PROYECTO:

REHABILITACION DEL CANAL EL EUCALIPTO EN EL SECTOR DE PALERMO, DISTRITO DE CHAO, PROVINCIA DE VIRU,
DEPARTAMENTO DE LA LIBERTAD
Subpresupuesto:
Cliente: PROGRAMA SUB SECTORIAL DE IRRIGACIONES -PSI
Lugar: SECTOR DE PALERMO, DISTRITO DE CHAO, PROVINCIA DE VIRU,
DEPARTAMENTO DE LA LIBERTAD

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


FECHA: DICIEMBRE 2019 DURACIÓN 3.5 MESES
P. Unit. Parcial
ITEM DESCRIPCION UND METRADO MES1 MES2 MES3 MES4
S/. S/.
01 OBRAS PROVISIONALES 18,002.90 18,002.90 - - -

01.01 ALMACEN, OFICINA Y GUARDIANIA glb 1.00 2,500.00 2,500.00 2,500.00 - - -

01.02 CARTEL DE OBRA und 1.00 1,680.67 1,680.67 1,680.67 - - -

01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIAS glb 1.00 7,400.00 7,400.00 7,400.00 - - -

01.04 HABILITACION DE CAMINOS DE ACCESO km 1.00 6,422.23 6,422.23 6,422.23 - - -

02 SEGURIDAD Y SALUD 11,287.50 7,687.25 2,627.25 729.75 243.25

02.01 ELABORACION, IMPLEMENTACION Y ADMISTRACION DEL PLAN DE SEGURIDADY SALUD glb 1.00 5,000.00 5,000.00 3,102.50 1,897.50 - -

02.02 EQUIPO DE PROTECCIÓN INDIVIDUAL glb 15.00 157.00 2,355.00 2,355.00 - - -


CAPACITACIÓN EN SEGURIDAD Y SALUD mes 3.50 695.00 2,432.50 729.75 729.75 729.75 243.25
02.03

02.04 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS DE SEGURIDAD Y SALUD und 1.00 1,500.00 1,500.00 1,500.00 - - -

03 REHABILITACIÓN DE LA CONDUCCION 1,096,136.84 328,841.05 438,454.74 328,841.05 -

03.01 CANAL DE CONDUCCION 1,096,136.84 328,841.05 438,454.74 328,841.05 -


TRABAJOS PRELIMINARES 53,388.62 16,016.59 21,355.45 16,016.59 -
03.01.01

03.01.01.01 DESBROCE Y LIMPIEZA DE TERRENO m2 6,665.40 4.28 28,527.91 8,558.37 11,411.16 8,558.37 -

03.01.01.02 TRAZO, NIVELACION Y REPLANTEOS m2 3,703.00 2.04 7,554.12 2,266.24 3,021.65 2,266.24 -

03.01.01.03 CONTROL TOPOGRÁFICO mes 3.50 4,944.74 17,306.59 5,191.98 6,922.64 5,191.98 -

03.01.02 MOVIMIENTO DE TIERRAS 306,759.84 92,027.95 122,703.94 92,027.95 -

03.01.02.01 DEMOLICION DE ESTRUCTURAS DE CONCRETO m3 242.72 131.53 31,924.96 9,577.49 12,769.98 9,577.49 -

03.01.02.02 EXCAVACION EN MATERIAL CONGLOMERADO m3 1,686.47 67.31 113,516.30 34,054.89 45,406.52 34,054.89 -

03.01.02.03 REFINE, NIVELACIÓN Y COMPACTACIÓN m2 4,924.50 5.06 24,917.97 7,475.39 9,967.19 7,475.39 -

03.01.02.04 RELLENO COMPACTADO C/ MATERIAL PROPIO m3 1,349.18 26.92 36,319.93 10,895.98 14,527.97 10,895.98 -

03.01.02.05 RELLENO COMPACTADO C/ MATERIAL DE PRESTAMO m3 1,585.22 55.30 87,662.67 26,298.80 35,065.07 26,298.80 -

03.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 580.01 21.41 12,418.01 3,725.40 4,967.20 3,725.40 -
OBRAS DE CONCRETO SIMPLE 687,294.92 206,188.48 274,917.97 206,188.48 -
03.01.03

03.01.03.01 CONCRETO f´c=175 kg/cm2 m3 1,034.15 332.41 343,761.80 103,128.54 137,504.72 103,128.54 -

03.01.03.02 ENCOFRADO Y DESENCOFRADO m2 7,879.20 43.60 343,533.12 103,059.94 137,413.25 103,059.94 -

03.01.04 JUNTAS 48,693.46 14,608.04 19,477.38 14,608.04 -

03.01.04.01 JUNTA DE CONTRACCIÓN m 1,969.80 11.75 23,145.15 6,943.55 9,258.06 6,943.55 -

03.01.04.02 JUNTA DE DILATACIÓN CON WS 6" m 492.45 51.88 25,548.31 7,664.49 10,219.32 7,664.49 -

04 OBRAS DE ARTE 72,449.03 2,010.19 11,345.42 40,047.59 19,045.83

04.01 CAPTACIÓN 2,010.19 2,010.19 - - -

04.01.01 MOVIMIENTO DE TIERRAS 467.39 467.39 - - -

04.01.01.01 EXCAVACION EN MATERIAL CONGLOMERADO m3 6.38 67.31 429.44 429.44 - - -

04.01.01.02 REFINE, NIVELACIÓN Y COMPACTACIÓN m2 7.50 5.06 37.95 37.95 - - -


PROYECTO:
REHABILITACION DEL CANAL EL EUCALIPTO EN EL SECTOR DE PALERMO, DISTRITO DE CHAO, PROVINCIA DE VIRU,
DEPARTAMENTO DE LA LIBERTAD
Subpresupuesto:
Cliente: PROGRAMA SUB SECTORIAL DE IRRIGACIONES -PSI
Lugar: SECTOR DE PALERMO, DISTRITO DE CHAO, PROVINCIA DE VIRU,
DEPARTAMENTO DE LA LIBERTAD

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


FECHA: DICIEMBRE 2019 DURACIÓN 3.5 MESES
P. Unit. Parcial
ITEM DESCRIPCION UND METRADO MES1 MES2 MES3 MES4
S/. S/.
OBRAS DE CONCRETO SIMPLE 48.19 48.19 - - -
04.01.02
04.01.02.01 CONCRETO SOLADO e=0.05m, F'c=100 kg/cm2 m3 0.23 209.51 48.19 48.19 - - -
OBRAS DE CONCRETO ARMADO
04.01.03 1,317.41 1,317.41 - - -

04.01.03.01 CONCRETO f'c=210 kg/cm2 m3 1.24 410.37 508.86 508.86 - - -

04.01.03.02 ENCOFRADO Y DESENCOFRADO m2 8.42 43.60 367.11 367.11 - - -

04.01.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 63.70 6.93 441.44 441.44 - - -
REVOQUES Y ENLUCIDOS 177.20 177.20 - - -
04.01.04

04.01.04.01 TARRAJEO CON IMPERMEABILIZANTE m2 4.21 42.09 177.20 177.20 - - -

04.02 TOMA LATERALES TIPO I (12 UND) 23,314.88 - 9,325.95 9,325.95 4,662.98

04.02.01 MOVIMIENTO DE TIERRAS 1,054.33 - 421.73 421.73 210.87

04.02.01.01 EXCAVACION EN MATERIAL CONGLOMERADO m3 14.04 67.31 945.03 - 378.01 378.01 189.01

04.02.01.02 REFINE, NIVELACIÓN Y COMPACTACIÓN m2 21.60 5.06 109.30 - 43.72 43.72 21.86
OBRAS DE CONCRETO SIMPLE 226.27 - 90.51 90.51 45.25
04.02.02

04.02.02.01 CONCRETO SOLADO e=0.05m, F'c=100 kg/cm2 m3 1.08 209.51 226.27 - 90.51 90.51 45.25
OBRAS DE CONCRETO ARMADO
04.02.03 7,637.70 - 3,055.08 3,055.08 1,527.54

04.02.03.01 CONCRETO f'c=210 kg/cm2 m3 6.79 410.37 2,786.41 - 1,114.56 1,114.56 557.28

04.02.03.02 ENCOFRADO Y DESENCOFRADO m2 70.68 43.60 3,081.65 - 1,232.66 1,232.66 616.33

04.02.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 255.36 6.93 1,769.64 - 707.86 707.86 353.93
REVOQUES Y ENLUCIDOS 1,601.10 - 640.44 640.44 320.22
04.02.04

04.02.04.01 TARRAJEO CON IMPERMEABILIZANTE m2 38.04 42.09 1,601.10 - 640.44 640.44 320.22

04.02.05 JUNTAS 1,400.76 - 560.30 560.30 280.15

04.02.05.01 JUNTA DE DILATACIÓN CON WS 6" m 27.00 51.88 1,400.76 - 560.30 560.30 280.15

04.02.06 CARPINTERIA METALICA 11,394.72 - 4,557.89 4,557.89 2,278.94

04.02.06.01 COMPUERTA DE IZAJE H2 - 24 MOD 5 TIPO ARMCO 50X50 und 12.00 949.56 11,394.72 - 4,557.89 4,557.89 2,278.94

04.03 TOMA LATERAL TIPO II (6 UND) 13,615.30 - - 10,892.24 2,723.06

04.03.01 MOVIMIENTO DE TIERRAS 527.17 - - 421.74 105.43

04.03.01.01 EXCAVACION EN MATERIAL CONGLOMERADO m3 7.02 67.31 472.52 - - 378.02 94.50

04.03.01.02 REFINE, NIVELACIÓN Y COMPACTACIÓN m2 10.80 5.06 54.65 - - 43.72 10.93


OBRAS DE CONCRETO SIMPLE 113.14 - - 90.51 22.63
04.03.02

04.03.02.01 CONCRETO SOLADO e=0.05m, F'c=100 kg/cm2 m3 0.54 209.51 113.14 - - 90.51 22.63
OBRAS DE CONCRETO ARMADO
04.03.03 4,310.42 - - 3,448.34 862.08

04.03.03.01 CONCRETO f'c=210 kg/cm2 m3 3.39 410.37 1,391.15 - - 1,112.92 278.23

04.03.03.02 ENCOFRADO Y DESENCOFRADO m2 35.34 43.60 1,540.82 - - 1,232.66 308.16

04.03.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 198.91 6.93 1,378.45 - - 1,102.76 275.69
PROYECTO:
REHABILITACION DEL CANAL EL EUCALIPTO EN EL SECTOR DE PALERMO, DISTRITO DE CHAO, PROVINCIA DE VIRU,
DEPARTAMENTO DE LA LIBERTAD
Subpresupuesto:
Cliente: PROGRAMA SUB SECTORIAL DE IRRIGACIONES -PSI
Lugar: SECTOR DE PALERMO, DISTRITO DE CHAO, PROVINCIA DE VIRU,
DEPARTAMENTO DE LA LIBERTAD

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


FECHA: DICIEMBRE 2019 DURACIÓN 3.5 MESES
P. Unit. Parcial
ITEM DESCRIPCION UND METRADO MES1 MES2 MES3 MES4
S/. S/.
REVOQUES Y ENLUCIDOS 800.55 - - 640.44 160.11
04.03.04
04.03.04.01 TARRAJEO CON IMPERMEABILIZANTE m2 19.02 42.09 800.55 - - 640.44 160.11

04.03.05 JUNTAS 700.38 - - 560.30 140.08

04.03.05.01 JUNTA DE DILATACIÓN CON WS 6" m 13.50 51.88 700.38 - - 560.30 140.08

04.03.06 CARPINTERIA METALICA 5,697.36 - - 4,557.89 1,139.47

04.03.06.01 COMPUERTA DE IZAJE H2 - 24 MOD 5 TIPO ARMCO 50X50 und 6.00 949.56 5,697.36 - - 4,557.89 1,139.47

04.03.07 SUMINISTRO E INSTALACION DE TUBERIAS (TOMA LATERAL TIPO II) 1,466.28 - - 1,173.02 293.26

04.03.07.01 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC DE 200mm (8") m 36.00 40.73 1,466.28 - - 1,173.02 293.26

04.04 CRUCE VEHICULAR (3 UND) 20,194.67 - 2,019.47 12,116.80 6,058.40

04.04.01 MOVIMIENTO DE TIERRAS 2,050.00 - 205.00 1,230.00 615.00

04.04.01.01 EXCAVACION EN MATERIAL CONGLOMERADO m3 27.84 67.31 1,873.91 - 187.39 1,124.35 562.17

04.04.01.02 REFINE, NIVELACIÓN Y COMPACTACIÓN m2 34.80 5.06 176.09 - 17.61 105.65 52.83
OBRAS DE CONCRETO SIMPLE 9,348.55 - 934.86 5,609.13 2,804.57
04.04.02

04.04.02.01 CONCRETO F´c=175 kg/cm2 + 30%PM m3 15.84 278.39 4,409.70 - 440.97 2,645.82 1,322.91

04.04.02.02 CONCRETO f´c=175 kg/cm2 m3 3.84 332.41 1,276.45 - 127.65 765.87 382.94

04.04.02.03 ENCOFRADO Y DESENCOFRADO m2 84.00 43.60 3,662.40 - 366.24 2,197.44 1,098.72


OBRAS DE CONCRETO ARMADO
04.04.03 8,796.12 - 879.61 5,277.67 2,638.84

04.04.03.01 CONCRETO f'c=210 kg/cm2 m3 8.10 410.37 3,324.00 - 332.40 1,994.40 997.20

04.04.03.02 ENCOFRADO Y DESENCOFRADO m2 44.28 43.60 1,930.61 - 193.06 1,158.37 579.18

04.04.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 511.04 6.93 3,541.51 - 354.15 2,124.91 1,062.45

04.05 ALIMENTADORES TIPO I 9,795.31 - - 4,897.66 4,897.66

04.05.01 MOVIMIENTO DE TIERRAS 878.61 - - 439.31 439.31

04.05.01.01 EXCAVACION EN MATERIAL CONGLOMERADO m3 11.70 67.31 787.53 - - 393.77 393.77

04.05.01.02 REFINE, NIVELACIÓN Y COMPACTACIÓN m2 18.00 5.06 91.08 - - 45.54 45.54


OBRAS DE CONCRETO SIMPLE 2,552.44 - - 1,276.22 1,276.22
04.05.02

04.05.02.01 CONCRETO SOLADO e=0.05m, F'c=100 kg/cm2 m3 0.90 209.51 188.56 - - 94.28 94.28

04.05.02.02 CONCRETO F´c=175 kg/cm2 + 30%PM m3 3.33 278.39 927.04 - - 463.52 463.52

04.05.02.03 CONCRETO f´c=175 kg/cm2 m3 1.29 332.41 428.81 - - 214.41 214.41

04.05.02.04 ENCOFRADO Y DESENCOFRADO m2 23.12 43.60 1,008.03 - - 504.02 504.02


OBRAS DE CONCRETO ARMADO
04.05.03 5,783.00 - - 2,891.50 2,891.50

04.05.03.01 CONCRETO f'c=210 kg/cm2 m3 5.06 410.37 2,076.47 - - 1,038.24 1,038.24

04.05.03.02 ENCOFRADO Y DESENCOFRADO m2 33.15 43.60 1,445.34 - - 722.67 722.67

04.05.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 326.29 6.93 2,261.19 - - 1,130.60 1,130.60
REVOQUES Y ENLUCIDOS 581.26 - - 290.63 290.63
04.05.04
PROYECTO:
REHABILITACION DEL CANAL EL EUCALIPTO EN EL SECTOR DE PALERMO, DISTRITO DE CHAO, PROVINCIA DE VIRU,
DEPARTAMENTO DE LA LIBERTAD
Subpresupuesto:
Cliente: PROGRAMA SUB SECTORIAL DE IRRIGACIONES -PSI
Lugar: SECTOR DE PALERMO, DISTRITO DE CHAO, PROVINCIA DE VIRU,
DEPARTAMENTO DE LA LIBERTAD

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


FECHA: DICIEMBRE 2019 DURACIÓN 3.5 MESES
P. Unit. Parcial
ITEM DESCRIPCION UND METRADO MES1 MES2 MES3 MES4
S/. S/.
04.05.04.01 TARRAJEO CON IMPERMEABILIZANTE m2 13.81 42.09 581.26 - - 290.63 290.63

04.06 ALIMENTADOR TIPO II 3,518.68 - - 2,814.94 703.74

04.06.01 MOVIMIENTO DE TIERRAS 132.13 - - 105.70 26.43

04.06.01.01 EXCAVACION EN MATERIAL CONGLOMERADO m3 1.76 67.31 118.47 - - 94.78 23.69

04.06.01.02 REFINE, NIVELACIÓN Y COMPACTACIÓN m2 2.70 5.06 13.66 - - 10.93 2.73


OBRAS DE CONCRETO SIMPLE 29.33 - - 23.46 5.87
04.06.02

04.06.02.01 CONCRETO SOLADO e=0.05m, F'c=100 kg/cm2 m3 0.14 209.51 29.33 - - 23.46 5.87
OBRAS DE CONCRETO ARMADO
04.06.03 2,624.01 - - 2,099.21 524.80

04.06.03.01 CONCRETO f'c=210 kg/cm2 m3 1.98 410.37 812.53 - - 650.02 162.51

04.06.03.02 ENCOFRADO Y DESENCOFRADO m2 17.42 43.60 759.51 - - 607.61 151.90

04.06.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 151.80 6.93 1,051.97 - - 841.58 210.39
REVOQUES Y ENLUCIDOS 733.21 - - 586.57 146.64
04.06.04
04.06.04.01 TARRAJEO CON IMPERMEABILIZANTE m2 17.42 42.09 733.21 - - 586.57 146.64

05 FLETE 33,540.25 16,770.13 13,416.10 3,354.03 -

05.01 FLETE TERRESTRE glb 1.00 16,580.25 16,580.25 8,290.13 6,632.10 1,658.03 -

05.02 FLETE RURAL glb 1.00 16,960.00 16,960.00 8,480.00 6,784.00 1,696.00 -

06 PLAN DE MONITOREO ARQUEOLOGICO 37,400.00 10,785.42 10,572.92 11,302.08 4,739.58

06.01 MONITOREO ARQUELÓGICO glb 1.00 37,400.00 37,400.00 10,785.42 10,572.92 11,302.08 4,739.58

07 MITIGACION AMBIENTAL 15,500.00 4,650.00 4,650.00 4,650.00 1,550.00

07.01 MITIGACION AMBIENTAL glb 1.00 15,500.00 15,500.00 4,650.00 4,650.00 4,650.00 1,550.00

COSTO DIRECTO S/. S/. 1,284,316.52 388,746.94 481,066.43 388,924.50 25,578.66


PRESUPUESTO TOTAL MENSUAL (S/.) S/. 1,284,316.52 S/.388,746.94 S/.481,066.43 S/.388,924.50 S/.25,578.66
COSTO DIRECTO S/. 1,284,316.52
GASTOS GENERALES (5.76 % DE COSTO DIRECTO) 5.76% 74,028.05 S/.22,407.39 S/.27,728.69 S/.22,417.62 S/.1,474.35
UTILIDAD (6.23%) 6.23% 80,058.14 S/.24,232.62 S/.29,987.38 S/.24,243.69 S/.1,594.45
SUB TOTAL 1,438,402.71 S/.435,386.95 S/.538,782.49 S/.435,585.81 S/.28,647.46
IGV (18%) 18.00% 258,912.49 S/.78,369.65 S/.96,980.85 S/.78,405.45 S/.5,156.54
PRESUPUESTO TOTAL S/. 1,697,315.20 S/.513,756.60 S/.635,763.34 S/.513,991.26 S/.33,804.01
% DE AVANCE DE OBRA 30.3% 37.5% 30.3% 2.0%
PRESUPUESTO TOTAL ACUMULADO S/. 1,697,315.20 S/.513,756.60 S/.1,149,519.93 S/.1,663,511.19 S/.1,697,315.20
% DE AVANCE ACUMULADO DE OBRA 30.3% 67.7% 98.0% 100.0%
S/18,002.90 OBRAS PROVISIONALES
S/2,500.00 ALMACEN, O glb 1.00 2,500.00
S/1,680.67 CARTEL DE und 1.00 1,680.67
S/7,400.00 MOVILIZACI glb 1.00 7,400.00
S/6,422.23 HABILITACI km 1.00 6,422.23
S/7,687.25 S/2,627.25 S/729.75 S/243.25 SEGURIDAD Y SALUD
S/3,102.50 S/1,897.50 ELABORACIOglb 1.00 5,000.00
S/2,355.00 EQUIPO DE glb 15.00 157.00
CAPACITACIÓN EN SEGURIDAD Y SALUD
S/729.75 S/729.75 S/729.75 S/243.25 mes 3.50 695.00
1,500.00 RECURSOS und 1.00 1,500.00
328,841.05 438,454.74 328,841.05 REHABILITACIÓN DE LA CONDUCCION
328,841.05 438,454.74 328,841.05 CANAL DE CONDUCCION
TRABAJOS PRELIMINARES
16,016.59 21,355.45 16,016.59
8,558.37 11,411.16 8,558.37 DESBR m2 6,665.40 4.28
2,266.24 3,021.65 2,266.24 TRAZO m2 3,703.00 2.04
5,191.98 6,922.64 5,191.98 CONTR mes 3.50 4,944.74
92,027.95 122,703.94 92,027.95 MOVIMIENTO DE TIERRAS
9,577.49 12,769.98 9,577.49 DEMO m3 242.72 131.53
34,054.89 45,406.52 34,054.89 EXCA m3 1,686.47 67.31
7,475.39 9,967.19 7,475.39 REFIN m2 4,924.50 5.06
10,895.98 14,527.97 10,895.98 RELLE m3 1,349.18 26.92
26,298.80 35,065.07 26,298.80 RELL m3 1,585.22 55.30
3,725.40 4,967.20 3,725.40 ELIMI m3 580.01 21.41
OBRAS DE CONCRETO SIMPLE
206,188.48 274,917.97 206,188.48
103,128.54 137,504.72 103,128.54 CONCRE m3 1,034.15 332.41
103,059.94 137,413.25 103,059.94 ENCO m2 7,879.20 43.60
14,608.04 19,477.38 14,608.04 JUNTAS
6,943.55 9,258.06 6,943.55 JUNTA m 1,969.80 11.75
7,664.49 10,219.32 7,664.49 JUNTA m 492.45 51.88
2,010.19 11,345.42 40,047.59 19,045.83 OBRAS DE ARTE
2,010.19 CAPTACIÓN
467.39 MOVIMIENTO DE TIERRAS
429.44 EXCA m3 6.38 67.31
37.95 REFIN m2 7.50 5.06
OBRAS DE CONCRETO SIMPLE
48.19
48.19 CONCR
OBRAS m3
DE CONCRETO ARMADO 0.23 209.51
1,317.41
508.86 CONCRE m3 1.24 410.37
367.11 ENCO m2 8.42 43.60
441.44 ACERO kg 63.70 6.93
REVOQUES Y ENLUCIDOS
177.20
177.20 TARRA m2 4.21 42.09
9,325.95 9,325.95 4,662.98 TOMA LATERALES TIPO I (12 UND)
421.73 421.73 210.87 MOVIMIENTO DE TIERRAS
378.01 378.01 189.01 EXCA m3 14.04 67.31
43.72 43.72 21.86 REFIN m2 21.60 5.06
OBRAS DE CONCRETO SIMPLE
90.51 90.51 45.25
90.51 90.51 45.25 CONCR
OBRAS m3
DE CONCRETO ARMADO 1.08 209.51
3,055.08 3,055.08 1,527.54
1,114.56 1,114.56 557.28 CONCRE m3 6.79 410.37
1,232.66 1,232.66 616.33 ENCO m2 70.68 43.60
707.86 707.86 353.93 ACERO kg 255.36 6.93
REVOQUES Y ENLUCIDOS
640.44 640.44 320.22
640.44 640.44 320.22 TARRA m2 38.04 42.09
560.30 560.30 280.15 JUNTAS
560.30 560.30 280.15 JUNTA m 27.00 51.88
4,557.89 4,557.89 2,278.94 CARPINTERIA METALICA
4,557.89 4,557.89 2,278.94 COMPU und 12.00 949.56
10,892.24 2,723.06 TOMA LATERAL TIPO II (6 UND)
421.74 105.43 MOVIMIENTO DE TIERRAS
378.02 94.50 EXCA m3 7.02 67.31
43.72 10.93 REFIN m2 10.80 5.06
OBRAS DE CONCRETO SIMPLE
90.51 22.63
90.51 22.63 CONCR
OBRAS m3
DE CONCRETO ARMADO 0.54 209.51
3,448.34 862.08
1,112.92 278.23 CONCRE m3 3.39 410.37
1,232.66 308.16 ENCO m2 35.34 43.60
1,102.76 275.69 ACERO kg 198.91 6.93
REVOQUES Y ENLUCIDOS
640.44 160.11
640.44 160.11 TARRA m2 19.02 42.09
560.30 140.08 JUNTAS
560.30 140.08 JUNTA m 13.50 51.88
4,557.89 1,139.47 CARPINTERIA METALICA
4,557.89 1,139.47 COMPU und 6.00 949.56
1,173.02 293.26 SUMINISTRO E INSTALACION DE TUBERIAS (TOMA LATERA
1,173.02 293.26 SUMIN m 36.00 40.73
2,019.47 12,116.80 6,058.40 CRUCE VEHICULAR (3 UND)
205.00 1,230.00 615.00 MOVIMIENTO DE TIERRAS
187.39 1,124.35 562.17 EXCA m3 27.84 67.31
17.61 105.65 52.83 REFIN m2 34.80 5.06
OBRAS DE CONCRETO SIMPLE
934.86 5,609.13 2,804.57
440.97 2,645.82 1,322.91 CONCR m3 15.84 278.39
127.65 765.87 382.94 CONCRE m3 3.84 332.41
366.24 2,197.44 1,098.72 ENCO DE CONCRETO
OBRAS m2 ARMADO 84.00 43.60
879.61 5,277.67 2,638.84
332.40 1,994.40 997.20 CONCRE m3 8.10 410.37
193.06 1,158.37 579.18 ENCO m2 44.28 43.60
354.15 2,124.91 1,062.45 ACERO kg 511.04 6.93
4,897.66 4,897.66 ALIMENTADORES TIPO I
439.31 439.31 MOVIMIENTO DE TIERRAS
393.77 393.77 EXCA m3 11.70 67.31
45.54 45.54 REFIN m2 18.00 5.06
OBRAS DE CONCRETO SIMPLE
1,276.22 1,276.22
94.28 94.28 CONCR m3 0.90 209.51
463.52 463.52 CONCR m3 3.33 278.39
214.41 214.41 CONCRE m3 1.29 332.41
504.02 504.02 ENCO DE CONCRETO
OBRAS m2 ARMADO 23.12 43.60
2,891.50 2,891.50
1,038.24 1,038.24 CONCRE m3 5.06 410.37
722.67 722.67 ENCO m2 33.15 43.60
1,130.60 1,130.60 ACERO kg 326.29 6.93
REVOQUES Y ENLUCIDOS
290.63 290.63
290.63 290.63 TARRA m2 13.81 42.09
S/2,814.94 S/703.74 ALIMENTADOR TIPO II
S/105.70 S/26.43 MOVIMIENTO DE TIERRAS
S/94.78 S/23.69 EXCA m3 1.76 67.31
S/10.93 S/2.73 REFIN m2 2.70 5.06
OBRAS DE CONCRETO SIMPLE
S/23.46 S/5.87
S/23.46 S/5.87 CONCR
OBRAS m3
DE CONCRETO ARMADO 0.14 209.51
S/2,099.21 S/524.80
S/650.02 S/162.51 CONCRE m3 1.98 410.37
S/607.61 S/151.90 ENCO m2 17.42 43.60
S/841.58 S/210.39 ACERO kg 151.80 6.93
REVOQUES Y ENLUCIDOS
S/586.57 S/146.64
S/586.57 S/146.64 TARRA m2 17.42 42.09
S/16,770.13 S/13,416.10 S/3,354.03 FLETE
S/8,290.13 S/6,632.10 S/1,658.03 FLETE TERR glb 1.00 16,580.25
S/8,480.00 S/6,784.00 S/1,696.00 FLETE RURA glb 1.00 16,960.00
S/10,785.42 S/10,572.92 S/11,302.08 S/4,739.58 PLAN DE MONITOREO ARQUEOLOGICO
S/10,785.42 S/10,572.92 S/11,302.08 S/4,739.58 MONITOREO glb 1.00 37,400.00
S/4,650.00 S/4,650.00 S/4,650.00 S/1,550.00 MITIGACION AMBIENTAL
S/4,650.00 S/4,650.00 S/4,650.00 S/1,550.00 MITIGACION glb 1.00 15,500.00
18,002.90
2,500.00
1,680.67
7,400.00
6,422.23
11,287.50
5,000.00
2,355.00
2,432.50
1,500.00
1,096,136.84 30% 40% 30%
1,096,136.84
53,388.62
28,527.91
7,554.12
17,306.59
306,759.84
31,924.96
113,516.30
24,917.97
36,319.93
87,662.67
12,418.01
687,294.92
343,761.80 30% 40% 30%
343,533.12
48,693.46
23,145.15 30% 40% 30%
25,548.31
72,449.03
2,010.19
467.39
429.44
37.95
48.19
48.19
1,317.41
508.86
367.11
441.44
177.20
177.20
23,314.88
1,054.33 40% 40% 20%
945.03
109.30
226.27
226.27
7,637.70
2,786.41
3,081.65
1,769.64
1,601.10
1,601.10
1,400.76
1,400.76
11,394.72
11,394.72
13,615.30
527.17 0.80 20%
472.52
54.65
113.14
113.14
4,310.42
1,391.15
1,540.82
1,378.45
800.55
800.55
700.38
700.38
5,697.36
5,697.36
1,466.28
1,466.28
20,194.67
2,050.00 10% 60% 30%
1,873.91
176.09
9,348.55
4,409.70
1,276.45
3,662.40
8,796.12
3,324.00
1,930.61
3,541.51
9,795.31
878.61
787.53
91.08
2,552.44
188.56
927.04
428.81
1,008.03
5,783.00
2,076.47
1,445.34
2,261.19
581.26
581.26
3,518.68
132.13
118.47
13.66
29.33
29.33
2,624.01
812.53
759.51
1,051.97
733.21 50% 40% 10%
733.21
33,540.25
16,580.25
16,960.00
37,400.00
37,400.00
15,500.00
15,500.00
CALENDARIO DE UTILIZACION DE EQUIPO

Cantidad PLAZO DE EJECUCION


Item Descripción
Und Semana 1 Semana 2 Semana 3 Semana 4

MANO DE OBRA

1.1 CAPATAZ 1 1 1 1

1.2 OPERARIO 1 1 1 1

1.3 OFICIAL 1 1 1 1

1.4 PEON 1 1 1 1

1.5 TOPOGRAFO 1 1 1 1 1
1.6 MANO DE OBRA - T 2 2 2 2 2
1.7 MANO DE OBRA - LT 1 1 1 1 1
1.8 MANO DE OBRA-A 1 1 1 1 1
1.9 MANO DE OBRA - SEÑALIZACION 2 2 2
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y
1.10 1 1 1 1 1
SALUD EN EL TRABAJO
1.11 MANO DE OBRA - PROTECCION COLECTIVA 1 1 1
1.12 CHARLAS DE CAPACITACION EN SEGURIDAD AL PERSONAL 1 1 1 1 1
1.13 MANO DE OBRA - CAPACITACION EN SEGURIDAD 1 1 1 1 1
MATERIALES
2.1 ALAMBRE NEGRO Nro. 8 1 1 1 1 1
2.2 ALAMBRE NEGRO Nro.16 1 1 1 1
2.3 CLAVOS CON CABEZA DE 2 1/2", 3", 4" 1 1 1 1 1
2.4 CLAVOS CON CABEZA DE 3" 1 1 1 1 1
2.5 CLAVOS CON CABEZA DE 4" 1 1 1
2.6 ACERO 1 1 1
2.7 ARENA GRUESA 1 1 1
2.8 ARENA FINA 1 1 1 1
2.9 PIEDRA CHANCADA DE 1/2” Y 3/4" 1 1 1
2.10 AGUA 1 1 1 1 1
2.11 AGUA 1 1 1 1
2.12 ASFALTO LIQUIDO RC-250 1 1 1 1
2.13 MEZCLA ASFALTICA EN CALIENTE 1 1 1
2.14 TRANSPORTE DE MEZCLA ASFALTICA C/VOLQUETE 10M3 1 1 1 1
2.15 LADRILLO KK TIPO IV 24X13X09 CM 1 1 1 1
2.16 CEMENTO PORTLAND TIPO I (42.5kg) 1 1 1 1
2.17 PEGAMENTO PARA TUBERIA PVC 1 1 1 1
2.18 CAL (BOLSA X 20 kg) 1 1 1 1
2.19 CORDEL 1 1 1 1
2.20 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO 1 1 1 1
2.21 EXTINTOR DE POLVO SECO 1 1 1 1
2.22 DISCO DE CORTE DE 16" 1 1
2.23 CASCO DE PROTECCION 1 1
2.24 BOTINES DE CUERO 1 1
2.25 TAPONES AUDITIVOS 1 1
2.26 GUANTES DE CUERO 1 1
2.27 RESPIRADOR CONTRA POLVO 1 1
2.28 CHALECOS REFLECTIVOS 1 1
2.29 LENTES DE PROTECCION 1 1
2.30 MATERIALES - PROTECCION COLECTIVA 1 1
2.31 MATERIALES - SEÑALIZACION SEGURIDAD 1 1
2.32 CAMILLA 1 1
2.33 BOTIQUIN CON MEDICINA 1
2.34 CILINDRO VACIO 1
2.35 TAPA DE CONCRETO C/MARCO F°F PARA BUZON ø 0.60m 1
2.36 GASOLINA 95 OCTANOS 1
2.37 HORMIGON 1
2.38 AFIRMADO 1
2.39 MADERA TORNILLO 1
2.40 MADERA TORNILLO-A 1
2.41 KEROSENE INDUSTRIAL 1
2.42 TUBO PVC-SAP - 8" (5M) 1
2.43 TUBO PVC-SAP-4" (3M) 1
2.44 TUBO PVC-SAP - 6" (5M) 1
2.45 TAPON PVC SAL P/DESAGUE 08” 1
EQUIPOS 1
3.1 HERRAMIENTA 1
3.2 HERRAMIENTA-T 1
3.3 HERRAMIENTA - LT 1
3.4 COMP. NEUMATICA - 93 HP - 335/375 PCM 1
3.5 MARTILLO NEUMATICO - 25/29 KG 1
3.6 RETROEXCAVADORA S/LLANT. 62 HP -1 YD3 1
3.7 TRACTOR DE TIRO DE 60HP 1
3.8 PLANCHA COMPACTADORA VIBRAT. 4.0 HP 1
3.9 RODILLO NEUMATICO AUTOP. 81-100HP 5.5-20T 1
3.10 RODILLO TANDEM ESTATIC AUT 58-70HP 8-10T 1
3.11 MEZCLADORA DE CONC.(TAMBOR) 11 P3,18 HP 1
3.12 VIBRADOR A GASOLINA Y 1 3/4", 4 HP 1
3.13 CORTADORA DE CONCRETO 13 HP 1
3.14 CAMION VOLQUETE 4x2, 210/280 HP, 8 M3 1
3.15 TEODOLITO Y MIRA 1
3.16 BARREDORA MECANICA 10-20HP
3.17 PAVIMENTADORA SOBRE ORUGAS 105HP 10-16'
3.18 CAMION IMPRIMADOR 6x2 178-210HP 2000 GLN
CRONOGRAMA DE ADQUISICION DE MATERIALES

Descripción P. Unit. Parcial PLAZO DE EJECUCION


Item Und Cant.
S/. S/. Semana 1 Semana 2 Semana 3 Semana 4

MANO DE OBRA

1.1 CAPATAZ H-H 85.53 20.06 1715.73

1.2 OPERARIO H-H 486.37 18.24 8871.40

1.3 OFICIAL H-H 147.67 15.28 2256.36

1.4 PEON H-H 1101.79 13.74 15138.61

1.5 TOPOGRAFO H-H 2.99 21.07 63.03

1.6 MANO DE OBRA - T GLB 1.00 70.00 70.00

1.7 MANO DE OBRA - LT GLB 1.00 315.00 315.00

1.8 MANO DE OBRA-A GLB 1.00 360.00 360.00

1.9 MANO DE OBRA - SEÑALIZACION GLB 1.00 102.95 102.95


ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE
1.10 GLB 1.00 500.00 500.00
SEGURIDAD Y SALUD EN EL TRABAJO
1.11 MANO DE OBRA - PROTECCION COLECTIVA GLB 1.00 118.15 118.15

1.12 CHARLAS DE CAPACITACION EN SEGURIDAD AL PERSONAL GLB 26.00 30.00 780.00

1.13 MANO DE OBRA - CAPACITACION EN SEGURIDAD GLB 260.00 0.30 78.00

30369.23

MATERIALES

2.1 ALAMBRE NEGRO Nro. 8 kg 9.79 2.47 24.18

2.2 ALAMBRE NEGRO Nro.16 kg 28.91 2.47 71.40

2.3 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 2.32 2.80 6.49

2.4 CLAVOS CON CABEZA DE 3" kg 0.77 2.80 2.15

2.5 CLAVOS CON CABEZA DE 4" kg 6.55 2.80 18.35

2.6 ACERO kg 622.06 2.40 1492.94

2.7 ARENA GRUESA m3 28.10 58.60 1646.83

2.8 ARENA FINA m3 1.31 102.50 134.48

2.9 PIEDRA CHANCADA DE 1/2” Y 3/4" m3 10.47 70.64 739.74

2.10 AGUA m3 27.87 5.68 158.30

2.11 AGUA GLB 1.00 300.00 300.00

2.12 ASFALTO LIQUIDO RC-250 gal 39.46 9.51 375.29

2.13 MEZCLA ASFALTICA EN CALIENTE m3 16.03 320.00 5130.11

2.14 TRANSPORTE DE MEZCLA ASFALTICA C/VOLQUETE 10M3 m3 16.03 46.64 747.71

2.15 LADRILLO KK TIPO IV 24X13X09 CM und 50.00 0.85 42.50

2.16 CEMENTO PORTLAND TIPO I (42.5kg) bl 182.43 16.95 3092.22

2.17 PEGAMENTO PARA TUBERIA PVC gal 4.11 97.71 401.44

2.18 CAL (BOLSA X 20 kg) bl 16.81 8.43 141.69

2.19 CORDEL M 63.87 0.15 9.58

2.20 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO gal 2.50 13.56 33.85

2.21 EXTINTOR DE POLVO SECO und 1.00 129.80 129.80

2.22 DISCO DE CORTE DE 16" und 0.88 550.85 487.12

2.23 CASCO DE PROTECCION und 10.00 9.24 92.40

2.24 BOTINES DE CUERO par 10.00 44.83 448.30


CRONOGRAMA DE ADQUISICION DE MATERIALES

Descripción P. Unit. Parcial PLAZO DE EJECUCION


Item Und Cant.
S/. S/. Semana 1 Semana 2 Semana 3 Semana 4

2.25 TAPONES AUDITIVOS par 10.00 2.12 21.20

2.26 GUANTES DE CUERO par 10.00 12.63 126.30

2.27 RESPIRADOR CONTRA POLVO und 10.00 2.46 24.60

2.28 CHALECOS REFLECTIVOS und 10.00 7.54 75.40

2.29 LENTES DE PROTECCION und 10.00 5.34 53.40

2.30 MATERIALES - PROTECCION COLECTIVA GLB 1.00 1181.52 1181.52

2.31 MATERIALES - SEÑALIZACION SEGURIDAD GLB 1.00 1029.48 1029.48

2.32 CAMILLA und 1.00 250.00 250.00

2.33 BOTIQUIN CON MEDICINA und 1.00 296.61 296.61

2.34 CILINDRO VACIO und 1.00 67.80 67.80

2.35 TAPA DE CONCRETO C/MARCO F°F PARA BUZON ø 0.60m und 5.00 300.00 1500.00

2.36 GASOLINA 95 OCTANOS gal 88.43 11.02 974.52

2.37 HORMIGON m3 0.02 40.14 0.80

2.38 AFIRMADO m3 53.92 33.60 1811.68

2.39 MADERA TORNILLO p2 252.66 4.40 1111.69

2.40 MADERA TORNILLO-A GLB 1.00 240.00 240.00

2.41 KEROSENE INDUSTRIAL gal 9.87 9.55 94.22

2.42 TUBO PVC-SAP - 8" (5M) M 193.20 23.19 4480.26

2.43 TUBO PVC-SAP-4" (3M) M 18.49 7.42 137.18

2.44 TUBO PVC-SAP - 6" (5M) M 17.03 15.40 262.20

2.45 TAPON PVC SAL P/DESAGUE 08” und 4.42 36.76 162.54

29628.27

EQUIPOS

3.1 HERRAMIENTA %MO 958.30

3.2 HERRAMIENTA-T GLB 1.00 280.00 280.00

3.3 HERRAMIENTA - LT GLB 1.00 35.00 35.00

3.4 COMP. NEUMATICA - 93 HP - 335/375 PCM h-m 2.71 99.81 270.11

3.5 MARTILLO NEUMATICO - 25/29 KG h-m 2.71 4.49 12.16

3.6 RETROEXCAVADORA S/LLANT. 62 HP -1 YD3 h-m 6.85 124.08 849.87

3.7 TRACTOR DE TIRO DE 60HP h-m 0.25 57.69 14.23

3.8 PLANCHA COMPACTADORA VIBRAT. 4.0 HP h-m 78.60 24.16 1898.92

3.9 RODILLO NEUMATICO AUTOP. 81-100HP 5.5-20T h-m 1.21 127.67 154.29

3.10 RODILLO TANDEM ESTATIC AUT 58-70HP 8-10T h-m 1.21 93.28 112.73

3.11 MEZCLADORA DE CONC.(TAMBOR) 11 P3,18 HP h-m 14.31 10.65 152.39

3.12 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h-m 12.48 4.95 61.78

3.13 CORTADORA DE CONCRETO 13 HP h-m 60.78 10.00 607.82

3.14 CAMION VOLQUETE 4x2, 210/280 HP, 8 M3 h-m 3.87 196.77 760.75

3.15 TEODOLITO Y MIRA h-m 2.99 13.46 40.27

3.16 BARREDORA MECANICA 10-20HP h-m 0.25 46.79 11.54

3.17 PAVIMENTADORA SOBRE ORUGAS 105HP 10-16' h-m 1.21 133.17 160.94
CRONOGRAMA DE ADQUISICION DE MATERIALES

Descripción P. Unit. Parcial PLAZO DE EJECUCION


Item Und Cant.
S/. S/. Semana 1 Semana 2 Semana 3 Semana 4

3.18 CAMION IMPRIMADOR 6x2 178-210HP 2000 GLN h-m 0.25 122.29 30.16

6411.24