Sei sulla pagina 1di 1

14'

3'-6"

As Per Drain Width


A

3'-6"
3'-6"
1'-9" 16Nos 1"Ø J-Bolts

PLAN VIEW OF FOOTING


to get Clearance of 5.4 m
To be adjust as per Site

16Nos 1"Ø J-Bolts


16#4Bars
#4@9"c/c #5@12"c/c
#4@6"c/c
#4@12"c/c #5@6"c/c
B
1'-6"

Drain Top Slab


To be adjusted as
per site levels

Drain Wall

Drain Bottom Slab


1'
3"

SECTION A-A (For J-Bolts) SECTION A-A (For footing Steel)

3'-6"
#5@6"c/c
#4@6"c/c Reinforcement Details
Shown in Section A-A
1'-6"
To be adjusted as
per site levels

1'-3" 1'-3"
1'
3"

SECTION B-B SECTION B-B SECTION B-B

Pedestarian Bridge End Column Foundation Detail.

Potrebbero piacerti anche