 AH

AH

al DC Load

FIER MODULES
GLOBE MODERNIZATION PROJECT
Technical Site Survey Report
Site Name: BAUANG2 BTS Site Type: THREE-LEGGED
Date Survey: 19-Apr-18

PROPOSED POWER SUFFICIENCY REPORT


1) PROPOSED RECTIFIER MODULE BRAND HUAWEI
2) NO. OF PROPOSED RECT. MODULES INSTALLED / OPERATIONAL 5 5
3) PRESENT LOAD READING 21.00 A
4) RECTIFIER MODULE RATING (WATTS / AMPS) 2000 W 37.3 A
5) BATTERY BRAND / VOLTAGE PER CELL LEOCH 12 V
6) NUMBER OF BATTERIES / AMPEREHOUR 16 units 100 AH

Proposed Additional Load - Huawei RTN905 IDU = 2A


Actual Capacity : 5 x 37.3 A = 187 A
Backup Battery Capacity : 1 string @ 48 volts of 100 Ampere-Hour
Number of Batteries x 12 V ÷ 48 volts = strings x 100 AH
16 x 12 ÷ 48 = 4 Site Namex 100 AH
= 4 Site Namex 100 AH = 400 AH
Computation:
186.7 A Actual Capacity
- 40.0 A - 10% Charging Current for 4 PLA ID
- 21.0 A - Present Load
- 37.3 A - N + 1 Redundant Module
88.4 Amps DC Power Deficit
- 2.0 A - Proposed Additional Load
86.4 Amps TOTAL POWER DEFICIT
Ø Backup Time Computation:
Proposed Additional Load For Globe MWR Last Mile Project = Total DC Load
21.0 A + 2 A = 23.0 A
Backup battery capacity ÷ Total DC Load = Backup Time
400 Amps-Hr ÷ 23.0 A = 17.391304 PICTURE C
Ø Additional modules:
Total DC Power Deficit ÷ Module Rating = Additional Modules
86.4 Amps ÷ 37.3 A = 2.3128600 » -3 RECTIFIER MODULES
Additional Battery:
Required Back Up Time X Total DC Load
Battery Capacity
4 H. X 122 A
= 4 Batteries = 1 String
100AH
REMARKS:
UAWEI

1.00 A
37.3 A
12 V
100 AH

AH

al DC Load

FIER MODULES
9. Site Pictures
9.1 Panoramic View

0º 30º

90º 120º

7
180º 210º

270º 300º

9.2 Pictures of Existing Antenna (4 sectors)

N/A N/A N

PANNEL ANTENNA PANNEL ANTENNA PANNE

N/A N/A N

8
PANNEL ANTENNA PANNEL ANTENNA PANNE

N/A N/A N

PANNEL ANTENNA PANNEL ANTENNA PANNE


9.2.1 Pictures of Existing Microwave Antenna

N/A N

MICROWAVE ANTENNA MICROWAVE ANTENNA MICROWA

9.3 Pictures of Existing Transport Equipment (Datacom and Optical Equipment and IDU)

N/A N/A
9
N/A N/A

9.4 Pictures of Existing G900 / G1800 / UMTS2100

N/A N

9.5 Pictures of Existing Equipment Room

N
/
A
10
PICTURE A PICTURE B PIC

9.6 Pictures of Existing Cable Ladder

N/A N/A

Existing Indoor Cable Ladder Existing Outdoor Cable

9.7 Pictures of Existing Busbar and Feeder Window

N/A N/A N

Existing Indoor Busbar Existing Outdoor Busbar Existing F

9.8 Pictures Site Access

11
N/A N/A

Picture of Site Road Access

N/A N/A N

Picture of Nearest Access Road Picture of Access Door/Gate Front V

9.9 Site Surrounding Environment (need provide C1 Greenfield site only)

NOT NOT N
AVAILABLE AVAILABLE AVAI

0º 60º

12
NOT NOT N
AVAILABLE AVAILABLE AVAI

180º 240º

9.10a Pictures of Existing Rectifier System 1

EXISTING RECTIFIER RECTIFIER MODULES ACTUA

N/A
N/A

DC DISTRIBUTION BREAKERS PROPOSE TAPPING POINT


9.10b Pictures of Existing Rectifier System 2

13
EXISTING RECTIFIER RECTIFIER MODULES ACTUA

N/A
N/A

DC DISTRIBUTION BREAKERS PROPOSE TAPPING POINT


9.10c Pictures of Existing Rectifier System 3

EXISTING RECTIFIER RECTIFIER MODULES ACTUA

14
N/A
N/A

DC DISTRIBUTION BREAKERS PROPOSE TAPPING POINT

9.11a Pictures of Existing Battery System 1

BATTERY BANK SYSTEM1 BRAND / MODEL


9.11b Pictures of Existing Battery System 2

BATTERY BANK SYSTEM1 BRAND / MODEL


9.11c Pictures of Existing Battery System 3

15
BATTERY BANK SYSTEM1 BRAND / MODEL

9.12 Existing Ventilation System

N/A N/A N

AIR CONDITIONER ACU CONTROLLER ACU

9.13 Proposed IDU Location

16
9.14 Proposed Antenna Location

17
60º

150º

18
240º

330º

N/A

PANNEL ANTENNA

N/A

19
PANNEL ANTENNA

N/A

PANNEL ANTENNA

N/A

MICROWAVE ANTENNA

N/A
20
N/A

N/A

21
PICTURE C

N/A

Existing Outdoor Cable Ladder

N/A

Existing Feeder Window

22
N/A

Road Access

N/A

Front View of Site

nfield site only)

NOT
AVAILABLE

120º

23
NOT
AVAILABLE

300º

ACTUAL READING

N/A

PROPOSE TAPPING POINT

24
ACTUAL READING

N/A

PROPOSE TAPPING POINT

ACTUAL READING

25
N/A

PROPOSE TAPPING POINT

BRAND / MODEL

BRAND / MODEL

26
BRAND / MODEL

N/A

ACU BRAND

27
28
Path Profile

14
15
10. Layout
10.1 Floor Plan Layout

10.2 Proposed IF Cable Plan Lay out

15
LEGEND:

POWER
GRND
IF CABLE

16
17
18