HIGH CAPACITY SYSTEM SUMMARIES
‘BUS RAPID TRANSIT
‘220 24900)
0) 8 se
nm 20) aan
anu soz00)
oe sg 0
eu sa)
ry aan
500 Es se
5 sso) 5000)
F 40% FederalShare —_L_60%Local Share
pa a ON ud
VISION PLAN CAPITAL COSTS SUMMARY
PROGRAM LEVEL
RE Rrra nnn
aarsieet ORT UTS ereemneg USER urate eres iets UAT tetas
wocamery $3.28 $558 $5.98 $838 $798 $1038 $398 $648 $5.98 $8.48
Tomy $498 $7.28 $768 $108 $968 $128 $568 $8.18 $7.68 $10.18
amttenl 575 $298 $38 «SAB «S$3.88 | S48B $228 $3.28 $38 SHB
$6.18
loattunding $2.98 $438 $4.68 $68 $5.88 $7.28 $3.48 $498 $4.68
be LO ec ccdVISION PLAN
HIGH CAPACITY TRANSIT OPTIONS
Orange Line
‘9
Tech Ridge to Slaughter
Blue Line
‘AUS Airport to ACC Highland and Republi Square
som —$6n
247,000
CT capital Cost 20255 (8) $3.28
294,000
$838
Her O&M, 2028 (6)
385M
sim
aL Neen
Oy ¥
VISION PLAN
LRT SYSTEM WITH DOWNTOWN TUNNEL
Orange Line s
+ Tech Ridge to Slaughter e
Blue Line
+ AUS Aiport to ACC Highland and Republic Square eo
Downtown Tunnel
Conceptually Guadalupe, Steet, Tity
+ 16Raes
Tunnel
Downtown
ro
Cee ee
‘atom Reap ttl with HCT (2040) 287,000
299,000 2
eT Capt Cost 20255 (8) $798 $1038
CT O& M, 2028) 36M son
pee LOR eedDam a
CITY OF AUSTIN RIGHT OF WAY
LRT & BRT SYSTEM
Orange Line (LRT)
* North Lamar Transit Center to South Congress Transit Center
Blue Line (LRT)
* Aiport to North Lamar Transit Center
Gold Line (BRT)
‘ACC Highland to Republe Square
‘MetroRapid (802)
Tech Ridge to North Lamar Transit Center
+ Sfaughter to South Congres Transit Center
ee eae
System Ridership tra wth HCT(QO40) 270,000 281,000
CT capt com 20255 (8) $3.98 $6.48
cr 08m, 2028 04) sim sin
ve
CITY OF AUSTIN RIGHT OF WAY
LRT & BRT SYSTEM WITH DOWNTOWN TUNNEL
Orange Line (LRT)
* North Lamar Transit Centr to South Congress Transit Center
Blue Line (LRT)
+ ‘Aeport to North Lamar Transit Center
Gold Line (8RT)
+ ACCHighland to Republic Square
‘MetroRapid (801)
Tech idge to North Lamar Transit Center
+ Slaughter to South Congress Transit Center
Downtown Tunnel
+ Conceptual Guadalupe, Street, Tinty
Le Miles
Street
High Capacity Transit (Only) Bess eo
System Reh total wh HCT(2040), 270,000 284,000
CT capa cos 2025 (6) $5.98 sao
wera m,2028 0) som sss
Pee aoe cnn