Sir Cr Reddy College Of Engineering

Dept Of Mechanical
Assignment-1
Details on the cover page
college name :
dept ,class and section:mechanical(II-A or II-B)
assignment no:1
name:
roll no:
submitted to:

batch 1

1. There are two industries A and B manufacturing hose couplings.The standard time per
piece is 15 minutes.The output of two small scale industries is 30 and 20 respectively per
shift of 8 hours.Find the productivity of each pers hift of 8 hours.what is the expected
production of each per week consisting of 6 days.

2. Explain the contributions of Taylor for scientific management and how it leads to the

concept of scientific management.

3. Briefly discuss the factors to be considered for the selection of a location for a factory
Construction.

4. State the differences between method study and work measurement with their
objectives.

5. Explain the need and procedure for conducting work sampling study.

batch2

6. What is meant by management? Explain Fayol’s principles of management. (7M).

7. There are two industries A and B manufacturing hose couplings.The standard time per
piece is 15 minutes.The output of two small scale industries is 30 and 20 respectively per
shift of 8 hours.Find the productivity of each pers hift of 8 hours.what is the expected
production of each per week consisting of 6 days.

8. What is plant layout? Explain the principles and symptoms of a poor plant layout.

9. Explain in detail the advantages and procedure of work study.

10. Establish a relation between work study and productivity.

batch 3

11.There are two industries A and B manufacturing hose couplings.The standard time per
piece is 15 minutes.The output of two small scale industries is 30 and 20 respectively per
shift of 8 hours.Find the productivity of each pers hift of 8 hours.what is the expected
production of each per week consisting of 6 days.
12. Explain the tools and techniques of industrial engineering.

13. Define productivity. What are the various factors affecting?

14. Discuss the various types of production.

15. What do you understand by work measurement and elaborate the important
techniques involved in work measurement?

batch 4

16. Describe the nature and importance of management in modern business organization.

17. There are two industries A and B manufacturing hose couplings.The standard time
per piece is 15 minutes.The output of two small scale industries is 30 and 20 respectively
per shift of 8 hours.Find the productivity of each pers hift of 8 hours.what is the expected
production of each per week consisting of 6 days.

18. State the symptoms of a bad plant layout.

19. Name the various recording techniques used in method study. Give the various

symbols used in recording techniques with their meaning.

20. Explain the objectives of time study and techniques

batch 5

21. Describe the principles of scientific management in brief.


22. There are two industries A and B manufacturing hose couplings.The standard time
per piece is 15 minutes.The output of two small scale industries is 30 and 20 respectively
per shift of 8 hours.Find the productivity of each pers hift of 8 hours.what is the expected
production of each per week consisting of 6 days.

23. Explain in detail the various types of plant layouts?


24. What are flow process charts? Give their importance. [8M]
25. What do you understand by work measurement and elaborate the important
Techniques involved in work measurement?
batch 6

26.Explain theory x and theory y and show as a manager how you would apply them to
motivate your staff
27. Explain briefly major factors to be considered in selecting the location of a paper mill.
28. Discuss about breakdown maintenance.
29. What are Therblings? List various Therblings and their use in method study.
30. Stop watch time study of an element is done on an operation, the readings were
observed as follows
0.52 0.51 0.52 0.52 0.51 0.50 0.50 0.52
The average rating factor for the operator is 120%. Find out the Standard time,
assuming allowances 20%.