Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
MATERIALS unit
End Inner
105.00 105.00
TEKSCREW, GYPSUM 6” X 1 1/4” (FLUTED BLACK) pc
PATCHING COMPOUND kg 9.00 7.50
GLUE,VINYL gal 3.00 4.00
PAINT THINNER gal 2.00 2.00
PUTTY,GLAZING ( PLASOLLUX) gal 0.50 0.50
CONCRETE NEUTRALIZER gal 0.50 0.50
TILE ADHESIVE bag 6.00 4.00
CEMENT bag 5.00 2.00
LACQUER SANDING SEALER ltr 0.50 0.50
DOOR JAMB .80m X 2.10m set 1.00 1.00
LOOSE PIN HINGES 3 1/2" X 3 1/2" pcs 3.00 3.00
LOCKSET,DOOR CYLINDRICAL pcs 1.00 1.00
MOULDED DOORS,FLUSH .80m x 2.10 set 1.00 1.00
SAND PAPER #100 m 4.00 4.00
SANDPAPER #150 pcs 8.00 8.00
FLAT LATEX WHITE gal 6.00 6.00
QDE MAPLE gal 1.00 1.00
FLAT WALL ENAMEL WHITE ltr 1.00 1.00
QDE WHITE gal 1.00 1.00
OIL WOOD STAIN MAPLE gal 0.50 0.50
CLEAR GLOSS LACQUER ltr 0.50 0.50
TILE GROUT WHITE kg 5.00 3.00
LATEX,SEMI GLOSS BRIDAL WHITE
DAVIES(MCS-0103) gal 14.00 10.00
TILES UNGLAZED 16" X 16" - GLORIZA BEIGE pcs 312.00 138.00
PLANKS VINYL 4" X 36" - CARAMEL KENT pcs 460.00 330.00
GYPSUM PUTTY gal 5.00 5.00
AREA VOL VT Cement sand
ACTIVITY # L W H S IP m3
inner GF excavation
column footing 3 0.8 0.8 0.25 12 0.3
wall footing 17.95 0.4 0.15 10 0.6
column GF 3 0.4 0.15 2.6 6 0.3
slab on fill 3.55 4 0.1 11 0.8
slab on fill cr 2 1.25 0.1 4 0.3
wall 11.9 2.6
plastering 18 1
mortar 4" 17 1.4
firewall cr 2.05 2.6
plastering 4 0.2
mortar 6" 6 0.5
Beam 3 4 0.15 0.35 9 0.6
beam cr 2 2 0.15 0.35 4 0.2
steel deck suspended slab 2.75 4 0.125 13 0.6
suspended slab cr 2 1.25 0.1 3 0.6
2F Roof Beam 3 4 0.15 0.35 9 0.6
beam cr 2 2 0.15 0.35 2 0.2
Column 2F 3 0.4 0.15 2.6 6 0.3
wall 11.9 2.6
plastering 18 1
mortar 4" 17 1.4
firewall cr 2.05 2.6
plastering 4 0.2
mortar 6" 6 0.5
pitchwall 4.75 0.48
plastering 2 0.1
mortar 4" 2 0.2
pitchwall 2.05 0.6
plastering 1 0.1
mortar 6" 2 0.2
total 50 136 12.2
Gravel Chb Steel Ties #16
m3 4" 6" 16 12 10 V H kg
0.6 6 0.6
1.1 12 1
0.6 12 12 1.2
1.5 12 1
0.5 3 0.5
404 9 12 1.5
70 2 2 0.3
0.9 12 15 2.7
0.4 4 6 1.2
1.4
0.3 5 1
0.9 12 15 2.7
0.4 4 6 1.2
0.6 12 12 1.8
404 9 12 1.5
70 2 2 0.3
31 1 1 0.2
17 1 1 0.1 147
0.8 8 0.8
1.7
0.8 16 16 1.6
1.5 10 1
0.5 3 0.5
0.6 6 0.5
1 6 0.5
414 9 12 1.5
383 8 11 1.4
2.1 28 35 6.3
1.4
1
0.3 5 1
2.1 28 35 6.3
0.8 16 16 1.6
376 8 11 1.4
289 6 8 1.1
31 1 1 0.2
17 1 1 0.1
87 2 3 0.4
0.4 4 8 1.2
0.2 2 4
15.2 821 776 101 6 139 35 47 27.4
221
AREA VOL VT Cement sand Gravel Chb Steel Ties #16
ACTIVITY # L W H S IP m3 m3 4" 6" 16 12 10 V H kg
End GF excavation
column footing 3 0.8 0.8 0.25 2 0.1 0.2 2 0.2
wall footing 26.15 0.4 0.15
column GF 5 0.4 0.15 2.6 2 0.1 0.2 4 4 0.6
slab on fill 3.55 4 0.1 11 0.8 1.5 12 1
slab on fill cr 2 1.25 0.1 4 0.3 0.5 3 0.5
slab on fill kitchen 2.5 4 0.1
wall 15.75 2.6
plastering
mortar 4"
firewall 10.4 2.6
plastering
mortar 6"
Beam 3 4 0.15 0.35 3 0.2 0.3 4 5 0.9
beam cr 2 2 0.15 0.35 2 0.1 0.2 2 3 0.6
4 2.75 0.15 0.35
10
11 Dry ceiling works (ceiling eaves & 16 sqm 103
interior ceiling)
12 Tile works (wall tiles) 7.8 sqm 315
13 Tile works (floor tiles) 36.6 sqm 285
14 Installation of plumbing fixtures 1 lot 774.5
(shower head, shower valve, faucet,
lavatory, water closet, floor drain,
embedded tissue holder & soap
holder)
15 Painting works (exterior/interior) 253.97 sqm 58
QTY
97995.28
TOTAL
AMOUNT
3,962.88
297.00
4,638.28
5,411.12
4,659.77
8,049.60
5,640.75
292.25
334.00
0.00
1,648.00
2,457.00
10,431.00
774.50
14,730.26
63,326.41