Sei sulla pagina 1di 19

1 2 3 4 5 6 7 8

3 4 2
A WARNING A
Where a metallic water service is to be replaced using non
metallic pipe a licensed electrician shall assess affected
property's electricity supply for defects and the likely
effect on earthing adequacy. Work can commence once the
electrician declares in writing that it is safe to proceed.

200 max.
B B
1

Finished Surface Level

GENERAL NOTES
C C
From Water main To Consumer Property 1. All dimensions in millimeters (mm), unless noted otherwise.
2. Installation and fittings schedule is also suitable for DN.25 meter.
1 1 3. All existing metallic service connections should be considered an electrical hazard and electrical
bridging leads (min. 70 Amp rating) and low voltage insulated gloves should be utilised at all times.
4. Reinstate all surfaces to match existing.
DN.20 METER RENEWAL
5. Reinstall property pressure limiting valve where existing.
1:5 6. Installation must comply with Manufacturer's specifications.
7. Connectors and gate valves must be pressure rated PN16. Minimum body dezincification resistant
D D
brass to AS/NZS 2345 and comply with Potable Water Contact to AS/NZS 4020.
8. Provide additional adaptors to suit the existing property connection materials.
9. All products to be in accordance with City West Water's "Approved Products Catalogue".
SCHEDULE OF ITEMS
10. All copper fittings to be 'Viega pro-press' system, or equivalent.
No. DESCRIPTION
11. All pipes and fittings are to be approved by TasWater.
1 Pipe and Fittings (PN 16 minimum)
2 Nut and Tail Connector
ITEMS SUPPLIED BY TASWATER
3 Ball Valve - W/MRK R/A Lockable Quarter Turn Brass DZR,
1. Water meter - complete with inbuilt strainer and dual check valve.
E
Resilient Seated with Extendable Nut and Tail. E
2. Water meter nuts and tails.
4 'Sensus' Water Meter with Dual Check Valve
3. Valves

ITEMS NOT SUPPLIED BY TASWATER


1. Pipework and adaptor couplings.
0 0.1 0.2 0.3 0.4 0.5 metres
SCALE -1:5

Revision Notes Scale 1:5 DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.20 AND DN.25 WATER METER RENEWAL
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
ABOVE GROUND
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 01 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Limit of Works

A Meter box with A


150 150 LOCATION METER BOX TYPE
non-slip lid
Non Trafficable Standard polyethylene meter box with black/green non-slip lid
('Draper' Model DRA 20/1 or 20/3)
Finished Surface Level
Footpath and Paved areas Standard polyethylene meter box with galvanised non-slip lid
(Class B to AS/NZS 3996) ('Draper' Model DRA 30/5)

200 ( + 30)
Trafficable Proprietary or in-situ meter boxes with trafficable lids to AS/NZS 3996

B B

GENERAL NOTES
1. All dimensions in millimeters (mm), unless noted otherwise.
4 2 2. Installation and fittings schedule is also suitable for DN.25 meter.
1 1 3. All existing metallic service connections should be considered an electrical hazard and electrical
C
bridging leads (min. 70 Amp rating) and low voltage insulated gloves should be utilised at all times. C
From Water main Nominal single size To consumer property 4. Reinstate all surfaces to match existing.
bluestone bedding 5. Footpaths and paved areas are defined as areas with a Class B wheel loading to AS/NZS 3996.
(50mm thick)
In areas with wheel loading greater than Class B then a polyethylene pit is unsuitable.
6. In footpaths and paved areas the Polyethylene meter box must be supported with an insitu N25
DN.20 METER RENEWAL
concrete surround of minimum dimension 50 wide and 100 deep ('Rapidset' not permitted).
1:5 7. Reinstall property pressure limiting valve where existing.
8. Installation must comply with Manufacturer's specifications.
SCHEDULE OF ITEMS
9. Connectors and gate valves must be pressure rated PN16. Minimum body dezincification resistant
D No. DESCRIPTION D
brass to AS/NZS 2345 and comply with Potable Water Contact to AS/NZS 4020.
1 Pipe and Fittings (PN 16 minimum) 10. Provide additional adaptors to suit the existing property connection materials.
2 Nut and Tail Connector 11. All products to be in accordance with City West Water's "Approved Products Catalogue".
3 Ball Valve - W/MRK R/A Lockable Quarter Turn Brass DZR, 12. All copper fittings to be 'Viega pro-press' system, or equivalent.
Resilient Seated with Extendable Nut and Tail.
13. All pipes and fittings are to be approved by TasWater.
4 'Sensus' Water Meter with Dual Check Valve
ITEMS SUPPLIED BY TASWATER
1. Polyethylene meter box
E
WARNING E
Where a metallic water service is to be replaced using non 2. Water meter - complete with inbuilt strainer and dual check valve.
metallic pipe a licensed electrician shall assess affected
3. Water meter nuts and tails.
property's electricity supply for defects and the likely
effect on earthing adequacy. Work can commence once the 4. Valves
electrician declares in writing that it is safe to proceed.

ITEMS NOT SUPPLIED BY TASWATER


0 0.1 0.2 0.3 0.4 0.5 metres
1. Pipework and adaptor couplings.
SCALE -1:5

Revision Notes Scale 1:5 DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.20 AND DN.25 WATER METER RENEWAL
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
BELOW GROUND (NON-TRAFFICABLE)
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 02 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Limit of Works

A Meter box with cast steel lid A


150 150
(Refer Sheet 4)
LOCATION METER BOX TYPE
Non Trafficable Standard polyethylene meter box with green/black non-slip lid
Finished Surface Level
('Draper' Model DRA 20/1 or 20/3)

Footpath and Paved areas Standard polyethylene meter box with galvanised non-slip lid

200 ( + 30)
(Class B to AS/NZS 3996) ('Draper' Model DRA 30/5)
Trafficable Proprietary or in-situ meter boxes with trafficable lids to AS/NZS 3996

B B

GENERAL NOTES
1. All dimensions in millimeters (mm), unless noted otherwise.
Insitu concrete nib all 2. Installation and fittings schedule is also suitable for DN.25 meter.
around polyethylene
4 2 3. All existing metallic service connections should be considered an electrical hazard and electrical
meter box frame
C
1 1 bridging leads (min. 70 Amp rating) and low voltage insulated gloves should be utilised at all times. C
4. Reinstate all surfaces to match existing.
From Water main Nominal single size To consumer property 5. Footpaths and paved areas are defined as areas with a Class B wheel loading to AS/NZS 3996.
bluestone bedding In areas with wheel loading greater than Class B then a polyethylene pit is unsuitable.
(50mm thick)
6. In footpaths and paved areas the Polyethylene meter box must be supported with an insitu N25
concrete surround of minimum dimension 50 wide and 100 deep ('Rapidset' not permitted).
DN.20 METER RENEWAL
7. Reinstall property pressure limiting valve where existing.
1:5
8. Installation must comply with Manufacturer's specifications.
SCHEDULE OF ITEMS 9. Connectors and gate valves must be pressure rated PN16. Minimum body dezincification resistant
D D
No. DESCRIPTION brass to AS/NZS 2345 and comply with Potable Water Contact to AS/NZS 4020.

1 Pipe and Fittings (PN 16 minimum) 10. Provide additional adaptors to suit the existing property connection materials.
11. All products to be in accordance with City West Water's "Approved Products Catalogue".
2 Nut and Tail Connector
12. All copper fittings to be 'Viega pro-press' system, or equivalent.
3 Ball Valve - W/MRK R/A Lockable Quarter Turn Brass DZR,
Resilient Seated with Extendable Nut and Tail. 13. All pipes and fittings are to be approved by TasWater.

4 'Sensus' Water Meter with Dual Check Valve


ITEMS SUPPLIED BY TASWATER
1. Polyethylene meter box
E WARNING E
Where a metallic water service is to be replaced using non 2. Water meter - complete with inbuilt strainer and dual check valve.
metallic pipe a licensed electrician shall assess affected 3. Water meter nuts and tails.
property's electricity supply for defects and the likely
effect on earthing adequacy. Work can commence once the 4. Valves
electrician declares in writing that it is safe to proceed.
ITEMS NOT SUPPLIED BY TASWATER
0 0.1 0.2 0.3 0.4 0.5 metres
1. Pipework and adaptor couplings.
SCALE -1:5

Revision Notes Scale 1:5 DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.20 AND DN.25 WATER METER RENEWAL
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
BELOW GROUND (TRAFFICABLE)
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 03 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

354 (Hole size) 694


R 37.5
(Hole size) 88 519 87

Saw-cutting line
after coring holes

87
B B

80
Drill 4 - DN.12 holes for
securing bolts

590 (Cover size)


594 (Hole size)

454

279

120
Drill 4 - DN.75 holes

C C

79
88
D CONCRETE DRILLING TEMPLATE D

1:5

350 (Cover size) R 35.0


(Cover size)

(6mm steel plate)

CAST STEEL COVER GENERAL NOTES


1. All dimensions in millimeters (mm), unless noted otherwise.
E 1:5 E
2. Installation
- Locate position in property for water meter.
- Secure template in place with 4 x M10 chemical anchors.
- Core DN.75 holes into concrete using the template as a guide.
- Remove template and saw-cut concrete to form opening for cast iron cover.

0 0.1 0.2 0.3 0.4 0.5 metres


SCALE -1:5

Revision Notes Scale 1:5 DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and CAST STEEL COVER
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
AND CUTTING TEMPLATE
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 04 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

TABLE 1
TasWater Responsibility Property Owner Responsibility
LOCATION METER BOX TYPE
(incl. meter box)

Connection
Non Trafficable Standard polyethylene meter box with green non-slip lid

Point
A A

Property bdy.
(Class A to AS/NZS 3996 - extra light duty) ('Draper' Model DRA 20/3, or simiar approved)
500 Meter box
Footpath and Paved areas Alluminium alloy meter box with alloy non-slip lid Refer Table 1 Concrete nib in
75
footpath and paved areas
(Class B to AS/NZS 3996 - light duty) ('Bennet & Kingston' box and lid, or similar approved)
Existing surface

65

(+ 25)
Road surface

200
300 Min.
W.S.A.A. guidelines
B B

Cover as per
Connect to water main Pipework
in accordance with WSA-W111 to property
3 2 1 4
and TasWater Supplement
Flow Mass concrete plinth in Bedding (50 min. thick)
footpath and paved areas. 7 (Nom.) clean, single size metal

PE100 pipe (min. PN.16)


Install metallic detector tape above non-metallic BOUNDARY CONNECTION
C pipework and connect to brass ferrule cock. C
1 : 10

SCHEDULE OF ITEMS
DN.100 Sleeve for non-metallic No. DESCRIPTION COMMENTS
pipes in trafficable areas. 1 'Sensus' Water Meter with Dual Check Valve Supplied by TasWater
2 Ball Valve - W/MRK Lockable Quarter Turn Brass DZR, Resilient Seated with Extendable Nut and Tail Supplied by TasWater
3 Pipe and Fittings (PN.16 minimum)

4 Brass Nut and Tail Supplied by TasWater


D D

GENERAL NOTES
1. All dimensions in millimeters (mm), unless noted otherwise.
2. Water connection to be located next to driveway entrance.
VALVE & EQUIPMENT SCHEDULE 3. Water connection point to be located between driveway entrance and nearest side boundary,
1. Only use products with watermark certification and approved for use by TasWater and listed within unless otherwise approved.
City West Water's approved products catalogue. 4. Light trafficable areas are defined as areas with Class 'B' wheel loadings to AS/NZS 3996. In areas with wheel
2. Installation must comply with manufacturer's written instructions loadings greater than Class 'B' then an aluminium alloy pit with concrete surround is unsuitable.

E 3. TPFNR ferrule cock, connectors, tapping band and gate valve must be pressure rated PN16 minimum 5. In rural and semi-rural situations the cast iron mains cover may be replaced with a DN.150 PVC end connection E
body dezincification brass to AS/NZS 2345 and comply with potable water contact to AS/NZS 4020. and screw cap where approved by authorised officer.

4. All valves must be resilient seated, clockwise closing to AS 1628 with 316 stainless steel bolts and washers. 6. Refer to TasWater's boundary backflow containment guidelines for hazard ratings.

5. In footpaths and paved areas the meter box must be supported with insitu N25 concrete. 7. Any pressure limiting valves installed under the requirements of clause 3.3.4 of AS.3500.1-2003 are to be installed
outside of and downstream of the meter box.
6. Unless approved otherwise the water meter/s, tails and meter boxes are to be supplied by TasWater.
8. After installation of meter, TasWater must be notified by returning meter sheet to "Development@taswater.com.au"
0 0.2 0.4 0.6 0.8 1.0 metres stating TasWater reference number in subject line.
SCALE - 1 : 10 9. Failure to install or contact TasWater after installation will result in non issue of any compliance certificates.

Revision Notes Scale 1 : 10 DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.20 AND DN.25 WATER METERS
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
BELOW GROUND (LOW HAZARD)
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 05 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

SCHEDULE OF ITEMS
A No. DESCRIPTION COMMENTS A

1 'Sensus' Water Meter with Dual Check Valve Supplied by TasWater


2 Ball Valve - W/MRK Lockable Quarter Turn Brass DZR, Resilient Seated wih Extendable Nut and Tail Supplied by TasWater Property Owner Responsibility TasWater Property Owner Responsibility
Responsibility
3 Brass Nut and Tail Supplied by TasWater

Connection
Point
4 Pipe and Fittings (PN.16 minimum) Meter box
Refer Table 1 Concrete nib in
75
footpath and paved areas

Finished surface level


TABLE 1

65
B B

(+ 25)
LOCATION METER BOX TYPE

200

300 Min.
Non Trafficable Standard polyethylene meter box with green non-slip lid

300 Min.
(Class A to AS/NZS 3996 - extra light duty) ('Draper' Model DRA 20/3, or simiar approved)
4
Footpath and Paved areas Alluminium alloy meter box with alloy non-slip lid
(Class B to AS/NZS 3996 - light duty) ('Bennet & Kingston' box and lid, or similar approved) Flow

2 1 3 4
Pipework to
C Mass concrete plinth in Bedding (50 min. thick) dwelling C
Pipework from boundary
meter assembly footpath and paved areas. 7 (Nom.) clean, single size metal

METER CONNECTION
1 : 10

D D
VALVE & EQUIPMENT SCHEDULE
1. Only use products with watermark certification and approved for use by GENERAL NOTES
TasWater and listed within City West Water's approved products catalogue. 1. All existing service connections should be considered an electrical hazard and
2. Installation must comply with manufacturer's written instructions electrical bridging leads (min. 70 Amp rating) and low voltage insulated gloves
shall be utilised at all times.
3. All valves must be resilient seated, clockwise closing to AS 1628
with 316 stainless steel bolts and washers. 2. Water meter to be located in common ground in front of dwelling.
4. In footpaths and paved areas the meter box must be supported with 3. Applicant must install water meter within appropriate pit as per these drawings.
insitu N25 concrete. 4. Works to be completed by a competent plumber.
E 5. Unless approved otherwise the water meter/s, tails and meter WARNING 5. Installation must meet these requirements, if not TasWater will rectify with all E
boxes are to be supplied by TasWater. Where a metallic water service is to be replaced using non
associated cost to be borne by the applicant / developer.
metallic pipe a licensed electrician shall assess affected
property's electricity supply for defects and the likely 6. Any pressure limiting valves installed under the requirements of clause 3.3.4 of
effect on earthing adequacy. Work can commence once the AS 3500.1-2003 are to be installed outside of and downstream of the meter box.
electrician declares in writing that it is safe to proceed.
7. After installation of meter, TasWater must be notified by returning meter sheet to
Development@taswater.com.au stating TasWater reference number in subject line.
0 0.2 0.4 0.6 0.8 1.0 metres
8. Failure to install or contact TasWater after installation will result in non issue of any
SCALE - 1 : 10 compliance certificates.

Revision Notes Scale 1 : 10 DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.20 AND DN.25 WATER METERS
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
SUB METER (LOW HAZARD)
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 06 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

20mm Tapping for Pressure Testing,


Ball valve and 20mm plug.
6 6 4 SCHEDULE OF ITEMS
A 7 8 9 7 No. DESCRIPTION A
COMMENTS
5 1 DN.25 'Sensus' Water meter with Dual Check Valve Supplied by TasWater

2 2 DN.25 Ball Valve - W/MRK R/A Lockable Quarter Turn Brass DZR,
Resilient Seated with Extendable Nut and Tail

6 3 DN.25 x 20 Brass Tee (Fem - Fem x Fem) Or Approved Equivalent


5

300 min.
1 3 10 6
4 DN.25 'Viega' Pro-press Water Male Line Adaptor Or Approved Equivalent
11 12 11
5 DN.25 Type 'A' Copper Pipework
B 6 DN.25 Brass Nipple B

7 DN.25 Ball Valve - Lockable Quarter Turn brass DZR with brass handle, resilient seated.

8 DN.25 Strainer Owned, operated and


maintained by Property Owner

ELEVATION 9 Medium Hazard DN.25 'ValvCheQ' DC03 Double Check Valve Owned, operated and
1 : 10 High hazard DN.25 'ValvCheQ' RPZD RP03 Valve Only maintained by Property Owner

TasWater Responsibilty Property Owner Responsibility 10 Vent only applies to RPZD


C C
11 Pipe Wrapped where Concrete will contact Pipe (Refer Note 5)
(450 / 482) 12 100mm (minimum) Reinforced Concrete Slab SL72 placed central

3 7 6 8 7 4
Direction of Flow Direction of Flow

GENERAL NOTES
1. All dimensions in millimeters (mm), unless noted otherwise.

D 2. Installation and fittings schedule is also suitable for DN.20 meter. D


2 1 6 6 9 6 5
3. Dimensions shown in brackets apply to (DN.20 / DN.25).
PLAN 4. All existing metallic service connections should be considered an electrical hazard and electrical
1 : 10 bridging leads (min. 70 Amp rating) and low voltage insulated gloves should be utilised at all times.
5. All metallic pipe work to be 'Denso' wrapped, or equivalent where it comes in contact
with concrete - to protect it from corrosion.
VALVE & EQUIPMENT SCHEDULE 6. Where a vented back flow prevention device is required such as a Reduced Pressure Zone
1. Only use products with watermark certification and approved for use by TasWater Device (RPZD) it shall:
and listed within City West Water's approved products catalogue. - Comply with AS 3500 and AS 2845; and shall
E 2. Installation must comply with manufacturer's written instructions. - Have free ventilation to the atmosphere for the relief valve at all times. E
3. All valves must be resilient seated, clockwise closing to AS 1628 with 316 stainless - Not to be in an area that may be subject to ponding;
steel bolts and washers. - Have the relief drain outlet not less than 300mm above the surrounding surface.
4. Unless approved otherwise the water meter/s, tails and meter boxes are to 7. Install the meter assembly in cage in accordance with TWS-W-0003.
be supplied by TasWater.
8. Install and locate the meter assembly so that the meter can be easily read.

0 0.2 0.4 0.6 0.8 1.0 metres 9. The Property Owner is responsible for the ongoing maintenance of the security cage.
SCALE - 1 : 10

Revision Notes Scale 1 : 20 DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.20 AND DN.25 WATER METERS
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
MEDIUM - HIGH HAZARD
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 07 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

2 7 1 1 SCHEDULE OF ITEMS
A No. DESCRIPTION COMMENTS
4 1 3 Pipe supports
A A

Property bdy.
1 1 'Sensus' Water Meter with Dual Check Valve Supplied by TasWater
2 Brass Nut and Tail Supplied by TasWater
8
6 3 'Viega' Pro-press Water Female Line Adaptor Or Approved Equivalent
(typ.) 9
325

4 Ball Valve - W/MRK R/A Lockable Quarter Turn Brass

Cover *
DZR, Resilient Seated with Extendable Nut and Tail.

5 Universal Adaptor

Concrete slab A 6 Type 'A' Copper Pipework


B (Refer Note 8) B
Concrete slab 7 Gate Valve - Brass, Resilient Seated with Brass handle
Denso wrap 450 (typ.) 1000 (min.) Pipework to 5 (Refer Note 8)
through concrete main connection 8 DN.40 Brass Plug
(Refer Sheet 5) 9 DN.40 Type 'A' Copper Manifold Refer Detail
Copper pipe to help
support meter assembly PROFILE

SECTION A - A
ABOVE GROUND Length as required
1 : 20
*

C Cover 300 Min. for non-trafficable C


135 150 FTC
450 Min. for trafficable
(Refer Table 5.3 of AS3500.1)

DN.40 Male DN.40 Type 'A' DN.40 Type 'A' Copper


thread coupling Manifold Joiner Soldered joints
(As Required) DN.40 Female
D
thread coupling D
(FTC - DN20 Female thread coupling, typ. 3 places)
VALVE & EQUIPMENT SCHEDULE
1. Only use products with watermark certification and approved for use by DN.40 MANIFOLD
TasWater and listed within City West Water's approved products catalogue. 1:5
2. Installation must comply with manufacturer's written instructions.
GENERAL NOTES
3. All valves must be resilient seated, clockwise closing to AS 1628
with 316 stainless steel bolts and washers. 1. All dimensions in millimeters (mm), unless noted otherwise. 6. All supports shall be designed to suit the pipes and
2. The meter assemblies are to be installed and located so that the meters can be easily read. assembly sizes selected.
4. In footpaths and paved areas the meter box must be supported with
insitu N25 concrete. 3. For pipes less than DN.100, or where freezing is likely the cage is to be lined 7. The property owner is responsible for the ongoing
with a polycarbonate frost shield. maintenance of the security cage.
E 5. Unless approved otherwise the water meter/s, tails and meter E
4. Where a vented back flow prevention device is required such as a Reduced Pressure 8. Concrete slab - 100mm thick, 25Mpa and with SL72
boxes are to be supplied by TasWater.
Zone Device (RPZD) it shall - comply with AS 3500 and AS 2845 and shall: reinforcement placed central.
- have free ventilation to the atmosphere for the relief valve at all times; - With Cage {extend the finished edge 50mm (all round)
0 0.1 0.2 0.3 0.4 0.5 metres - not be in an area that may be subject to ponding; past the proposed cage size}.
SCALE -1:5 - have the relief drain outlet not less than 300mm above the surrounding surface.
- Without Cage {Pipe work to be placed centrally on slab
5. The cage enclosure and associated support structure shall be hot-dipped galvanised and the finished edge 150mm from pipe edge}.
0 0.4 0.8 1.2 1.6 2.0 metres after fabrication to AS 2312 : 2002.
SCALE - 1 : 20

Revision Notes Scale AS SHOWN DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.20 WATER METER MANIFOLD
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
ABOVE GROUND
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 08 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

SCHEDULE OF ITEMS
No. DESCRIPTION COMMENTS
A Heavy duty path tap box 1 'Sensus' Water Meter with Dual Check Valve Supplied by TasWater A

Property bdy.
(Refer Sheet 5)
500
2 Brass Nut and Tail Supplied by TasWater
3 11 2
3 Ball Valve - W/MRK Lockable Quarter Turn Brass DZR, Resilient Seated with Extendable Nut and Tail

4 'Viega' Pro-press Water Female Line Adaptor Or Approved Equivalent

(+ 25)
Cover *

150
5 'Viega' Pro-press Water Female Line Adaptor Or Approved Equivalent

6 Gate Valve - Brass DZR, Resilient Seated with Brass Handle


7 Universal Adaptor
B B
8 DN.40 Type 'A' Copper Manifold Refer Detail
Pipework to
main connection 7 6 4 1 5 9 DN.40 Brass Plug
(Refer Sheet 5)
10 DN.40 Type 'A' Manifold Joiner (As Required)

*
Cover 300 Min. for non-trafficable
450 Min. for trafficable
PROFILE (Refer Table 5.3 of AS3500.1)
11 Meter Pit - Non-Trafficable 'Draper' Model Modular DRA 100, or similar Refer Sheet 5

Length as required
9

(typ.)
150
135 470 (min.) FTC
C C
8

10
DN.40 Male DN.40 Type 'A' DN.40 Type 'A' Copper Soldered joints
thread coupling Manifold Joiner
(As Required) DN.40 Female
470 (min.)

thread coupling
D (FTC - DN20 Female thread coupling, typ. 3 places) D
8
DN.40 MANIFOLD
7 6 1:5
(min.)
300

VALVE & EQUIPMENT SCHEDULE


PLAN VIEW 1. Only use products with watermark certification and approved for use by
TasWater and listed within City West Water's approved products catalogue.
E
BELOW GROUND E
2. Installation must comply with manufacturer's written instructions.
GENERAL NOTES
1 : 20
BELOW GROUND 3. All valves must be resilient seated, clockwise closing to AS 1628
with 316 stainless steel bolts and washers.
0 0.1 0.2 0.3 0.4 0.5 metres 1. All dimensions in millimeters (mm), unless noted otherwise.
SCALE -1:5 2. Water connection to be located next to driveway entrance. 4. In footpaths and paved areas the meter box must be supported with
insitu N25 concrete.
3. Light trafficable areas are defined as areas with a Class 'B' wheel
0 0.4 0.8 1.2 1.6 2.0 metres 5. Unless approved otherwise the water meter/s, tails and meter
loading to AS/NZS 3996. In areas with a wheel loading greater than
SCALE - 1 : 20 Class 'B' then a "Draper" pit is unsuitable. boxes are to be supplied by TasWater.

Revision Notes Scale AS SHOWN DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.20 WATER METER MANIFOLD
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
BELOW GROUND
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 09 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

VALVE & EQUIPMENT SCHEDULE


SCHEDULE OF ITEMS
1. Only use products with watermark certification and approved for use by TasWater and listed
No. DESCRIPTION COMMENTS
A within City West Water's approved products catalogue. A
1 'Sensus' Water meter with Dual Check Valve Supplied by TasWater 2. Installation must comply with manufacturer's written instructions.
2 Ball Valve - W/MRK Lockable Quarter Turn Brass DZR, Toughened safety 3. All valves must be resilient seated, clockwise closing to AS 1628 with 316 stainless steel
glass, or perspex bolts and washers.
window Cabinet
Resilient Seated with Extendable Nut and Tail number 4. Unless approved otherwise the water meter/s, tails and meter boxes are to be supplied
3 'Viega' Pro-press Water Female Line Adaptor Or Approved Equivalent by TasWater.

4 Type 'A' Copper Pipework


CABINET DOOR LAYOUT
1 : 20
5 DN.40 Copper Manifold Refer Sheet 8
50 (min.)
B B
GENERAL NOTES
1. The meters are to be easily accessible and readable from floor level of common property.
Maximum height for the centreline of the meter assembly is to be 1600mm.

25 (min.)
2. Where meters are located in a utility room, adequate ventillation must be provided.
The cupboard must not be classified as a confined space for entry purposes.
3. The cabinet shall be marked clearly with the words "Water Meters" on the outside of
the door as shown. Where more than one meter cabinet is installed then each cabinet
shall have a cabinet ID number fixed to the outside of the door as shown.
METER TAG
*

Cover 300 Min. for non-trafficable 4. All cabinets shall be either bunded as shown, or drained to the stormwater system to manage
450 Min. for trafficable seepage from maintenance events. All penetrations shall be sealed.
N.T.S.
C (Refer Table 5.3 of AS3500.1) C
25 5. The cabinet shall have a minimum 100mm bund if it is located inside a building.
Wall
(min.) 6. The cabinet size shall provide for the minimum dimensions shown.
Pipework to Unit
100 7. Water meter cabinets shall allow access to the meter assembly for maintenance and
4 4
customer interactions.
115

3 8. A minimum of 2 sq. metres, or an area of 1.5 x door width (which ever is greater) shall be
2 2 provided for maintenance and customer interaction. The cabinet shall have adequate lighting
during daylight hours and shall not require additional aids such as ladders to maintain meters
1 1 or to obtain meter data.
2 9. There will be sufficient room for the cabinet door(s) to swing open completely and provision
2
1600 (max.)

for them to be held open.


115

3
D D
10. The cabinet material shall be either 1mm thick steel, or 1.5mm thick 5251, or 5083 alloy
50 aluminium. Cabinets shall be powder coated to suit building architecture.
4 (min.) 4 11. The cabinet door(s) are to be fabricated from a non-metallic product, preferable to have either
toughened safety glass or perspex viewing port to enable easy viewing of meter assembly
without opening doors.
Cover *

12. The cabinet does not need to be locked, but must be fitted with a latch where a double padlock
can be fitted in the future as required.
13. The meter cabinet shall be strategically located to enable best maximum range for AMR (best
150 150 option is by locating meter cabinet so that the TasWater meter reader can automatically
Pipework to read the meters from the closest road frontage without having to enter the complex.)
E Main connection 14. All external edges are to be rounded. E
(Refer Sheet 5) 5
15. Cabinet door(s) shall have a hand operated one point stainless steel quarter turn latch to close
FRONT VIEW SIDE VIEW the door and shall have lift off type hinges with hinge pins - both stainless steel.
16. The meters may be installed in a fire facility cabinet with shown installation dimensions
CABINET GENERAL ARRANGEMENT to be maintained.
17. The meter tag shall have a hole to allow attachment to meter assembly.
0 0.4 0.8 1.2 1.6 2.0 metres 1 : 20
18. The meter tag needs to be of a material that is water proof and the required
SCALE - 1 : 20 information to be in a legible permanent print to identify the meter.

Revision Notes Scale AS SHOWN DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.20 WATER METER MANIFOLD
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
LOW HAZARD
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 10 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

BOUNDARY CONNECTION PARTS LIST


No. DESCRIPTION COMMENTS
A A
1 DN.32 'Sensus' Iperl Water Meter with Dual Check Valve Supplied by TasWater

2 DN.32 Gate Valve Supplied by TasWater

3 DN.32 Type 'A' Copper Pipework

4 B-Press Fittings or Equivalent


TasWater Responsibility Property Owner Responsibility 5 DN.32 BSP to Table E Flange Adaptor

Connection
Meter box
Concrete nib in

Point
Refer Note 5 75
footpath and paved areas
B B
Finished surface level

65

(+ 25)
200
C C

3 3
1
4 2 5 5 4
Direction of Flow

Bedding (50 min. thick)


D D
7 (Nom.) clean, single size metal

ELEVATION
1:5

VALVE & EQUIPMENT SCHEDULE


1. Only use products with watermark certification and approved for use by TasWater and listed
within City West Water's approved products catalogue.
GENERAL NOTES
E 1. All dimensions in millimeters (mm), unless noted otherwise. E
2. Installation must comply with manufacturer's written instructions.
3. All valves must be resilient seated, clockwise closing to AS 1628 with 316 stainless steel 2. Installation and fittings schedule is also suitable for DN.40 meter.
bolts and washers. 3. A 3mm clearance has been added where a gasket is required.
4. Unless approved otherwise the water meter/s, tails and meter boxes are to be supplied 4. All metallic pipe work to be 'Denso' wrapped, or equivalent where it comes in contact
by TasWater.
with concrete - to protect it from corrosion.
0 0.1 0.2 0.3 0.4 0.5 metres 5. Install and locate the meter assembly so that the meter can be easily read.
SCALE -1:5 6. Meter Box - "NDS" Pro Series Part No.222BCB.

Revision Notes Scale 1:5 DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.32 AND DN.40 WATER METERS
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
BELOW GROUND
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 11 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

BOUNDARY CONNECTION PARTS LIST


25mm Tapping for Pressure Testing, No. DESCRIPTION COMMENTS
Ball valve and 20mm plug.
A A
1 1 DN.32 'Sensus' Iperl Water Meter with Dual Check Valve Supplied by TasWater
11 11 11 11 3 8 2 DN.32 Gate Valve Supplied by TasWater

4 4 3 Medium Hazard DN.32 'ValvCheQ' DC03 Double Check Valve Owned, operated and
High hazard DN.32 'ValvCheQ' RPZD RP03 Valve Only maintained by Property Owner

4 DN.32 Type 'A' Copper Pipework


5 100mm (minimum) Reinforced Concrete Slab SL72 placed central

300 min.
8 2 10 10 12 7 13 12 6 Pipe Wrapped where Concrete will contact Pipe (Refer Note 5)
B 6 9 5 6 B
7 DN.32 Strainer Owned, operated and
maintained by Property Owner

8 B-Press Fittings or Equivalent

9 DN.32 x 25 Fem x Fem BSP Reducing Tee

10 DN.32 BSP to Table E Flange Adaptor


ELEVATION 11 DN.32 Nipple
1 : 10 12 DN.32 Ball Valve - Lockable Quarter Turn brass
C C

TasWater Responsibilty Property Owner Responsibility DZR with brass handle, resilient seated

13 Vent only applies to RPZD


(1027 / 1203)

11 9 12 11 7 12 8

Direction of Flow Direction of Flow

D GENERAL NOTES D

1. All dimensions in millimeters (mm), unless noted otherwise.


4 8 2 10 1 10 11 3 4 2. Installation and fittings schedule is also suitable for DN.40 meter.
3. Dimensions shown in brackets apply to (DN.32 / DN.40).
PLAN 4. A 3mm clearance has been added where a gasket is required.
1 : 10 5. All metallic pipe work to be 'Denso' wrapped, or equivalent where it comes in contact
VALVE & EQUIPMENT SCHEDULE with concrete - to protect it from corrosion.
1. Only use products with watermark certification and approved for use by TasWater and listed 6. Install and locate the meter assembly so that the meter can be easily read.
within City West Water's approved products catalogue.
E 7. Where a vented back flow prevention device is required such as a E
2. Installation must comply with manufacturer's written instructions. Reduced Pressure Zone Device (RPZD) it shall:
3. All valves must be resilient seated, clockwise closing to AS 1628 with 316 stainless steel - Comply with AS 3500 and AS 2845; and shall
bolts and washers.
- Have free ventilation to the atmosphere for the relief valve at all times.
4. Unless approved otherwise the water meter/s, tails and meter boxes are to be supplied - Not to be in an area that may be subject to ponding;
by TasWater.
- Have the relief drain outlet not less than 300mm above the surrounding surface.
0 0.2 0.4 0.6 0.8 1.0 metres 8. Install the meter assembly in cage in accordance with TWS-W-0003.
SCALE - 1 : 10 9. The Property Owner is responsible for the ongoing maintenance of the security cage.

Revision Notes Scale 1 : 10 DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.32 AND DN.40 WATER METERS
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
MEDIUM - HIGH HAZARD
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 12 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

10 10
BOUNDARY CONNECTION PARTS LIST
No. DESCRIPTION COMMENTS
A 5 5 A
1 DN.50 'Sensus' Meistream Plus Water Meter Supplied by TasWater
2 DN.50 'Sensus' WP-F Dirt Box Supplied by TasWater
3 DN.50 Gate Valve Supplied by TasWater
4 Low Hazard DN.50 'ValvCheQ' DCO3U Double Check Valve Owned, operated and

300 min.
9 3 11 2 1 6 11 4 9 Non-Testable maintained by Property Owner
5 DN.50 "Type A" Copper Water Pipe
8 7 Pipe Support Bracket 8
6 DN.50 x 200mm Hydrant Riser with 25mm Tapping for Supplied by TasWater
Refer Sheet 18
B Pressure Testing, 20mm Valve and Plug B

7 100mm (minimum) Reinforced Concrete Slab SL72 placed central


8 Pipe Wrapped where Concrete will contact Pipe (Refer Note 3)
9 B-Press Fittings or Equivalent
10 DN.50 BSP to Table E Flange Adaptor
11 DN.50 Nipple
ELEVATION
1 : 10
C C

TasWater Responsibility Property Owner Responsibility


1188

Direction of Flow Direction of Flow


VALVE & EQUIPMENT SCHEDULE
1. Only use products with watermark certification and approved for use by TasWater
and listed within City West Water's approved products catalogue.
D D
2. Installation must comply with manufacturer's written instructions.
11
3. All valves must be resilient seated, clockwise closing to AS 1628 with 316 stainless
5 9 3 2 1 6 10 4 9 5 steel bolts and washers.
11 10 4. Unless approved otherwise the water meter/s, tails and meter boxes are to be
supplied by TasWater.
PLAN
1 : 10
GENERAL NOTES
1. All dimensions in millimeters (mm), unless noted otherwise.
E E
2. A 3mm clearance has been added where a gasket is required.
3. All metallic pipe work to be 'Denso' wrapped, or equivalent where it comes in contact
with concrete - to protect it from corrosion.
4. Install and locate the meter assembly so that the meter can be easily read.
5. Install the meter assembly in cage in accordance with TWS-W-0003.
0 0.2 0.4 0.6 0.8 1.0 metres
6. The Property Owner is responsible for the ongoing maintenance of the security cage.
SCALE - 1 : 10

Revision Notes Scale 1 : 10 DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.50 WATER METER
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
LOW HAZARD
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 13 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

11 11 12 4
GENERAL NOTES
5 5 1. All dimensions in millimeters (mm), unless noted otherwise.
A A
2. A 3mm clearance has been added where a gasket is required.
3. All metallic pipe work to be 'Denso' wrapped, or equivalent where it comes in contact
with concrete - to protect it from corrosion.
4. Install and locate the meter assembly so that the meter can be easily read.

300 min.
10 3 12 2 1 7 12 13 9 14 13 10 5. Where a vented back flow prevention device is required such as a
Reduced Pressure Zone Device (RPZD) it shall:
8 6 8 - Comply with AS 3500 and AS 2845; and shall
- Have free ventilation to the atmosphere for the relief valve at all times.
B - Not be in an area that may be subject to ponding; B
- Have the relief drain outlet not less than 300mm above the surrounding surface.
6. Install the meter assembly in cage in accordance with TWS-W-0003.

Pipe Support Bracket 7. The Property Owner is responsible for the ongoing maintenance of the security cage.
Refer Sheet 18
ELEVATION VALVE & EQUIPMENT SCHEDULE
1 : 10
1. Only use products with watermark certification and approved for use by TasWater
TasWater Responsibility Property Owner Responsibility and listed within City West Water's approved products catalogue.
C 2. Installation must comply with manufacturer's written instructions. C
1590
3. All valves must be resilient seated, clockwise closing to AS 1628 with 316 stainless
13 13 steel bolts and washers.
Direction of Flow Direction of Flow 4. Unless approved otherwise the water meter/s, tails and meter boxes are to be
supplied by TasWater.

12
5 10 3 2 1 7 11 12 9 4 10 5
D 12 11 D
PLAN
1 : 10

BOUNDARY CONNECTION PARTS LIST No. DESCRIPTION COMMENTS


No. DESCRIPTION COMMENTS 7 DN.50 x 200mm Hydrant Riser with 25mm Tapping for Supplied by TasWater
Pressure Testing, 20mm Valve and Plug
1 DN.50 'Sensus' Meistream Plus Water Meter Supplied by TasWater
2 DN.50 'Sensus' WP-F Dirt Box Supplied by TasWater 8 Pipe Wrapped where Concrete will contact Pipe (Refer Note 3)
3 DN.50 Gate Valve Supplied by TasWater 9 DN.50 Strainer Owned, operated and
E maintained by Property Owner E
4 Medium Hazard DN.50 'ValvCheQ' DCO3 Double Check Valve Owned, operated and
High hazard DN.50 'ValvCheQ' RPZD RP03 Valve Only maintained by Property Owner 10 B-Press Fittings or Equivalent
5 DN.50 "Type A" Copper Water Pipe 11 DN.50 BSP to Table E Flange Adaptor
6 100mm (minimum) Reinforced Concrete Slab SL72 placed central 12 DN.50 Nipple
13 DN.50 Ball Valve
0 0.2 0.4 0.6 0.8 1.0 metres
14 Vent only Applies to RPZD
SCALE - 1 : 10

Revision Notes Scale 1 : 10 DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.50 WATER METER
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
MEDIUM - HIGH HAZARD
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 14 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

BOUNDARY CONNECTION PARTS LIST


No. DESCRIPTION COMMENTS
A A
1 DN.65 'Sensus' Meistream Plus Water Meter Supplied by TasWater
2 DN.65 'Sensus' WP-F Dirt Box Supplied by TasWater
3 DN.65 Lug Type Butterfly Valve with Worm Gear Actuator Supplied by TasWater

5 4 Low Hazard DN.65 'ValvCheQ' DCO3U Double Check Owned, operated and
5
Valve Non-Testable maintained by Property Owner

5 DN.65 PN16 Metallic Water Pipe Copper not to be used for DN.100
6 DN.65 x 200mm Hydrant Riser with 25mm Tapping for Supplied by TasWater
B Pressure Testing, 20mm Valve and Plug B

300 min.
3 2 1 6 4
7 100mm (minimum) Reinforced Concrete Slab SL72 placed central
8 7 8 8 Pipe Wrapped where Concrete will contact Pipe (Refer Note 5)

Pipe Support Bracket


C C
Refer Sheet 18

ELEVATION
1 : 10 VALVE & EQUIPMENT SCHEDULE
1. Only use products with watermark certification and approved for use by TasWater
TasWater Responsibility Property Owner Responsibility and listed within City West Water's approved products catalogue.
2. Installation must comply with manufacturer's written instructions.
3. All valves must be resilient seated, clockwise closing to AS 1628 with 316 stainless
(752 / 827 / 858) (403 / 403 / 541) steel bolts and washers.
D D
4. Unless approved otherwise the water meter/s, tails and meter boxes are to be
Direction of Flow Direction of Flow
supplied by TasWater.

GENERAL NOTES
1. All dimensions in millimeters (mm), unless noted otherwise.
5 3 2 1 6 4 5 2. Installation and fittings schedule is also suitable for DN.80 and DN.100 meters.
3. Dimensions shown in brackets apply to (DN.65 / DN.80 / DN.100).
E E
PLAN 4. A 3mm clearance has been added where a gasket is required.
1 : 10
5. All metallic pipe work to be 'Denso' wrapped, or equivalent where it comes in contact
with concrete - to protect it from corrosion.
6. Install and locate the meter assembly so that the meter can be easily read.
7. Install the meter assembly in cage in accordance with TWS-W-0003.
0 0.2 0.4 0.6 0.8 1.0 metres
8. The Property Owner is responsible for the ongoing maintenance of the security cage.
SCALE - 1 : 10

Revision Notes Scale 1 : 10 DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.65, DN.80 AND DN.100 WATER METERS
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
LOW HAZARD
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 15 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

GENERAL NOTES
1. All dimensions in millimeters (mm), unless noted otherwise.

A
2. Installation and fittings schedule is also suitable for DN.80 and DN.100 meters. A
5 5 3. Dimensions shown in brackets apply to (DN.65 / DN.80 / DN.100).
4. A 3mm clearance has been added where a gasket is required.
5. All metallic pipe work to be 'Denso' wrapped, or equivalent where it comes in contact
with concrete - to protect it from corrosion.
6. Install and locate the meter assembly so that the meter can be easily read.
7. Where a vented back flow prevention device is required such as a
3 2 1 6 3 9 10 4 3

300 min.
Reduced Pressure Zone Device (RPZD) it shall:
- Comply with AS 3500 and AS 2845; and shall
B - Have free ventilation to the atmosphere for the relief valve at all times. B
8 7 Pipe Support Bracket 8
Refer Sheet 18 - Not be in an area that may be subject to ponding;
- Have the relief drain outlet not less than 300mm above the surrounding surface.
8. Install the meter assembly in cage in accordance with TWS-W-0003.
9. The Property Owner is responsible for the ongoing maintenance of the security cage.

VALVE & EQUIPMENT SCHEDULE


1. Only use products with watermark certification and approved for use by TasWater
C
ELEVATION and listed within City West Water's approved products catalogue.
C
1 : 10 2. Installation must comply with manufacturer's written instructions.
3. All valves must be resilient seated, clockwise closing to AS 1628 with 316 stainless
TasWater Responsibility Property Owner Responsibility
steel bolts and washers.
4. Unless approved otherwise the water meter/s, tails and meter boxes are to be
(752 / 827 / 858) (778 / 810 / 1012) supplied by TasWater.

Direction of Flow Direction of Flow


BOUNDARY CONNECTION PARTS LIST
No. DESCRIPTION COMMENTS
D 1 DN.65 'Sensus' Meistream Plus Water Meter Supplied by TasWater D

2 DN.65 'Sensus' WP-F 250mm Dirt Box Supplied by TasWater


3 DN.65 Lug Type Butterfly Valve with Worm Gear Actuator Supplied by TasWater
5 3 2 1 6 3 9 4 3 5
4 Medium Hazard DN.65 'ValvCheQ' DCO3U Double Check Valve Owned, operated and
High Hazard DN.65 'ValvCheQ' RPZD RP03 Valve Only maintained by Property Owner
PLAN
1 : 10 5 DN.65 PN16 Metallic Water Pipe Copper not to be used for DN.100
6 DN.65 x 200mm Hydrant Riser with 25mm Tapping for Supplied by TasWater
Pressure Testing, 20mm Valve and Plug
E E
7 100mm (minimum) Reinforced Concrete Slab SL72 placed central
8 Pipe Wrapped where Concrete will contact Pipe (Refer Note 5)
9 DN.65 Strainer Owned, operated and
maintained by Property Owner

0 0.2 0.4 0.6 0.8 1.0 metres 10 Vent only applies on High Hazard installations where
SCALE - 1 : 10 a RPZD is used

Revision Notes Scale 1 : 10 DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.65, DN.80 AND DN.100 WATER METERS
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
MEDIUM - HIGH HAZARD
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 16 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

1 7 1 BOUNDARY CONNECTION PARTS LIST


No. DESCRIPTION COMMENTS
A 1 DN.100 Lug type Butterfly Valve with Worm Gear Actuator 1 x Supplied by TasWater A

2 Low Hazard 'ValvCheQ' DN.100 SDCT03 Single Check Valve Owned, operated and
3 maintained by Property Owner
3
3 DN.100 PN16 Metallic Water Pipe Copper not to be used
4 Metered Bypass Supplied by TasWater
5 100mm (minimum) Reinforced Concrete Slab SL72 placed central
6 Pipe Wrapped where Concrete will contact Pipe (Refer Note 3)
330

300 min.
7 'Sensus' Meter size for Low Flow Bypass DN.25 Bypass for DN.100 - DN.150
B B
5 440 DN.32 Bypass for DN.200
6 6
DN.40 Bypass for >DN.200

Tee
Direction of Flow Domestic Assembly 25mm and above
ELEVATION (Refer separate sheets)
C 1 : 10 C

Dedicated Fire Service


TasWater Responsibilty Property Owner Responsibility
PLAN - DOMESTIC ASSEMBLY
3 1 2 1 3
Direction of Flow Direction of Flow 1 : 20

VALVE & EQUIPMENT SCHEDULE


1. Only use products with watermark certification and approved for use by TasWater and listed
within City West Water's approved products catalogue.
D D
2. Installation must comply with manufacturer's written instructions.
3. All valves must be resilient seated, clockwise closing to AS 1628 with 316 stainless steel bolts and washers.
4. Unless approved otherwise the water meter/s, tails and meter boxes are to be supplied by TasWater.
4
GENERAL NOTES
1. All dimensions in millimeters (mm), unless noted otherwise.
2. Install and locate the meter assembly so that the meter can be easily read.
7
3. All metallic pipe work to be 'Denso' wrapped, or equivalent where it comes in contact
E
PLAN with concrete - to protect it from corrosion. E
1 : 10
4. Where a vented back flow prevention device is required such as a Reduced Pressure Zone Device (RPZD), it shall:
- Comply with AS 3500 and AS 2845; and shall
- Have free ventilation to the atmosphere for the relief valve at all times;
0 0.2 0.4 0.6 0.8 1.0 metres
- Not be in an area that may be subject to ponding;
SCALE - 1 : 10
- Have the relief drain outlet not less than 300mm above the surrounding surface.
0 0.4 0.8 1.2 1.6 2.0 metres 5. Install the meter assembly in cage in accordance with TWS-W-0003.
SCALE - 1 : 20 6. The Property Owner is responsible for the ongoing maintenance of the security cage.

Revision Notes Scale 1 : 10 DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.100 WATER METER
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
FIRE CONNECTION
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 17 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

BOUNDARY CONNECTION PARTS LIST No. DESCRIPTION COMMENTS


A No. DESCRIPTION COMMENTS 6 Low Hazard DN.100 'ValvCheQ' DCO3 Double Check Non-Testable Valve Owned, operated and A
Medium Hazard DN.100 'ValvCheQ' DCO3 Double Check Testable Valve maintained by Property Owner
1 DN.100 'EuroMag MUT 2200' EL Flow Meter Supplied by TasWater
High Hazard DN.100 'ValvCheQ' RPZD RP03 Complete Assembly
2 DN.100 Strainer Owned, operated and
maintained by Property Owner 7 Earth Stake through 50mm Conduit

3 DN.100 Lug Type Butterfly Valve with Worm Gear Actuator 1 x Supplied by TasWater 8 DN.100 x 200mm Hydrant Riser with 25mm Tapping Supplied by TasWater
for Pressure Testing, 20mm Valve and Plug
4 DN.100 Lug Type Butterfly Valve with Worm Gear Actuator or Approved Equivalent
- Not Required for Non-Testable Backflow Devices 9 100mm (minimum) Reinforced Concrete Slab SL72 placed central

5 DN.100 PN16 Metallic Water Pipe Copper not to be used 10 Concrete Thrust Block made to WSAA Standard (Refer MRWA-W-205)

B 11 Pipe Wrapped where Concrete will contact Pipe (Refer Note 3) B

12 Main Isolator Supplied by TasWater

VALVE & EQUIPMENT SCHEDULE


1. Only use products with watermark certification and approved for use by TasWater and listed
within City West Water's approved products catalogue.
2. Installation must comply with manufacturer's written instructions. TasWater Responsibility Property Owner Responsibility
3. All valves must be resilient seated, clockwise closing to AS 1628 with 316 stainless steel bolts and washers.
4. Unless approved otherwise the water meter/s, tails and meter boxes are to be supplied by TasWater. 1220

C Direction of Flow C

GENERAL NOTES 3 4

1. All dimensions in millimeters (mm), unless noted otherwise. WARNING


2. A 3mm clearance has been added where a gasket is required. Where a metallic water service is to be replaced using non
metallic pipe a licensed electrician shall assess affected
3. All metallic pipework to be 'Denso' wrapped, or equivalent where it
property's electricity supply for defects and the likely
comes in contact with concrete - to protect it from corrosion.

(3 x DN)
effect on earthing adequacy. Work can commence once the

300
electrician declares in writing that it is safe to proceed. 5 8 2 6
4. Where a vented back flow prevention device is required such as a 5

300 min.
Reduced Pressure Zone Device (RPZD) it shall:
- Comply with AS 3500 and AS 2845; and shall
D 1 D
- Have free ventilation to the atmosphere for the relief valve at all times.
9
- Not be in an area that may be subject to ponding;
- Have the relief drain outlet not less than 300mm above the surrounding surface.
5. Install the meter assembly in cage in accordance with TWS-W-0003.

500 (min.)
(5 x DN)
6. The Property Owner is responsible for the ongoing maintenance of the security cage.
7. Install and locate the meter assembly so that the meter can be easily read. 11 11
12 7
8. The Magflow Meter requires a straight length of pipe measured from the centre of the meter:
- To an upstream length of 5 times the Nominal diameter; and
Direction of Flow
- To a downstream length of 3 times the Nominal diameter to minimize turbulance.
E 9. Earth the meter as per manufacturer's specifications. E

10. Locate the meter in an upright position to ensure accuracy. 10


11. Install main isolator in ground to ensure minimum turbulence near the meter.
12. Concrete slab to have 50mm conduit for correct installation of earth stake.

ELEVATION
0 0.4 0.8 1.2 1.6 2.0 metres
1 : 20
SCALE - 1 : 20
Revision Notes Scale 1 : 10 DRAWING ISSUE
5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and DN.100 WATER METER
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
ELECTROMAGNETIC FLOW METER
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 18 of 19 5

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

'Unistrut' UN6 two-piece pipe clamp


A A
or, approved equivalent

140

= =

30 30
Fillet weld DN15 pipe 140 x 60 x 10
to pipe clamp Plate

B M8 Locking Bolt B
50

250

=
Height adjustable Stand

60
Refer Note 5

=
250

Fillet weld DN20 pipe Drill 2 holes for M10


Base Plate - Refer Detail to base Plate chemical anchors
C C
DN20 pipe

BASE PLATE
FRONT VIEW SIDE VIEW 1:2

'Unistrut' UN6 two-piece pipe clamp


or, approved equivalent

D D

Base Plate - Refer Detail

PLAN VIEW GENERAL NOTES


1. All dimensions in millimeters (mm), unless noted otherwise.
2. All materials and fixings to be galvanised mild steel.
PIPE SUPPORT BRACKET 3. Secure base plate to either a concrete slab or concrete footings with M10 chemical anchors.
E E
1:5 4. Pour 300 x 300 x 300 concrete footings if no concrete slab is present.
5. Height Adjustable Stand
- Weld to base plate 250 long x DN20 (wt 2.11) pipe.
0 0.04 0.08 0.12 0.16 0.20 metres - Weld to pipe clamp 250 long x DN15 (wt 2.11) pipe.
SCALE -1:2 - Insert DN15 pipe into DN20 adjust height to suit.
0 0.1 0.2 0.3 0.4 0.5 metres - Drill hole through DN15 pipe and secure with locking bolt.
SCALE -1:5 6. Select the pipe clamp to suit the pipe diameter.

Revision Notes Scale AS SHOWN DRAWING ISSUE


5. AMENDMENTS TO SHEETS 7, 12 AND 17 Datum N/A Drawn R. HAWLEY
TASWATER STANDARD DRAWING
F 07/02/2017
F
Sheet Size A3 Designed R. CAMERON 08/02/2017 PROPERTY SERVICE CONNECTIONS
Verified R. JAMES 20/03/2017 This drawing and the information it contains is, and PIPE SUPPORT BRACKET
remains the property of TasWater and must not be
Project No. JR16982-035 Discipline W disclosed to third parties, or copied or reproduced wholly
or in part or in any format without the written consent
DETAILS
of the owners. The information contained herein is also
Vault Folder STANDARDS C 2018 correct and up-to-date, but all details should be verified Sheet Number REVISION
TASMANIAN WATER & SEWAGE CORPORATION PTY LTD

Drawing
Number
Rev. 5 Date 31/10/2018 Approved G. HENDERSON References HPRM File Ref. T15/82-006-0004
on site by the user prior to construction.
This drawing is produced on an A3 size sheet,
DO NOT SCALE a sheet plotted at any other size.
ABN: 47 162220 653 TWS-W-0002 19 of 19 5

1 2 3 4 5 6 7 8

Potrebbero piacerti anche