CLIENT : M/S GUJARAT FLOUROCHEMIC

PROJECT : MICRO POWDER PLANT


DOCUMENT NO. : APPENDIX A TO PE-3155-ELQAP
DOCUMENT TITLE : INSTALLATION & INSPECTION P
REV. NO. : R0

INSPECTION CHECKLIST FOR INSTALLATION OF HV AND LV CABLES.

Controlling
Sr. Activities
Document
Check for adequacy of rating, size & length of the cable for the Laid route Markup /
1
corresponding feeder. Cable Schedule

2 Check for any damage on the cable.

3 Check that cable laying has been done as per IFC Drawing Cable Schedule

Check that no source of heat, gas, water & oil or drains, piping,
4
Air conditioning ducts are near the cable.

Check those cable number tags are provided along the route as IFC Cable Schedule /
5
per Cable Schedule Laid route Markup

6 Check that the cable bending radius is as per IS specifications.

Check those cable route markers & joint markers are provided as
7
per IFC drawing.

8 Check that all concrete cable trenches are filled with sand.

9 Check that the RCC covers of trenches are effectively sealed.

Check that cables are properly clamped / supported on cable


10
trays.

Check that the cable trays / pipe racks are sturdy & are designed
11
to withstand the weight of the cables.

12 Cable Termination

Check that Double compression flameproof glands are used for


12.1
flameproof equipment.

Check that Double compression weatherproof glands are used for


12.2
standard equipment.

Check for the correct type, size of glands used and correct
12.3
method used for cable termination.

Check for proper size, type of lugs used and verify correct
12.4
marking of phases on the cables.

Check that ferruling on all terminations Conforms to wiring


13 Vedor Drawing
drawing.
14 Check for proper dressing of cables.

Check for proper connection of the earth screening cable to the


15
earthing strip.

16 Check that single core cables are not earthed at both ends.

Check for sufficient accessibility & facilities for disconnecting or


17
removal of cables is available.

18 Check all openings covered / plugged.

19 Check that no loose items are left in the cable end box.

Check for provision of canopy, to prevent entry of moisture,


20
wherever required.

21 Check for continuity of phase and earth

Check & record IR values of the cable at all three phases, Ph –


22
Ph, Ph – E & Ph - N

Perform & record HVDC test on the cables at all three phases
23
(Check & record IR values before & after HVDC test )

24 Check for tightness of cables to bus bars.

Check for the correct size of bolts used & check for presence of
25
plain and spring washers of proper size.

Transfer of documents. Eg: IR & PI value readings, Stage wise


26
inspection clearance / test reports etc.
M/S GUJARAT FLOUROCHEMICALS LIMITED
MICRO POWDER PLANT
APPENDIX A TO PE-3155-ELQAP-01
INSTALLATION & INSPECTION PLAN FOR LOW AND HIGH VOLTAGE CABLES

Acceptance Contractor /
GFL Engineer
Criteria Technician

Physical Verification Mandatory Check Verify

Visual Mandatory Check Verify

Physical Verification Check Verify

Visual Check Verify

Physical
Check Verify
Verification.

Visual Check Verify

Visual Check Verify

Visual Check Verify

Visual Check Verify

Visual Check Verify

Physical Verification Check Verify

Verify

Check Verify

Check Verify

Check Verify

Check Verify

Physical verification Check Verify


Visual Mandatory Check Verify

Visual Check Verify

Physical Verification Check Verify

Physical Verification Check Verify

Visual Check Verify

Visual Check Verify

Visual Check Verify

Visual Check Verify

Megger Check Verify

Megger Check Verify

Physical Verification Check Verify

Visual Check Verify

Mandatory Check Verify


CLIENT : M/S GUJARAT FLOUROCHEMICALS LIMITED
PROJECT : MICRO POWDER PLANT
DOCUMENT NO. : APPENDIX A TO PE-3155-ELQAP-01
DOCUMENT TITLE : INSPECTION REPORT FOR INSTALLATION OF LOW AND HIGH VOLTAGE CA

PLANT
UNIT
REFERENCE DRAWINGS A) CABLE SCHEDULE B) IFC DRAWINGS
MANUFACTURER
VOLTAGE GRADE
CABLE TYPE

SR. NO. CABLE TAG SOURCE EQPT. DESTINATION EQPT CABLE SIZE NO. OF CABLES ROUTE LENGTH
NOTES:
REFER CHECKLIST FOR INSPECTION OF HV AND LV CABLES.
REFER LATEST REVISION OF CABLE SCHEDULE AND IFC DRAWINGS
REV. NO. : R0
CREATED BY : AJ
APPROVED BY : DB
STALLATION OF LOW AND HIGH VOLTAGE CABLES

TERMINATION KIT /
LUG TYPE AND SIZE GLAND TYPE & SIZE REMARKS
TYPE
INSPECTION ENGINEER

DATE AND SIGNATURE