Sei sulla pagina 1di 1

1.

Create a company code

To edit your new company code-> Select Edit Company Code Data, select it and click on the
details button.
2. Define valuation level

There are two options available: Valuation are is a Plant (recommended) you need to define
a separate valuation area for each plant, and stock materials will be evaluated separately for
each plant.
Valuation level is a Company Code.
3. Creating Plants

4. Check the material types


5. Assign plants to Company Codes
IMG- Enterprise structure – assignment - Logistic General – Assign plant to Company code.
6. Creating Storage Locations for Plants

These are created under the plan, so that you can reuse the same storage location code for
other plants.
7.
OKKP copy controlling area

Potrebbero piacerti anche