Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
An engineering professional with expertise focused on Environment, Health, Safety and Health
Project Management, ISO 14001, ISO-TS 16949, GMP, HACCP Facilities Management,
Wastewater Treatment Operation, Utilities Management and HVAC Operation for over 13 years
progressive experience in both local and Semiconductor Company, Construction, and Fast
Moving Food Industry.
Result focused with proven ability and positive collaborative attitude with an approach to generate
solution based on business needs while managing relations and work environment. Ability to
handle multiple demands, set priorities and allocate time effectively for a higher level position of
business acumen. Adept at taking initiative to identify, analyze and implement process
improvements.
Significant Accomplishments
2008 Recipient Of Kyocera Crystal Device Philippines Inc., Monthly Star Awardee For
Kaihen Kaizen For Continuous Improvement
Certificate of Appreciation for Kyocera Crystal Device Philippines Inc. -Blood Donors
Recognition Ceremony with the theme" Every Blood Donor is a Hero" held at Marriot
Hotel last August 14, 2012
Recipient of On the Spot Award, Kyocera Crystal Device Philippines. Inc., last May 19,
2014. Cebu City Marriot Hotel
Excellence in Action Award, Kyocera Crystal Device Philippines. Inc., Cebu City Marriot
Hotel last February 8, 2013.
Organized Partnership with Non-Government Institution.
Blood Donation – in coordination with Philippine Red Cross, revitalized blood donation
activity in 2010 by having a total of 102 donors. The highest numbers of blood bags since
Kyocera joined the blood donation activity in 2005. With the persistent campaigned
through flyers, videos, seminars, contest and etc., the blood collected shoot up to 156 in
2011 and was surpassed in 2012 by collecting at total 260 blood bags.
Professional Membership
Improvement of Cat Walk Line Railings and Platforms – PHP 1.8 M – for compliance of
OSH Standards.
Rehabilitation of Fire Hydrants – PHP 2.4 M – for compliance of OSH and BFP
Standards.
Installation of ERTCabinet including accessories – PHP 2.1 M -– for compliance of OSH
and BFP Standards.
Construction of 800 cubic meters Fire Sprinkler Cistern – PHP 9.3 M – for compliance of
OSH and BFP Standards.
Construction of Pump House and Installation Diesel Engine Fire Pump – PHP 6.2 M -–
for compliance of OSH and BFP Standards.
Rehabilitation of Paging System – PHP 1.3 M -– for compliance of OSH and BFP
Standards.
Rehabilitation of Fire Detection and Alarm System – PHP 2.6 M -– for compliance of OSH
and BFP Standards
Rehabilitation of Clinic – PHP 1M – for compliance of OSH Standards.
Rehabilitation of Canteen – PHP 1M – for compliance of OSH Standards.
Rehabilitation Gate 2 Roofing and Walkway – PHP 600T– for compliance of OSH
Standards
Installation Compressed Air Line – PHP 6 M – Productivity Project.
Installation of Production Line Hot Water Pipe – PHP 900T – Productivity Project
Installation of CCTV cameras – PHP 5M – for compliance of OSH Standards.
Installation of Door Access Control – PHP 3M -– for compliance of OSH Standards.
Installation of Real Time RH Monitoring – PHP 4 M – Clean Room Project.
Repair of ducting and Replacement of Insulation – PHP 2 M – HVAC Project.
Replacement of Office Ergonomic Chairs – PHP 1.3 M– for compliance of OSH
Standards.
Replacement of Fire Extinguishers – PHP 2.3 M - for compliance of OSH and BFP
Standards.
Rehabilitation of Exit Signs – PHP 600T - for compliance of OSH and BFP Standards
Rehabilitation of Emergency Lighting System – PHP 1.2 M - for compliance of OSH and
BFP Standards.
Installation Fire Sprinkler System – PHP 28 M - for compliance of OSH and BFP
Standards
Replacement of Air Handling Unit Line 2 – PHP 2 M - HVAC Project.
Replacement of Air Handling Unit Line 1 – PHP 1.8 M - HVAC Project.
Installation of Pack Off Collapsible Ducting – PHP 600T- HVAC Project
Installation of 30 KVA QC UPS – PHP 1.3 M – Predictive Maintenance Project
Installation of 200 Tonner Chiller with Reheat System – PHP 14.6 M - HVAC and Project.
Improvement of Chilled Water Looping System – PHP 1.1 M - HVAC Project
Installation of 40 Tonner ACU – PHP 700T - HVAC Project
Installation of new Trane AHU – PHP 4 M - HVAC Project
Installation of new Dehumidifier – PHP 1.5 M - HVAC Project for clean room
Improvement Water Looping System for COP – PHP 1.5 M - HVAC a Project
Installation of Hot Water Tank System – PHP 2.5 M - HVAC Project
Construction & Acquisition Of Measuring Instrument Calibration Laboratory & Certification
To ISO-IEC 17025 – PHP 5M
Trainings/Seminars
Attended a total of 250 hours for Environment, Health and Safety Seminars, Calibration
Management trainings, Facilities Maintenance and conventions available for Manufacturing
and Construction.
Work Experience
Strategic Functions
Develops plans and strategies to increase facilities and site contractor efficiency,
productivity and adherence to services expectations and contracted key performance
indicators.
Develops plans and strategies to manage, drive and promote effective Environmental
Health and Safety (EHS) programs and to continually develop, implement and maintain
company procedures and guidelines which adhere to Global EHS objectives, local and
national government regulatory agencies.
Develops plans and programs to manage, develop and implement policies, guidelines
and/or procedures on matters involving safety and conservation of air, water and energy
Organizes programs to enhance people development and skills development.
Day-to-Day Operational Functions
1. Plans, organizes, and directs the execution of work orders for the 3 rd party BFU service
provider as well as the site janitorial maintenance service provider to ensure that all
operational parameters required by the manufacturing plant are within standards and
quality specifications;
2. Plans, organizes, and directs the execution of work orders for the 3 rd party BFU service
provider as well as the site janitorial maintenance service provider to ensure that all
office work areas are properly air-conditioned and illuminated for the efficient functioning
of office based personnel;
3. Monitors and reports, on a weekly and monthly basis, the plant’s utilities consumption
and compares these side by side against production outputs for the same period to be
able to monitor and assess any fluctuations and abnormalities in usage. Analyses the
effects of varying production volumes against utilities consumption and institutes
measures and corrective actions for improvement.
4. Participates in the Daily Production Review or Shift Handover Meeting to jointly review
the previous shift or day’s performance, review downtime factors which may have been
caused by utilities or janitorial service performance failures, review action steps and
implement corrective actions moving forward. Coordinates planned activities to all
concerned for proper execution as agreed.
5. Collaborates with all Third Party Service Providers involved to ensure achievement of
quality initiatives, budget line OEE & efficiency, plan achievement, resolution of issues,
documentation and other activities that relate to the overall performance of the plant.
Equipment Reliability/Proactive Maintenance (Team-based)
Project Implementation Of Waste Water Treatment Facilities (STP) – PHP 3.8 M – for
compliance of OSH Standards & DENR Standards
Upgrade Of Company Three-Phase Electrical Supplies Through Coordination With
VECO.-PHP 2.6 Million
Renovation Of Training Room A&B-PHP 350,000
Renovation Of DEMO Kitchen –PHP 494,000
Renovation Proofer Room & Production Office – PHP 460,000
Installation Of 30hp Walk In Blast Freezer –PHP 3 Million
Installation Walk In Freezer, Walk In Chiller –PHP 2.5 Million
Installation Of Double Vacuum Machine- PHP 900,000
Installation Of Metal Detector, Shrink Wrap- 1.5 Million
Installation Of Chlorinator- PHP 450,000
Rehabilitation Of Company Fire Pro ( Sprinkler System) – PHP 1.6 Million
Rehabilitation Of FDAS (Fire Detection & Alarm System)- PHP 800 TH
Quality / GMP
Organization/People Development
Calibration System 1
December 4 2007, Kyocera Crystal Conference Room
Calibration System 2
October 30 2008, Kyocera Crystal Conference Room.,
Supplier Development
February 10 2010, Kyocera Crystal Conference Room.,
REACH Training
Registration, Evaluation, Authorization of Certain Chemicals (Safety)
March 03, 2015 Kyocera Crystal Conference Room.,
WEE Training
Wasted Electronic and Electrical Equipment
March 03, 2015 Kyocera Crystal Conference Room.,
TQM Training
Total Quality Management
May 15, 2015 Harbour City Dimsum House Inc.,
EMS 14001
Environmental Management System
July 28-29, 2017 Harolds Hotel Cebu
PCO Module 2 (Advance Pollution Control Officer Training Course) 3RD TRAINING
COURSE
Sept 5-12, 2017 Sarosa Hotel, Mabolo St.Cebu city
“OHAS 18001:2007”
Occupational Health & Safety Management System
October 4-5 Montebello Villa Hotel,QCS Philippines
“ORGANIZATIONAL MANAGEMENT”
August 14,2017 Casino Espanol,QCS Philippines
Personal Details
Educational Background
College Education
School : CIT University, Cebu City
Year Graduated : March 2004
References: