Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Jaigarh-Dabhol Pipeline ODPL) and all works at SV stations for Western Gateway Project.
For
00 30.10.2018 S.Rohit Kumar
Approval
CLIENT
IAPII104
WELDING PROCEDURE SPECIFICATION
2~~E~i,~~~~AO~~~~~,l~~~.~M~~:~e~~;o~:!'~~»e<;r~'liOn'
: Jaigarh-Dabhol pipeline (JDPl) and all Work!. at SV station for Weste rn Gatway Projects
~~J
A G Y
~O~ r'" rOo c-h .. P~QP'.
~
~
L
-
~
Welding Process : GMAW (Mechanized) + GMAW·P
BASE MATERIAL MATERIAL RANGE QUALIFIED YS O!: 70000 PSI IYS= Yield Str ength)
PIPE GRADE : APISL Gr X70m PSl ·l THICKNESS RANGE QUALIFIED : 4.8mm - 19.1mm
n
DIAMETER : 30 00 DIAMETER RANGE QUALIFIED : 002:12.750"
Time NA Shielded M/Co 2 75Ar/2SC0 2 70-90 (For Roo1)55-75 (For Other Pas.5)
Other NA Backing NA NA NA
Distance to be Recorded : Pre-heat 75mm or greater from Toe of Be ....el/lnterpass at Toe o f Be....el
POSITION: TECHNIQUE:
Other Multi pas.s or Single Pass (Per side) : Single pass, Multi pils.5 only for capping
Time lapse belvl·C'f'n compltrion of '·001 and sla11 of se<"ond nm: Min .2 Minules
Time lapse berw~n fomm('ncemtnt of refond mn ;tnd sial' of Ihird run : Min. 60 Minutes
s,~
Bevel Angle
:::;::.
Wall Thk
: 37.5'''
.::~:~::m
: 19.0Smm
lcjfi/2R~:~ J-8mm
.--- - --1c -">-'T-----,
j ~ j
Not" If'=f=$
<
'1 1.3 mm
1.DimentionClI Tolerances -O.2mm +O .Smm and !l.S· mm 37S . . -:
2.MaK.misalignment (hig·low) :to be Qualified
AWS Welding Filler Sile In Volt Cun-enl Wire S d Gas Flow . Fllle, Brand Direction of Speed Htat Input Hntlnput
Passes , ~ Rille Polanry Name . Min Mal Remal'Ju
elas.siflcation Prosses (mm) (V) (Amp) (lnt/Mln) _(dm) Welding (Inc/nun) (KJ/illch) JK.Jllnch)
Root ER70S-G ER70S-G 0,9mm 18·24 18G--220 360-410 80-90 DeEP BOHLER Down Hill 28-32 2,75 3,54
Hot Pass ER7OS-6 GMAW-P 1.0mm 22·25 18().230 350-450 &0-80 DCEP BOHLER Down Hill 12-22 5.31 7.28
FiII-l ER70S~ GMAW-P 1.0mm 22-2S 1811-230 3504S0 6().80 DCEP BOHLER Down Hill 12-22 s.31 7.28
FiII-2 ER70S~ GMAW-P 1,Omm 22-25 1811-230 350450 60-80 Dap BOHLER Down Hill 12-22 5.31 7.28
FiII-3 ER70S·6 GMAW-P 1.0mm 22-25 18()..230 35Q-4S0 60-80 DCEP BOHLER Down Hill 12-25 5.31 7_28
FiII4 ER70s-{; GMAW-P 1.0mm 22-25 180-230 350450 60-8{) DCEP BOHLER Down Hill 12-25 5.31 7.28
Capping ER70S-6 GMAW·P 1.0mm 23-26 125-165 250-350 60-80 DCEP BOHLER Down Hill 12-25 3.91 5.11
1. II weld cools below preheat temperature . the weld will be preheated to at least the minimum qualified preheat temperature around the circumference of the pipe .
2 WIre Brush & Grind As Needed. Gnnding 12 O'clocl<.! 6 O'clock tie-ins as needed.
3. ln the e'olent thai the root is incomplete. the fO rtly mechanized co mpleted on the misfire area. Pipe must remain supported until completion of root. Uft and lower will be performed after 100% of the root pass has been deposrted .