EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A DATA REPORTING:
Output for cumulative weld data & welder data required is reported
SAEP-1160,
A2 weekly in the weld tracking and welder performance report. Shop and
Para. 5.4
field weld and welder data may be included on the same report.
B INSPECTION:
REFERENCE DOCUMENTS:
1. SAEP-1160, Tracking and Reporting of Welding, NDT and Pressure Testing for Capital Projects, (2 August 2016)
2. SAES-W-017, Welding Requirements for API Tanks, (1 January 2018)
ATTACHMENTS:
Attachment 1 - Weekly reporting details
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
a) PMI Backlog
d) HT Backlog
g) Weld rejection rate by line class and NDT method (joint and linear basis)
j) SA RTFI results – to be reported by number of weld films reviewed, separate film quality and