1) 10” SCH 60 & 10” SCH 160 PIPES HAVE SAME INTERNAL DIAMETER?
a) TRUE.
b) FALSE.
Ans: FALSE, AS OD IS CONSTANT AND WHEN SCHEDULE INCREASES THICKNESS INCREACES AND ID
DECREASES.
b) PROCESS PIPING
d) MATERIALS
3) WRITE THE DIFFERENCE BETWEEN ASTM A 312 TP 304 & ASTM A312 TP 316? WHICH IS SUPERIOR,
WHY?
Ans: ASTM A 312 TP 316 IS SUPERIOR THAN ASTM A 312 TP 304. 304 CONTAINS 18% CHROMIUM AND 8%
NICKEL, WHEREAS 316 CONTAINS 16% CHROMIUM, 10% NICKEL AND 2% MOLYBDENUM.
MOLYBDENUM IS ADDED TO HELP RESIST CORROSION TO CHLORIDES.(LIKE SEA WATER AND DE-
ICING SALTS)
4) WRITE THE NAMES OF ANY FOUR LOW ALLOY STEEL FITTINGS (ASTM)?
Ans: SRB TEST IS THE TEST USED FOR FINDING THE COUNT OF SULFATE REDUCING BACTERIA. SRB
COUNT SHOULD BE 103/ ML OR LESS AS DETERMINED BY THE RAPID CHECK II METHOD OR ALTERNATIVE
TEST METHOD APPROVED BY SUPERVISOR,CTU/ME&CCD/CSD. For Hydro testing Requirements.
6) WRITE ANY ASTM CODES FOR CS BOLTS AND NUTS?
Ans: ASTM A193 B7 / B7M FOR BOLTS & ASTM AI94 2H / 2HM FOR NUTS.
Ans: NOT LESS THAN 1.5 PERCENTAGE OF DESIGN PRESSUREOF THE PIPING SYSTEM.
9) STUD BOLT PROJECTION AFTER BOLT TIGHTENING SHOULD BE? (REFER TO WHICH STANDARD).
Ans: FOR A MIN. ALL THREADS TO ENGAGE. (REFERS TO SAEP-351) (MIN OF 0 OR MORE THREAD
PROJECTION IS POSSIBLE)
a) ASTM
b) API
c) ASME
d) AWWA
a) SS ________________ b) CS _____________________
12) FLATTENING OF BENDS, MEASURED AS THE DIFFERENCE BETWEEN THE LARGEST AND THE
SMALLEST OUTSIDE DIAMETER AT ANY CROSS SECTION, SHALL NOT EXCEED _____% OF
NOMINAL PIPE DIA? (REFER TO WHICH STANDARD).
a) 3%
b) 5%
c) 8%
d) 10%
Ans: 5%
13) COMPRESSED FIBRE SHEET GASKET CAN BE USED IN RF FLANGE FACES FOR FLANGES IN NON-
HAZARDOUS FLUID FLOW SERVICES?
a) TRUE
b) FALSE
Ans: FALSE, AS SHEET GASKETS ARE COMMONLY USED IN FLAT FACE FLANGES.
15) IN WHICH ORIENTATION DOES THE INSTRUMENT OF ORIFICE FLANGE CONNECTED IN A PIPELINE
FOR GASEOUS SERVICES?
16) FOR A 2” HEADER PIPE, ½” BRANCH CONNECTION IS NEEDED, WHICH OF THE FOLLOWING WILL
YOU PREFER?
a) SOCKOLET
b) EQUAL TEE
c) REDUCER TEE
d) BRANCH REINFORCED.
Ans: SOCKOLET IS PREFFERD.( REFER TO STANDARD SAES L-110 CHART 1)
17) SEALANT COMPOUNDS OR TEFLON TAPE TO BE REMOVED FROM PIPE THREADS PRIOR TO SEAL
WELDING OF THREADED JOINTS?
a) TRUE
b) FALSE
Ans: TRUE
18) AT WHICH LOCATION BE VENT HOLE TO BE PROVIDED ON HORIZONTAL DUMMY PIPE SUPPORT,
WHAT’S THE SIZE OF VENT HOLE?(REFER TO WHICH STANDARD).
Ans: NEAR THE RUN PIPE AT 6’O CLOCK POSITION , 6 MM VENT HOLE TO BE PROVIDED.(REFER TO
STANDARD SAES L 350 13.2)
a) 25 ____________ b) CS ______________
c) 2 ______________ d) P ________________
b) CS-MATERIAL
c) 2-CORROSION ALLOWANCE
d) P-SERVICE
20) MAXIMUM DIAMETER SOCKET WELD JOINTS ALLOWED IN HAZARDOUS SERVICE? (REFER TO
WHICH STANDARD).
a) ½”
b) 1 ½”
c) 3”
d) 2”
Ans: Shell Test, Closure or Seat Test and Back Seat Test for Gland/Stem Leak
Ans: Heat Number, Material Grade, Physical Dimension, Chemical composition, Mechanical and NDT test
record and Tensile Test Record.
Ans: Pipe schedule, Length, Material specification, Pipe size, Ovality, dent.
28) What dimensions should be checked when inspecting a Flange raised face welding?
29) How should a socket weld flange be setup for welding to a Pipe?
Ans: Before Welding verify the required Gap is provided, 1.5mm to 3mm gap by Marking Method or Gap
ring.
31) Where the Saudi Aramco Line Class Designators and Service Code are be found?
Ans: It is found in SAES-L-105 and Project Piping Material Specification for the individual Packages
followed by the International Standard B31.3.
32) Break down the line class 6” – CA-127-1CS3C
6” = Pipe Size
CA = Drawing No.
127 = Drawing No.
1CS3C = 1 – 150 Flange Rating,
CS – Carbon Steel (Base Material),
3 – Corrosion Allowance (4.8mm) &
C – Caustic
33) How do you verify that the correct piping material is used?
Ans: It can be identified through the following ways
1. Heat No. Traceability with MTC
2. With Material ASTM Specification
3. Color Coding system
4. Positive Material Identification
34) What is often overlooked during orifice flange fabrication?
Ans:
1. Orifice Tapping Hole orientation
2. Flow direction
3. Flush grinding after Welding
4. NDT after Flushing
5. Seal Welding of Orifice tapping with instrument connection
6. All parallel pipe lines with adjacent orifice fittings shall have a min spacing of 300 mm (12 in) between
flanges outside diameters if horizontal taps are required.
35) When a flange connects the pump or other equipment, is there any special tolerance involved?
For piping over 3-inch NPS and connected to machinery/equipment, flange alignment shall be within the
following limits unless piping analysis per SAES-L-120 shows that loads and moments are within the
manufacturer's limits for the machinery/equipment nozzle:
a) Vertical bolt hole offset: ± 2.4 mm
b) Horizontal bolt hole offset: ± 2.4 mm
c) Rotational offset: ± 2.4 mm
d) Flange face tilt across diameter: 0.025 mm per 25 mm (0.001 inch per inch) of flange outside
diameter up to a maximum of 0.672 mm (0.030 inch), and 0.254mm (0.010 inch) for all flanges
with an outside diameter less than 10 inches.
e) Flange face separation, gasket thickness: ± 1.6 mm
f) Combination of vertical, horizontal and rotational offset: ± 3.2 mm
36) What is required thread engagement for piping at Saudi Aramco and where can it be found?
The Minimum number of the engaged threads per nominal size is as follows.
1. For ½” and ¾” - 6 threads must be engaged
2. For 1” to 1 ½” - 7 threads must be engaged
3. For 2” to 3” - 8 threads must be engaged ,It is found in SAES-L-350
37) How can an inspector determine if cold spring exists visually on a flanged section of pipe?
Ans: It can be determined, if the pipe is stressed mechanically like Bending, Twisting or Pulling. And it is not
acceptable
Ans: In water analysis we check the PH value and chloride content, For CS PH value is 7.5± 5 and chloride
content is < 250ppm. For SS PH value is 7.5 ± 0.5 and chloride content is < 50ppm.
Ans:To remove condensate when there is a rise of same in the pipe along the flow direction. If drip leg is not
provided in steam line, the condensate which forms inside the pipe will result in water hammer effect causing
damage to the piping system.
Ans: Hold Point is defined as an inspection point beyond which an activity must not proceed
without the approval of a designated organization or authority
NCR: (Non Conformity report): A record reporting the variation from the specified
requirements.
CAR: Corrective action report: A record reporting the action taken to eliminate the effect
and causes of an existing non –conformity, defect or other undesirable situation in order
to prevent recurrence.
DR: Deviation report: A record of the concessions granted by client or owner to certain
deviation from project specification.
An inspection point, defined in an appropriate document, beyond which an activity can proceed
after notifying the designated organization or authority.
A review point, defined in an appropriate document, is the point at which a work activity cannot
proceed without first ensuring the review and approval of applicable documents or personnel
qualifications by a designated organization or authority.
52) Quality Control Procedure (QCP)?
A QCP is a documented procedure detailing the processes necessary to complete a specific work
activity.
Ans: An ITP is a document based on the detailed manufacturing, fabrication and construction
program and identify each process description. The ITP will set out related sequence of activities
to be inspected, examined and tested.
Ans: Pipe is identified by Nominal bore and thickness is defined by schedule, whereas Tube is
identified by OD
56) What is the difference between Machine bolt and Stud bolt?
Ans: Machine bolt has a head on one side but Stud bolt have Nuts on both sides.
57) What is soluble dam and for what purpose it is using in piping?
Ans: Soluble dam is a water soluble material used for restricting the purge gas within the pipe for welding
especially SS and Alloy materials.
58) What should the radius of Long radius elbow and short radius elbow?
59) Normally where do we use the following? -Concentric Reducer & Eccentric Reducer?
Ans: Concentric Reducer: Pump Discharge and vertical Pipe line etc.
Eccentric Reducer: Pump suction to avoid cavitation & to maintain elevation (BOP) in rack.
Ans: No, air pockets may form if concentric reducer is used at pump suction, which results in cavitation,
and cause damage to pump. To avoid this use eccentric reducer with flat up side in pump suction.
61) What is the basic difference between Pipe specification A106 Gr.A / Gr.B/ Gr.C.?
Ans: Difference is due to the Carbon content. The Letter “L” denotes lower percentage of carbon.
% of carbon content in : -
63) What is the thumb rule to calculate spanner size for given bolt?
64) What is steam tracing? How do we decide the location of SSM and CRM?
Ans: Steam tracing is a process which is used to prevent a fluid passing through a process line from freezing
by keeping the temperature high enough for free flow of fluid and thus maintaining the pumpability.
SSM and CRM and generally located 38m max for open system and 24m for closed system when we use LP
steam up to 3.5 kg/sq cm. as a heating media.