Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Points awarded- 1
construction
Points awarded- 5
1. AIRPORT
3 6
2. HOTELS- CHOSEN BROWNFIELD SITE
4 5 SOFITEL,TRIDENT PROPOSAL- MIXED USE BUSINESS
5 3. MUMBAI UNIVERSITY
8 4 2 6 7
4. EXHIBITION
CENTRE
5
5 GROUNDS- JIO COMMERCIAL OFFICES
GARDEN, BKC
4
GROUNDS. SERVICE APARTMENTS
5. COOPERATE OFFICES
6. RESIDENCIES METRO RAILLINE 3COMING UP
7. SCHOOLS
8. PAY AND PARK Criteria 3. Soil conservation Points awarded- 2
AMENITIES AND FUNCTIONS IN CLOSE PROXIMITY PROPOSED BUILT DEMARCATION
NET IMPERVIOUSNESS
OF THE SITE- 4043SQM
Zoning as per cardinal directions Criteria 7. Plan utilities efficiently and optimize on-
site circulation efficiency Points awarded- 3
OPEN GRID PERMEABLE
Vehicular entries MINIMAL HARD PAVED AREAS
PAVERS USED
Negative pressure pockets created in the plaza
depression allows wind to flow through it.
NET IMPERVIOUSNESS OF
THE SITE - 4043sqm TREE FOLIAGE SHADING
OPENSPACES
GROUND LVL PLAN
HEALTH AND WELL-BEING CONSERVATION &EFFICIENT UTILIZATION OF
Criteria 8. Provide minimum level of RESOURCES
sanitation/safety facilities for construction Criteria 10. Reduce landscape water requirement
workers Points awarded- 2 Points awarded- 3
Criteria 9. Reduce air pollution during Criteria 11. Reduce the water use by the building
construction Points awarded- 2
Points awarded- 2
Criteria 12. Efficient water use during construction
Points awarded- 1
Criteria 13. Optimize building design to reduce
conventional energy demand Points awarded- 8
SECTION CC’
RECYCLE, REUSE AND RECHARGE OF WATER HEALTH AND WELL BEING
Criteria 20. Waste-water treatment Criteria 26. Use low-VOC paints
Points awarded- 2 /adhesives/sealants Points awarded- 3
Criteria 27. Minimize ozone depleting
Criteria 21. Water recycle and reuse (including rainwater)
Points awarded- 5 substances Points awarded- 1
Criteria 22. Reduction in waste during construction Criteria 28. Ensure water quality
Points awarded- 1 Points awarded- 2
Criteria 23. Efficient waste segregation Criteria 29. Acceptable outdoor and indoor
noise levels Points awarded- 2
Points awarded- 1
Criteria 30. Tobacco smoke control
Criteria 24. Storage and disposal of wastes
Points awarded- 1
Points awarded- 1
Criteria31. Provide at least the minimum
Criteria 25. Resource recovery from waste
level of accessibility for persons with
Points awarded- 2
disabilities Points awarded- 1
Dedicated space allotted for
waste collection and segregation Criteria32. Energy audit and validation
Criteria33. Operation and
maintenance Points awarded- 2
Environmental education
Green supply chain
Integrated pest management
The earth berm created will help
Life cycle costing
prevent noise from the central plaza/ Row of trees along the edge of the site helps in cutting
off the noise from the busy road. Points awarded- 4
performance space disturb other functions PLAN AT 4.5M LVL