Sei sulla pagina 1di 2

HYUNDAI ENGINEERING & CONSTRUCTION

HAMAD MEDICAL CITY CP-300B Hospital Fit Out Project


Permit No…………..

HOT WORK PERMIT


INSTRUCTIONS REQUIRED PRECUATIONS CHECKLIST
Tick as applicable
1 Person doing Hot Work: Indicate time started and post
permit at Hot Work location. Indicate time completed Available sprinklers /hose streams and fire
and leave permit posted for Fire Watch extinguishers are serviceable/ operable

2 Fire Watch 1: Prior to leaving area, do final inspection, Hot work equipment in good repair.
sign, leave permit posted. Firewatch to continously check Appropriatte PPE is worn by concerned employees
for one hour after completion.
3 Fire Watch 2: Monitor situation for +3 hrs after completion. Flammable liquids, dust, lint, oily deposits removed.

HOT WORK BEING DONE BY :


Requirements within 11 metres of work

Company :
Explosive atmosphere in area is eliminated
Job No.
Floors swept clean.
DATE & TIME
Combustible floors wet down, covered with damp
sand or fire resistive sheets.

LOCATION/AREA OF WORK Other combustibles removed where possible or


protected with fire resistive tarpaulins.

NATURE OF JOB ie welding, grinding, burning, brazing, soldering Work on walls. Ceiling and roofs

All floor and wall openings covered.


NAME, NUMBER & TRADE OF PERSON DOING HOT WORK Fire resistive tarpaulins suspended beneath work.
1 Ducts and conveyors shut down or protected to
prevent passage of sparks to other combustibles.
Work on enclosed equipment
2

Construction in non-combustible
3 Combustibles on other side of walls, ceilings or
roofs are moved away.

I verify the above location has been examined, the precuations checked on the Enclosed equipment cleaned of all combustibles
Required Precautions Checklist have been taken to prevent fire, and permission
is authorised for this work. Containers purged of flammable vapours / liquids.

Pressurised vessels, piping and equipment isolated and


Name & Signature Name& Signature Name & Signature vented from service.
SubCon /Originator Construction Dept Hyundai HSE Dept
Fire watch has suitable extinguishers.

Fire watch/Hot work area monitoring

On completion of day's job Fire watch will be provided during and for 60 minutes
after work, including any meal breaks.
Work area was monitored for an additional 3 hours
following completion of Hot Work and found fire safe. Provide a charged hose line.
Fire watch is trained in use of equipment and sounding alarm.

Name & Signature Name& Signature Name & Signature


SubCon /Originator Construction Dept Hyundai HSE Dept
Other precautions taken (Specify and advise why)

Fire watch provided in adjoing areas as needed.


WORK COMPLETION & PERMIT CLOSING DETAILS
Area to be continously checked for 1 hour and .
DATE & TIME :
monitored for additional 3 hours on job completion.

HDEC-HSE-F012-HWP
DAI ENGINEERING & CONSTRUCTION
DICAL CITY CP-300B Hospital Fit Out Project
Permit No…………..

WORK PERMIT

Fire watch is trained in use of equipment and sounding alarm.

HDEC-HSE-F012-HWP

Potrebbero piacerti anche