KEY PLAN

A4 A4

30.00
30.00
A1
4

0+675
makam
A5 A5

0+425
A3 A3

0+125
A2

NOTE
JUST FOR WATCHING, PLEASE DON'T DIM ON ALL DRAWING
A5 A5

A1
A4 A4

ANCHOR BOLT PLAN

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
ANCHOR BOLT PLASTIC CAP NO. PROYEK : 022/EPCC/INKA/2018
BOLT WITH NUT
d DIMEMSIONS (mm)
SIZE COMPONENT
QTY. SYM. THREAD
(d) ID L T1 T2 Th dh hw PRO H PT. INDUSTRI KERETA API (Persero)
PITCH Jl. Yos Sudarso No.71
PRO

Madiun 63112
M24 AB-24 530 160 35 20 42 8 100 395 3 Ø60
T1

M30 AB-30 645 180 40 25 50 9 130 475 3.5 Ø76 PT. YODYA KARYA (Persero)
Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340
H+T2 (MIN 12d)

PLASTIC PIPE & CAP PVC Ø...


PT. ADHI KARYA (Persero) Tbk.
DEPARTEMEN EPC
L

Jl. Raya Pasar Minggu KM.18


Jakarta 12510
PRO
2 THREAD PITCH

50

SIKAGROUT REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL


(NOT BY ATAD)
RC COLUMN
T2

(NOT BY ATAD)

TACK WELD ANCHOR BOLT PLAN


@ 2 POINT
Note : Installations must correct according the table above for projection

NOTE : I1-CARBODY MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-220-210 0

CIVIL 1:500 3 of 23
ANCHOR BOLT SCHEDULE AND PROJECTION DETAILS
All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
NOTE

DETAIL A1 DETAIL A2 DETAIL A3

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

STIFFENER DETAIL PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
DETAIL A5 Jl. Raya Pasar Minggu KM.18
Jakarta 12510

DETAIL A4
REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

ANCHOR BOLT DETAIL

I1-CARBODY MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-220-211 0

CIVIL 1:10 4 of 23

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

A4 A4

30.00
30.00
A1
4

0+675
makam
A5 A5

0+425
A3 A3

0+125
A2

NOTE
JUST FOR WATCHING, PLEASE DON'T DIM ON ALL DRAWING
A5 A5

A1
A4 A4

ANCHOR BOLT PLAN

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
ANCHOR BOLT PLASTIC CAP NO. PROYEK : 022/EPCC/INKA/2018
BOLT WITH NUT
d DIMEMSIONS (mm)
SIZE COMPONENT
QTY. SYM. THREAD
(d) ID L T1 T2 Th dh hw PRO H PT. INDUSTRI KERETA API (Persero)
PITCH Jl. Yos Sudarso No.71
PRO

Madiun 63112
M24 AB-24 530 160 35 20 42 8 100 395 3 Ø60
T1

M30 AB-30 645 180 40 25 50 9 130 475 3.5 Ø76 PT. YODYA KARYA (Persero)
Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340
H+T2 (MIN 12d)

PLASTIC PIPE & CAP PVC Ø...


PT. ADHI KARYA (Persero) Tbk.
DEPARTEMEN EPC
L

Jl. Raya Pasar Minggu KM.18


Jakarta 12510
PRO
2 THREAD PITCH

50

SIKAGROUT REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL


(NOT BY ATAD)
RC COLUMN
T2

(NOT BY ATAD)

TACK WELD ANCHOR BOLT PLAN


@ 2 POINT
Note : Installations must correct according the table above for projection

NOTE : I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-203 0

CIVIL 1:500 3 of 22
ANCHOR BOLT SCHEDULE AND PROJECTION DETAILS
All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
NOTE

DETAIL A1 DETAIL A2 DETAIL A3

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

STIFFENER DETAIL PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
DETAIL A5 Jl. Raya Pasar Minggu KM.18
Jakarta 12510

DETAIL A4
REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

ANCHOR BOLT DETAIL

I2-COMPONENT MANUFACTURE: (150 x 50 m) PWIB-CV-DWG-221-204 0

CIVIL 1:10 4 of 22

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
NOTE
A3 A3
A1

A2 A2

JUST FOR WATCHING, PLEASE DON'T DIM ON ALL DRAWING

A1
A3 A3

EPCC PEMBANGUNAN WORKSHOP


ANCHOR BOLT PLAN PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

ANCHOR BOLT PLAN

L1-SURFACE TREATMENT PWIB-CV-DWG-230-002 0

CIVIL 1:420 3 of 19

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
NOTE

DETAIL A1 DETAIL A2 DETAIL A3

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
ANCHOR BOLT PLASTIC CAP NO. PROYEK : 022/EPCC/INKA/2018
BOLT WITH NUT
d DIMEMSIONS (mm)
SIZE COMPONENT
QTY. SYM. THREAD
(d) ID L T1 T2 Th dh hw PRO H PT. INDUSTRI KERETA API (Persero)
PITCH Jl. Yos Sudarso No.71
PRO

Madiun 63112
M24 AB-24 530 160 35 20 42 8 100 395 3 Ø60
T1

M30 AB-30 645 180 40 25 50 9 130 475 3.5 Ø76 STIFFENER DETAIL PT. YODYA KARYA (Persero)
Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340
H+T2 (MIN 12d)

PLASTIC PIPE & CAP PVC Ø...


PT. ADHI KARYA (Persero) Tbk.
DEPARTEMEN EPC
L

Jl. Raya Pasar Minggu KM.18


Jakarta 12510
PRO
2 THREAD PITCH

50

SIKAGROUT REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL


(NOT BY ATAD)
RC COLUMN
T2

(NOT BY ATAD)

TACK WELD
ANCHOR BOLT DETAIL
@ 2 POINT
Note : Installations must correct according the table above for projection

NOTE : L1-SURFACE TREATMENT PWIB-CV-DWG-230-003 0

CIVIL 1:10 4 of 19
ANCHOR BOLT SCHEDULE AND PROJECTION DETAILS
All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
1 : 300
KEY PLAN

A1
A3

30.00
30.00
0+675
A2 A4

makam

0+425
A3
A1

0+125
NOTE

A1
A3

A4 A2

A3
A1

EPCC PEMBANGUNAN WORKSHOP


GROUND PLAN PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

BOLT WITH NUT ANCHOR BOLT


d DIMEMSIONS (mm) PT. INDUSTRI KERETA API (Persero)
SIZE COMPONENT Jl. Yos Sudarso No.71
QTY. SYM. THREAD
(d) ID L T1 T2 Th dh hw PRO H Madiun 63112
PITCH
PRO

M24 AB-24 530 160 35 20 42 8 100 395 3


T1

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
M30 AB-30 645 180 40 25 50 9 130 475 3.5 Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


H+T2 (MIN 12d)

DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510
PRO
L

50
2 THREAD PITCH

SIKAGROUT REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL


(NOT BY ATAD)
RC COLUMN
(NOT BY ATAD)
ANCHOR BOLT PLAN
T2

DETAIL ANCHOR BOLT

TACK WELD Note : Installations must correct according the table above for projection
@ 2 POINT
NOTE : FIMAL TESTING (M) PWIB-CV-DWG-270-002 0

CIVIL 3 of 19
ANCHOR BOLT SCHEDULE AND PROJECTION DETAILS
All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
1 : 10
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
NOTE

DETAIL A1 DETAIL A2 DETAIL A3

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

STEEL COLUMN BASE AT ± 0.000 STEEL COLUMN BASE AT +0.250


PT. YODYA KARYA (Persero)
DETAIL A4 (FOR DETAIL A4.) (FOR DETAIL A1; A2; A3.) Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340
STIFFENER DETAIL

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
Jl. Raya Pasar Minggu KM.18
Jakarta 12510

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

ANCHOR BOLT PLAN


DETAIL ANCHOR BOLT

FIMAL TESTING (M) PWIB-CV-DWG-270-003 0

CIVIL
4 of 19

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

A4 A4

30.00
30.00
A1

0+675
makam
A5 A5

0+425
A3 A3

0+125
A2

NOTE
JUST FOR WATCHING, PLEASE DON'T DIM ON ALL DRAWING
A5 A5

A1
A4 A4

ANCHOR BOLT PLAN

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
ANCHOR BOLT PLASTIC CAP NO. PROYEK : 022/EPCC/INKA/2018
BOLT WITH NUT
d DIMEMSIONS (mm)
SIZE COMPONENT
QTY. SYM. THREAD
(d) ID L T1 T2 Th dh hw PRO H PT. INDUSTRI KERETA API (Persero)
PITCH Jl. Yos Sudarso No.71
PRO

Madiun 63112
M24 AB-24 530 160 35 20 42 8 100 395 3 Ø60
T1

M30 AB-30 645 180 40 25 50 9 130 475 3.5 Ø76 PT. YODYA KARYA (Persero)
Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340
H+T2 (MIN 12d)

PLASTIC PIPE & CAP PVC Ø...


PT. ADHI KARYA (Persero) Tbk.
DEPARTEMEN EPC
L

Jl. Raya Pasar Minggu KM.18


Jakarta 12510
PRO
2 THREAD PITCH

50

SIKAGROUT REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL


(NOT BY ATAD)
RC COLUMN
T2

(NOT BY ATAD)

TACK WELD ANCHOR BOLT PLAN


@ 2 POINT
Note : Installations must correct according the table above for projection

NOTE : N1-FINAL ASSEMBLY 1: (150 x 50 m) PWIB-CV-DWG-250-210 0

CIVIL 1:500 3 of 25
ANCHOR BOLT SCHEDULE AND PROJECTION DETAILS
All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
NOTE

DETAIL A1 DETAIL A2 DETAIL A3

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

STIFFENER DETAIL PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
DETAIL A5 Jl. Raya Pasar Minggu KM.18
Jakarta 12510

DETAIL A4
REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

ANCHOR BOLT DETAIL

N1-FINAL ASSEMBLY 1: (150 x 50 m) PWIB-CV-DWG-250-211 0

CIVIL 1:10 4 of 25

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

A7 A7

30.00
30.00
A6

0+675
makam
A5 A5

0+425
A3 A3

0+125
A2

NOTE
JUST FOR WATCHING, PLEASE DON'T DIM ON ALL DRAWING
A5 A5

A1
A4 A4

ANCHOR BOLT PLAN

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
ANCHOR BOLT PLASTIC CAP NO. PROYEK : 022/EPCC/INKA/2018
BOLT WITH NUT
d DIMEMSIONS (mm)
SIZE COMPONENT
QTY. SYM. THREAD
(d) ID L T1 T2 Th dh hw PRO H PT. INDUSTRI KERETA API (Persero)
PITCH Jl. Yos Sudarso No.71
PRO

Madiun 63112
M24 AB-24 530 160 35 20 42 8 100 395 3 Ø60
T1

M30 AB-30 645 180 40 25 50 9 130 475 3.5 Ø76 PT. YODYA KARYA (Persero)
Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340
H+T2 (MIN 12d)

PLASTIC PIPE & CAP PVC Ø...


PT. ADHI KARYA (Persero) Tbk.
DEPARTEMEN EPC
L

Jl. Raya Pasar Minggu KM.18


Jakarta 12510
PRO
2 THREAD PITCH

50

SIKAGROUT REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL


(NOT BY ATAD)
RC COLUMN
T2

(NOT BY ATAD)

TACK WELD ANCHOR BOLT PLAN


@ 2 POINT
Note : Installations must correct according the table above for projection

NOTE : N2-FINAL ASSEMBLY 2: (150 x 50 m) PWIB-CV-DWG-260-201 0

CIVIL 1:500 3 of 26
ANCHOR BOLT SCHEDULE AND PROJECTION DETAILS
All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
NOTE

DETAIL A1 DETAIL A2 DETAIL A3 DETAIL A4

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
DETAIL A5 Jl. Raya Pasar Minggu KM.18
Jakarta 12510

DETAIL A6 DETAIL A7
REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

ANCHOR BOLT DETAIL

N2-FINAL ASSEMBLY 2: (150 x 50 m) PWIB-CV-DWG-260-202 0

CIVIL 1:10 4 of 26
STIFFENER DETAIL
All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

A4 A4

30.00
30.00
A1

0+675
makam
A5 A5

0+425
A3 A3

0+125
A2

NOTE
JUST FOR WATCHING, PLEASE DON'T DIM ON ALL DRAWING
A5 A5

A1
A4 A4

ANCHOR BOLT PLAN

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
ANCHOR BOLT PLASTIC CAP NO. PROYEK : 022/EPCC/INKA/2018
BOLT WITH NUT
d DIMEMSIONS (mm)
SIZE COMPONENT
QTY. SYM. THREAD
(d) ID L T1 T2 Th dh hw PRO H PT. INDUSTRI KERETA API (Persero)
PITCH Jl. Yos Sudarso No.71
PRO

Madiun 63112
M24 AB-24 530 160 35 20 42 8 100 395 3 Ø60
T1

M30 AB-30 645 180 40 25 50 9 130 475 3.5 Ø76 PT. YODYA KARYA (Persero)
Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340
H+T2 (MIN 12d)

PLASTIC PIPE & CAP PVC Ø...


PT. ADHI KARYA (Persero) Tbk.
DEPARTEMEN EPC
L

Jl. Raya Pasar Minggu KM.18


Jakarta 12510
PRO
2 THREAD PITCH

50

SIKAGROUT REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL


(NOT BY ATAD)
RC COLUMN
T2

(NOT BY ATAD)

TACK WELD ANCHOR BOLT PLAN


@ 2 POINT
Note : Installations must correct according the table above for projection

NOTE : N3-FINAL ASSEMBLY 3: (150 x 50 m) PWIB-CV-DWG-261-201 0

CIVIL 1:500 3 of 26
ANCHOR BOLT SCHEDULE AND PROJECTION DETAILS
All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
KEY PLAN

30.00
30.00
0+675
makam

0+425

0+125
NOTE

DETAIL A1 DETAIL A2 DETAIL A3

EPCC PEMBANGUNAN WORKSHOP


PT. INKA (PERSERO) DI
BANYUWANGI
NO. PROYEK : 022/EPCC/INKA/2018

PT. INDUSTRI KERETA API (Persero)


Jl. Yos Sudarso No.71
Madiun 63112

STIFFENER DETAIL PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
DETAIL A5 Jl. Raya Pasar Minggu KM.18
Jakarta 12510

DETAIL A4
REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

ANCHOR BOLT DETAIL

N3-FINAL ASSEMBLY 3: (150 x 50 m) PWIB-CV-DWG-261-202 0

CIVIL 1:10 4 of 26

All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing
1 : 140
KEY PLAN

A1 A2 A1

Lokasi
SU.1

A1 A2 A1

7.0000

30.0000

ANCHOR BOLT PLAN

NOTE

STEEL COLUMN BASE AT +0.250


EPCC PEMBANGUNAN WORKSHOP
PT. INKA (PERSERO) DI
DETAIL A1 DETAIL A2 BANYUWANGI
ANCHOR BOLT PLASTIC CAP NO. PROYEK : 022/EPCC/INKA/2018
BOLT WITH NUT
d DIMEMSIONS (mm)
SIZE COMPONENT
QTY. SYM. THREAD
(d) ID L T1 T2 PRO H PT. INDUSTRI KERETA API (Persero)
PITCH Jl. Yos Sudarso No.71
PRO

Madiun 63112
M24 AB-24 530 160 35 100 395 3 Ø60
T1

PT. YODYA KARYA (Persero)


Gedung Yodya Tower, Lt.8
Jl. D.I Panjaitan Kav.8, Cawang
Jakarta Timur, DKI Jakarta, 13340
H+T2 (MIN 12d)

PT. ADHI KARYA (Persero) Tbk.


DEPARTEMEN EPC
L

Jl. Raya Pasar Minggu KM.18


PLASTIC PIPE & CAP PVC Ø... Jakarta 12510
2 THREAD PITCH

PRO

REV. DESKRIPSI DEGND CHEKD APPRD AUTHD TGL

TOC
T2

TACK WELD ANCHOR BOLT PLAN


@ 2 POINT

Note : Installations must correct according the table above for projection OFFICE: (60 x 8 m) PWIB-CV-DWG-281-002 0
NOTE :

CIVIL 1:140 3 of 23
ANCHOR BOLT SCHEDULE AND PROJECTION DETAILS
All details of trims, covers are not shown in this set. The detail department will decide the details when making the Fabrication drawing