Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
- REVISED ACCESS
1.3 HALLWAY OF FIRE
07 AUG 2018 EMAILED
COMMENTS
C/O EDD DESIGN
EXIT.
- RELOCATION OF
BREASTFEEDING,
CLINIC, TELCO
OFFICE, AHU
4.1
REVISION 02
- RE-DESIGN OF
1.1
2.1 MAIN CANOPY
11 SEPT 2018 OIS-00-00 VALUE
ENGINEERING
SUPPORT.
- REVISED LAYOUT
OF TRANSPORT
TERMINAL
REVISED DSGN
2.2 DRAWINGS
21 SEPT 2018 DSGN
PLANS
C/O DSGN
- ADDITIONAL
1.1 2.5 SERVICE STAIR
29 OCT 2018 DS-RFI-006 C/O SM
STORE
- REVISED ATRIUM
OPENING
REVISED
2.6 ORIENTATION OF
05 NOV 2018 DS-RFI-007 C/O SM
STORE
SM STORE
ESCALATOR
REVISED TENANT
2.7 ZONING
07 NOV 2018 RECIEVED
EMAIL
C/O EDD
DESIGN
REVISION 03
- ADJUSTMENT OF
3.1 SM STORE WALL
02 JAN 2019 DCN-002 C/O SM
STORE
ENTRANCE
- REMOVAL OF PWD
ELEVATOR @ SM
STORE
- APPROVED AHU
3.2 ROOM SIZES
09 JAN 2019 DCN-002 APPROVED
BY HTS1
- ADJUSTMENT @
3.3 CINEMA BLEACHERS
07 FEB 2019 DCN-002 C/O EDD
DESIGN
1.3 - MARKETING
3.4 LAYOUT & SHORT
22 FEB 2019 DCN-002 C/O EDD
DESIGN
4.4 TERM LEASE
REVISION 04
-ADDITIONAL
4.1 RAILING ON FIRE
03 APR 2019 DCN-004 C/O EDD
DESIGN
EXIT
-ADDITIONAL FIRE
4.2 24 MAY 2019 RFI-012 C/O SM
ROOFDECK EXIT STORE
-ADDITIONAL
4- Mason/ helper mason 4.7 DUMBWAITER
08 JUN 2019 DCN-005 C/O SM
STORE
-RELOCATION AND
4.8 RE-LAYOUT OF AHU
08 JUN 2019 DCN-005 C/O SM
STORE
-ADJUSTMENT ON
4.10 FOODCOURT 08 JUN 2019 DCN-005 C/O EDD
DESIGN
SERVICE HALLWAY
-ADDITIONAL GLASS
4.11 FACADE 08 JUN 2019 DCN-005 C/O EDD
DESIGN
-EIFS ENTRANCE
4.12 PORTAL
08 JUN 2019 DCN-005 C/O EDD
DESIGN
ADJUSTMENT
CLERESTORY
OPENING
DESIGN: JRP DESIGN CONSULTANT: PROJECT: OWNER: SHEET CONTENTS: SHEET NO.:
These drawings are property of
FOR CONSTRUCTION
REVISION NO.04 DATE: 07/10/19