Grouting
Revision History
Rev. Revision Date Created by Checked by Approved by Description
Cross checked
Department Name Date Signature
Main Contractor
Table of Contents:
1. Scope ..................................................................................................................................................................... 3
2. TYPES OF MORTAR ............................................................................................................................................ 3
2.1 Grouting and wedging mortars......................................................................................................................... 3
2.2 Mortar qualities........................................................................................................................................... 3
3. POURING CONDITIONS................................................................................................................................ 3
3.1 Mechanical anchoring and wedging ................................................................................................................ 3
3.2 Time of grouting and wedging mortar pouring ................................................................................................ 4
3.3 Basement level preparation prior to mortar pouring................................................................................ 4
3.4 Pouring of wedging mortar ....................................................................................................................... 4
3.5 Upper level of the wedging mortar........................................................................................................... 4
1. SCOPE
The present document sets out the instructions and recommendations for grouting and wedging
of monoblock equipment and rotating machines.
It defines in particular :
- the types of mortar to be used
- the pouring conditions
2. TYPES OF MORTAR
3. POURING CONDITIONS
Type and dimensions such as to allow the bolts to be tightened to their rated torque load
before grouting and wedging mortars are poured
- Continuously
- Take all necessary precautions to avoid the formation of air pockets under the
metal frame (eg: pouring on a single side, with hydrostatic chimney or injection pump)