PROGRES UNTUK ITEM PENGIRIMAN

PILE SLAB FORMWORK 4 SET
26 OKT JAM 18.00
QUANTITY  QUANTITY    SUDAH  QUANTITY 
QUANTITY     TERKIRIM TOTAL  KETERANGAN    
NO ITEM PEKERJAAN TOTAL     UNTUK  QTY TERFABRIKASI
1 SET TERKIRIM (KEKURANGAN)
(UNIT) TAHAP I TAHAP II DIFABRIKASI SETTING WELDING PAINTING

1 BRACKET 8 32 32 32 ‐ 32 ‐ ‐ OK
2 CROSS FRAME 3000 30 120 19 30 49 71 71 41 10 0
3 BASE FORM A1 3733x1200 6 24 6 6 12 12 4 1 0 ‐8
4 BASE FORM B1 2400x1200 2 8 2 2 4 4 4 4 4 OK
5 SIDE FORM A1 2400x800 16 64 13 13 51 45 21 9 ‐6
6 SIDE FORM B1 3200x800 4 16 4 4 12 10 4 4 ‐2
7 END FORM 1200x800 2 8 2 2 6 2 2 2 OK
8 PLATE SHEET 800x800 7 28 6 6 22 9 0 0 ‐13
9 PLATFORM A1 4800x800 8 32 2 2 30 29 17 4 ‐1
10 PLATFORM B1 4200x800 4 16 4 4 12 12 8 4 0
11 RAILLING A1 1000 24 96 28 28 68 58 58 30 ‐10
12 RAILLING B1 4000 8 32 8 8 24 16 16 0 ‐8
13 RAILLING C1 6000 16 64 16 16 48 31 31 0 ‐17
14 CLAMP PIPA SWIVEL 56 224 112 112
15 WINGNUT 130 520 260 260
16 TIEROD L 1.5M 65 260 130 130
17 HTB M16X100 140 560 280 280
18 HTB M16X50 380 1520 760 760