A plate will be installed to close the ring with the appropriate length. The plate to use in the close of the ring was requested to the USA
shop and the plate is shiping on Feb 9/2018 and it will stay on site around Feb 17/2018.
Responsible/Responsable: Date/Fecha:
Responsible for the Implementation Term for the Implementation Date for Control and Monitoring
Responsable de la Implementación Plazo para la Implementación Fecha para el Control y Seguimiento
2/18/2018 7/2/2018
C: MONITORING AND CONTROL / SEGUIMIENTO Y CONTROL:
Verification of Implementation by: Effectiveness check by:
Comprobación de la Implantación por: Comprobación de efectividad por:
Te plate added the length short was ordered to USA TTI Shop The plate arrived on site pit 100-1 on Sunday, Feb 18/2018
D: REMARKS / OBSERVACIONES:
The plate was installed and was verified and the diameter is correct.