Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
SAMSI C/L OF THE EXP GAP C/L OF THE EXP GAP HARISCHANDRAPUR
22540 C/C Exp. Joint
21000 C/C Dist of Bearing
Hand Rail FRL + 100.000
1.0 1.0
1.5 1.5
450x450
PTFE Bearing HFL +96.580
+ 95.200 + 95.200
Sill lvl. Sill lvl.
+ 69.400 + 69.400
Bottom of Found. Bottom of Found.
RETURN WALL
HAND RAIL
300
FOOTPATH
L OF CARRIAGEWAY
CRASH BARRIER
APPROACH SLAB
15400
FLOW
16000
C
DRAINAGE SPOUT
CRASH BARRIER
FOOTPATH
300
PLAN AT TOP
(SCALE - 1:225)
GOBINDER SINGH
DESIGN DIRECTOR
HALF PLAN AT BOTTOM DATED : 03-09-18
(SCALE - 1:225)
DATE 03-09-18
CLIENT:- CONTRACTOR:- PROOF CHECK CONSULTANT:- AUTHORITY ENGINEER:- PROJECT :- TITLE :- GENERAL ARRANGEMENT DRAWING FOR
CONSULTANT :-
MINOR BRIDGE OVER LOCAL RIVER AT CH-
GOVERNMENT OF WEST BENGAL TASPL Chaitanya Projects Consultancy Pvt. Ltd. Upgradation of NH-81 with a minimum of 2 lane with 19+656 KM OF SAMSI TO HARISCHANDRAPUR
CUBE ENGITECH CONSULTANT PVT.LTD . Office of the Executive Engineer M/S SINGH - RKC (JV) Flat no. HIG II, 7&8 E1 paved shoulder configuration starting from Km ROAD, (1X22.540M SPAN)
Technocrats Advisory Services Pvt. Ltd.
JEEVAN LOK HOSPITAL COMPLEX, National Highway Division No.: - VII (Committed to resource and energy conservation) Greenwood Sonata Apartment 19.205 to Km 46.550 in the District of Malda, on EPC
MAIN ROAD HINOO, Public Works(Roads) Directorate 145, Mithila Appartments, 76,
Action Area-II, New Town, Rajahat, mode in the State of West Bengal under Annual Plan DRAWING NO. :- NH-81/GAD/LR/001
I.P. Extension, Patparganj, New Delhi - 110092
RANCHI-2 Near City Center-2, Kolkata-157 2017-2018
SCALE :- AS SHOWN
900
.
a
700
ABUTMENT CAP
SECTION 'A-A'
c 12 T
O -2 Nos.
c 12 T
O -1 No.
b (8 LEGGED)
a 12 T
O - @100mm c/c
.
b (8 LEGGED) a 25 T
O - 6 Nos.
12 T
O - @150mm c/c (both faces)
a
.
a 20 T
O - 6 Nos.
(both faces)
GOBINDER SINGH
DESIGN DIRECTOR c
DATED : 03-09-18 c
700
TYPE-1
GAP 20 TYPE-1 GAP 20
900
900 TYPE-1 900
700
TYPE-2 625 TYPE-2
400
400
700 PEDESTAL
250
250
1000
1000
1000
313
313
388
DATE 03-09-18
CLIENT:- CONTRACTOR:- PROOF CHECK CONSULTANT:- AUTHORITY ENGINEER:- PROJECT :- TITLE :- ABUTMENT A1&A2 DIMENSIONAL & SEISMIC
CONSULTANT :- ARRESTER DETAIL DRAWING FOR
GOVERNMENT OF WEST BENGAL TASPL Chaitanya Projects Consultancy Pvt. Ltd. Upgradation of NH-81 with a minimum of 2 lane with MINOR BRIDGE OVER LOCAL RIVER AT CH-
Office of the Executive Engineer paved shoulder configuration starting from Km 19+656 KM OF SAMSI TO HARISCHANDRAPUR
CUBE ENGITECH CONSULTANT PVT.LTD . M/S SINGH - RKC (JV) Technocrats Advisory Services Pvt. Ltd. Flat no. HIG II, 7&8 E1
ROAD, (1X22.540M SPAN)
JEEVAN LOK HOSPITAL COMPLEX, National Highway Division No.: - VII (Committed to resource and energy conservation) Greenwood Sonata Apartment 19.205 to Km 46.550 in the District of Malda, on EPC
MAIN ROAD HINOO, Public Works(Roads) Directorate 145, Mithila Appartments, 76,
Action Area-II, New Town, Rajahat, mode in the State of West Bengal under Annual Plan DRAWING NO. :- NH-81/DD/LR/-402
I.P. Extension, Patparganj, New Delhi - 110092
RANCHI-2 Near City Center-2, Kolkata-157 2017-2018
SCALE :- AS SHOWN
SCHEDULE OF REINFORCEMENT FOR ABUTMENT:A1&A2
9a
10 10 8a 8b
11
8a 8b
11
A A vertical staggered
tied to alternate
5 vertical bars
6
10
7 7
9b
4 3 Section A-A 18
13 NOTES :
1. All dimensions are in millimetres and all levels are in metres.
14a 14b 2. No dimension shall be scaled from this drawing, only written
dimensions shall be followed.
3 Clear cover to all reinforcement shall be as follows:
2 a) RCC Pile/pile cap ... 75 mm
b) RCC Abutment wall ... 50 mm
16 Top c) RCC Bed block / Pier cap ... 50 mm
d) Return walls ... 75 mm
1 4 End cover to all reinforcement shall be 50 mm clear, unless
otherwise specified.
12 17 5 The TMT bars need not be provided with any hooks at the ends,
only a right angle bend shall be provided for bars upto 25 O.
17 6 Bond, Anchorage length, Splices etc., shall be governed as per
REINFORCEMENT DETAIL OF A1 & A2 PILE Should be as per IRC:112 SECTION 15.
16 Bottom 7 Lap length reinforcement :
(i) Minimum lap length of reinforcement shall be decided as per
GOBINDER SINGH
DESIGN DIRECTOR
15 2L Stirrups IRC 112 clause 15.2.3,15.2.4, & 15.2.5
DATED : 03-09-18
(ii) Not more than 50% of reinforcement shall be lapped
2 at any one location.
8 No. of bars shall not be counted from this drawing, the
spacing or number specified shall only be followed.
9 The water cement ratio should be as per table 14.2 of
1 IRC: 112-2011 and conforming to notes- 5,6,7 and 8.
10 The location of bores do not match exactly with the proposed
REINFORCEMENT DETAIL OF A1 & A2 PILE foundation locations causing small variations in depths of
foundation strata. A minimum embedment of 2.0 m below
maximum scour level.
DATE 03-09-18
300
Section A-A
NTS NOTES :-
Section B-B
T
T
.5
1:1
L L L L
T
T
1:2
DETAIL OF MESH
DETAIL OF MESH TYPE M2
TYPE M1