Kode : SBS - 417

LEMBAR
PT. SUASA BENUA SUKSES KONTROL
Hal : 1/2

BUNKER PRELOADING PLAN & OPERATION CHECK-LIST

MT: ……………………………………………………. PORT: ………………………………….. Supplier/ Barge: ………………..……………

Date: ………….…………………. TIME START BUNKERING: …………………………… TIME COMPLETED: ……………………………..

PERSON IN CHARGE MONITORING OPERATION: ……………………………………..…………………………………………………………

1. Bunker Tanks to be Loaded:


Volume at Loading Loading Maximum
Grade Tonnes Maximum Line Pressure
Temp Temperature Transfer Rate
Fuel Oil
Gas Oil/Diesel
Lub. Oil in Bulk

Loading Rate : Starting: _______________ Bulk: __________________ Topping Off: ___________________

TIME
FILL SEQUENCE TANK PRODUCT NAME COMM TIME COMPLETED
ENCE

Please use Annex 1 for detail of Bunker Planning

CAUTION!
TANKS NOT BEING BUNKERED MUST BE SOUNDED AT REGULAR INTERVALS WHILE BUNKERING TO
ENSURE THAT OIL IS NOT ENTERING DUE TO LEAKING VALVES OR DUE TO ANY OTHER CAUSES.

Notes and Special Instructions (crew assignments, monitoring procedures, valve alignments, etc)

______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
Kode : SBS - 417
LEMBAR
PT. SUASA BENUA SUKSES KONTROL
Hal : 2/2

Manning Requirement: ______ No. of Persons on Duty during bunkering/Transfer.

Position/Duty of Each Person Required During Oil Transfer:

POSITION NAME DUTIES POSITION NAME DUTIES

OVERALL INCHARGE MANIFOLD CONNECTION


CHIEF ENGINEER PLANNING, MONITORING & FITTER DISCONNECTION, MANIFOLD
EXECUTION SAMPLING & WATCH
SET UP LINES AND TRAINEE
4TH ENGINEER ASSIST FITTER
MONITOR BUNKER LEVELS SEAMEN
JUNIOR MOORING OPERATIONS AND
ASSIST 4/E DUTY A.B
ENGINEER DECK ROVER WATCH

Vessel is equipped with fixed __________Ltrs; & Portable _____________Ltrs of accidental Discharge Containment.

Status of Valves Operated During HFO/DO/LO Bunkering:

GUIDANCE NOTE:
1. A copy fuel oil transfer piping diagram MUST be prominently displayed and MAY be attached to
this Bunker Preloading Plan.
2. This page may be used during the bunkering operations as a quick reference to the status of the
valves, especially when many tanks are involved in the operation.

DURING AFTER
SR.NO. IDENTITY OF VALVES LOCATION
BUNKERING BUNKERING
OPEN SHUT OPEN SHUT

Other Instructions: