Sei sulla pagina 1di 2

Our cornerstone The Company The Staff

The cornerstone of ISC’s competence derives from ISC Consulting Engineers A/S was founded in 1967 by The combined staff of the company comprises
Offshore
Substations
the ability to undertake the complete range of tasks Kjeld Thomsen M.Sc. (Struct. Eng.), former associate 210 employees (year 2011) of which approxi-
associated with substation design, from FEED/concept professor at the Technical University of Denmark. mately 70 percent are graduates in civil and
design through detailed design, Tender documents, structural engineering, electrical or mechanical
Assistance during fabrication and installation and com- ISC offices are located in Copenhagen, Esbjerg, Viborg, and related disciplines. The company’s expertise
missioning phase. Kalundborg, Kolding and Aalborg in Denmark. also covers management, planning, computer
applications, information systems and mainte-
l Layout: Working with the client to achieve ISC provides comprehensive independent consulting nance systems.
the best platform layout solution services within all fields of planning, feasibility studies,
civil, structural, mechanical, process and electrical Furthermore, ISC maintains standing agree-
l Structural: Design of an economic yet robust engineering on a worldwide basis. ments of cooperation with individual experts and
structure which optimises efficient public scientific institutions, thereby supple-
installation ISC has special experience and knowledge in the field menting the company’s know-how in connection
of planning and design of advanced civil works such with assignments requiring multiprofessional
l Electrical: Detailing plans for electrical as Øresund Fixed Link which is the cable stayed bridge teams of specialists outside the company’s own
installations connecting Sweden and Denmark. With its 490 m main staff.
span the bridge is the longest for a railway bridge in
l HVAC: Design of systems to maintain the the world. ISC has also special experience in the design
correct conditions for the sensitive and planning of other civil works such as Industrial
platform equipment Plants, Power Stations, Port Facilities, Oil & Gas, Air-
ports and Railways.
l Mechanical: Working together with the client to
ascertain the appropriate demands ISC has worldwide experience gained on projects
and specifications for equipment, carried out in more than 70 countries on 5 continents.
lifting and environmental protection

l Fire & Safety: Cooperating together with the


client to achieve cost effective fire
& safety design
BE A
PART
OF OUR
FUTURE

For further information about the products and


services ISC Consulting Engineers A/S can pro-
vide, please visit www.isc.dk

ISC Consulting Engineers A/S


Øster Alle 31
DK 2100 Copenhagen Ø
Denmark
Phone: +45 35 27 88 00
Fax: +45 35 27 88 44
E-Mail: info@isc.dk Innovative Engineering

Innovative Engineering
ISC and Offshore West of Duddon Sands Walney I Princess Amalia
Substation Design Wind park capacity : 339 MW Wind park capacity : 184 MW Wind park capacity : 120 MW
No. of transformers : 2 No. of transformers : 2 No. of transformers : 1
Dimensions : 29x15 meters Dimensions : 13x23 meters Dimensions : 20x11 meters
ISC Consulting Engineers A/S has many Topside weight : 1495 tonnes Topside weight : 1030 tonnes Topside weight : 650 tonnes
Jacket weight : 1154 tonnes Jacket weight : 994 tonnes Installation year : 2007
years of experience in the design of offshore Installation year : 2013 Installation year : 2010 Water depth : 19-24 meters
substations, dating back to the design of the Water depth : 19 meters Water depth : 21-30 meters Substructure : Monopile
Substructure : Jacket with 4 piles Substructure : Jacket with 4 piles No. of wind turbines : 115
world’s first offshore substation, installed at No. of wind turbines : 103 No. of wind turbines : 51 Location : Netherlands
the Nysted Offshore Wind Farm in 2003. Location : United Kingdom Location : United Kingdom Design : Topside detailed design
Design : Complete detailed design, Design : Complete detailed design,
ISC’s experience in the design of offshore topside and jacket topside and jacket
structures is founded on the knowledge
obtained from over 35 years in the offshore Borkum Riffgrund I Gunfleet Sands Nysted I
oil and gas industry.
Wind park capacity : 320 MW Wind park capacity : 172 MW Wind park capacity : 165.6 MW
No. of transformers : 2 No. of transformers : 2 No. of transformers : 1
Since then ISC has successfully undertaken Dimensions : 31x15 meters Dimensions : 20x30 meters Dimensions : 15x28 meters
Topside weight : 1784 tonnes Topside weight : 1315 tonnes Topside weight : 670 tonnes
the complete detailed design of a further 10 Jacket weight : 1435 tonnes Jacket weight : 259 tonnes Installation year : 2003
Installation year : 2014 Weight transition piece : 155 tonnes Water depth : 6-10 meters
offshore substations. ISC’s portfolio clearly Water depth : 24 meters Installation year : 2008 Substructure : Concrete gravity
demonstrates a comprehensive expertise Substructure : Jacket with 4 piles Water depth : 6-15 meters No. of wind turbines : 72
No. of wind turbines : 89 Substructure : Monopile Location : Denmark
within the field of offshore substation Location : Germany No. of wind turbines : 48 Design : Topside detailed design
design, including a broad spectrum of top- Design : Complete detailed design, Location : United Kingdom
topside and jacket Design : Complete detail design
side layouts as well as jacket and monopile topside and transition piece.
Examples of Offshore Projects in the Oil & Gas Sector
substructures.
Walney II Horns Rev 2 Nini East
ISC has also demonstrated the ability to work
alongside local authorities across Europe to Wind park capacity : 184 MW Wind park capacity : 209 MW Production : Gas and oil
No. of transformers : 2 No. of transformers : 1 No. of decks : 4
produce superior solutions which conform to Dimensions : 13x23 meters Dimensions : 32x25 meters Dimensions : 21x15 meters
Topside weight : 1030 tonnes Topside weight : 1238 tonnes Topside weight : 696 tonnes
the local requirements. Jacket weight : 995 tonnes Jacket weight : 798 tonnes Jacket weight : 1929 tonnes
Installation year : 2011 Installation year : 2008 Installation year : 2009
Water depth : 21-30 meters Water depth : 13 meters Water depth : 60 meters
Substructure : Jacket with 4 piles Substructure : Jacket with 4 piles Substructure : Star jacket with 3 piles
No. of wind turbines : 51 No. of wind turbines : 91 Location : Danish North Sea
Location : United Kingdom Location : Denmark Design : Complete detailed design,
Design : Complete detailed design, Design : Complete detailed design, topside and star jacket
topside and jacket topside and jacket

Baltic I, monopile Lillgrund Danish North Sea


Wind park capacity : 48 MW Wind park capacity : 110 MW Detailed design of a number of plat-
Transition piece weight : 1100 tonnes No. of transformers : 1 forms in the Danish North Sea for
Installation year : 2010 Dimensions : 22 meters Dansk Undergrunds Consortium
Water depth : 19 meters Topside weight : 670 tonnes and AP Møller Maersk.
Substructure : Monopile Installation year : 2007 This includes the production fields:
No. of wind turbines : 88 Water depth : 4-10 meters : Gorm : Skjold
Location : Germany Substructure : Concrete gravity : Tyra : Valdemar
Design : Monopile detailed design No. of wind turbines : 48 : Dan : Halfdan
Location : Sweden : Dagmar : Krak
Design : Topside detailed design

DAN FG, Installation of topside Danish North Sea.

Baltic I:
Offshore Substations Horns Rev 2: Lillgrund: Installed 2010
Installed 2008 Installed 2007
Walney: Nysted:
Phase I Installed 2010
Phase II Installed 2011 Borkum Riffgrund I: Installed 2003
Installation 2014

West of Duddon Sands:


Installation 2013

Princess Amalia:
Installed 2007

Gunfleet Sands:
Installed 2008