GRAND TOTAL -
Currency
BOQ FOR CONSTRUCTION OF WALKWAY AND FENCING OFF-UTILITIES: STORMWATER/SOAKA
TANK
BILL OF QUANTITIES
Note: this bill covers all items of work that are deemed to be included in the measurements and sp
Unit Cost
S. No. Description of work Quantity Unit
NGN
SUB STRUCTURE
1 EXCAVATON AND EARTH WORK
1.1 TRENCH EXCAVATION
Excavate trench for foundation exceeding 0.30m in
width max. depth n.e 1.5 meters starting at ground
level.
Walkway 408.43 Cu m
1.1 TRENCH EXCAVATION
Excavate trench for foundation exceeding 0.30m in width
max. depth n.e 1.5 meters starting at ground level.
Walkway 408.429 Cu m
1.2 FILLING TO EXCAVATION
Back fill selected excavated materials around foundation,
average thickness n.e 0.25 meter arising from excavation
levelled & compacted.
Walkway 274.2309 Cu m
1.3 FILLING TO MAKE UP LEVEL
Hardcore filling average thckness exceeding 0.25 meter
obtained off site imported rock laterite materials in layers
n.e 150mm thick in:
150 - 200mm depth
Walkway 233.388 Cu m
1.4 SURFACE TREATMENT
Prepare and apply "dieldrex 20" anti-termite treatment to
faces and bottom of excavation (Trench & Pit)
Walkway 2333.88 Sqr M
-
-
-
-
-
-
-
-
-
BOQ FOR CONSTRUCTION OF PERIMETER FENCING WALL FOR RECREATIONAL AREA AT RED ROOF
BILL OF QUANTITIES
Note: this bill covers all items of work that are deemed to be included in the measurements and specifications.
Unit Cost Total Cost
S. No. Description of work Quantity Unit
NGN NGN
SITE PREPARATION
Allow provisional sum for the demolition of the existing
1 1.00 Ls -
wall on the fence line of the premises.
SUB STRUCTURE
2 EXCAVATON AND EARTH WORK
0 Fence 106.47 Cu m -
2.1 TRENCH EXCAVATION
Excavate trench for foundation exceeding 0.30m in
width max. depth n.e 1.5 meters starting at ground level.
Fence 106.47 Cu m -
2.2 FILLING TO EXCAVATION
Back fill selected excavated materials around
foundation, average thickness n.e 0.25 meter arising
from excavation levelled & compacted.
Fence 71.49 Cu m -
2.3 FILLING TO MAKE UP LEVEL
Hardcore filling average thckness exceeding 0.25 meter
obtained off site imported rock laterite materials in layers
n.e 150mm thick in:
150 - 200mm depth 14.40 Cu m -
Fence 11.91 Cu m -
2.4 SURFACE TREATMENT
Prepare and apply "dieldrex 20" anti-termite treatment to
faces and bottom of excavation (Trench & Pit)
Fence 53.24 Cu m -
2.5 LEVELLING AND COMPACTION
Level and compact bottom of excavation to receive
i
concrete.
a Fence 118.30 Cu m -
E IN-SITU CONCRETE/LARGE PRECAST
3
CONCRETE
44
Fence 8.94 Cu m -
Sub-total 63.98 Cu m -
4 FORMWORK FOR IN SITU CONCRETE
Sawn formwork and support including striking and
removing to:-
a Sides of ground beam 50.70 Sqr M -
45
plain high yield tensile reinforcement bars 12mm dia
i
@200mm c/c to BS 4449 in; Barbecue
Columns 1,714.50 Kg -
Beams 1,203.28 Kg -
ii Ditto 8mm diam. Mild steel stirup @ 250mm in:-
Columns 385.28 Kg -
Beams 270.40 Kg -
Sub-Total 3,573.46 Kg -
BLOCK WORK
230mm hollow sandcrete block work bedded and jointed
10 in cement and sand mortar mix(1:3) and filled solid with
weak concrete.
b Deductions
i Beams (77.74) Sqm
ii Columns (110.77) Sqm
iii Entrance gate (17.20) Sqm
Sub-Total 520.99 Sqm -
CEMENT-SAND (1:3); PLAIN RENDERING;
12
FINISHING TROWELLED SMOOTH:
Surface over the wall ; internal & external 1,453.40 Sqm
Deductions
a Door 1 (28.80) Sqm
Sub-Total 1,424.60 Sqm -
13 PAINTING/CLEAR FINISHING:
Apply 3 coats of briliant white meyer emulsion paint or
1,453.40 Sqm
its approved equivalent to general surfaces.
Deductions
c Door 1 (28.80) Sqm
Sub-Total 1,424.60 Sqm -
SUB-TOTAL
DOORS AND OTHER ACCESSORIES
STEEL GATE:Supply and install 3mm thick High yeild
double panel chakered steel gate in 4"x2"x3mm thick
hollow black pipe frame. 1.To be braced with
2"x2"x2mm thick black square pipe internally. And
surported by 3.5"x3.5"x3mm angle iron from top to
17 bottom @ both opening and to be welded to three 1.00 Ls -
anchorage on each side. Embeded into RC pillar.
3. To fix rollers at
the bottom and provide U steel chanell embeded in
concrete footing, for the rollers to roll through. 4. Gates
must be painted with blue oil paint.
Supply and fix (1800 x 2100)the following Purposed
18 made, double leaf steel door,with steel frame and sub- 1.00 Ls -
frame as well as matching frame.
Allow provissional sum for the Supply and fixing of
19 169.00 M -
concertina wire on the top of the wall.
Supply and fix Y steel concertina wire hanger to allow fix
20 956.83 Kg -
the concertina wire. Spaced 1200mm c/c
SUB-TOTAL 1,127.83 -
TOTAL COST OF THE PROJECT
46
GRAND TOTAL -
47
BOQ FOR CONSTRUCTION OF SPECTATOR STAND FOR RECREATIONAL AREA AT RED RO
BILL OF QUANTITIES
Note: this bill covers all items of work that are deemed to be included in the measurements a
specifications.
Unit Cost
S. No. Description of work Quantity Unit
NGN
SUB STRUCTURE
1 EXCAVATON AND EARTH WORK
0 Spetator stand 3.24 Cu m
1.2 TRENCH EXCAVATION
Excavate trench for foundation exceeding 0.30m in
width max. depth n.e 1.5 meters starting at ground
level.
Spetator stand 3.24 Cu m
1.3 FILLING TO EXCAVATION
Back fill selected excavated materials around
foundation, average thickness n.e 0.25 meter arising
from excavation levelled & compacted.
Spetator stand 0.65 Cu m
2 SURFACE TREATMENT
Prepare and apply "dieldrex 20" anti-termite treatment
to faces and bottom of excavation (Trench & Pit)
Spetator stand 21.60 Sqr M
3 LEVELLING AND COMPACTION
Level and compact bottom of excavation to receive
i
concrete.
a Spetator stand 5.40 Sqr M
he measurements and
Total Cost
NGN
-
-
-
-
-
-
-
-
-
-
-
BOQ FOR CONSTRUCTION OF MULTIPURPOSE COURT
BILL OF QUANTITIES
Note: this bill covers all items of work that are deemed to be included in the measurements and sp
Unit Cost
S. No. Description of work Quantity Unit
NGN
SUB STRUCTURE
1 EXCAVATON AND EARTH WORK
1.1 TRENCH EXCAVATION
Excavate trench for foundation exceeding 0.30m in width
max. depth n.e 1.5 meters starting at ground level.
i multipurpose court 281.2 Cu m
2.2 FILLING TO EXCAVATION
Back fill selected excavated materials around foundation,
average thickness n.e 0.25 meter arising from excavation
levelled & compacted.
i Around the foudation 13.44 Cu m
2.3 FILLING TO MAKE UP LEVEL
Hardcore filling average thckness exceeding 0.4meter
obtained off site imported rock laterite materials in layers
n.e 400mm thick in:
150 - 200mm depth
2.4 SURFACE TREATMENT
Prepare and apply "dieldrex 20" anti-termite treatment to
840 Sqr M
faces and bottom of excavation (Trench & Pit)
2.5 LEVELLING AND COMPACTION
Level and compact bottom of excavation to receive
concrete.
multipurpose court 703 Sqr M
Sub-total Sqr M
5 REINFORCEMENT FOR IN SITU CONCRETE
plain high yield tensile reinforcement bars 12mm dia
@200mm c/c to BS 4449 in;
Columns 112.14 Kg
Ground beam 398.72 Kg
Sub-total 510.86 Kg
Hollow sandcrete block work,bedded and jointed in
6 cement and sand mortar (1:6). Wall;filled solid with weak
concrete.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
BOQ FOR CONSTRUCTION OF BARBECUE SHED
BILL OF QUANTITIES
Note: this bill covers all items of work that are deemed to be included in the measurements and spe
Unit Cost
S. No. Description of work Quantity Unit
NGN
SUB STRUCTURE
2 EXCAVATON AND EARTH WORK
d Barbecue Shed 18.96 Cu m
2.1 TRENCH EXCAVATION
GRAND TOTAL
urements and specifications.
Total Cost
NGN
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
BOQ FOR CONSTRUCTION OF FIVE A-SIDE FOOTBALL PITCH
BILL OF QUANTITIES
Note: this bill covers all items of work that are deemed to be included in the measurements a
specifications.
Unit Cost
S. No. Description of work Quantity Unit
NGN
SUB STRUCTURE
1 EXCAVATON AND EARTH WORK
1.1 TRENCH EXCAVATION
Excavate trench for foundation exceeding 0.30m in
width max. depth n.e 1.5 meters starting at ground
level.
i Five-a-side Football Pitch 557.28 Cu m
2.2 FILLING TO EXCAVATION
Back fill selected excavated materials around
foundation, average thickness n.e 0.25 meter arising
from excavation levelled & compacted.
i Gravel sub base 247.68 Cu m
ii Sharp sand layer/bed 247.68 Cu m
2.3 FILLING TO MAKE UP LEVEL
Hardcore filling average thckness exceeding 0.4meter
obtained off site imported rock laterite materials in
layers n.e 400mm thick in:
150 - 200mm depth
Five-a-side Football Pitch
2.4 SURFACE TREATMENT
Prepare and apply "dieldrex 20" anti-termite treatment
760 Sqr M
to faces and bottom of excavation (Trench & Pit)
2.5 LEVELLING AND COMPACTION
Level and compact bottom of excavation to receive
concrete.
Five-a-side Football Pitch 619.2 Sqr M
GRAND TOTAL
PITCH
he measurements and
Total Cost
NGN
-
-
-
-
-
-
-
-