DESCRIPCIÓN Jul-17 Aug-17 Sep-17 Oct-17 Nov-17

ITEM MONTO
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL
DEL 08 AL 31 DEL 01 AL 31 DEL 01 AL 30 DEL 01 AL 31 DEL 01 AL 04
CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO – SAN IGNACIO - CAJAMARCA"

BLOQUE 01: 06 AULAS

OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.2.1 EXCAVACION DE CIMIENTOS CORRIDOS Y VIG. CONEX. 4,546.08 4,546.08
OE.2.1.6 ELIMINACION .MAT.EXCED. EN CARRETILLA D = 30 max. 4,364.68 4,364.68
OE.2.1.4.1 RELLENO COMPACATDO PARA ESTRUCTURAS CON MATERIAL PROPIO 435.85 435.85
OE.2.1.4.2 RELLENO Y COMPACTADO CON AFIRMADO H=0.30M EN PISOS Y ZAPATAS 7,613.48 7,613.48
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.3 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON 2,058.63 2,058.63
OE.2.2.1 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 6,731.23 6,731.23
OE.2.2.6.1 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. 1,326.36 1,326.36
OE.2.2.6.2 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO 1,615.44 1,615.44
OE.2.2.9 CONCRETO EN FALSO PISO MEZCLA 1:10 CEMENTO-HORMIGON E=4" 5,783.89 5,783.89
OE.2.2.9 CANALETA DE CONCRETO MEZCLA 1:10 CEMENTO-HORMIGON E=10CM 2,147.24 2,147.24
OE.2.2.6.1 ENCOFRADO Y DESENCOFRADO DE CANALETA 1,905.77 1,905.77
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.2 ZAPATAS
OE.2.3.2.1 CONCRETO EN ZAPATAS F'c = 210 Kg/cm2 17,031.73 8515.87 8515.87
OE.2.3.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA ZAPATAS 8,970.55 4485.28 4485.28
OE.2.3.3 VIGAS DE CONEXION
OE.2.3.3.1 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 4,528.26 4,528.26
OE.2.3.3.2 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION 5,257.85 5,257.85
OE.2.3.3.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS DE CIMENTACION 7,200.90 7,200.90
OE.2.3.7 COLUMNAS
OE.2.3.7.1 CONCRETO EN COLUMNAS F´c = 210 Kg/cm2 8,676.89 8,676.89
OE.2.3.7.2 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 13,274.46 13,274.46
OE.2.3.7.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA COLUMNAS 35,153.65 35,153.65
OE.2.3.8 VIGAS
OE.2.3.8.1 CONCRETO EN VIGAS F'C=210 KG/CM2 21,256.13 21,256.13
OE.2.3.8.2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS 26,424.85 26,424.85
OE.2.3.8.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS 26,416.15 26,416.15
OE.2.3.9.2 LOSAS ALIGERADAS
OE.2.3.9.2.1 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 18,344.34 6,420.52 6,420.52 5,503.30
OE.2.3.9.2.2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS 28,082.00 9,828.70 9,828.70 8,424.60
OE.2.3.9.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA LOSAS ALIGERADAS 13,822.19 4,837.77 4,837.77 4,146.66
OE.2.3.9.2.4 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO 5,971.32 2,089.96 2,089.96 1,791.40
OE.2.3.9.2.5 LADRILLO DE ARCILLA HUECO 7X30X30 PROV.Y COLOCADO 8,982.39 3,143.84 3,143.84 2,694.72
OE.3.1 ALBAÑILERIA
OE.3.1.1 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARENA 10,359.95 5179.98 5179.98
OE.3.1.1 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA 10,519.75 5259.88 5259.88
OE.3 ARQUITECTURA
OE.3.2 REVOQUES ENLUCIDOS Y MOLDURAS
OE.3.2.2 TARRAJEO PRIMARIO EN MURO INTERIOR C/MORTERO 1:5 14,698.16 11023.62 3674.54
OE.3.2.5 TARRAJEO PRIMARIO EN COLUMNA C/MORTERO 1:5 7,257.63 7,257.63

OE.3.2.6 TARRAJEO PRIMARIO EN VIGA C/MORTERO 1:5 5,762.35 5,762.35


OE.3.2.4 TARRAJEO PRIMARIO EN DERRAMES C/MORTERO 1:5 14,238.85 14,238.85
OE.3.2.19 BRUÑAS 11,559.75 11,559.75
OE.3.3 CIELORRASOS
OE.3.3.3 CIELO RASO C/MORTERO 1:4 X 1.5CM. 14,181.31 14,181.31
OE.3.4 PISOS Y PAVIMENTOS
OE.3.4.1 CONTRAPISO DE 1 1/2". 8,467.20 8,467.20
OE.3.4.2.21 PISO DE CERAMICA DE COLOR OSCURO DE 40X40 CM. 20,154.24 20,154.24
OE.3.4.4 VEREDAS PISO DE CEMENTO PULIDO Y BRUÑADO E=2" S/COLOREAR 5,520.44 5,520.44
OE.3.5 CONTRAZOCALOS
OE.3.5.1.4 CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM 1,966.58 1,966.58
OE.3.6 CUBIERTAS
OE.3.6.9.1 COBERTURA TIPO TEJA ANDINA 14,285.24 14,285.24
OE.3.6.9.2 CUMBRERA TIPO TEJA ANDINA 28,071.52 28,071.52
OE.3.7 CARPINTERIA DE MADERA
OE.3.7.3 LISTONES DE MADERA PARA SOPORTE DE PLANCHA TIPO TEJA ANDINA 3,753.41 3,753.41
OE.3.8 CARPINTERIA METALICA
OE.3.8.10 PUERTAS CON PLANCHA ACANALADA 5,335.81 5,335.81
OE.3.8.1 VENTANA DE FIERRO 11,791.83 11,791.83
OE.3.8.18 REJILLA EN LAS CANALETAS (0.30 DE ANCHO ) 3,154.68 3,154.68
OE.4.5.1 CANALETA PLUVIAL INCLUIDO GANCHOS Y SOPORTE 4,371.71 2185.855 2185.855
OE.4.5.2 BAJADA PLUVIAL CON TUBERIA DE PVC SAL 4" 565.50 565.50
OE.2.6.1 JUNTAS SELLADORA CON SILICONA EN VENTANAS 1,898.10 1,898.10
OE.3.9 CERRAJERIA
OE.3.9.1.1 BISAGRA ALUMINIZADA DE 4" EN PUERTAS 459.60 459.60
OE.3.9.1.1 BISAGRA ALUMINIZADA DE 2.5" EN VENTANAS 1,608.60 1,608.60
OE.3.9.2.1 CERRADURA DOS GOLPES EN PUERTA 583.98 583.98
OE.3.9.2.2 CERROJO SAPITO EN VENTANA 462.00 462.00
OE.3.9.5 MANIJA DE BRONCE PARA PUERTAS DE FIERRO 214.20 214.20
OE.3.10 VIDRIOS, CRISTALES Y SIMILARES
OE.3.10.2 VIDRIOS SEMIDOBLES IMPORTADO 16,284.57 16,284.57
OE.3.11 PINTURA
OE.3.11.1.1 PINTURA LATEX 2 MANOS EN CIELO RASO Y VIGAS 9,171.85 9,171.85
OE.3.11.1.2 PINTURA LATEX 2 MANOS EN MUROS Y COLUMNAS 12,153.52 12,153.52
OE.3.11.1.3 PINTURA LATEX 2 MANOS EN VESTIDURAS Y BRUÑAS 24,404.59 24,404.59
OE.3.11.2 PINTURA ANTICORROSIBA EPOXICA Y ESMALTE EN PUERTAS ANCANALADAS 412.24 412.24
OE.3.11.3 PINTURA ANTICORROSIBA EPOXICA Y ESMALTE EN VENTANAS 2,436.68 2,436.68
OE.3.11.6 PINTURA ANTICORROSIBA EPOXICA Y ESMALTE EN REJILLAS 1,701.17 1,701.17
OE.3.11.5 PINTURA ESMALTE EN ZOCALO 2 MANOS_x000D_ 1,728.72 1,728.72
OE.3.12 SEGURIDAD
VARIOS, LIMPIEZA Y JARDINERIA
OE.3.12.1 PIZARRA ACRILICA DE 4.00 m x 1.25 m. 1,759.02 1,759.02
OE.3.12.2 JUNTA DE DILATACIÒN CON ESPUMA PLÀSTICA Y JEBE MICROPOROSO 557.21 557.21
OE.3.12.3 JUNTAS DE DILATACION EN PISO ASFALTICAS 890.82 890.82
OE.5 INSTALACIONES ELECTRICAS
OE.5.2 SALIDA PARA ALUMBRADO
OE.5.2.1 SALIDA PARA CENTROS DE LUZ EN TECHO 3,359.52 3,359.52

OE.5.2 SALIDA PARA TOMACORRIENTES


OE.5.2.1 SALIDA PARA TOMACORRIENTE EMPOTRADO EN PARED DOBLE_x000D_ 2,421.60 2,421.60
OE.5.2.7 C/TOMA A TIERRA,
TABLEROS 20A, 220V
ELECTRICO
OE.5.2.7.1 TABLEROS DISTRIBUCION CAJA METALICA CON 12 POLOS 1,206.24 1,206.24
OE.5.5 ARTEFACTOS DE ILUMINACION
OE.5.5.1.1 ARTEFACTO DOBLE MODELO TECNOLIGHT DE 36 W C /BALASTO_x000D_ 2,261.76 2,261.76
OE.5.5.1.2 ELECTRONICO
ARTEFACTO SIMPLE MODELO SPOTS DOWNLED DE 32 WATS 1,199.76 599.88 599.88
OE.5.2.8 SUMINISTRO E INSTALACION DE INTERRUPTORES
OE.5.2.8.1 INTERRUPTOR UNIPOLAR SIMPLE 103.44 103.44
OE.5.2.8.2 INTERRUPTOR BIPOLAR SIMPLE 131.28 131.28
OE.5.2.4 TUBERIAS Y ACCESORIOS
OE.5.2.4.1 TUBERIA PVC SEL ( ELECTRICAS ) d = 3/4", EMPOTRADA EN PISO,_x000D_ 1,103.91 1,103.91
OE.5.2.4.2 PARED
TUBERIA PVC SEL ( ELECTRICAS ) d = 3/4",EMPOTRADA EN TECHO 2,094.36 2,094.36
COSTO DIRECTO 574,546.96 38,751.09 235,934.54 187,054.74 108,773.72 4,032.87
GASTOS GENERALES (10% C.D.) 57,454.70 3,875.11 23,593.45 18,705.47 10,877.37 403.29
UTILIDAD (6% C.D.) 34,472.82 2,325.07 14,156.07 11,223.28 6,526.42 241.97

SUBTOTAL 666,474.48 44,951.26 273,684.07 216,983.50 126,177.51 4,678.13


IMPUESTO GENERAL A LAS VENTAS(18%) 119,965.41 8,091.23 49,263.13 39,057.03 22,711.95 842.06
MONTO TOTAL 786,439.89 53,042.49 322,947.20 256,040.53 148,889.46 5,520.19
FACTOR DE RELACION 1.00000 1.00000 1.00000 1.00000 1.00000 1.00000
MONTO CONTRACTUAL 786,439.89 53,042.49 322,947.20 256,040.53 148,889.46 5,520.19
% DE AVANCE MENSUAL 6.74% 41.06% 32.56% 18.93% 0.70%
% DE AVANCE ACUMULADO 6.74% 47.81% 80.37% 99.30% 100.00%
VALORIZACION DE OBRA N° 01 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 08/07/2017 AL 31/07/2017

Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN
IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %

OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.2.1 EXCAVACION DE CIMIENTOS CORRIDOS Y VIG. CONEX. m3 246.40 18.45 4,546.08 246.40 4,546.08 246.40 4,546.08 0.00 0.00 0.00%
OE.2.1.6 ELIMINACION .MAT.EXCED. EN CARRETILLA D = 30 max. m3 285.46 15.29 4,364.68 285.46 4,364.68 285.46 4,364.68 0.00 0.00 0.00%
OE.2.1.4.1 RELLENO COMPACATDO PARA ESTRUCTURAS CON MATERIAL Pm3 18.04 24.16 435.85 14.43 348.68 14.43 348.68 3.61 87.17 20.00%
OE.2.1.4.2 RELLENO Y COMPACTADO CON AFIRMADO H=0.30M EN PISOS Y m3 62.58 121.66 7,613.48 50.06 6,090.78 50.06 6,090.78 12.52 1,522.70 20.00%
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.3 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 75.38 27.31 2,058.63 45.23 1,235.18 45.23 1,235.18 30.15 823.45 40.00%
OE.2.2.1 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% m3 28.55 235.77 6,731.23 17.13 4,038.74 17.13 4,038.74 11.42 2,692.50 40.00%
OE.2.2.6.1 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 4.18 317.31 1,326.36 0.00 0.00 0.00 0.00 4.18 1,326.36 100.00%
OE.2.2.6.2 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 43.09 37.49 1,615.44 0.00 0.00 0.00 0.00 43.09 1,615.44 100.00%
OE.2.2.9 CONCRETO EN FALSO PISO MEZCLA 1:10 CEMENTO-HORMIGONm2 152.73 37.87 5,783.89 0.00 0.00 0.00 0.00 152.73 5,783.89 100.00%
OE.2.2.9 CANALETA DE CONCRETO MEZCLA 1:10 CEMENTO-HORMIGON m3 4.71 455.89 2,147.24 0.00 0.00 0.00 0.00 4.71 2,147.24 100.00%
OE.2.2.6.1 ENCOFRADO Y DESENCOFRADO DE CANALETA m2 53.82 35.41 1,905.77 0.00 0.00 0.00 0.00 53.82 1,905.77 100.00%
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.2 ZAPATAS
OE.2.3.2.1 CONCRETO EN ZAPATAS F'c = 210 Kg/cm2 m3 37.69 451.89 17,031.73 18.84 8,515.87 18.84 8,515.87 18.85 8,515.87 50.00%
OE.2.3.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA ZAPATAS kg 1,794.11 5.00 8,970.55 897.06 4,485.28 897.06 4,485.28 897.06 4,485.28 50.00%

4
VALORIZACION DE OBRA N° 01 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 08/07/2017 AL 31/07/2017

Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN
IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %
OE.2.3.3 VIGAS DE CONEXION
OE.2.3.3.1 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 9.30 486.91 4,528.26 0.00 0.00 0.00 0.00 9.30 4,528.26 100.00%
OE.2.3.3.2 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 74.40 70.67 5,257.85 0.00 0.00 0.00 0.00 74.40 5,257.85 100.00%
OE.2.3.3.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS DE CIMENTACkg 1,440.18 5.00 7,200.90 0.00 0.00 0.00 0.00 1,440.18 7,200.90 100.00%
OE.2.3.7 COLUMNAS
OE.2.3.7.1 CONCRETO EN COLUMNAS F´c = 210 Kg/cm2 m3 18.40 471.57 8,676.89 0.00 0.00 0.00 0.00 18.40 8,676.89 100.00%
OE.2.3.7.2 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 166.43 79.76 13,274.46 0.00 0.00 0.00 0.00 166.43 13,274.46 100.00%
OE.2.3.7.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA COLUMNAS kg 7,030.73 5.00 35,153.65 0.00 0.00 0.00 0.00 7,030.73 35,153.65 100.00%
OE.2.3.8 VIGAS
OE.2.3.8.1 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 39.74 534.88 21,256.13 0.00 0.00 0.00 0.00 39.74 21,256.13 100.00%
OE.2.3.8.2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 325.71 81.13 26,424.85 0.00 0.00 0.00 0.00 325.71 26,424.85 100.00%
OE.2.3.8.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS kg 5,283.23 5.00 26,416.15 0.00 0.00 0.00 0.00 5,283.23 26,416.15 100.00%
OE.2.3.9.2 LOSAS ALIGERADAS
OE.2.3.9.2.1 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 34.58 530.49 18,344.34 0.00 0.00 0.00 0.00 34.58 18,344.34 100.00%
OE.2.3.9.2.2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERA m2 475.00 59.12 28,082.00 0.00 0.00 0.00 0.00 475.00 28,082.00 100.00%
OE.2.3.9.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA LOSAS ALIGERADAS kg 2,607.96 5.30 13,822.19 0.00 0.00 0.00 0.00 2,607.96 13,822.19 100.00%
OE.2.3.9.2.4 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO und 2,117.49 2.82 5,971.32 0.00 0.00 0.00 0.00 2,117.49 5,971.32 100.00%
OE.2.3.9.2.5 LADRILLO DE ARCILLA HUECO 7X30X30 PROV.Y COLOCADO und 3,957.00 2.27 8,982.39 0.00 0.00 0.00 0.00 3,957.00 8,982.39 100.00%
OE.3.1 ALBAÑILERIA
OE.3.1.1 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARE m2 126.31 82.02 10,359.95 0.00 0.00 0.00 0.00 126.31 10,359.95 100.00%
OE.3.1.1 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENAm2 149.79 70.23 10,519.75 0.00 0.00 0.00 0.00 149.79 10,519.75 100.00%
COSTO DIRECTO 308,802.01 0.00 33,625.28 33,625.29 275,176.75
GASTOS GENERALES FIJOS (10.00% CD) 0.10000 30,880.20 - 3,362.53 3,362.53 27,517.68
UTILIDAD (6.00 % CD) 0.06000 18,528.12 - 2,017.52 2,017.52 16,510.61
SUB TOTAL 358,210.33 0.00 39,005.33 39,005.34 319,205.04
TOTAL (F.R.=1.00000) 1.00000 358,210.33 0.00 39,005.33 10.89% 39,005.34 319,205.04 89.11%

5
VALORIZACION DE OBRA N° 02 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/08/2017 AL 31/08/2017

Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN
IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %

OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.2.1 EXCAVACION DE CIMIENTOS CORRIDOS Y VIG. CONEX. m3 246.40 18.45 4,546.08 246.40 4,546.08 0.00 0.00 246.40 4,546.08 0.00 0.00 0.00%
OE.2.1.6 ELIMINACION .MAT.EXCED. EN CARRETILLA D = 30 max. m3 285.46 15.29 4,364.68 285.46 4,364.68 0.00 0.00 285.46 4,364.68 0.00 0.00 0.00%
OE.2.1.4.1 RELLENO COMPACATDO PARA ESTRUCTURAS CON MATERIAL Pm3 18.04 24.16 435.85 14.43 348.68 3.61 87.17 18.04 435.85 0.00 0.00 0.00%
OE.2.1.4.2 RELLENO Y COMPACTADO CON AFIRMADO H=0.30M EN PISOS Y m3 62.58 121.66 7,613.48 50.06 6,090.78 12.52 1,522.70 62.58 7,613.48 0.00 0.00 0.00%
OE.2.2 OBRAS DE CONCRETO SIMPLE 0.00 0.00
OE.2.2.3 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 75.38 27.31 2,058.63 45.23 1,235.18 30.15 823.45 75.38 2,058.63 0.00 0.00 0.00%
OE.2.2.1 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% m3 28.55 235.77 6,731.23 17.13 4,038.74 11.42 2,692.49 28.55 6,731.23 0.00 0.00 0.00%
OE.2.2.6.1 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 4.18 317.31 1,326.36 0.00 0.00 4.18 1,326.36 4.18 1,326.36 0.00 0.00 0.00%
OE.2.2.6.2 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 43.09 37.49 1,615.44 0.00 0.00 43.09 1,615.44 43.09 1,615.44 0.00 0.00 0.00%
OE.2.2.9 CONCRETO EN FALSO PISO MEZCLA 1:10 CEMENTO-HORMIGONm2 152.73 37.87 5,783.89 0.00 0.00 152.73 5,783.89 152.73 5,783.89 0.00 0.00 0.00%
OE.2.2.9 CANALETA DE CONCRETO MEZCLA 1:10 CEMENTO-HORMIGON m3 4.71 455.89 2,147.24 0.00 0.00 0.00 0.00 0.00 0.00 4.71 2,147.24 100.00%
OE.2.2.6.1 ENCOFRADO Y DESENCOFRADO DE CANALETA m2 53.82 35.41 1,905.77 0.00 0.00 0.00 0.00 0.00 0.00 53.82 1,905.77 100.00%
OE.2.3 OBRAS DE CONCRETO ARMADO 0.00 0.00
OE.2.3.2 ZAPATAS 0.00 0.00
OE.2.3.2.1 CONCRETO EN ZAPATAS F'c = 210 Kg/cm2 m3 37.69 451.89 17,031.73 18.84 8,515.87 18.84 8,515.87 37.69 17,031.73 0.00 0.00 0.00%
OE.2.3.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA ZAPATAS kg 1,794.11 5.00 8,970.55 897.06 4,485.28 897.06 4,485.28 1,794.11 8,970.55 0.00 0.00 0.00%

6
VALORIZACION DE OBRA N° 02 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/08/2017 AL 31/08/2017

Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN
IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %
OE.2.3.3 VIGAS DE CONEXION 0.00 0.00
OE.2.3.3.1 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 9.30 486.91 4,528.26 0.00 0.00 9.30 4,528.26 9.30 4,528.26 0.00 0.00 0.00%
OE.2.3.3.2 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 74.40 70.67 5,257.85 0.00 0.00 74.40 5,257.85 74.40 5,257.85 0.00 0.00 0.00%
OE.2.3.3.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS DE CIMENTACkg 1,440.18 5.00 7,200.90 0.00 0.00 1,440.18 7,200.90 1,440.18 7,200.90 0.00 0.00 0.00%
OE.2.3.7 COLUMNAS 0.00 0.00
OE.2.3.7.1 CONCRETO EN COLUMNAS F´c = 210 Kg/cm2 m3 18.40 471.57 8,676.89 0.00 0.00 18.40 8,676.89 18.40 8,676.89 0.00 0.00 0.00%
OE.2.3.7.2 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 166.43 79.76 13,274.46 0.00 0.00 166.43 13,274.46 166.43 13,274.46 0.00 0.00 0.00%
OE.2.3.7.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA COLUMNAS kg 7,030.73 5.00 35,153.65 0.00 0.00 7,030.73 35,153.65 7,030.73 35,153.65 0.00 0.00 0.00%
OE.2.3.8 VIGAS 0.00 0.00
OE.2.3.8.1 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 39.74 534.88 21,256.13 0.00 0.00 13.91 7,439.65 13.91 7,439.65 25.83 13,816.49 65.00%
OE.2.3.8.2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 325.71 81.13 26,424.85 0.00 0.00 114.00 9,248.70 114.00 9,248.70 211.71 17,176.15 65.00%
OE.2.3.8.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS kg 5,283.23 5.00 26,416.15 0.00 0.00 1,849.13 9,245.65 1,849.13 9,245.65 3,434.10 17,170.50 65.00%
OE.2.3.9.2 LOSAS ALIGERADAS 0.00 0.00
OE.2.3.9.2.1 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 34.58 530.49 18,344.34 0.00 0.00 12.10 6,420.52 12.10 6,420.52 22.48 11,923.83 65.00%
OE.2.3.9.2.2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERA m2 475.00 59.12 28,082.00 0.00 0.00 166.25 9,828.70 166.25 9,828.70 308.75 18,253.30 65.00%
OE.2.3.9.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA LOSAS ALIGERADAS kg 2,607.96 5.30 13,822.19 0.00 0.00 912.79 4,837.77 912.79 4,837.77 1,695.17 8,984.42 65.00%
OE.2.3.9.2.4 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO und 2,117.49 2.82 5,971.32 0.00 0.00 741.12 2,089.96 741.12 2,089.96 1,376.37 3,881.36 65.00%
OE.2.3.9.2.5 LADRILLO DE ARCILLA HUECO 7X30X30 PROV.Y COLOCADO und 3,957.00 2.27 8,982.39 0.00 0.00 1,384.95 3,143.84 1,384.95 3,143.84 2,572.05 5,838.55 65.00%
OE.3.1 ALBAÑILERIA 0.00 0.00
OE.3.1.1 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARE m2 126.31 82.02 10,359.95 0.00 0.00 63.16 5,179.98 63.16 5,179.98 63.15 5,179.97 50.00%
OE.3.1.1 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENAm2 149.79 70.23 10,519.75 0.00 0.00 74.89 5,259.88 74.89 5,259.88 74.90 5,259.88 50.00%
COSTO DIRECTO 308,802.01 33,625.29 163,639.28 197,264.58 111,537.46
GASTOS GENERALES FIJOS (10.00% CD) 0.10000 30,880.20 3,362.53 16,363.93 19,726.46 11,153.75
UTILIDAD (6.00 % CD) 0.06000 18,528.12 2,017.52 9,818.36 11,835.87 6,692.25
SUB TOTAL 358,210.33 39,005.34 189,821.57 228,826.91 129,383.46
TOTAL (F.R.=1.00000) 1.00000 358,210.33 39,005.34 189,821.57 52.99% 228,826.91 129,383.46 36.12%

7
VALORIZACION DE OBRA N° 03 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/09/2017 AL 30/09/2017

Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO –
SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %

OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.2.1 EXCAVACION DE CIMIENTOS CORRIDOS Y VIG. CONEX. m3 246.40 18.45 4,546.08 246.40 4,546.08 0.00 0.00 246.40 4,546.08 0.00 0.00 0.00%
OE.2.1.6 ELIMINACION .MAT.EXCED. EN CARRETILLA D = 30 max. m3 285.46 15.29 4,364.68 285.46 4,364.68 0.00 0.00 285.46 4,364.68 0.00 0.00 0.00%
OE.2.1.4.1 RELLENO COMPACATDO PARA ESTRUCTURAS CON MATERIAL P m3 18.04 24.16 435.85 18.04 435.85 0.00 0.00 18.04 435.85 0.00 0.00 0.00%
OE.2.1.4.2 RELLENO Y COMPACTADO CON AFIRMADO H=0.30M EN PISOS Y m3 62.58 121.66 7,613.48 62.58 7,613.48 0.00 0.00 62.58 7,613.48 0.00 0.00 0.00%
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.3 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 75.38 27.31 2,058.63 75.38 2,058.63 0.00 0.00 75.38 2,058.63 0.00 0.00 0.00%
OE.2.2.1 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% m3 28.55 235.77 6,731.23 28.55 6,731.23 0.00 0.00 28.55 6,731.23 0.00 0.00 0.00%
OE.2.2.6.1 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 4.18 317.31 1,326.36 4.18 1,326.36 0.00 0.00 4.18 1,326.36 0.00 0.00 0.00%
OE.2.2.6.2 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 43.09 37.49 1,615.44 43.09 1,615.44 0.00 0.00 43.09 1,615.44 0.00 0.00 0.00%
OE.2.2.9 CONCRETO EN FALSO PISO MEZCLA 1:10 CEMENTO-HORMIGONm2 152.73 37.87 5,783.89 152.73 5,783.89 0.00 0.00 152.73 5,783.89 0.00 0.00 0.00%
OE.2.2.9 CANALETA DE CONCRETO MEZCLA 1:10 CEMENTO-HORMIGON m3 4.71 455.89 2,147.24 0.00 0.00 0.00 0.00 0.00 0.00 4.71 2,147.24 100.00%
OE.2.2.6.1 ENCOFRADO Y DESENCOFRADO DE CANALETA m2 53.82 35.41 1,905.77 0.00 0.00 0.00 0.00 0.00 0.00 53.82 1,905.77 100.00%
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.2 ZAPATAS
OE.2.3.2.1 CONCRETO EN ZAPATAS F'c = 210 Kg/cm2 m3 37.69 451.89 17,031.73 37.69 17,031.73 0.00 0.00 37.69 17,031.73 0.00 0.00 0.00%
OE.2.3.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA ZAPATAS kg 1,794.11 5.00 8,970.55 1,794.11 8,970.55 0.00 0.00 1,794.11 8,970.55 0.00 0.00 0.00%

8
VALORIZACION DE OBRA N° 03 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/09/2017 AL 30/09/2017

Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO –
SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %
OE.2.3.3 VIGAS DE CONEXION
OE.2.3.3.1 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 9.30 486.91 4,528.26 9.30 4,528.26 0.00 0.00 9.30 4,528.26 0.00 0.00 0.00%
OE.2.3.3.2 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 74.40 70.67 5,257.85 74.40 5,257.85 0.00 0.00 74.40 5,257.85 0.00 0.00 0.00%
OE.2.3.3.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS DE CIMENTACkg 1,440.18 5.00 7,200.90 1,440.18 7,200.90 0.00 0.00 1,440.18 7,200.90 0.00 0.00 0.00%
OE.2.3.7 COLUMNAS
OE.2.3.7.1 CONCRETO EN COLUMNAS F´c = 210 Kg/cm2 m3 18.40 471.57 8,676.89 18.40 8,676.89 0.00 0.00 18.40 8,676.89 0.00 0.00 0.00%
OE.2.3.7.2 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 166.43 79.76 13,274.46 166.43 13,274.46 0.00 0.00 166.43 13,274.46 0.00 0.00 0.00%
OE.2.3.7.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA COLUMNAS kg 7,030.73 5.00 35,153.65 7,030.73 35,153.65 0.00 0.00 7,030.73 35,153.65 0.00 0.00 0.00%
OE.2.3.8 VIGAS
OE.2.3.8.1 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 39.74 534.88 21,256.13 13.91 7,439.65 13.91 7,439.65 27.82 14,879.29 11.92 6,376.84 30.00%
OE.2.3.8.2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 325.71 81.13 26,424.85 114.00 9,248.70 114.00 9,248.70 228.00 18,497.40 97.71 7,927.46 30.00%
OE.2.3.8.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS kg 5,283.23 5.00 26,416.15 1,849.13 9,245.65 1,849.13 9,245.65 3,698.26 18,491.31 1,584.97 7,924.85 30.00%
OE.2.3.9.2 LOSAS ALIGERADAS
OE.2.3.9.2.1 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 34.58 530.49 18,344.34 12.10 6,420.52 12.10 6,420.52 24.21 12,841.04 10.37 5,503.31 30.00%
OE.2.3.9.2.2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERA m2 475.00 59.12 28,082.00 166.25 9,828.70 166.25 9,828.70 332.50 19,657.40 142.50 8,424.60 30.00%
OE.2.3.9.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA LOSAS ALIGERADAS kg 2,607.96 5.30 13,822.19 912.79 4,837.77 912.79 4,837.77 1,825.57 9,675.53 782.39 4,146.66 30.00%
OE.2.3.9.2.4 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO und 2,117.49 2.82 5,971.32 741.12 2,089.96 741.12 2,089.96 1,482.24 4,179.92 635.25 1,791.40 30.00%
OE.2.3.9.2.5 LADRILLO DE ARCILLA HUECO 7X30X30 PROV.Y COLOCADO und 3,957.00 2.27 8,982.39 1,384.95 3,143.84 1,384.95 3,143.84 2,769.90 6,287.67 1,187.10 2,694.72 30.00%
OE.3.1 ALBAÑILERIA
OE.3.1.1 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARE m2 126.31 82.02 10,359.95 63.16 5,179.98 63.16 5,179.98 126.31 10,359.95 0.00 0.00 0.00%
OE.3.1.1 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENAm2 149.79 70.23 10,519.75 74.89 5,259.88 74.89 5,259.88 149.79 10,519.75 0.00 0.00 0.00%
COSTO DIRECTO 308,802.01 197,264.58 62,694.63 259,959.19 48,842.85
GASTOS GENERALES FIJOS (10.00% CD) 0.10000 30,880.20 19,726.46 6,269.46 25,995.92 4,884.29
UTILIDAD (6.00 % CD) 0.06000 18,528.12 11,835.87 3,761.68 15,597.55 2,930.57
SUB TOTAL 358,210.33 228,826.91 72,725.77 301,552.66 56,657.71
TOTAL (F.R.=1.00000) 1.00000 358,210.33 228,826.91 72,725.77 20.30% 301,552.66 56,657.71 15.82%

9
VALORIZACION DE OBRA N° 04 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/10/2017 AL 31/10/2017

Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO –
SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %

OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.2.1 EXCAVACION DE CIMIENTOS CORRIDOS Y VIG. CONEX. m3 246.40 18.45 4,546.08 246.40 4,546.08 0.00 0.00 246.40 4,546.08 0.00 0.00 0.00%
OE.2.1.6 ELIMINACION .MAT.EXCED. EN CARRETILLA D = 30 max. m3 285.46 15.29 4,364.68 285.46 4,364.68 0.00 0.00 285.46 4,364.68 0.00 0.00 0.00%
OE.2.1.4.1 RELLENO COMPACATDO PARA ESTRUCTURAS CON MATERIAL P m3 18.04 24.16 435.85 18.04 435.85 0.00 0.00 18.04 435.85 0.00 0.00 0.00%
OE.2.1.4.2 RELLENO Y COMPACTADO CON AFIRMADO H=0.30M EN PISOS Y m3 62.58 121.66 7,613.48 62.58 7,613.48 0.00 0.00 62.58 7,613.48 0.00 0.00 0.00%
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.3 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 75.38 27.31 2,058.63 75.38 2,058.63 0.00 0.00 75.38 2,058.63 0.00 0.00 0.00%
OE.2.2.1 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% m3 28.55 235.77 6,731.23 28.55 6,731.23 0.00 0.00 28.55 6,731.23 0.00 0.00 0.00%
OE.2.2.6.1 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 4.18 317.31 1,326.36 4.18 1,326.36 0.00 0.00 4.18 1,326.36 0.00 0.00 0.00%
OE.2.2.6.2 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 43.09 37.49 1,615.44 43.09 1,615.44 0.00 0.00 43.09 1,615.44 0.00 0.00 0.00%
OE.2.2.9 CONCRETO EN FALSO PISO MEZCLA 1:10 CEMENTO-HORMIGONm2 152.73 37.87 5,783.89 152.73 5,783.89 0.00 0.00 152.73 5,783.89 0.00 0.00 0.00%
OE.2.2.9 CANALETA DE CONCRETO MEZCLA 1:10 CEMENTO-HORMIGON m3 4.71 455.89 2,147.24 0.00 0.00 0.00 0.00 0.00 0.00 4.71 2,147.24 100.00%
OE.2.2.6.1 ENCOFRADO Y DESENCOFRADO DE CANALETA m2 53.82 35.41 1,905.77 0.00 0.00 0.00 0.00 0.00 0.00 53.82 1,905.77 100.00%
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.2 ZAPATAS
OE.2.3.2.1 CONCRETO EN ZAPATAS F'c = 210 Kg/cm2 m3 37.69 451.89 17,031.73 37.69 17,031.73 0.00 0.00 37.69 17,031.73 0.00 0.00 0.00%
OE.2.3.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA ZAPATAS kg 1,794.11 5.00 8,970.55 1,794.11 8,970.55 0.00 0.00 1,794.11 8,970.55 0.00 0.00 0.00%

10
VALORIZACION DE OBRA N° 04 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/10/2017 AL 31/10/2017

Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO –
SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %
OE.2.3.3 VIGAS DE CONEXION
OE.2.3.3.1 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 9.30 486.91 4,528.26 9.30 4,528.26 0.00 0.00 9.30 4,528.26 0.00 0.00 0.00%
OE.2.3.3.2 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 74.40 70.67 5,257.85 74.40 5,257.85 0.00 0.00 74.40 5,257.85 0.00 0.00 0.00%
OE.2.3.3.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS DE CIMENTACkg 1,440.18 5.00 7,200.90 1,440.18 7,200.90 0.00 0.00 1,440.18 7,200.90 0.00 0.00 0.00%
OE.2.3.7 COLUMNAS
OE.2.3.7.1 CONCRETO EN COLUMNAS F´c = 210 Kg/cm2 m3 18.40 471.57 8,676.89 18.40 8,676.89 0.00 0.00 18.40 8,676.89 0.00 0.00 0.00%
OE.2.3.7.2 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 166.43 79.76 13,274.46 166.43 13,274.46 0.00 0.00 166.43 13,274.46 0.00 0.00 0.00%
OE.2.3.7.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA COLUMNAS kg 7,030.73 5.00 35,153.65 7,030.73 35,153.65 0.00 0.00 7,030.73 35,153.65 0.00 0.00 0.00%
OE.2.3.8 VIGAS
OE.2.3.8.1 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 39.74 534.88 21,256.13 27.82 14,879.29 11.92 6,376.84 39.74 21,256.13 0.00 0.00 0.00%
OE.2.3.8.2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 325.71 81.13 26,424.85 228.00 18,497.40 97.71 7,927.46 325.71 26,424.85 0.00 0.00 0.00%
OE.2.3.8.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS kg 5,283.23 5.00 26,416.15 3,698.26 18,491.31 1,584.97 7,924.85 5,283.23 26,416.15 0.00 0.00 0.00%
OE.2.3.9.2 LOSAS ALIGERADAS
OE.2.3.9.2.1 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 34.58 530.49 18,344.34 24.21 12,841.04 0.00 0.00 24.21 12,841.04 10.37 5,503.31 30.00%
OE.2.3.9.2.2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERA m2 475.00 59.12 28,082.00 332.50 19,657.40 0.00 0.00 332.50 19,657.40 142.50 8,424.60 30.00%
OE.2.3.9.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA LOSAS ALIGERADAS kg 2,607.96 5.30 13,822.19 1,825.57 9,675.53 0.00 0.00 1,825.57 9,675.53 782.39 4,146.66 30.00%
OE.2.3.9.2.4 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO und 2,117.49 2.82 5,971.32 1,482.24 4,179.92 0.00 0.00 1,482.24 4,179.92 635.25 1,791.40 30.00%
OE.2.3.9.2.5 LADRILLO DE ARCILLA HUECO 7X30X30 PROV.Y COLOCADO und 3,957.00 2.27 8,982.39 2,769.90 6,287.67 0.00 0.00 2,769.90 6,287.67 1,187.10 2,694.72 30.00%
OE.3.1 ALBAÑILERIA
OE.3.1.1 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARE m2 126.31 82.02 10,359.95 126.31 10,359.95 0.00 0.00 126.31 10,359.95 0.00 0.00 0.00%
OE.3.1.1 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENAm2 149.79 70.23 10,519.75 149.79 10,519.75 0.00 0.00 149.79 10,519.75 0.00 0.00 0.00%
COSTO DIRECTO 308,802.01 259,959.19 22,229.14 282,188.32 26,613.70
GASTOS GENERALES FIJOS (10.00% CD) 0.10000 30,880.20 25,995.92 2,222.91 28,218.83 2,661.37
UTILIDAD (6.00 % CD) 0.06000 18,528.12 15,597.55 1,333.75 16,931.30 1,596.82
SUB TOTAL 358,210.33 301,552.66 25,785.80 327,338.45 30,871.89
TOTAL (F.R.=1.00000) 1.00000 358,210.33 301,552.66 25,785.80 7.20% 327,338.45 30,871.89 8.62%

11
VALORIZACION DE OBRA N° 05 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/11/2017 AL 30/11/2017

Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO –
SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %

OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.2.1 EXCAVACION DE CIMIENTOS CORRIDOS Y VIG. CONEX. m3 246.40 18.45 4,546.08 246.40 4,546.08 0.00 0.00 246.40 4,546.08 0.00 0.00 0.00%
OE.2.1.6 ELIMINACION .MAT.EXCED. EN CARRETILLA D = 30 max. m3 285.46 15.29 4,364.68 285.46 4,364.68 0.00 0.00 285.46 4,364.68 0.00 0.00 0.00%
OE.2.1.4.1 RELLENO COMPACATDO PARA ESTRUCTURAS CON MATERIAL P m3 18.04 24.16 435.85 18.04 435.85 0.00 0.00 18.04 435.85 0.00 0.00 0.00%
OE.2.1.4.2 RELLENO Y COMPACTADO CON AFIRMADO H=0.30M EN PISOS Y m3 62.58 121.66 7,613.48 62.58 7,613.48 0.00 0.00 62.58 7,613.48 0.00 0.00 0.00%
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.3 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 75.38 27.31 2,058.63 75.38 2,058.63 0.00 0.00 75.38 2,058.63 0.00 0.00 0.00%
OE.2.2.1 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% m3 28.55 235.77 6,731.23 28.55 6,731.23 0.00 0.00 28.55 6,731.23 0.00 0.00 0.00%
OE.2.2.6.1 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 4.18 317.31 1,326.36 4.18 1,326.36 0.00 0.00 4.18 1,326.36 0.00 0.00 0.00%
OE.2.2.6.2 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 43.09 37.49 1,615.44 43.09 1,615.44 0.00 0.00 43.09 1,615.44 0.00 0.00 0.00%
OE.2.2.9 CONCRETO EN FALSO PISO MEZCLA 1:10 CEMENTO-HORMIGONm2 152.73 37.87 5,783.89 152.73 5,783.89 0.00 0.00 152.73 5,783.89 0.00 0.00 0.00%
OE.2.2.9 CANALETA DE CONCRETO MEZCLA 1:10 CEMENTO-HORMIGON m3 4.71 455.89 2,147.24 0.00 0.00 4.71 2,147.24 4.71 2,147.24 0.00 0.00 0.00%
OE.2.2.6.1 ENCOFRADO Y DESENCOFRADO DE CANALETA m2 53.82 35.41 1,905.77 0.00 0.00 53.82 1,905.77 53.82 1,905.77 0.00 0.00 0.00%
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.2 ZAPATAS
OE.2.3.2.1 CONCRETO EN ZAPATAS F'c = 210 Kg/cm2 m3 37.69 451.89 17,031.73 37.69 17,031.73 0.00 0.00 37.69 17,031.73 0.00 0.00 0.00%
OE.2.3.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA ZAPATAS kg 1,794.11 5.00 8,970.55 1,794.11 8,970.55 0.00 0.00 1,794.11 8,970.55 0.00 0.00 0.00%

12
VALORIZACION DE OBRA N° 05 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/11/2017 AL 30/11/2017

Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO –
SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %
OE.2.3.3 VIGAS DE CONEXION
OE.2.3.3.1 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 9.30 486.91 4,528.26 9.30 4,528.26 0.00 0.00 9.30 4,528.26 0.00 0.00 0.00%
OE.2.3.3.2 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 74.40 70.67 5,257.85 74.40 5,257.85 0.00 0.00 74.40 5,257.85 0.00 0.00 0.00%
OE.2.3.3.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS DE CIMENTACkg 1,440.18 5.00 7,200.90 1,440.18 7,200.90 0.00 0.00 1,440.18 7,200.90 0.00 0.00 0.00%
OE.2.3.7 COLUMNAS
OE.2.3.7.1 CONCRETO EN COLUMNAS F´c = 210 Kg/cm2 m3 18.40 471.57 8,676.89 18.40 8,676.89 0.00 0.00 18.40 8,676.89 0.00 0.00 0.00%
OE.2.3.7.2 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 166.43 79.76 13,274.46 166.43 13,274.46 0.00 0.00 166.43 13,274.46 0.00 0.00 0.00%
OE.2.3.7.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA COLUMNAS kg 7,030.73 5.00 35,153.65 7,030.73 35,153.65 0.00 0.00 7,030.73 35,153.65 0.00 0.00 0.00%
OE.2.3.8 VIGAS
OE.2.3.8.1 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 39.74 534.88 21,256.13 27.82 14,879.29 0.00 0.00 27.82 14,879.29 11.92 6,376.84 30.00%
OE.2.3.8.2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 325.71 81.13 26,424.85 228.00 18,497.40 0.00 0.00 228.00 18,497.40 97.71 7,927.46 30.00%
OE.2.3.8.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS kg 5,283.23 5.00 26,416.15 3,698.26 18,491.31 0.00 0.00 3,698.26 18,491.31 1,584.97 7,924.85 30.00%
OE.2.3.9.2 LOSAS ALIGERADAS
OE.2.3.9.2.1 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 34.58 530.49 18,344.34 24.21 12,841.04 10.37 5,503.30 34.58 18,344.34 0.00 0.00 0.00%
OE.2.3.9.2.2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERA m2 475.00 59.12 28,082.00 332.50 19,657.40 142.50 8,424.60 475.00 28,082.00 0.00 0.00 0.00%
OE.2.3.9.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA LOSAS ALIGERADAS kg 2,607.96 5.30 13,822.19 1,825.57 9,675.53 782.39 4,146.66 2,607.96 13,822.19 0.00 0.00 0.00%
OE.2.3.9.2.4 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO und 2,117.49 2.82 5,971.32 1,482.24 4,179.92 635.25 1,791.40 2,117.49 5,971.32 0.00 0.00 0.00%
OE.2.3.9.2.5 LADRILLO DE ARCILLA HUECO 7X30X30 PROV.Y COLOCADO und 3,957.00 2.27 8,982.39 2,769.90 6,287.67 1,187.10 2,694.72 3,957.00 8,982.39 0.00 0.00 0.00%
OE.3.1 ALBAÑILERIA
OE.3.1.1 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARE m2 126.31 82.02 10,359.95 126.31 10,359.95 0.00 0.00 126.31 10,359.95 0.00 0.00 0.00%
OE.3.1.1 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENAm2 149.79 70.23 10,519.75 149.79 10,519.75 0.00 0.00 149.79 10,519.75 0.00 0.00 0.00%
COSTO DIRECTO 308,802.01 259,959.19 26,613.68 286,572.88 22,229.15
GASTOS GENERALES FIJOS (10.00% CD) 0.10000 30,880.20 25,995.92 2,661.37 28,657.29 2,222.92
UTILIDAD (6.00 % CD) 0.06000 18,528.12 15,597.55 1,596.82 17,194.37 1,333.75
SUB TOTAL 358,210.33 301,552.66 30,871.87 332,424.54 25,785.82
TOTAL (F.R.=1.00000) 1.00000 358,210.33 301,552.66 30,871.87 8.62% 332,424.54 25,785.82 7.20%

13
FÓRMULA POLINÓMICA
FÓRMULA 1: ESTRUCTURAS

Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS,
DISTRITO DE SAN IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado C/IGV: S/. 5,480,298.10
Contrato : N° 159-2015/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017

K = 0.305*(MOr / MOo) + 0.198*(Ir / Io) + 0.176*(Ar / Ao) + 0.157*(Cr / Co) + 0.084*(AGr / AGo) + 0.080*(Mr / Mo)

INDICE
JULIO 2017 AGOSTO 2017 SEPT 2017 OCTUBRE 2017 NOVIEMBRE 2017 DIC 2017 ENE 2018
CODIGO DESCRIPCION ELEMENTO SIMB COEF. PORC. BASE
INCID. ENE. 2017 Indice Reajuste Indice Reajuste Indice Reajuste Indice Reajuste Indice Reajuste Indice Reajuste Indice Reajuste
47 MANO DE OBRA INC. LEYES SOCIALES MO 0.305 100% 563.25 563.25 0.305 580.90 0.315 580.90 0.315 580.90 0.315 580.90 0.315 580.90 0.315 582.52 0.315

39 INDICE GENERAL DE PRECIOS AL CONSUM I 0.198 100% 437.38 441.67 0.200 444.64 0.201 444.57 0.201 442.48 0.200 441.61 0.200 442.30 0.200 442.87 0.200

2 ACERO DE CONSTRUCCIÓN LISO A 0.176 100% 477.63 467.84 0.172 474.70 0.175 485.11 0.179 488.45 0.180 482.69 0.178 491.28 0.181 497.78 0.183

21 CEMENTO PORTLAND TIPO I C 0.157 100% 462.57 465.71 0.158 465.71 0.158 465.71 0.158 465.71 0.158 465.71 0.158 465.71 0.158 475.73 0.161

5 AGREGADO GRUESO AG 0.084 100% 441.11 446.20 0.085 448.18 0.085 450.52 0.086 449.54 0.086 449.82 0.086 450.15 0.086 450.09 0.086

43 MADERA NACIONAL PARA ENCOF. Y CARPIN M 0.080 100% 706.95 710.90 0.080 715.43 0.081 716.76 0.081 719.16 0.081 722.52 0.082 724.34 0.082 722.03 0.082

COEFICIENTE DE REAJUSTE ( K ) 1.000 1.000 1.015 1.020 1.020 1.019 1.022 1.027
15

CONTROL DE REAJUSTES
VALORIZACION DE OBRA N° 01 AL N°06 - BLOQUE 01

“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE
Obra
### SAN IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso ###
LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Residente: ING. LUIS BAZAURI VALLEJO Monto Contratado C/IGV: : S/. 5,480,298.10
Contrato ###
N° 838-2017-MPSI/GM Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ F.R.: : 1.00000
Entidad ###
MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: : 08/07/2017
Ubicación ###
PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: : 120 D.C.
Contratista ###
CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: : 11/4/2017

�=𝑽∗(𝑲−�)

PROGRAMADO EJECUTADO
VALORIZACIÓN V Kr R R V Kr R R REAJUSTE
RECONOCIDO
V*(K-1) ACUMULADO V*(K-1) ACUMULADO
1.- ESTRUCTURAS
Nº 01 - JUL. 2017 44,951.26 1.015 674.27 674.27 39,005.33 1.015 585.08 585.08 585.08
Nº 02 - AGOS. 2017 244,446.35 1.020 4,888.93 5,563.20 189,821.57 1.020 3,796.43 4,381.51 3,796.43
Nº 03 - SEPT. 2017 42,642.34 1.020 852.85 6,416.05 72,725.77 1.020 1,454.52 5,836.03 1,454.52
Nº 04 - OCT. 2017 26,170.38 1.019 497.24 6,913.29 25,785.80 1.019 489.93 6,325.96 489.93
Nº 05 - NOV. 2017 0.00 1.022 0.00 6,913.29 30,871.87 1.022 679.18 7,005.14 587.33
N° 06 - DIC. 2017 0.00 1.027 0.00 6,913.29 0.00 1.027 0.00 7,005.14 0.00

SUB T0TAL 358,210.34 6,913.29 358,210.34 7,005.14 6,913.29

15
CÁLCULO DE DEDUCCIONES POR ADELANTO DIRECTO
VALORIZACION DE OBRA N° 01 AL N°06 - BLOQUE 01
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA
Obra DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN
: IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Monto Referencial C/IGV: 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Monto Referencial S/IGV: 4,644,320.42
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Monto Contratado C/IGV: 5,480,298.10
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA F.R.: 1.00000
Contratista : CONSORCIO SAN IGNACIO Fecha de Inicio: 7/8/2017
Residente: : ING. LUIS BAZAURI VALLEJO Plazo de Ejecución: 120 D.C.
Supervisor: : ING. ANDRES ABELARDO DELGADO PEREZ Fecha de Término: 11/4/2017

D= V*A (Kr/Ka-1)/C

MONTOS SIN IGV


FÓRMULAS POLINÓMICAS Adelanto Efectivo Del Contrato Ka
A C
1.- ESTRUCTURAS 25,074.72 358,210.33 1.000
TOTAL S/. 25,074.72 S/358,210.33

VALORIZACIONES MONTO AMORTIZACIÓN MONTO DEDUCCION


VALORIZADO ADELANTO CONTRATO Kr Ka
(A) (C) (D)

16
CÁLCULO DE DEDUCCIONES POR ADELANTO DIRECTO
VALORIZACION DE OBRA N° 01 AL N°06 - BLOQUE 01
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA
Obra DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN
: IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Monto Referencial C/IGV: 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Monto Referencial S/IGV: 4,644,320.42
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Monto Contratado C/IGV: 5,480,298.10
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA F.R.: 1.00000
Contratista : CONSORCIO SAN IGNACIO Fecha de Inicio: 7/8/2017
Residente: : ING. LUIS BAZAURI VALLEJO Plazo de Ejecución: 120 D.C.
Supervisor: : ING. ANDRES ABELARDO DELGADO PEREZ Fecha de Término: 11/4/2017

D= V*A (Kr/Ka-1)/C

MONTOS SIN IGV


FÓRMULAS POLINÓMICAS Adelanto Efectivo Del Contrato Ka
A C
1.- ESTRUCTURAS 25,074.72 358,210.33 1.000
TOTAL S/. 25,074.72 S/358,210.33

VALORIZACIONES MONTO AMORTIZACIÓN MONTO DEDUCCION


VALORIZADO ADELANTO CONTRATO Kr Ka
(A) (C) (D)
FORMULA 1: ESTRUCTURA
Nº 01 - JUL. 2017 39,005.33 2,730.37 358,210.33 1.015 1.000 40.96
Nº 02 - AGOS. 2017 189,821.57 13,287.51 358,210.33 1.020 1.000 265.75
Nº 03 - SEPT. 2017 72,725.77 5,090.80 358,210.33 1.020 1.000 101.82
Nº 04 - OCT. 2017 25,785.80 1,805.01 358,210.33 1.019 1.000 34.30
Nº 05 - NOV. 2017 30,871.87 2,161.03 358,210.33 1.022 1.000 47.54
N° 06 - DIC. 2017 0.00 0.00 358,210.33 1.027 1.000 0.00

SUB-TOTAL 358,210.34 25,074.72 358,210.33 490.36

17
AMORTIZACION POR ADELANTO DIRECTO
VALORIZACION DE OBRA N° 01 AL N°06 - BLOQUE 01

“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDAR


Obra: LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO
IGNACIO - CAJAMARCA"
Proceso: LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS
Entidad: MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Monto Referencial C/IGV:
Ubicación: PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial S/IGV:
Contratista: CONSORCIO SAN IGNACIO Monto Contratado C/IGV:
Residente: ING. LUIS BAZAURI VALLEJO F.R.:
Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Fecha de Inicio:
Proyectista: ING. WILLIAM DELGADO PEREZ Plazo de Ejecución:
Fecha de Término:

CONTROL DE ADELANTO DIRECTO


FORMULA 1: ESTRUCTURA

Porcentaje del
VAL Monto Val.. Amortizacion Amortizacion Acum.
Adelanto
A. Directo = 25,074.72

Nº 01 - JUL. 2017 39,005.33 2,730.37 2,730.37


Nº 02 - AGOS. 2017 189,821.57 13,287.51 16,017.88
Nº 03 - SEPT. 2017 72,725.77 5,090.80 21,108.69
7.00%
Nº 04 - OCT. 2017 25,785.80 1,805.01 22,913.69
Nº 05 - NOV. 2017 30,871.87 2,161.03 25,074.72
N° 06 - DIC. 2017 0.00 0.00 25,074.72

25,074.72 25,074.72
TOTAL ADEL. EN S/.
ION POR ADELANTO DIRECTO
N DE OBRA N° 01 AL N°06 - BLOQUE 01

EL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE


L CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO – SAN
CA"

S/. 5,480,298.10
S/. 4,644,320.42
S/. 5,480,298.10
1.00000000
7/8/2017
300 D.C.
11/4/2017

L DE ADELANTO DIRECTO
325102.4294

Saldo
S/.

22,344.35
9,056.84
3,966.04
2,161.03
0.00
0.00
RESUMEN DE VALORIZACIONES
VALORIZACION DE OBRA N° 01 AL N°06 - BLOQUE 01
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL
Obra : CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Monto Referencial C/IGV: 5,480,298.10
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Monto Referencial S/IGV: 4,644,320.42
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Contratado C/IGV: 5,480,298.10
Contratista : CONSORCIO SAN IGNACIO F.R.: 1.00000
Residente : ING. LUIS BAZAURI VALLEJO Fecha de Inicio: 7/8/2017
Supervisor : ING. ANDRES ABELARDO DELGADO PEREZ Plazo de Ejecución: 120 D.C.
Proyectista : ING. WILLIAM DELGADO PEREZ Fecha de Término: 11/4/2017

FORMULA 1: ESTRUCTURAS
Deduccion Amortizacion
N° V Reajuste ( R ) VB VN E IGV Monto A Fact.
A.D. A.M. D A.D. A.M. A
Nº 01 - JUL. 2017 39,005.33 585.08 40.96 40.96 39,549.45 2,730.37 2,730.37 36,819.08 36,819.08 6,627.43 43,446.52
Nº 02 - AGOS. 2017 189,821.57 3,796.43 265.75 265.75 193,352.25 13,287.51 13,287.51 180,064.74 180,064.74 32,411.65 212,476.39
Nº 03 - SEPT. 2017 72,725.77 1,454.52 101.82 101.82 74,078.47 5,090.80 5,090.80 68,987.67 68,987.67 12,417.78 81,405.45
Nº 04 - OCT. 2017 25,785.80 489.93 34.30 34.30 26,241.43 1,805.01 1,805.01 24,436.43 24,436.43 4,398.56 28,834.99
Nº 05 - NOV. 2017 30,871.87 587.33 47.54 47.54 31,411.66 2,161.03 2,161.03 29,250.63 29,250.63 5,265.11 34,515.74
N° 06 - DIC. 2017 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00