Sei sulla pagina 1di 4

PARKWAY INTERNATIONAL CONTRACTING L.L.

C
RISK ASSESMENT
COMPANY NAME PARKWAY INTERNATIONAL CONTRACTING L.L.C
EXCAVATION
PROPOSED NEIGHBORHOOD RETAIL CENTER @ JUMEIRAH PARK –
PROJECT NAME TASK ASSESSED
DUBAI – UAE

RISK RATING SCORE RISK AFTER


TAKING
HAZARD Residual
HAZARDS CONTROL MEASURES REMARKS
EFFECT LIKELI Risk
HOOD
SEVERITY RISK CONTROL
MEASURES

• Obtain Work permit from the concerned


authorities. • Refer to drawings of buried services •
Electrocution,
Damage to Make sure for “services route marker”.
buried services
Damage to 4 6 High • Carry out detection test to identify the presence
1x6=6 Low
service lines.
of sewer, telephone, water, fuel, gas & electrical
lines.
PARKWAY INTERNATIONAL CONTRACTING L.L.C
RISK ASSESMENT
COMPANY NAME PARKWAY INTERNATIONAL CONTRACTING L.L.C
EXCAVATION
PROPOSED NEIGHBORHOOD RETAIL CENTER @ JUMEIRAH PARK –
PROJECT NAME TASK ASSESSED
DUBAI – UAE

• Hard barricades (MS pipe) or PVC barricades


duly filled with water. • Display required signage
Fall of man, boards. • Provide Warning lamp (beacon/flasher) •
material or Bodily injury, Provide stoppers of concrete block under the types Low
vehicle in fatal
6 6 High to prevent fall of vehicle. • Do not stack material
1x6=6
excavation on edges. • Prevent vehicle movement within 1.5
meters
From the edge of trench.

Collapse of
wall,
• Provide shoring for Banks or trenches more
Than 1.5 meter height or depth.
edge of Bodily injury, Low
5 6 High • Provide appropriate bench cutting or sloping 1x6=6
excavation, fatal
Based on soil condition.
• Do not stack material on edges.
adjacent
structure
PARKWAY INTERNATIONAL CONTRACTING L.L.C
RISK ASSESMENT
COMPANY NAME PARKWAY INTERNATIONAL CONTRACTING L.L.C
EXCAVATION
PROPOSED NEIGHBORHOOD RETAIL CENTER @ JUMEIRAH PARK –
PROJECT NAME TASK ASSESSED
DUBAI – UAE

TEAM NAME:
DESIGNATION SIGNATURE SEVERITY PROBABILITY
(PERSONS INVOLVED)

1 = fatality or permanent disability 1 = common or frequent occurrence


Abdul Raouf Sattar Safety Manager 2 = serious loss time injury/illness 2 = is known to occur or "it has happened"
3 = moderate loss time injury/illness 3 = could occur or "I've heard of it happening"
Mr. Murad Al Zoabi Project Manager
4 = minor loss time injury/illness 4 = not likely to occur
5 = no lost time 5 = practically impossible

Severity “meets” Probability = Rating

RISK RATING
LOW = 1 – 10 MEDIUM = 11 – 16 HIGH = 17 - 25