LOADING AND UNLOADING SCHEDULE (STATIC)

LATERAL LOAD TEST ON PILOT TEST PILE (ASTM D 3966)

CLIENT: SHAPOORJI PALLONJI, RIYADH

PROJECT: SABIC MAIN BUILDING, JUBAIL

BORED PILING WORKS

Design Working Load = 34 Ton Pile Dia = 60 cm


Ultimate Load (200%) = 68 Ton Pile Depth(COL) = 30 m
Pile No: = PTP-05 Test No =
Hydraulic Jacks =1
Jack Sr.# = 0714334
Pressure
Load on Pile Guage
% of Design Load Reading Time Criteria
(Ton)
(Bar)
0 0 0 0
25 9 10 10 Mins.
50 17 25 10 Mins.
75 26 45 15 Mins.
100 34 65 20 Mins.
125 43 85 20 Mins.
150 51 105 20 Mins.
170 58 120 20 Mins.
180 61 130 20 Mins.
190 65 135 20 Mins.
200 68 145 60 Mins.
150 51 105 10 Mins
100 34 65 10 Mins
50 17 25 10 Mins
0 0 0 1 Hr.

Loading : Reading at intervals of 0, 2, 4, 8, 10, 20 Mins


Reading at intervals of 0, 2, 4, 8, 10, 20, 30, 40, 50, 60 mins
1 hr. for the holding time
Unloading : Reading at intervals of 0, 2, 4, 8, 10 Mins.