SUB SURFACE EXPLORATION LOG
PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN
LOCATION : PARAKAN
BORE HOLE NUMBER : BH - 1 DRILLING TYPE MACHINE : GT DATE COMMENCED : 28-Nov-16
METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : 29-Nov-16
COORDINATES X : - CORE DIAMETER (mm) : 73 GEOLOGIST : -
Y : - WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER :
GROUND ELEVATION : 1.200 meter DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER : HANIF
TOTAL DEPTH (m) : 35.00 meter CASSING DIAMETER (MM) : 89 WEATHER : -

CORE RECOVERY BORING MACHINE


SPT STANDARD PENETRATION TEST

BORE PROFILE
& N VALUE NUMBER OF BLOWS
DEPTH (m)

SPT TEST
G.W.L (m)

10 20 30 40 50 60

SAMPLE

REMARS
Cassing
DATE

UNIT

(%)

CORE DESCRIPTIONS
UNCONF. COMP. TEST
COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0
N1 N2 N3 N
0.0

brown silty clay fine sand low plasticity


1.0

brown silty clay with gravel low plasticity


2.0

brown silty clay with gravel low plasticity


3.0

spt 1 8 9 10 20
brown silty clay with gravel low plasticity
Cassing f 89 mm

4.0

brown silty clay with gravel low plasticity


5.0

uds
brown silty clay with gravel low plasticity
6.0

spt 2 9 12 14 26
brown silty clay with gravel low plasticity
7.0

brown silty clay with gravel low plasticity


8.0

yellowish brown, gravely sand , low plasticity


9.0

brown, gravely sand , low plasticity


spt 3 10 13 15 28
10.0

brown silty sand with gravel low plasticity


11.0 uds

brown silty sand with gravel low plasticity


12.0

spt 4 12 16 18 34
brown, sandy clay with rock, low plasticity
13.0

dark brown, sandy clay , with gravel, low plasticity


14.0

light grey, gravely sand, non plasticity


15.0

spt 5 20 25 28 53
15.45
last spt
16.0

17.0

5 5 8 13
18.0

19.0

5 7 8 15

20.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 1 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SUB SURFACE EXPLORATION LOG
SEMARANG

PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN


LOCATION : PARAKAN DRILLING TYPE MACHINE DATE COMMENCED
BORE HOLE NUMBER : BH - 1 CORE TYPE : GT DATE COMPLETED : 42702
METHOD OF SAMPLING : Rotary Drilling CORE DIAMETER (mm) : SINGLE GEOLOGIST : 42703
COORDINATES X : - WEIGHT OF HAMMER (Kg) : 73 GEOTECHICAL ENGINEER : -
Y : - DIST.FALLING HAMMER (cm) : 63.5 DRILLING MASTER :
GROUND ELEVATION : 1.200 meter CASSING DIAMETER (MM) : 75 WEATHER : HANIF
TOTAL DEPTH (m) : 35.00 meter : 89 : -

BORING MACHINE
CORE RECOVERY CORE DESCRIPTIONS SPT
N1 & N2 N3 N
N VALUE
STANDARD PENETRATION TEST

BORE PROFILE
NUMBER OF BLOWS
DEPTH (m)

SPT TEST
G.W.L (m)

10 20 30 40 50 60

SAMPLE

REMARS
Cassing
DATE

UNIT

(%)

UNCONF. COMP. TEST


COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0

20.0 5 7 8 15

SPT-10

21.0

6 7 9 16
22.0

SPT-11

23.0

5 7 9 16
24.0

SPT-12

25.0

5 7 10 17
26.0

SPT-13
26 Juni 2016

Sedimentasi

27.0

Lempung Lanauan, Abu-abu, Kaku,


29.0 Plastisitas Tinggi. 5 7 9 16

SPT-14

29.0

6 8 10 18
30.0

SPT-15

31.0

5 8 10 18
32.0

SPT-16

33.0

6 7 8 15
34.0

SPT-17

35.0

36.0

37.0

38.0

39.0

40.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 2 Of 2
SUB SURFACE EXPLORATION LOG

REMARS

Sheet 1 Of 2
REMARS

Sheet 2 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SEMARANG SUB SURFACE EXPLORATION LOG
PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN
LOCATION : PARAKAN
BORE HOLE NUMBER : BH - 2 DRILLING TYPE MACHINE : GT DATE COMMENCED : 6 DES 2016
METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : 11 DES 2016
COORDINATES X : - CORE DIAMETER (mm) : 73 GEOLOGIST : -
Y : - WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER :
GROUND ELEVATION : 1.200 meter DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER : HANIF
TOTAL DEPTH (m) : 35.00 meter CASSING DIAMETER (MM) : 89 WEATHER : -

CORE RECOVERY BORING MACHINE

BORE PROFILE
SPT STANDARD PENETRATION TEST
DEPTH (m)

& N VALUE NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

CORE DESCRIPTIONS
UNCONF. COMP. TEST
COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0
N1 N2 N3 N
0.0

dark grey with brown, silty clay, low plasticity


1.0

greynish brown,silty clay, low plasticity


2.0

greynish brown,silty clay with gravel, low plasticity


3.0

spt 1 8 9 11 20
greynish brown,silty clay with gravel, low plasticity
Cassing f 89 mm

4.0

light brown silty clay high plasticity


5.0

brownies grey, sandy clay , low plasticity


6.0

spt 2 9 12 14 26
light brown,sandy clay with gravel low plasticity
7.0

light brown,sandy clay with gravel low plasticity


8.0

yellowish brown, sandy clay , low plasticity


9.0

yellowish brown, sandy clay , low plasticity


spt 3 10 13 15 28
10.0

brown, sandy clay , low plasticity


11.0

brown, sandy clay , low plasticity


12.0

spt 4 12 16 18 34
brownies grey, sandy clay with rock, low plasticity
13.0

dark brown, sandy clay , with gravel, low plasticity


14.0

light grey, gravely sand, non plasticity


15.0

spt 5 20 25 28 53
15.45
last spt
16.0

17.0

5 5 8 13
18.0

19.0

5 7 8 15

20.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 1 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SUB SURFACE EXPLORATION LOG
SEMARANG

PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN


LOCATION : PARAKAN DRILLING TYPE MACHINE DATE COMMENCED
BORE HOLE NUMBER : BH - 2 CORE TYPE : GT DATE COMPLETED : 6 DES 2016
METHOD OF SAMPLING : Rotary Drilling CORE DIAMETER (mm) : SINGLE GEOLOGIST : 11 DES 2016
COORDINATES X : - WEIGHT OF HAMMER (Kg) : 73 GEOTECHICAL ENGINEER : -
Y : - DIST.FALLING HAMMER (cm) : 63.5 DRILLING MASTER :
GROUND ELEVATION : 1.200 meter CASSING DIAMETER (MM) : 75 WEATHER : HANIF
TOTAL DEPTH (m) : 35.00 meter : 89 : -

BORING MACHINE CORE DESCRIPTIONS N1 N2SPTN3 N


& N VALUE
CORE RECOVERY

BORE PROFILE
STANDARD PENETRATION TEST
DEPTH (m)

NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

UNCONF. COMP. TEST


COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0

20.0 5 7 8 15

SPT-10

21.0

6 7 9 16
22.0

SPT-11

23.0

5 7 9 16
24.0

SPT-12

25.0

5 7 10 17
26.0

SPT-13
26 Juni 2016

Sedimentasi

27.0

Lempung Lanauan, Abu-abu, Kaku,


5 7 9 16
29.0 Plastisitas Tinggi.
SPT-14

29.0

6 8 10 18
30.0

SPT-15

31.0

5 8 10 18
32.0

SPT-16

33.0

6 7 8 15
34.0

SPT-17

35.0

36.0

37.0

38.0

39.0

40.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 2 Of 2
SUB SURFACE EXPLORATION LOG

REMARS

Sheet 1 Of 2
REMARS

Sheet 2 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SEMARANG SUB SURFACE EXPLORATION LOG
PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN
LOCATION : PARAKAN
BORE HOLE NUMBER : BH - 3 DRILLING TYPE MACHINE : GT DATE COMMENCED : 1 DES 2016
METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : 2 DES 2016
COORDINATES X : - CORE DIAMETER (mm) : 73 GEOLOGIST : -
Y : - WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER :
GROUND ELEVATION : 1.200 meter DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER : HANIF
TOTAL DEPTH (m) : 35.00 meter CASSING DIAMETER (MM) : 89 WEATHER : -

CORE RECOVERY BORING MACHINE

BORE PROFILE
SPT STANDARD PENETRATION TEST
DEPTH (m)

& N VALUE NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

CORE DESCRIPTIONS
UNCONF. COMP. TEST
COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0
N1 N2 N3 N
0.0

dark brown, silty clay, with gravel


1.0

yellowish brown, silty clay low plasticity


2.0

brown
3.0 uds
spt 1 8 10 14 24
yellowish brown, sandy clay with gravel non plasticity
Cassing f 89 mm

4.0

yellowish brown, sandy clay with gravel non plasticity


5.0

brown, sandy clay , low plasticity


6.0

spt 2 12 14 15 29
yellowish brown, sandy clay low plasticity
7.0

greynish brown sandy clay low plasticity


8.0

light brown sandy clay with gravel low plasticity


9.0

light brown sandy clay with gravel low plasticity


spt 3 14 17 20 37
10.0

dark brown sandy clay wih gravel non plasticity


11.0

light grey and dark brown sandy clay wih gravel non plasticity

12.0

spt 4 15 18 21 39
dark brown sandy clay low plasticity
13.0

grey sandy clay with gravel


14.0

grey sandy clay with rock


15.0

spt 5 21 26 26 52
15.45
last spt
16.0

17.0

5 5 8 13
18.0

19.0

5 7 8 15

20.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 1 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SUB SURFACE EXPLORATION LOG
SEMARANG

PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN


LOCATION : PARAKAN DRILLING TYPE MACHINE DATE COMMENCED
BORE HOLE NUMBER : BH - 3 CORE TYPE : GT DATE COMPLETED : 1 DES 2016
METHOD OF SAMPLING : Rotary Drilling CORE DIAMETER (mm) : SINGLE GEOLOGIST : 2 DES 2016
COORDINATES X : - WEIGHT OF HAMMER (Kg) : 73 GEOTECHICAL ENGINEER : -
Y : - DIST.FALLING HAMMER (cm) : 63.5 DRILLING MASTER :
GROUND ELEVATION : 1.200 meter CASSING DIAMETER (MM) : 75 WEATHER : HANIF
TOTAL DEPTH (m) : 35.00 meter : 89 : -

BORING MACHINE CORE DESCRIPTIONS N1 N2SPTN3 N


& N VALUE
CORE RECOVERY

BORE PROFILE
STANDARD PENETRATION TEST
DEPTH (m)

NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

UNCONF. COMP. TEST


COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0

20.0 5 7 8 15

SPT-10

21.0

6 7 9 16
22.0

SPT-11

23.0

5 7 9 16
24.0

SPT-12

25.0

5 7 10 17
26.0

SPT-13
26 Juni 2016

Sedimentasi

27.0

Lempung Lanauan, Abu-abu, Kaku,


5 7 9 16
29.0 Plastisitas Tinggi.
SPT-14

29.0

6 8 10 18
30.0

SPT-15

31.0

5 8 10 18
32.0

SPT-16

33.0

6 7 8 15
34.0

SPT-17

35.0

36.0

37.0

38.0

39.0

40.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 2 Of 2
SUB SURFACE EXPLORATION LOG

REMARS

Sheet 1 Of 2
REMARS

Sheet 2 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SEMARANG SUB SURFACE EXPLORATION LOG
PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN
LOCATION : PARAKAN
BORE HOLE NUMBER : BH - 4 DRILLING TYPE MACHINE : GT DATE COMMENCED : 2 DES 2016
METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : 3 DES 2016
COORDINATES X : - CORE DIAMETER (mm) : 73 GEOLOGIST : -
Y : - WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER :
GROUND ELEVATION : 1.200 meter DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER : HANIF
TOTAL DEPTH (m) : 35.00 meter CASSING DIAMETER (MM) : 89 WEATHER : -

CORE RECOVERY BORING MACHINE

BORE PROFILE
SPT STANDARD PENETRATION TEST
DEPTH (m)

& N VALUE NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

CORE DESCRIPTIONS
UNCONF. COMP. TEST
COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0
N1 N2 N3 N
0.0

dark brown, silty clay, low plasticity


1.0

dark brown, sandy clay with stone, low plasticity


2.0

dark brown sandy clay low plasticity


3.0 uds

spt 1 14 15 18 33
dark brown sandy clay low plasticity
Cassing f 89 mm

4.0

dark brown sandy clay low plasticity


5.0

uds
dark brown sandy clay with gravel low plasticity
6.0

spt 2 13 17 18 35
dark brown sandy clay with gravel low plasticity
7.0

uds
dark brown sandy clay with gravel low plasticity
.
8.0

spt 3 14 19 22 41
yellowish brown sandy clay with gravel
9.0

brown sandy clay with gravel


10.0

light grey sandy clay low plasticity


11.0

light grey gravely sand with rock non plasticity


12.0

spt 4 25 28 30 58
light grey , rock non plasticity
13.0

dark grey , rock non plasticity


14.0

dark grey , rock non plasticity


15.0

spt 5 25 30 30 60
15.45
last spt
16.0

17.0

5 5 8 13
18.0

19.0

5 7 8 15

20.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 1 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SUB SURFACE EXPLORATION LOG
SEMARANG

PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN


LOCATION : PARAKAN DRILLING TYPE MACHINE DATE COMMENCED
BORE HOLE NUMBER : BH - 4 CORE TYPE : GT DATE COMPLETED : 2 DES 2016
METHOD OF SAMPLING : Rotary Drilling CORE DIAMETER (mm) : SINGLE GEOLOGIST : 3 DES 2016
COORDINATES X : - WEIGHT OF HAMMER (Kg) : 73 GEOTECHICAL ENGINEER : -
Y : - DIST.FALLING HAMMER (cm) : 63.5 DRILLING MASTER :
GROUND ELEVATION : 1.200 meter CASSING DIAMETER (MM) : 75 WEATHER : HANIF
TOTAL DEPTH (m) : 35.00 meter : 89 : -

BORING MACHINE CORE DESCRIPTIONS N1 N2SPTN3 N


& N VALUE
CORE RECOVERY

BORE PROFILE
STANDARD PENETRATION TEST
DEPTH (m)

NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

UNCONF. COMP. TEST


COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0

20.0 5 7 8 15

SPT-10

21.0

6 7 9 16
22.0

SPT-11

23.0

5 7 9 16
24.0

SPT-12

25.0

5 7 10 17
26.0

SPT-13
26 Juni 2016

Sedimentasi

27.0

Lempung Lanauan, Abu-abu, Kaku,


5 7 9 16
29.0 Plastisitas Tinggi.
SPT-14

29.0

6 8 10 18
30.0

SPT-15

31.0

5 8 10 18
32.0

SPT-16

33.0

6 7 8 15
34.0

SPT-17

35.0

36.0

37.0

38.0

39.0

40.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 2 Of 2
SUB SURFACE EXPLORATION LOG

REMARS

Sheet 1 Of 2
REMARS

Sheet 2 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SEMARANG SUB SURFACE EXPLORATION LOG
PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN
LOCATION : PARAKAN
BORE HOLE NUMBER : BH - 5 DRILLING TYPE MACHINE : GT DATE COMMENCED : 29 nov 2016
METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : 1 DES 2016
COORDINATES X : - CORE DIAMETER (mm) : 73 GEOLOGIST : -
Y : - WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER :
GROUND ELEVATION : 1.200 meter DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER : HANIF
TOTAL DEPTH (m) : 35.00 meter CASSING DIAMETER (MM) : 89 WEATHER : -

CORE RECOVERY BORING MACHINE

BORE PROFILE
SPT STANDARD PENETRATION TEST
DEPTH (m)

& N VALUE NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

CORE DESCRIPTIONS
UNCONF. COMP. TEST
COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0
N1 N2 N3 N
0.0

light brown, silty clay with gravel, low plasticity


1.0

light brown, silty clay with gravel, low plasticity


2.0

light brown, silty clay with gravel, low plasticity


3.0

light brown, sandy clay, low plasticity


spt 1 11 14 16 30
Cassing f 89 mm

4.0

brown sandy clay low plasticity


5.0

brown sandy clay low plasticity


6.0

spt 2 12 14 17 31
brown sandy clay low plasticity
7.0

uds
brown, sandy clay , low plasicity
.
8.0

brown, sandy clay with gravel, low plasicity


9.0

spt 3 13 19 22 41
brown, sandy clay with gravel, low plasicity
10.0

dark brown, sandy clay with gravel, low plasicity


11.0

spt 4 14 19 15 44
dark grey, sandy clay with gravel, low plasicity
12.0

dark grey, sandy clay with gravel, low plasicity


13.0

dark grey, sandy clay with gravel, low plasicity


14.0

dark brown, sandy clay with gravel, low plasicity


15.0

spt 5 20 26 27 53
15.45
last spt
16.0

17.0

5 5 8 13
18.0

19.0

5 7 8 15

20.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 1 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SUB SURFACE EXPLORATION LOG
SEMARANG

PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN


LOCATION : PARAKAN DRILLING TYPE MACHINE DATE COMMENCED
BORE HOLE NUMBER : BH - 5 CORE TYPE : GT DATE COMPLETED : 29 nov 2016
METHOD OF SAMPLING : Rotary Drilling CORE DIAMETER (mm) : SINGLE GEOLOGIST : 1 DES 2016
COORDINATES X : - WEIGHT OF HAMMER (Kg) : 73 GEOTECHICAL ENGINEER : -
Y : - DIST.FALLING HAMMER (cm) : 63.5 DRILLING MASTER :
GROUND ELEVATION : 1.200 meter CASSING DIAMETER (MM) : 75 WEATHER : HANIF
TOTAL DEPTH (m) : 35.00 meter : 89 : -

BORING MACHINE CORE DESCRIPTIONS N1 N2SPTN3 N


& N VALUE
CORE RECOVERY

BORE PROFILE
STANDARD PENETRATION TEST
DEPTH (m)

NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

UNCONF. COMP. TEST


COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0

20.0 5 7 8 15

SPT-10

21.0

6 7 9 16
22.0

SPT-11

23.0

5 7 9 16
24.0

SPT-12

25.0

5 7 10 17
26.0

SPT-13
26 Juni 2016

Sedimentasi

27.0

Lempung Lanauan, Abu-abu, Kaku,


5 7 9 16
29.0 Plastisitas Tinggi.
SPT-14

29.0

6 8 10 18
30.0

SPT-15

31.0

5 8 10 18
32.0

SPT-16

33.0

6 7 8 15
34.0

SPT-17

35.0

36.0

37.0

38.0

39.0

40.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 2 Of 2
SUB SURFACE EXPLORATION LOG

REMARS

Sheet 1 Of 2
REMARS

Sheet 2 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SEMARANG SUB SURFACE EXPLORATION LOG
PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN
LOCATION : PARAKAN
BORE HOLE NUMBER : BH - 6 DRILLING TYPE MACHINE : GT DATE COMMENCED : 29 NOV 2016
METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : 1 DES 2016
COORDINATES X : - CORE DIAMETER (mm) : 73 GEOLOGIST : -
Y : - WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER :
GROUND ELEVATION : 1.200 meter DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER : HANIF
TOTAL DEPTH (m) : 35.00 meter CASSING DIAMETER (MM) : 89 WEATHER : -

CORE RECOVERY BORING MACHINE

BORE PROFILE
SPT STANDARD PENETRATION TEST
DEPTH (m)

& N VALUE NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

CORE DESCRIPTIONS
UNCONF. COMP. TEST
COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0
N1 N2 N3 N
0.0

brown sandy clay with gravel low plasticity


1.0

brown sandy clay with gravel low plasticity


2.0

brown sandy clay with gravel low plasticity


3.0

brown silty clay low plasticity


spt 1 2 3 4 7
Cassing f 89 mm

4.0

brown sandy clay low plasticity


5.0

yellowish brown sandy clay low plasticity


6.0

spt 2 11 13 19 34
yellowish brown sandy clay low plasticity
7.0

yellowish brown sandy clay low plasticity


.
8.0

light brown, sandy clay with gravel, low plasicity


9.0

spt 3 15 19 20 39
light brown, sandy clay with gravel, low plasicity
10.0

dark brown, sandy clay, low plasicity


11.0

dark brown, sandy clay with gravel, low plasicity


12.0

spt 4 17 20 25 45
dark grey, sandy clay, low plasicity
13.0

dark grey, sandy clay, low plasicity


14.0

dark grey, sandy clay, low plasicity


15.0

spt 5 23 25 27 52
15.45
last spt
16.0

17.0

5 5 8 13
18.0

19.0

5 7 8 15

20.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 1 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SUB SURFACE EXPLORATION LOG
SEMARANG

PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN


LOCATION : PARAKAN DRILLING TYPE MACHINE DATE COMMENCED
BORE HOLE NUMBER : BH - 6 CORE TYPE : GT DATE COMPLETED : 29 NOV 2016
METHOD OF SAMPLING : Rotary Drilling CORE DIAMETER (mm) : SINGLE GEOLOGIST : 1 DES 2016
COORDINATES X : - WEIGHT OF HAMMER (Kg) : 73 GEOTECHICAL ENGINEER : -
Y : - DIST.FALLING HAMMER (cm) : 63.5 DRILLING MASTER :
GROUND ELEVATION : 1.200 meter CASSING DIAMETER (MM) : 75 WEATHER : HANIF
TOTAL DEPTH (m) : 35.00 meter : 89 : -

BORING MACHINE CORE DESCRIPTIONS N1 N2SPTN3 N


& N VALUE
CORE RECOVERY

BORE PROFILE
STANDARD PENETRATION TEST
DEPTH (m)

NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

UNCONF. COMP. TEST


COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0

20.0 5 7 8 15

SPT-10

21.0

6 7 9 16
22.0

SPT-11

23.0

5 7 9 16
24.0

SPT-12

25.0

5 7 10 17
26.0

SPT-13
26 Juni 2016

Sedimentasi

27.0

Lempung Lanauan, Abu-abu, Kaku,


5 7 9 16
29.0 Plastisitas Tinggi.
SPT-14

29.0

6 8 10 18
30.0

SPT-15

31.0

5 8 10 18
32.0

SPT-16

33.0

6 7 8 15
34.0

SPT-17

35.0

36.0

37.0

38.0

39.0

40.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 2 Of 2
SUB SURFACE EXPLORATION LOG

REMARS

Sheet 1 Of 2
REMARS

Sheet 2 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SEMARANG SUB SURFACE EXPLORATION LOG
PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN
LOCATION : PARAKAN
BORE HOLE NUMBER : BH - 7 DRILLING TYPE MACHINE : GT DATE COMMENCED : 26 NOV 2016
METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : 29 NOV 2016
COORDINATES X : - CORE DIAMETER (mm) : 73 GEOLOGIST : -
Y : - WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER :
GROUND ELEVATION : 1.200 meter DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER : HANIF
TOTAL DEPTH (m) : 35.00 meter CASSING DIAMETER (MM) : 89 WEATHER : -

CORE RECOVERY BORING MACHINE

BORE PROFILE
SPT STANDARD PENETRATION TEST
DEPTH (m)

& N VALUE NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

CORE DESCRIPTIONS
UNCONF. COMP. TEST
COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0
N1 N2 N3 N
0.0

brown sandy clay with gravel low plasticity


1.0

brown sandy clay with gravel low plasticity


2.0

uds
brown sandy clay with gravel low plasticity
3.0

brown sandy clay with gravel low plasticity


spt 1 11 14 17 31
Cassing f 89 mm

4.0

brown sandy clay with gravel low plasticity


5.0

uds
dark brown silty clay with gravel low plasticity
6.0

spt 2 11 15 19 34
dark brown sandy clay low plasticity
7.0

dark grey sandy clay with gravel non plasticity


.
8.0

dark grey sandy clay with gravel non plasticity


9.0

spt 3 15 20 27 47
dark grey sandy clay with stone non plasticity
10.0

dark grey sandy clay with stone non plasticity


11.0

dark grey sandy clay with stone non plasticity


12.0

spt 4 17 23 29 54
dark grey sandy clay with stone non plasticity
13.0

dark grey, sandy clay with gravel, low plasicity


14.0

dark grey, sandy clay with stone, low plasicity


15.0

spt 5 24 27 30 57
15.45
last spt
16.0

17.0

5 5 8 13
18.0

19.0

5 7 8 15

20.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 1 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SUB SURFACE EXPLORATION LOG
SEMARANG

PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN


LOCATION : PARAKAN DRILLING TYPE MACHINE DATE COMMENCED
BORE HOLE NUMBER : BH - 7 CORE TYPE : GT DATE COMPLETED : 26 NOV 2016
METHOD OF SAMPLING : Rotary Drilling CORE DIAMETER (mm) : SINGLE GEOLOGIST : 29 NOV 2016
COORDINATES X : - WEIGHT OF HAMMER (Kg) : 73 GEOTECHICAL ENGINEER : -
Y : - DIST.FALLING HAMMER (cm) : 63.5 DRILLING MASTER :
GROUND ELEVATION : 1.200 meter CASSING DIAMETER (MM) : 75 WEATHER : HANIF
TOTAL DEPTH (m) : 35.00 meter : 89 : -

BORING MACHINE CORE DESCRIPTIONS N1 N2SPTN3 N


& N VALUE
CORE RECOVERY

BORE PROFILE
STANDARD PENETRATION TEST
DEPTH (m)

NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

UNCONF. COMP. TEST


COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0

20.0 5 7 8 15

SPT-10

21.0

6 7 9 16
22.0

SPT-11

23.0

5 7 9 16
24.0

SPT-12

25.0

5 7 10 17
26.0

SPT-13
26 Juni 2016

Sedimentasi

27.0

Lempung Lanauan, Abu-abu, Kaku,


5 7 9 16
29.0 Plastisitas Tinggi.
SPT-14

29.0

6 8 10 18
30.0

SPT-15

31.0

5 8 10 18
32.0

SPT-16

33.0

6 7 8 15
34.0

SPT-17

35.0

36.0

37.0

38.0

39.0

40.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 2 Of 2
SUB SURFACE EXPLORATION LOG

REMARS

Sheet 1 Of 2
REMARS

Sheet 2 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SEMARANG SUB SURFACE EXPLORATION LOG
PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN
LOCATION : temanggung
BORE HOLE NUMBER : BH - 3 DRILLING TYPE MACHINE : GT DATE COMMENCED : 4 DES 2016
METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : 5 DES 2016
COORDINATES X : - CORE DIAMETER (mm) : 73 GEOLOGIST : -
Y : - WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER :
GROUND ELEVATION : 1.200 meter DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER : HANIF
TOTAL DEPTH (m) : 35.00 meter CASSING DIAMETER (MM) : 89 WEATHER : -

CORE RECOVERY BORING MACHINE

BORE PROFILE
SPT STANDARD PENETRATION TEST
DEPTH (m)

& N VALUE NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

CORE DESCRIPTIONS
UNCONF. COMP. TEST
COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0
N1 N2 N3 N
0.0

brown silty clay low plasticity


1.0

brown sandy clay low plasticity


2.0

brown sandy clay low plasticity


3.0

brown sandy clay with gravel low plasticity


spt 1 7 9 11 20
Cassing f 89 mm

4.0

brown sandy clay with gravel low plasticity


5.0

brown sandy clay low plasticity


spt 2 7 11 15 26
6.0

brown sandy clay low plasticity


spt 2 12 13 15 28
7.0

brown sandy clay low plasticity


.
8.0

brown sandy clay low plasticity


9.0

uds
brown sandy clay low plasticity
spt 3 7 14 16 30
10.0

dark brown sandy clay with gravel low plasticity


11.0

dark brown sandy clay with gravel low plasticity


12.0

dark brown sandy clay with gravel low plasticity


13.0

dark grey sand stone non plasticity


14.0

dark grey sand stone non plasticity


15.0

spt 4 25 26 30 56
15.45
last spt
16.0

17.0

5 5 8 13
18.0

19.0

5 7 8 15

20.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 1 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SUB SURFACE EXPLORATION LOG
SEMARANG

PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN


LOCATION : temanggung DRILLING TYPE MACHINE DATE COMMENCED
BORE HOLE NUMBER : BH - 3 CORE TYPE : GT DATE COMPLETED : 4 DES 2016
METHOD OF SAMPLING : Rotary Drilling CORE DIAMETER (mm) : SINGLE GEOLOGIST : 5 DES 2016
COORDINATES X : - WEIGHT OF HAMMER (Kg) : 73 GEOTECHICAL ENGINEER : -
Y : - DIST.FALLING HAMMER (cm) : 63.5 DRILLING MASTER :
GROUND ELEVATION : 1.200 meter CASSING DIAMETER (MM) : 75 WEATHER : HANIF
TOTAL DEPTH (m) : 35.00 meter : 89 : -

BORING MACHINE CORE DESCRIPTIONS N1 N2SPTN3 N


& N VALUE
CORE RECOVERY

BORE PROFILE
STANDARD PENETRATION TEST
DEPTH (m)

NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

UNCONF. COMP. TEST


COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0

20.0 5 7 8 15

SPT-10

21.0

6 7 9 16
22.0

SPT-11

23.0

5 7 9 16
24.0

SPT-12

25.0

5 7 10 17
26.0

SPT-13
26 Juni 2016

Sedimentasi

27.0

Lempung Lanauan, Abu-abu, Kaku,


5 7 9 16
29.0 Plastisitas Tinggi.
SPT-14

29.0

6 8 10 18
30.0

SPT-15

31.0

5 8 10 18
32.0

SPT-16

33.0

6 7 8 15
34.0

SPT-17

35.0

36.0

37.0

38.0

39.0

40.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 2 Of 2
SUB SURFACE EXPLORATION LOG

REMARS

Sheet 1 Of 2
REMARS

Sheet 2 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SEMARANG SUB SURFACE EXPLORATION LOG
PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN
LOCATION : temanggung
BORE HOLE NUMBER : BH - 2 DRILLING TYPE MACHINE : GT DATE COMMENCED : 2 DES 2016
METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : 3 DES 2016
COORDINATES X : - CORE DIAMETER (mm) : 73 GEOLOGIST : -
Y : - WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER :
GROUND ELEVATION : 1.200 meter DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER : HANIF
TOTAL DEPTH (m) : 35.00 meter CASSING DIAMETER (MM) : 89 WEATHER : -

CORE RECOVERY BORING MACHINE

BORE PROFILE
SPT STANDARD PENETRATION TEST
DEPTH (m)

& N VALUE NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

CORE DESCRIPTIONS
UNCONF. COMP. TEST
COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0
N1 N2 N3 N
0.0

light brown sandy clay low plasticity


1.0

brown sandy clay low plasticity


2.0

brown sandy clay low plasticity


3.0

brown sandy clay low plasticity


spt 1 11 14 16 30
Cassing f 89 mm

4.0

brown sandy clay low plasticity


5.0

brown silty clay high plasticity


6.0 uds

brown silty clay high plasticity


spt 2 12 13 15 28
7.0

brown silty clay high plasticity


.
8.0

brown sandy clay with gravel low plasticity


9.0

spt 3 14 20 29 49
brown sandy clay with gravel low plasticity
10.0

dark brown sandy clay low plasticity


11.0 uds

dark grey sandy clay with stone non plasticity


12.0

spt 4 24 26 26 52
dark grey sandy clay with stone non plasticity
13.0

dark grey sandy clay with stone non plasticity


14.0

dark grey sandy clay with stone non plasticity


15.0

spt 5 24 25 30 55
15.45
last spt
16.0

17.0

5 5 8 13
18.0

19.0

5 7 8 15

20.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 1 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SUB SURFACE EXPLORATION LOG
SEMARANG

PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN


LOCATION : temanggung DRILLING TYPE MACHINE DATE COMMENCED
BORE HOLE NUMBER : BH - 2 CORE TYPE : GT DATE COMPLETED : 2 DES 2016
METHOD OF SAMPLING : Rotary Drilling CORE DIAMETER (mm) : SINGLE GEOLOGIST : 3 DES 2016
COORDINATES X : - WEIGHT OF HAMMER (Kg) : 73 GEOTECHICAL ENGINEER : -
Y : - DIST.FALLING HAMMER (cm) : 63.5 DRILLING MASTER :
GROUND ELEVATION : 1.200 meter CASSING DIAMETER (MM) : 75 WEATHER : HANIF
TOTAL DEPTH (m) : 35.00 meter : 89 : -

BORING MACHINE CORE DESCRIPTIONS N1 N2SPTN3 N


& N VALUE
CORE RECOVERY

BORE PROFILE
STANDARD PENETRATION TEST
DEPTH (m)

NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

UNCONF. COMP. TEST


COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0

20.0 5 7 8 15

SPT-10

21.0

6 7 9 16
22.0

SPT-11

23.0

5 7 9 16
24.0

SPT-12

25.0

5 7 10 17
26.0

SPT-13
26 Juni 2016

Sedimentasi

27.0

Lempung Lanauan, Abu-abu, Kaku,


5 7 9 16
29.0 Plastisitas Tinggi.
SPT-14

29.0

6 8 10 18
30.0

SPT-15

31.0

5 8 10 18
32.0

SPT-16

33.0

6 7 8 15
34.0

SPT-17

35.0

36.0

37.0

38.0

39.0

40.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 2 Of 2
SUB SURFACE EXPLORATION LOG

REMARS

Sheet 1 Of 2
REMARS

Sheet 2 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SEMARANG SUB SURFACE EXPLORATION LOG
PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN
LOCATION : temanggung
BORE HOLE NUMBER : BH - 1 DRILLING TYPE MACHINE : GT DATE COMMENCED : 3 DES 2016
METHOD OF SAMPLING : Rotary Drilling CORE TYPE : SINGLE DATE COMPLETED : 4 DES 2016
COORDINATES X : - CORE DIAMETER (mm) : 73 GEOLOGIST : -
Y : - WEIGHT OF HAMMER (Kg) : 63.5 GEOTECHICAL ENGINEER :
GROUND ELEVATION : 1.200 meter DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER : HANIF
TOTAL DEPTH (m) : 35.00 meter CASSING DIAMETER (MM) : 89 WEATHER : -

CORE RECOVERY BORING MACHINE

BORE PROFILE
SPT STANDARD PENETRATION TEST
DEPTH (m)

& N VALUE NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

CORE DESCRIPTIONS
UNCONF. COMP. TEST
COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0
N1 N2 N3 N
0.0

dark brown slty clay with organic low plasticity


1.0

dark brown sandy clay with organic low plasticity


2.0

spt 1
brown sandy clay with gravel low plasticity
11 12 14 26
3.0

brown sandy clay low plsticity


uds
Cassing f 89 mm

4.0

brown sandy clay low plsticity


spt 2 146 16 18 34
5.0

dark brown sandy clay low plasticity


6.0

spt3 16 19 21 40
dark brown sandy clay with gravel low plasticity
7.0

uds
dark brown sandy clay low plasticity
.
8.0

dark brown sandy clay non plasticity


9.0

spt 4 20 23 24 47
gravely sand brown non plasticity
10.0

dark brown sandy clay low plasticity


11.0

dark grey sandy clay with gravel non plasticity


12.0

spt 4 24 27 28 55
dark grey sandy clay with gravel non plasticity
13.0

dark grey sandy clay with gravel non plasticity


14.0

dark grey, sandy clay with stone, low plasicity


15.0

spt 5 24 27 30 57
15.45
last spt
16.0

17.0

5 5 8 13
18.0

19.0

5 7 8 15

20.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 1 Of 2
PT. ADHIYASA DESICON (JO)-PT. Sinergi Teknik Utama
ENGINERS-PLANNERS-ECONOMISTS-ARCHITECTS-AGRICULTURISTS
JL. PERDANA RAYA C1 NO. 7 TELP (024) 7475541
SUB SURFACE EXPLORATION LOG
SEMARANG

PROJECT : PERENCANAAN TEKNIK DED RING ROAD TEMANGGUNG-PARAKAN


LOCATION : temanggung DRILLING TYPE MACHINE DATE COMMENCED
BORE HOLE NUMBER : BH - 1 CORE TYPE : GT DATE COMPLETED : 3 DES 2016
METHOD OF SAMPLING : Rotary Drilling CORE DIAMETER (mm) : SINGLE GEOLOGIST : 4 DES 2016
COORDINATES X : - WEIGHT OF HAMMER (Kg) : 73 GEOTECHICAL ENGINEER : -
Y : - DIST.FALLING HAMMER (cm) : 63.5 DRILLING MASTER :
GROUND ELEVATION : 1.200 meter CASSING DIAMETER (MM) : 75 WEATHER : HANIF
TOTAL DEPTH (m) : 35.00 meter : 89 : -

BORING MACHINE CORE DESCRIPTIONS N1 N2SPTN3 N


& N VALUE
CORE RECOVERY

BORE PROFILE
STANDARD PENETRATION TEST
DEPTH (m)

NUMBER OF BLOWS

SPT TEST
G.W.L (m)

SAMPLE

REMARS
Cassing

10 20 30 40 50 60
DATE

UNIT

(%)

UNCONF. COMP. TEST


COMPRESSIVE STRENGTH
0.4 0.8 1.2 1.6 2.0 4.0

20.0 5 7 8 15

SPT-10

21.0

6 7 9 16
22.0

SPT-11

23.0

5 7 9 16
24.0

SPT-12

25.0

5 7 10 17
26.0

SPT-13
26 Juni 2016

Sedimentasi

27.0

Lempung Lanauan, Abu-abu, Kaku,


5 7 9 16
29.0 Plastisitas Tinggi.
SPT-14

29.0

6 8 10 18
30.0

SPT-15

31.0

5 8 10 18
32.0

SPT-16

33.0

6 7 8 15
34.0

SPT-17

35.0

36.0

37.0

38.0

39.0

40.0

REMARKS : Undisturbed Sampel (UDS)


TEST WAS STOPPED
Disturbed Sampel (DS)

Sheet 2 Of 2
SUB SURFACE EXPLORATION LOG

REMARS

Sheet 1 Of 2
REMARS

Sheet 2 Of 2

Potrebbero piacerti anche