SAMSI C/L OF THE EXP GAP C/L OF THE EXP GAP HARISCHANDRAPUR
22540 C/C Exp. Joint
21000 C/C Dist of Bearing
Hand Rail FRL + 100.000

1.0 1.0
1.5 1.5

450x450
PTFE Bearing HFL +96.580
+ 95.200 + 95.200
Sill lvl. Sill lvl.

+ 69.400 + 69.400
Bottom of Found. Bottom of Found.

GROUND LEVEL 95.800 95.700


FOUNDATION LVL. 69.400 69.400
CHAINAGE 0 21600
ELEVATION
(SCALE - 1:200)

RETURN WALL
HAND RAIL
300

FOOTPATH
L OF CARRIAGEWAY

CRASH BARRIER
APPROACH SLAB
15400

FLOW
16000
C

DRAINAGE SPOUT

CRASH BARRIER

FOOTPATH
300

3500 3750 5400 5400 5400 1050


HAND RAIL

PLAN AT TOP
(SCALE - 1:225)

300mm thk stone pitching over


150mm granular materials

GOBINDER SINGH
DESIGN DIRECTOR
HALF PLAN AT BOTTOM DATED : 03-09-18
(SCALE - 1:225)

DATE 03-09-18

CLIENT:- CONTRACTOR:- PROOF CHECK CONSULTANT:- AUTHORITY ENGINEER:- PROJECT :- TITLE :- GENERAL ARRANGEMENT DRAWING FOR
CONSULTANT :-
MINOR BRIDGE OVER LOCAL RIVER AT CH-
GOVERNMENT OF WEST BENGAL TASPL Chaitanya Projects Consultancy Pvt. Ltd. Upgradation of NH-81 with a minimum of 2 lane with 19+656 KM OF SAMSI TO HARISCHANDRAPUR
CUBE ENGITECH CONSULTANT PVT.LTD . Office of the Executive Engineer M/S SINGH - RKC (JV) Flat no. HIG II, 7&8 E1 paved shoulder configuration starting from Km ROAD, (1X22.540M SPAN)
Technocrats Advisory Services Pvt. Ltd.
JEEVAN LOK HOSPITAL COMPLEX, National Highway Division No.: - VII (Committed to resource and energy conservation) Greenwood Sonata Apartment 19.205 to Km 46.550 in the District of Malda, on EPC
MAIN ROAD HINOO, Public Works(Roads) Directorate 145, Mithila Appartments, 76,
Action Area-II, New Town, Rajahat, mode in the State of West Bengal under Annual Plan DRAWING NO. :- NH-81/GAD/LR/001
I.P. Extension, Patparganj, New Delhi - 110092
RANCHI-2 Near City Center-2, Kolkata-157 2017-2018
SCALE :- AS SHOWN
900

.
a

700

ABUTMENT CAP

SECTION 'A-A'

c 12 T
O -2 Nos.

c 12 T
O -1 No.

b (8 LEGGED)
a 12 T
O - @100mm c/c

.
b (8 LEGGED) a 25 T
O - 6 Nos.
12 T
O - @150mm c/c (both faces)
a

.
a 20 T
O - 6 Nos.

(both faces)
GOBINDER SINGH
DESIGN DIRECTOR c
DATED : 03-09-18 c

REINFORCEMENT DETAIL REINFORCEMENT DETAIL


TYPE-1 TYPE-2

PILE & PILE CAP LAYOUT PLAN (A1&A2)


440 700

700
TYPE-1
GAP 20 TYPE-1 GAP 20

900
900 TYPE-1 900

700
TYPE-2 625 TYPE-2
400

400
700 PEDESTAL
250

250
1000

1000

1000
313

313
388

700 750 700


1000

TYP. 3000 3000 3000 3000


SEISMIC ARRESTER SEISMIC ARRESTER
16000
TYPE-1 TYPE-2
ABUTMENT CAP

PEDESTAL & SEISMIC ARRESTER DETAILS ON ABUTMENT CAP

DATE 03-09-18

CLIENT:- CONTRACTOR:- PROOF CHECK CONSULTANT:- AUTHORITY ENGINEER:- PROJECT :- TITLE :- ABUTMENT A1&A2 DIMENSIONAL & SEISMIC
CONSULTANT :- ARRESTER DETAIL DRAWING FOR
GOVERNMENT OF WEST BENGAL TASPL Chaitanya Projects Consultancy Pvt. Ltd. Upgradation of NH-81 with a minimum of 2 lane with MINOR BRIDGE OVER LOCAL RIVER AT CH-
Office of the Executive Engineer paved shoulder configuration starting from Km 19+656 KM OF SAMSI TO HARISCHANDRAPUR
CUBE ENGITECH CONSULTANT PVT.LTD . M/S SINGH - RKC (JV) Technocrats Advisory Services Pvt. Ltd. Flat no. HIG II, 7&8 E1
ROAD, (1X22.540M SPAN)
JEEVAN LOK HOSPITAL COMPLEX, National Highway Division No.: - VII (Committed to resource and energy conservation) Greenwood Sonata Apartment 19.205 to Km 46.550 in the District of Malda, on EPC
MAIN ROAD HINOO, Public Works(Roads) Directorate 145, Mithila Appartments, 76,
Action Area-II, New Town, Rajahat, mode in the State of West Bengal under Annual Plan DRAWING NO. :- NH-81/DD/LR/-402
I.P. Extension, Patparganj, New Delhi - 110092
RANCHI-2 Near City Center-2, Kolkata-157 2017-2018
SCALE :- AS SHOWN
SCHEDULE OF REINFORCEMENT FOR ABUTMENT:A1&A2

9a

10 10 8a 8b

11

8a 8b
11
A A vertical staggered
tied to alternate
5 vertical bars
6
10

7 7
9b
4 3 Section A-A 18

Reinforcement in Abutment Stem & pile cap A1&A2

PILE CUT OFF


LEVEL

13 NOTES :
1. All dimensions are in millimetres and all levels are in metres.
14a 14b 2. No dimension shall be scaled from this drawing, only written
dimensions shall be followed.
3 Clear cover to all reinforcement shall be as follows:
2 a) RCC Pile/pile cap ... 75 mm
b) RCC Abutment wall ... 50 mm
16 Top c) RCC Bed block / Pier cap ... 50 mm
d) Return walls ... 75 mm
1 4 End cover to all reinforcement shall be 50 mm clear, unless
otherwise specified.
12 17 5 The TMT bars need not be provided with any hooks at the ends,
only a right angle bend shall be provided for bars upto 25 O.
17 6 Bond, Anchorage length, Splices etc., shall be governed as per
REINFORCEMENT DETAIL OF A1 & A2 PILE Should be as per IRC:112 SECTION 15.
16 Bottom 7 Lap length reinforcement :
(i) Minimum lap length of reinforcement shall be decided as per
GOBINDER SINGH
DESIGN DIRECTOR
15 2L Stirrups IRC 112 clause 15.2.3,15.2.4, & 15.2.5
DATED : 03-09-18
(ii) Not more than 50% of reinforcement shall be lapped
2 at any one location.
8 No. of bars shall not be counted from this drawing, the
spacing or number specified shall only be followed.
9 The water cement ratio should be as per table 14.2 of
1 IRC: 112-2011 and conforming to notes- 5,6,7 and 8.
10 The location of bores do not match exactly with the proposed
REINFORCEMENT DETAIL OF A1 & A2 PILE foundation locations causing small variations in depths of
foundation strata. A minimum embedment of 2.0 m below
maximum scour level.
DATE 03-09-18

CLIENT:- CONTRACTOR:- PROOF CHECK CONSULTANT:- AUTHORITY ENGINEER:- PROJECT :- TITLE :-


CONSULTANT :- ABUTMENT A2 REINFORCEMENT ARRANGEMENT
TASPL Upgradation of NH-81 with a minimum of 2 lane with DRAWING FOR MINOR BRIDGE OVER LOCAL RIVER
GOVERNMENT OF WEST BENGAL Chaitanya Projects Consultancy Pvt. Ltd. AT CH- 19+656 KM OF SAMSI TO
CUBE ENGITECH CONSULTANT PVT.LTD . Office of the Executive Engineer M/S SINGH - RKC (JV) Flat no. HIG II, 7&8 E1 paved shoulder configuration starting from Km
Technocrats Advisory Services Pvt. Ltd. HARISCHANDRAPUR ROAD, (1X22.540M SPAN)
JEEVAN LOK HOSPITAL COMPLEX, National Highway Division No.: - VII (Committed to resource and energy conservation) Greenwood Sonata Apartment 19.205 to Km 46.550 in the District of Malda, on EPC
MAIN ROAD HINOO, Public Works(Roads) Directorate 145, Mithila Appartments, 76,
Action Area-II, New Town, Rajahat, mode in the State of West Bengal under Annual Plan DRAWING NO. :- NH-81/RAD/LR/-403
I.P. Extension, Patparganj, New Delhi - 110092
RANCHI-2 Near City Center-2, Kolkata-157 2017-2018
SCALE :- AS SHOWN
B B A A

Top Plan of Abutment Plan of Approach Slab


showing Approach Slab

300

PCC 150 tk.

Section A-A
NTS NOTES :-

Section B-B
T
T
.5
1:1

L L L L

T
T
1:2

DETAIL OF MESH
DETAIL OF MESH TYPE M2
TYPE M1

DETAIL OF TOE PROTECTION WORK GOBINDER SINGH


DESIGN DIRECTOR
Scale- NTS
DATED : 03-09-18 DATE 03-09-18

CLIENT:- CONTRACTOR:- PROOF CHECK CONSULTANT:- AUTHORITY ENGINEER:- PROJECT :- TITLE :-


CONSULTANT :-
REINFORCEMENT DETAIL OF APPROACH SLAB,
GOVERNMENT OF WEST BENGAL TASPL Chaitanya Projects Consultancy Pvt. Ltd. Upgradation of NH-81 with a minimum of 2 lane with RETURN WALL & MESH FOR MINOR BRIDGE
CUBE ENGITECH CONSULTANT PVT.LTD . Office of the Executive Engineer M/S SINGH - RKC (JV) Flat no. HIG II, 7&8 E1 paved shoulder configuration starting from Km OVER LOCAL RIVER AT CH- 19+656 KM OF SAMSI
Technocrats Advisory Services Pvt. Ltd.
JEEVAN LOK HOSPITAL COMPLEX, National Highway Division No.: - VII (Committed to resource and energy conservation) Greenwood Sonata Apartment 19.205 to Km 46.550 in the District of Malda, on EPC TO HARISCHANDRAPUR ROAD, (1X22.540M SPAN)
MAIN ROAD HINOO, Public Works(Roads) Directorate 145, Mithila Appartments, 76,
Action Area-II, New Town, Rajahat, mode in the State of West Bengal under Annual Plan DRAWING NO. :- NH-81/RAD/LR/-404
I.P. Extension, Patparganj, New Delhi - 110092
RANCHI-2 Near City Center-2, Kolkata-157 2017-2018
SCALE :- AS SHOWN