Sei sulla pagina 1di 20

Line Maintenance

Standard Labor Hours Manual

Issue 4 07 June 2012 AE 3007

RECORD OF CHANGE

REVISION DATE SECTIONS DESCRIPTION OF CHANGE


AFFECTED

Initial Issue 9 August 1996 All Initial Issue

Revision 3 1 July 2001 All

Revision 4 7 June 2012 All Combined AE 3007A and AE 3007C into


one common document.

ROLLS-ROYCE PROPRIETARY
©2012 Rolls-Royce
The information in this document is the property of Rolls-Royce and may not be copied, or
communicated to a third party, or used, for any purpose other than that for which it is supplied
without the express written consent of Rolls-Royce.
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

TABLE OF CONTENTS

Title Page 1

Table of Contents 2

Introduction 3

Standard Labor Hours

Maintenance Tasks

Chapter 5 Maintenance Checks 6


Chapter 70 Standard Practices - Engine 7
Chapter 72 Engine 8
Chapter 73 Engine Fuel and Control 11
Chapter 74 Ignition 13
Chapter 75 Air 14
Chapter 76 Engine Controls 16
Chapter 77 Engine Indicating 17
Chapter 78 Exhaust 18
Chapter 79 Oil 19

Revision 4
Page 2 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

INTRODUCTION

GENERAL
The information contained in this manual can be used to calculate the number of
labor hours required to perform specific line maintenance tasks on the AE 3007
series turbofan engines. Please consult the AE3007 Standard Labor Hour
Manual for hours necessary to perform shop level and overhaul maintenance
tasks. The number of hours necessary to do each task has been determined
based on field experience, time studies and estimates with consideration given to
task procedures, accessibility, and other factors.

ASSUMPTIONS
• A skilled, experienced mechanic will perform the task.
• Work is performed IAW applicable published bulletins and technical manuals.
• All necessary facilities, tools and equipment are on hand and utilized per the
manufacturer’s instructions.
• All necessary replacement parts are available and in position.
• Labor hour allowances are the total, uninterrupted man-hour time required to
perform the task listed.

Inclusions
All labor hour allowances include the following:

¾ Time required to remove all engine access panels, ducts, tubes, harnesses,
and components necessary to gain access and to perform the task.
¾ Time required to complete all subtasks referenced by the engine
maintenance manual task necessary to get access.
¾ Time required to complete all necessary maintenance record entries and
other documentation.

Exclusions
Labor hour allowances listed for a given task do not include the following:

¾ Time required to prepare the aircraft including removal of cowling, pulling of


circuit breakers, and placing warning signs. The time required to perform
these tasks are outlined in the Additional Labor Hour Allowances section.
¾ Time required to run the engine when prescribed by the published task.
Time required for engine runs are listed as separate maintenance tasks
(Chapter 72, Engine – General) and must be added to the total time.
¾ Additional time required due to training of personnel or performing other
shop duties not directly specified in the procedures outlined in the task.

Revision 4
Page 3 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

ADDITIONAL LABOR HOUR ALLOWANCES

The following allowances are not listed in the standard labor hours section but
will be reimbursed in accordance with the warranty or CorporateCare®
agreement.

Access
Remove and install the engine cowling (upper and lower) 0.50 hours
Prepare the aircraft for engine maintenance 0.30 hours
(circuit breakers, placement of signs, etc)

Documentation
Completion of all related maintenance record entries and 0.30 hours
other applicable documentation

Troubleshooting
Document troubleshooting activities separately from other tasks. Reference the
applicable FIM task where possible. Allowances for troubleshooting vary widely
and will be evaluated on a case-by-case basis. Contact your Rolls-Royce
customer support representative for guidance regarding troubleshooting
allowances.

You should add troubleshooting and access times to the total time required to do
a task where applicable.

To ensure timely and accurate processing of claims, please provide task and/or
service bulletin numbers in all documentation. Also, please provide a brief
description of circumstances that required additional time for troubleshooting and
maintenance for all job documentation.

Example:

Troubleshooting FIM Task 73-25-00-810 3.0 hours


Perform Task 72-00-00-XXX-801 4.0 hours
Additional time required to remove component. 1.0 hours
Mounting studs required cutting to remove and
Standard repair (Task 72-00-00-XXX-801) to replace
Run the engine Task 72-00-00-XXX-801 1.0 hours
Open/Close the engine cowl (top and bottom) 0.5 hours
Prepare the aircraft for engine maintenance 0.25 hours
Complete documentation 0.25 hours
Total allowance 10.00 hours

Revision 4
Page 4 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

DEVIATION FROM STANDARD LABOR HOUR ALLOWANCES

The labor rates listed in this manual are based on field experience and time study
analysis. The following policies are applicable for resolving any standard labor
hour discrepancy:

• All requests for one-time deviations or modification to the standard labor hour
allowance must be submitted to Rolls-Royce in writing.
• One-time deviation requests will be reviewed by Rolls-Royce customer
service representatives and must be authorized prior to submission of a
request.
• Requests for permanent modifications to the established allowances will be
evaluated by a time study analysis as agreed to by Rolls-Royce.
• Time studies will be scheduled on a mutually agreeable basis.
• Once a time study has been accomplished and labor allowances found to be
mutually agreeable, there will be no requirement to perform additional time
studies unless there is a substantial modification to the maintenance task.
• Rolls-Royce retains the right to modify standard labor hour allowances at any
time based on actual fleet experience.

ALLOWANCES FOR SERVICE BULLETINS

The “Manpower” section of each service bulletin will give the allowed time to
complete all steps in that bulletin including tasks referenced to a published
manual.

A dash “-“ in the Hours Allowed column indicates that no official allowance has
been determined for that task at this time

Revision 4
Page 5 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

Chapter 05 Maintenance Checks

Section / Component / Maintenance Task Task No. Hours


Allowed

SCHEDULED MAINTENANCE CHECKS

Inspection- 600 HR Visual 05-21-00 2.5


Inspection - 1000 FH General Visual (All systems) 05-21-00 2.5
Borescope Inspection - Combustion Liner 72-40-00 1.5
Remove and Replace Fuel Nozzles (Every 73-11-10 9.0
2000FH) – 23065950
Bottom igniter – Detailed Inspection 74-21-10 1.5
Top igniter – Detailed Inspection 74-21-10A 2.0

UNSCHEDULED MAINTENANCE CHECKS

Inspection - Engine Involved in Accident or Incident 05-50-00-200-801 3.0


Inspection - Fire in Engine or Nacelle 05-50-00-200-802 1.0
Inspection - After Operation with Volcanic Ash in Air 05-50-00-200-803 16.5
Inspection - Foreign Object Damage 05-50-00-200-804 12.0
Inspection - Hard Landing Damage 05-50-00-200-805 12.0
Inspection - Lightning Strike Damage 05-50-00-200-806 4.0
Inspection - Sudden Stop 05-50-00-200-807 15.5
Inspection - Smoke on Shutdown 05-50-00-200-808 2.0

Clean Engine - Operation in Corrosive Environment 05-50-00-100-801 1.0


Clean Engine - after Fire-extinguishing Agent Discharge 05-50-00-100-802 54.0

Revision 4
Page 6 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

Chapter 70 Standard Practices - Engine

Section / Component / Maintenance Task Task No. Hours Allowed

1.0
Transported Engine – Receiving Inspection 71-00-01
0.5
Trend and Exceedence Files – Download and Transmission 71-00-02
0.5
Gain Access – Remove and Install the Engine Cowling 71-00-03
(Upper and Lower)
0.5
Gain Access – Prepare the Aircraft for Engine Maintenance 71-00-04
(Circuit Breakers, Placement of Signs, Etc.)
-
Documentation – Completion of all Related Maintenance 71-00-05
Record Entries and Other Applicable Documentation
-
Troubleshooting- Varies 71-00-06

Revision 4
Page 7 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

Chapter 72 Engine

Section / Component / Maintenance Task Task No. Hours Allowed

ENGINE – GENERAL
Reconfigure Engine (AE 3007C Only) - 4.5
Remove engine & install spare 72-00-00-000/400-801 58.0
Remove spare and install engine 72-00-00-000/400-801A -
*assumes all preparation, inspection, and
engine run, aircraft positioning, and engine
data download
Clean the Internal Surfaces of the Engine 72-00-00-100-801 5.0
Flush the Internal Surfaces of the Engine 72-00-00-100-802 1.0
Do the Test of the Engine 72-00-00-710-801 -
Engine start test 72-00-00-710-001 1.0
Operational check at MAX T/O 72-00-00-710-007 1.5
Engine Leak test at idle power 72-00-00-790-001 1.0
AIR INLET SECTION

FAN ROTOR ASSEMBLY


Balance the Fan 72-21-00-820-801 10.0

FAN WHEEL
Removal & Installation 72-21-10-000/400-801 3.0

FAN BLADE
Removal & Installation (One blade) 72-21-15-000/400-801 1.0
Removal & Installation (All blades) 72-21-15-000/400-801 1.0
Inspection 72-21-15-200-801 1.0
Repair 72-21-15-300-801 0.5

FAN SPINNER
Removal & Installation 72-21-20-000-801 0.5
Inspection 72-21-20-200-801 0.5

FAN SPINNER TIP


Removal & Installation 72-21-25-000/400-801 0.5

FAN BLADE FORWARD RETAINER


Removal & Installation 72-21-30-000/400-801 1.0

FAN BYPASS VANE


Removal & Installation (One vane segment) 72-25-10-000/400-801 2.5
Removal & Installation (All vane segments) 72-25-10-000/400-801 3.0
Inspection 72-25-10-200-801 0.5

CORE FAN VANE


Removal & Installation 72-25-15-000/400-801 5.0

Revision 4
Page 8 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

Chapter 72 Engine

Section / Component / Maintenance Task Task No. Hours Allowed

BYPASS FLOWPATH
Removal & Installation 72-25-20-000/400-801 2.5

NO. 0 CARBON SEAL


Removal & Installation 72-25-25-000/400-801 7.5

FAN CASE
Removal & Installation 72-25-30-000/400-801 5.5
Inspection 72-25-30-200-801 0.5
Repair 72-25-30-300-801/802/803 -

MID-SPAN ROLLER BEARING


Removal & Installation 72-25-35-000/400-801 8.0

FAN DRIVE SHAFT


Removal & Installation 72-25-40-000/400-801 8.5

COMPRESSOR SECTION
Borescope Inspection 72-30-00-200-801 12.0
Inspection for Vibration 72-30-00-200-802 -

COMBUSTION SECTION
Borescope Inspection - Combustion Liner 72-40-00-200-801 3.5

TURBINE SECTION
Borescope Inspection 72-50-00-200-801
HPT Subtasks 6.0
LPT Subtasks 2.0
Inspection for Vibration 72-50-00-200-804 -

AFT SUMP COVER


Removal & Installation 72-59-10-000/400-801 1.0

SHAFT PLUG
Removal & Installation 72-59-15-000/400-801 1.5

ACCESSORY DRIVES

ACCESSORY-DRIVE GEARBOX
Removal & Installation - AGB 72-63-10-000/400-801 4.5

Revision 4
Page 9 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

Chapter 72 Engine

Section / Component / Maintenance Task Task No. Hours Allowed

Removal & Installation - Magnetic Carbon Seal 72-63-10-000/400-802 2.0


Inspection 72-63-10-200-801 -

BYPASS SECTION
Inspection 72-70-00-200-801 -

INNER BYPASS DUCT


Remove & Install - LH Inner Duct 72-71-10-010/410-801 2.0
Remove & Install - RH Inner Duct 72-71-10-010/410-802 2.0
Remove & Install - Lower Inner Duct 72-71-10-010/410-803 2.0
Inspection - Floating Receptacle Assembly 72-71-10-200-801 -

ACCESS COVER (for Outer Bypass Duct)


Remove & Install 72-73-10-010/410-801 0.5

LOWER SERVICE FAIRING


Remove & Install - LH Lower Service Fairing 72-73-15-000/400-801 4.0
Remove & Install - RH Lower Service Fairing (LH 72-73-15-000/400-802 2.5
Engine)
Remove & Install - RH Lower Service Fairing (RH 72-73-15-000/400-802 2.0
Engine)

OUTER BYPASS DUCT


Repair - Threaded Insert 72-73-20-300-801 -

Revision 4
Page 10 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

Chapter 73 Engine Fuel and Control

Section / Component / Maintenance Task Task No. Hours Allowed

ENGINE FUEL & CONTROL - GENERAL


Inspection - Fuel Tubes 73-00-00-200-801 0.5

DISTRIBUTION

FUEL NOZZLE
Removal & Installation (Set of 16) 73-11-10-000/400-801 9.0

FUEL MANIFOLD
Removal & Installation - Upper Fuel Manifold 73-13-10-000/400-801 3.0
Removal & Installation - Lower Fuel Manifold 73-13-10-000/400-802 4.0
Removal & Installation - LH Fuel Manifold (3 pc) 73-13-10-000/400-803 2.0
Removal & Installation - RH Fuel Manifold (3 pc) 73-13-10-000/400-804 2.0

CVG-ACTUATOR FRONT-FRAME INNER FUEL CAP


Removal & Installation (LH Engine) 73-13-15-000/400-801 2.0
Removal & Installation (RH Engine) 73-13-15-000/400-801 13.0

FRONT-FRAME OUTER MANIFOLD


Removal & Installation (LH Engine) 73-13-20-000/400-801 0.5
Removal & Installation (RH Engine) 73-13-20-000/400-801 10.5

CONTROLLING

FUEL PUMP AND METERING UNIT


Removal & Installation 73-21-10-000/400-801 1.0
Removal & Installation - Fuel Filter 73-21-10-000/400-802 0.5

FADEC
Removal & Installation 73-25-10-000/400-801 2.0

INDICATING
Inspection - Bypass Indicators 73-30-00-200-801 0.5
Functional Test - Indicating System 73-30-00-700-801 1.0

FUEL TEMPERATURE SENSOR


Removal & Installation 73-31-10-000/400-801 0.5
Test 73-31-10-700-801 0.5
Inspection 73-31-10-200-801 0.5

Revision 4
Page 11 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

Chapter 73 Engine Fuel and Control

Section / Component / Maintenance Task Task No. Hours Allowed

FUEL-FILTER BYPASS INDICATORS


Electrical Impending Bypass Indicator
Removal & Installation (LH Engine) 73-37-10-000/400-801 0.5
Removal & Installation (RH Engine) 73-37-10-000/400-801 1.0
Mechanical Actual Bypass Indicator
Removal & Installation (LH Engine) 73-37-10-000/400-802 0.5
Removal & Installation (RH Engine) 73-37-10-000/400-802 1.0

Revision 4
Page 12 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

Chapter 74 Ignition

Section / Component / Maintenance Task Task No. Hours Allowed

IGNITION - GENERAL

ELECTRICAL POWER SUPPLY

ALTERNATOR ROTOR
Removal & Installation 74-11-10-000/400-801 3.0

ALTERNATOR STATOR
Removal & Installation 74-11-15-000/400-801 0.5

IGNITION EXCITER
Removal & Installation 74-13-10-000/400-801 1.0

DISTRIBUTION

IGNITER
Removal & Installation - Bottom Igniter 74-21-10-000/400-801 1.5
Removal & Installation - Top Igniter 74-21-10-000/400-802 1.5
Inspection Bottom Igniter 74-21-10-200-801 2.0
Top Igniter 1.5
IGNITOR LEAD (A)
Removal & Installation (LH Engine) 74-21-15-000/400-801 3.0
Removal & Installation (RH Engine) 74-21-15-000/400-801 3.5
Test 74-21-15-700-801 3.5
Inspection 74-21-15-200-801 4.0

IGNITOR LEAD (B)


Removal & Installation 74-21-20-000/400-801 3.5
Test 74-21-20-700-801 4.0
Inspection 74-21-20-200-801 4.0

Revision 4
Page 13 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

Chapter 75
Air

Section / Component / Maintenance Task Task No. Hours Allowed

COMPRESSOR-BLEED SYSTEM
Clean the system 75-31-00-100-801 5.0

COMPRESSOR-AIR-BLEED VALVE
Upper - Removal & Installation - LH 75-31-00-000/400-801 1.5
Upper - Removal & Installation - RH 2.0
Lower - Removal & Installation - LH 75-31-00-000/400-802 3.0
Lower - Removal & Installation - RH 3.5
Inspection – LH 75-31-10-200-801 1.0
Inspection – RH 1.5
Upper Clean - LH 75-31-10-100-801 2.0
Upper Clean - RH 2.5
Lower Clean - LH 3.5
Lower Clean - RH 4.0
Upper Repair - LH 75-31-10-300-801 2.0
Upper Repair - RH 2.5
Lower Repair - LH 3.5
Lower Repair - RH 4.0

COMPRESSOR ACCELERATION-BLEED-CONTROL VALVE


Acceleration-bleed-control valve - Removal & Installation (LH) 75-31-15-000/400-801- 0.5
001
Acceleration-bleed-control valve - Removal & Installation (RH) 75-31-15-000/400-801- 0.5
001
Acceleration-bleed-control valve – Clean + R/I (LH Engine) 75-31-15-000/400-801- 1.0
001
Acceleration-bleed-control valve – Clean + R/I (RH Engine) 75-31-15-000/400-801- 1.0
001
Start Bleed-control valve - Removal & Installation - LH 75-31-15-000/400-801- 0.5
002
Start Bleed-control valve - Removal & Installation - RH 75-31-15-000/400-801- 1.0
002

CUSTOMER-SERVICES CORE MANIFOLD


Removal & Installation 75-31-20-000/400-801 6.0

COMPRESSOR-BLEED-VALVE ADAPTER
Removal & Installation 75-31-25-000/400-801 4.5

CUSTOMER-SERVICES OUTER MANIFOLD


Removal & Installation 75-31-30-000/400-801 1.0

CUSTOMER OFFTAKE BLEED AIR TUBE


Removal & Installation 75-31-35-000/400-801 1.0

Revision 4
Page 14 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

Chapter 75
Air

Section / Component / Maintenance Task Task No. Hours Allowed


COMPRESSOR-VARIABLE-GEOMETRY ACTUATOR
Removal & Installation (LH Engine) 75-33-10-000/400-801 2.5
Removal & Installation (RH Engine) 75-33-10-000/400-801 3.5
Test – LH 75-33-10-700-801 1.5
Test - RH 2.0

COMPRESSOR-VARIABLE-GEOMETRY ACTUATOR
Inspection - LH 75-33-10-200-801 1.5
Inspection - RH 75-33-10-200-801 2.0

TORQUE TUBE
Removal & Installation - LH 75-33-15-000/400-801 2.5
Removal & Installation - RH 75-33-15-000/400-801 3.5

INDICATING

COMPRESSOR-INLET-TEMPERATURE SENSOR (T2.5)


Removal & Installation (LH Engine) 75-41-10-000/400-801 2.5
Removal & Installation (RH Engine) 75-41-10-000/400-801 1.5
Test – LH 75-41-10-700-801 2.0
Test – RH 75-41-10-700-801 1.5
Inspection – LH 75-41-10-200-801 2.0
Inspection - RH 75-41-10-200-801 1.5

COMPRESSOR-INLET-PRESSURE SENSOR (P2.5)


Removal & Installation 75-43-10-000/400-801 0.5
Test 75-43-10-700-801 0.5
Inspection 75-43-10-200-801 0.5

Revision 4
Page 15 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

Chapter 76 Engine Controls

Section / Component / Maintenance Task Task No. Hours Allowed

POWER CONTROLS

INTERNAL ENGINE-CONTROL (A) HARNESS


Removal & Installation 76-11-10-000/400-801 5.0

INTERNAL ENGINE-CONTROL (B) HARNESS


Removal & Installation 76-11-15-000/400-801 5.0

EXTERNAL ENGINE-CONTROL (A) HARNESS


Removal & Installation - LH engine 76-11-20-000/400-801 2.0
Removal & Installation - RH engine 76-11-20-000/400-802 2.0
Inspection 76-11-20-200-801 0.5

EXTERNAL ENGINE-CONTROL (B) HARNESS


Removal & Installation - LH engine 76-11-25-000/400-801 2.0
Removal & Installation - RH engine 76-11-25-000/400-802 2.0
Inspection 76-11-25-200-801 0.5

EXTERNAL ENGINE-INDICATING HARNESS


Removal & Installation - LH engine 76-13-10-000/400-801 1.5
Removal & Installation - RH engine 76-13-10-000/400-802 1.5

INTERNAL ENGINE-INDICATING HARNESS


Removal & Installation – LH engine 76-13-15-000/400-801 2.0
Removal & Installation – RH engine 76-13-15-000/400-801 2.5

Revision 4
Page 16 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

Chapter 77 Engine Indicating

Section / Component / Maintenance Task Task No. Hours Allowed

INDICATING
Inspection for overtemperature condition 77-00-00-200-801 5.0

POWER

HIGH-PRESSURE-ROTOR SPEED (N2) SENSOR


Removal & Installation 77-11-10-000/400-801 0.5
Test 77-11-10-700-801 0.5
Inspection 77-11-10-200-801 0.5

FAN SPEED (N1) SENSOR


Removal & Installation 77-11-15-000/400-801 0.5
Test 77-11-15-700-801 0.5
Inspection 77-11-15-200-801 0.5

TEMPERATURE

TURBINE-INTERSTAGE THERMOCOUPLE
Removal & Installation (16 thermocouples) 77-21-10-000/400-801 3.0
Test 77-21-10-700-801 2.0
Inspection 77-21-10-200-801 1.5

TURBINE-INTERSTAGE THERMOCOUPLE (A) HARNESS


Removal & Installation 77-21-15-000/400-801 2.0

TURBINE-INTERSTAGE THERMOCOUPLE (B) HARNESS


Removal & Installation 77-21-20-000/400-801 2.0

ITT TRIM PLUG


Removal & Installation 77-21-25-000/400-801 0.5

INTEGRATED ENGINE INSTRUMENT SYSTEMS

VIBRATION SENSORS
Front-frame (N1) - Removal & Installation 77-41-10-000/400-801 0.5
Compressor (N2) - Removal & Installation (LH Eng) 77-41-10-000/400-802 1.0
Compressor (N2) - Removal & Installation (RH Eng) 77-41-10-000/400-802 1.0
Test - Front-frame (N1) Vibration Sensor 77-41-10-700-801 0.5
Test - Compressor (N2) Vibration Sensor 77-41-10-700-802 1.0
Inspection - Front-frame (N1) Vibration Sensor 77-41-10-200-801 0.5
Inspection - Compressor (N2) Vibration Sensor 77-41-10-200-802 1.0

Revision 4
Page 17 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

Chapter 78 Exhaust

Section / Component / Maintenance Task Task No. Hours Allowed

EXHAUST - GENERAL

Inspection - Exhaust System 78-00-00-200-801 0.5


Inspection - Metal particles in RTBS 78-00-00-200-802 0.5

COLLECTOR/NOZZLE

EXHAUST CONE
Removal & Installation 78-11-10-000/400- 0.5
801

FORCED CORE-TO-BYPASS MIXER


Removal & Installation 78-11-15-000/400- 0.5
801

Revision 4
Page 18 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

Chapter 79 Oil

Section / Component / Maintenance Task Task No. Hours Allowed

OIL
Inspection - Oil tubes 79-00-00-200-801 0.5

STORAGE

OIL TANK
Drain the Oil Tank 79-11-10-680-801 0.5
Removal & Installation - Oil Tank 79-11-10-000/400-801 1.0
Removal & Installation - Chip-collector Drain Valve 79-11-10-000/400-802 1.0
Removal & Installation - Self-closing Sensor Valve 79-11-10-000/400-803 1.0
Removal & Installation - Chip-collector Plug 79-11-10-000/400-804 1.0

DISTRIBUTION

LUBE-AND-SCAVENGE PUMP
Removal & Install 79-21-10-000/400-801 3.0
Removal & Installation - Chip-collector Plug 79-21-10-000/400-802 0.5
Removal & Installation - Chip-collector Debris Monitor 79-21-10-000/400-803 0.5

OIL FILTER UNIT


Removal & Installation - Oil Filter Unit 79-23-10-000/400-801 1.5
Removal & Installation - Oil Filter Element 79-23-10-000/400-802 1.5

AIR-COOLED OIL COOLER (ACOC)


Removal & Install 79-25-10-000/400-801 3.0
Inspection 79-25-10-200-801 0.5

FUEL-COOLED OIL COOLER (FCOC)


Removal & Install 79-25-15-000/400-801 1.5
Inspection 79-25-15-200-801 0.5

RH-OUTER SERVICE MANIFOLD


Removal & Install (LH Engine) 79-27-20-000/400-801 4.0
Removal & Install (RH Engine) 79-27-20-000/400-801 4.0

LH-OUTER SERVICE MANIFOLD


Removal & Install (LH Engine) 79-27-25-000/400-801 2.5
Removal & Install (RH Engine) 79-27-25-000/400-801 2.5

CENTER-SUMP-VENT TUBE AND CENTER-SUMP SCAVENGE TUBE


Borescope Inspection –LH 79-27-30-200-801 3.0
Borescope Inspection - RH 79-27-30-200-801A 1.5
Clean 79-27-30-100-801 0.5
Inspection - Bypass Indicators 79-30-00-200-802 0.5

Revision 4
Page 19 of 20
Rolls-Royce
AE 3007 SERIES STANDARD LABOR HOURS MANUAL

Chapter 79 Oil

Section / Component / Maintenance Task Task No. Hours Allowed

OIL TEMPERATURE/PRESSURE SENSOR


Removal & Installation 79-31-10-000/400-801 1.5
Test 79-31-10-700-801 0.5
Inspection 79-31-10-200-801 0.5

LOW-OIL-PRESSURE SENSOR
Removal & Installation 79-33-10-000/400-801 1.5
Test 79-33-10-700-801 0.5
Inspection 79-33-10-200-801 0.5

OIL-LEVEL AND LOW-LEVEL WARNING SENSOR


Removal & Installation 79-35-20-000/400-801 2.5
Test 79-35-20-700-801 3.0
Inspection 79-35-20-200-801 3.0

MAGNETIC INDICATING PLUG


Removal & Installation 79-37-10-000/400-801 1.5
Test 79-37-10-700-801 0.5
Inspection 79-37-10-200-801 0.5

OIL-FILTER ELECTRICAL IMPENDING-BYPASS INDICATOR


Removal & Installation 79-37-15-000/400-801 1.5

OIL-FILTER MECHANICAL IMPENDING-BYPASS INDICATOR


Removal & Installation 79-37-20-000/400-801 1.5

OIL-FILTER MECHANICAL ACTUAL-BYPASS INDICATOR


Removal & Installation 79-37-25-000/400-801 1.5