IMPORTANT NOTES:
A GENERAL
1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE SPECIFIED & LEVELS ARE IN METER.
LAYOUT OF SLAB LEVEL RCC COLUMN
2. DO NOT SCALE THE DRAWING, ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED.
3. THE DRAWING MUST BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWING I.E. ARCHITECTURAL, ELECTRICAL & ALL SLAB ARE 150mm THICK COPING-CP1
STRUCTURAL DRAWING. (GA DRAWING OF MANUFACTURER)
4. ALL THE WORK SHALL BE CARRIED OUT AS PER RELEVANT FIELD QUALITY PLAN APPROVED BY GETCO.
F.G.L.
C
5. IN CASE OF ANY DOUBT OR DISCREPANCIES, PLEASE CONTACT ENGG. CELL. NO ASSUMPTIONS SHALL BE MADE.
NOTE: OUTSIDE INSIDE (SAND FIILING) C
6. ALL SAFETY PRECAUTIONS AS MENTIONED IN ELECTRICAL LAYOUT, SAFETY MANUAL & RELEVANT STANDARD CODES, SHALL BE
SCRUPULOUSLY FOLLOWED WHILE EXECUTION OF WORK.
B CONCRETE 1. CERTAIN MINIMUM GROUND BEAM
7. THE CEMENT SHALL BE OPC CEMENT WITH C3A CONTENT FROM 5 TO 8 % FOR ALL CIVIL WORK. REQUIREMENTS ARE INDICATED IN
8. ALL THE RCC WORK SHALL BE CARRIED OUT AS PER IS 456-2000, WITH LATEST REVISION.
9. THE GRADE OF CONCRETE SHALL BE M-30, EXCEPT LEAN CONCRETE MIX DESIGN SHALL BE DONE CONSIDERING 'SEVERE THIS DRAWING FOR GUIDANCE
ENVIRONMENT' EXPOSURE CONDITIONS. PURPOSE. HOWEVER BIDDER COLUMN
10. THE GRADE OF LEAN CONCRETE SHALL BE M-15
11. CONCRETING OF ALL CIVIL WORKS UNDER BIDDER SCOPE FOR GRADE OF M30 & M20 SHALL BE DONE WITH THE HELP OF DIGITAL SHALL QUOTE THE RATES
WEIGH BATCHER OR FLORI ( MOBILE CONCRETE BATCHING PLANT) ONLY.
ACCORDING TO SYSTEM F.G.L. GB F.G.L.
12. ALL CONCRETE SHALL BE MACHINE MIXED, VIBRATED & CURED FOR MINIMUM 10 DAYS.
13. USE OF NEEDLE VIBRATOR IS COMPULSORY FOR ALL CONCRETE WORKS. REQUIREMENTS. TYPICAL DETAILS OF COLUMN-FOOTING
C REINFORCEMENT
14. REINFORCEMENT BAR SHALL BE GRADE OF FE-500 CONFORMING TO IS-1786 CRS(CORROSION RESISTANCE STEEL). 2. THIS DRAWING IS GIVEN FOR BID
15. REINFORCEMENT SHALL BE BENT & FIXED IN ACCORDANCE WITH THE PROCEDURE SPECIFIED IN IS 2502-1963. PURPOSE ONLY. HOWEVER, 100MM THK
16. CLEAR COVER TO THE REINFORCEMENT SHALL BE AS AS PER TECHNICAL SPECIFICATION COPING DETAIL-CP1
17. LAP LENGTH SHOULD BE 50 TIMES OF DIA.. BIDDER HAS TO DEVELOP P.C.C
18. LAP AT SUPPORT SECTION, JOINT SECTION & MID SPAN SHALL BE AVOIDED.
19. OVERLAPPING OF REINFORCEMENT SHALL BE STAGGERED. CONSTRUCTION DRAWINGS AND TYPICAL DETAILS OF MASONRY
B
20. UNLESS OTHERWISE SPECIFIED DISTN., STEEL SHOULD BE 8 MM. TOR @ 200 MM. C/C. RELEVANT STRUCTURE B
21. IN CASE OF CONTINUOUS SUPPORT, REINFORCEMENTS ARE DEFERENT FOR TWO ADJACENT BEAMS / SLABS, THE HIGHER SUPPORT
REINFORCEMENT OF THE TWO SHALL BE PROVIDED AT THE SUPPORT. DRAWINGS ON THE BASIS OF THIS TENDER PURPOSE
D FOUNDATION DRAWING, APPROVED LAY OUT OF G
22. IN THE COURSE OF EXCAVATION, IF, SUB SOIL STRATA DIFFERS, THE SAME SHALL BE REPORTED TO THE CONCERN FOR NECESSARY GUJARAT ENERGY TRANSMISSION CORPN.LTD.
STEPS BY THE ENGINEERING CELL. SUB STATION, TENDER E
23. LAY-OUT, LINE-OUT & ORIENTATION SHALL BE CHECKED JOINTLY BY E. E. / D. E. - (CIVIL) & E. E. / D. E. - (CONST), ON THE BASIS OF
SPECIFICATION, SBC REPORT, T S.P.VIDYUT BHAVAN, RACE COURSE,
APPROVED ELECTRICAL LAY-OUT, GA DRAWING & THIS DRAWING, PRIOR TO START THE WORK. C
· FOR OPEN FOUNDATION SITE CONDITION, CONTOUR MAP VADODARA - 390 007
O
24. NO FOUNDATION SHALL REST ON FILLED-UP SOIL / BLACK COTTON SOIL.
· IF FILLED UP SOIL ENCOUNTERED, FOUNDATION SHALL BE TAKEN 300 MM BELOW VIRGIN SOIL. AND AS PER CODES &
· IF FOUNDATION FALLS ON EXCAVATED TRENCHES OF ADJOINING FOUNDATION, THAN FOUNDATION SHALL EXTENDED UP TO THE
DEPTH OF ADJOINING FOUNDATION.
STANDARDS.
· IF BLACK COTTON SOIL ENCOUNTERED, AT FOUNDATION DEPTH, THAN FOUNDATION SHALL REST ON COMPACTED SAND BED OF 3. GROUND BEAM SHALL BE
300MM THICK.
25. BACK FILLING OF FOUNDATION TRENCHES SHALL BE DONE WITH USE OF NON COHESIVE SOIL ONLY.
PROVIDED OF MINIMUM WIDTH
· THE BACK FILLING AROUND THE FOUNDATION SHALL BE ADEQUATE TO ACHIEVE THE PROCTOR DENSITY OF 95%. 350MM. LAYOUT & DETAILS OF SLAB LEVEL FOR STACK PLATFORM
· FOR PILE FOUNDATION
26. THE GRADE OF CONCRETE SHALL BE M-30 FOR PILE CAP, COLUMN, BEAM, RAFT, ETC., EXCEPT LEAN CONCRETE. 4. GROUND BEAM SHALL BE AT 220kV SARIGAM (GIS) SUB-STATION
27. THE GRADE OF CONCRETE FOR PILE SHALL BE M-30, CONFIRMING TO IS 456 WITH MINIMUM CEMENT CONTENT AS 400 kg. / M³. WITH
TREMIE CONCRETE.
PROVIDED CONNECTING TO ALL
28. CONCRETE SLUMP SHALL BE 120 TO 150MM. (VERY HIGH DEGREE OF WORKABILITY) FOR PILE FOUNDATION WITH TREMIE CONCRETE. RCC COLUMN. CHECKED: APPD:
A 29. CLEAR COVER TO THE REINFORCEMENT FOR PILE & PILE CAP SHALL BE 50MM A
30. FOR CONSTRUCTION SPECIFICATION OF IS 2911 (PART-III), LATEST REVISION SHALL BE FOLLOWED. SIZE:
31. THE PILE SHOULD PROJECT 100MM. IN TO THE PILE CAP CONCRETE. DE (CIVIL) EE (CIVIL) EE (ENGG.) ACE (ENGG.)
32. INTEGRITY TEST TO BE DONE FOR ALL PILES, PRIOR TO CAST PILE CAP. A3
33. INITIAL & ROUTINE PILE LOAD TEST SHALL BE CARRIED OUT ON ANY ONE PILE & SHALL BE COMPARE WITH VALUE OF SBC
REPORT.PAIOR TO START CONCRETING WORK
SCALE: DATE: DRG. NO: SHEET: REV:
· SPECIAL NOTE
34.TYPE OF FOUNDATION SHALL BE ADOPTED ON THE BASIS OF SOIL INVESTIGATION REPORT, SITE CONDITION. ELECTRICAL LAYOUT, 1 R0 FIRST PREPARATION GETCO / C / 1 OF 1 R0
RELEVANT STANDARDS & CODES. HOWEVER DECISION OF GETCO WILL BE FINAL. N.T.S 07.08.18