PROJECT : KMDA, Baidyabati

NAME LENGTH AREA TO BE DISCHARGED Check D/B SECTION OF SLOPE


OF DISCHARG
DRAIN IN m (Acres) E RATIO DRAIN Drain Road Drain Area perimrter

From To (Cusec) WIDTH-DEPTH


Top 1 in top width P
Bottom width
SELF ADDL TOTAL width B B2 d A
0.99
7 8 35.07 0.58 0.00 0.58 0.58 1.918 ok 1.00 0.3 0.90 0.30 566 566 1 0.180 1.64
8 9 31.16 0.40 0.58 0.98 0.97 1.240 ok 1.00 0.3 0.90 0.30 1355 1355 1 0.180 1.64
9 1 60.16 0.20 0.98 1.17 1.17 3.726 ok 1.00 0.3 0.90 0.30 150 146 1 0.180 1.64
27 18 49.03 0.59 0.00 0.59 0.59 2.915 ok 1.00 0.3 0.90 0.30 245 237 1 0.180 1.64
18 15 22.67 1.71 0.59 2.31 2.29 2.898 ok 1.00 0.3 0.90 0.30 248 #DIV/0! 1 0.180 1.64
15 14 55.08 1.62 2.31 3.92 3.89 2.886 no 1.00 0.3 0.90 0.30 250 #DIV/0! 1 0.180 1.64
14 10 111.58 2.41 3.92 6.34 6.29 3.590 no 1.20 0.3 1.02 0.36 251 #DIV/0! 1 0.238 1.91
10 1 115.96 2.16 6.34 8.50 8.43 5.045 no 1.30 0.35 1.26 0.46 350 350 1 0.366 2.38
1 26 86.40 0.00 8.50 8.50 8.43 4.388 no 1.30 0.35 1.26 0.46 600 -186 1 0.366 2.38

22 21 293.11 0.20 0.00 0.20 0.20 1.799 ok 1.20 0.3 1.02 0.36 1000 977 1 0.238 1.91
21 20 182.00 2.14 0.20 2.34 2.32 4.022 ok 1.20 0.3 1.02 0.36 200 214 1 0.238 1.91
20 19 109.81 0.20 2.34 2.54 2.52 3.041 ok 1.20 0.3 1.02 0.36 350 341 1 0.238 1.91
27a 19 116.00 0.59 2.54 3.13 3.11 1.469 no 1.20 0.3 1.02 0.36 1500 -2231 1 0.238 1.91
19 17 49.55 1.85 3.13 4.98 4.95 4.275 no 1.50 0.3 1.20 0.45 300 #DIV/0! 1 0.338 2.31
18a 17 114.00 #N/A 4.98 #N/A #N/A 3.438 ### 1.25 0.4 1.40 0.50 1400 -440 1 0.450 2.64
15a 16 114.00 #N/A #N/A #N/A #N/A 3.438 ### 1.25 0.4 1.40 0.50 1400 -440 1 0.450 2.64
17 16 22.86 2.12 #N/A #N/A #N/A 5.315 ### 1.50 0.4 1.60 0.60 900 #DIV/0! 2 0.600 3.08
16 13 49.04 2.07 #N/A #N/A #N/A 7.027 ### 1.00 0.6 1.80 0.60 1700 943 2 0.720 3.28
25 13 127.34 2.19 #N/A #N/A #N/A 7.481 ### 1.00 0.6 1.80 0.60 1500 980 2 0.720 3.28
13 12 7.00 6.87 #N/A #N/A #N/A 8.364 ### 1.00 0.6 1.80 0.60 1200 -135 2 0.720 3.28
14a 12 110.00 #N/A #N/A #N/A #N/A 10.951 ### 1.00 0.6 1.80 0.60 700 -425 2 0.720 3.28
12 11 56.59 #N/A #N/A #N/A #N/A 10.951 ### 1.00 0.6 1.80 0.60 700 1088 2 0.720 3.28
10a 11 113.00 #N/A 0.00 #N/A #N/A 0.983 ### 1.00 0.4 1.20 0.40 10000 -286 1 0.320 2.19
NAME LENGTH AREA TO BE DISCHARGED Check D/B SECTION OF SLOPE
OF DISCHARG
DRAIN IN m (Acres) E RATIO DRAIN Drain Road Drain Area perimrter

From To (Cusec) WIDTH-DEPTH


Top 1 in top width P
Bottom width
SELF ADDL TOTAL width B B2 d A
11 5 51.38 #N/A #N/A #N/A #N/A 12.516 ### 1.18 0.6 2.02 0.71 800 108 2 0.926 3.77
2 3 38.56 #N/A #N/A #N/A #N/A 12.957 ### 1.00 0.6 1.80 0.60 500 1676 2 0.720 3.28
8a 3 43.00 0.40 #N/A #N/A #N/A 28.974 ### 1.00 0.6 1.80 0.60 100 103 2 0.720 3.28
3 4 44.08 0.81 #N/A #N/A #N/A 13.892 ### 1.00 0.6 1.80 0.60 435 -1917 2 0.720 3.28
8b 4 54.00 0.58 #N/A #N/A #N/A 28.974 ### 1.00 0.6 1.80 0.60 100 118 2 0.720 3.28
4 5 34.41 1.00 #N/A #N/A #N/A 15.487 ### 1.00 0.6 1.80 0.60 350 -1434 2 0.720 3.28
5 6 47.81 1.72 #N/A #N/A #N/A 16.869 ### 1.00 0.6 1.80 0.60 295 1017 2 0.720 3.28

7a 29 62.80 0.38 0.00 0.38 0.37 3.108 ok 1.00 0.4 1.20 0.40 1000 997 1 0.320 2.19
29 6 70.58 0.38 0.38 0.75 0.75 9.827 ok 1.00 0.4 1.20 0.40 100 169 1 0.320 2.19
1:02
VELOCITY LEVEL AT START LEVEL AT END FREE
Section BOARD
side slope (m/sec) F.board AT

1 in at Start END

1 F.L F.S.L I.L F.L F.S.L I.L

1 0.604 0.10 91.73 91.63 91.33 91.67 91.57 91.27 0.10


1 0.390 0.10 91.67 91.57 91.27 91.65 91.55 91.25 0.10
1 1.173 0.10 91.65 91.55 91.25 91.24 91.15 90.85 0.09
1 0.918 0.10 91.77 91.67 91.37 91.57 91.47 91.17 0.09
1 0.912 0.09 91.57 91.47 91.17 91.57 91.38 91.08 0.18
1 0.908 0.18 91.57 91.38 91.08 91.57 91.16 90.86 0.40
1 0.942 0.40 91.57 91.16 90.80 91.57 90.72 90.36 0.85
1 0.897 0.85 91.57 90.72 90.26 91.24 90.39 89.93 0.85
1 0.781 0.85 91.24 90.39 89.93 91.70 90.24 89.79 1.46
1
1 0.472 0.10 93.30 93.20 92.84 93.00 92.91 92.55 0.1
1 1.055 0.09 93.00 92.91 92.55 92.15 92.00 91.64 0.2
1 0.798 0.15 92.15 92.00 91.64 91.83 91.68 91.32 0.14
1 0.385 0.10 91.77 91.67 91.31 91.83 91.60 91.24 0.23
1 0.897 0.23 91.83 91.60 91.15 91.83 91.43 90.98 0.39
1 0.487 0.10 91.57 91.47 90.97 91.83 91.39 90.89 0.44
1 0.487 0.10 91.57 91.47 90.97 91.83 91.39 90.89 0.44
1 0.627 0.44 91.83 91.39 90.79 91.83 91.36 90.76 0.47
1 0.553 0.47 91.83 91.36 90.76 91.77 91.33 90.73 0.44
1 0.589 0.10 91.90 91.80 91.20 91.77 91.72 91.12 0.05
1 0.658 0.44 91.77 91.33 90.73 91.83 91.33 90.73 0.50
1 0.862 0.10 91.57 91.47 90.87 91.83 91.31 90.71 0.52
1 0.862 0.52 91.83 91.31 90.71 91.77 91.23 90.63 0.54
1 0.174 0.10 91.38 91.28 90.88 91.77 91.26 90.86 0.51
VELOCITY LEVEL AT START LEVEL AT END FREE
Section BOARD
side slope (m/sec) F.board AT

1 in at Start END

1 F.L F.S.L I.L F.L F.S.L I.L


1 0.835 0.54 91.77 91.23 90.52 91.30 91.16 90.46 0.13
1 1.020 0.10 91.28 91.18 90.58 91.25 91.10 90.50 0.15
1 2.280 0.10 91.67 91.57 90.97 91.25 91.14 90.54 0.11
1 1.093 0.15 91.25 91.10 90.50 91.28 91.00 90.40 0.28
1 2.280 0.10 91.73 91.63 91.03 91.28 91.09 90.49 0.18
1 1.219 0.28 91.28 91.00 90.40 91.30 90.90 90.30 0.40
1 1.327 0.40 91.30 90.90 90.30 91.25 90.74 90.14 0.52
1
1 0.550 0.10 91.73 91.63 91.23 91.67 91.57 91.17 0.10
1 1.740 0.10 91.67 91.57 91.17 91.25 90.86 90.46 0.39
PROJECT : KMDA,
Baidyabati
NAME AREA TO Check D/B SECTION OF SLOPE VELOCITY LEVEL AT START FALL LEVEL AT END
OF BE DISCHARG RATI
DRAIN DISCHARG E O DRAIN Drain (m/sec) F.board
ED
From To (Cusec) WIDTH-DEPTH 1 in at Start
Bottom
width B d F.L F.S.L I.L F.L F.S.L I.L
0.99
7 8 0.58 1.918 ok 1.00 0.3 0.30 566 0.604 0.10 91.73 91.63 91.33 0.06 91.67 91.57 91.27
8 9 0.97 1.240 ok 1.00 0.3 0.30 1355 0.390 0.10 91.67 91.57 91.27 0.02 91.65 91.55 91.25
9 2 1.17 3.726 ok 1.00 0.3 0.30 150 1.173 0.10 91.65 91.55 91.25 0.40 91.24 91.15 90.85
27 18 0.59 3.857 ok 1.00 0.3 0.30 140 1.214 0.10 92.00 91.90 91.60 0.35 91.77 91.55 91.25
18 15 2.29 2.898 ok 1.00 0.3 0.30 248 0.912 0.22 91.77 91.55 91.25 0.09 91.57 91.46 91.16
15 14 3.89 4.254 ok 1.00 0.45 0.45 1000 0.595 0.11 91.57 91.46 91.01 0.06 91.57 91.40 90.95
14 10 6.29 6.406 ok 1.00 0.6 0.45 1000 0.672 0.16 91.57 91.40 90.95 0.11 91.57 91.29 90.84
10 2 8.43 8.736 ok 1.00 0.6 0.60 1100 0.687 0.28 91.57 91.29 90.69 0.11 91.24 91.19 90.59
2 3 9.60 9.658 ok 1.00 0.6 0.60 900 0.760 0.09 91.24 91.15 90.55 0.10 91.25 91.05 90.45

22 21 0.20 1.443 ok 1.00 0.3 0.30 1000 0.454 0.10 93.30 93.20 92.90 0.29 93.00 92.91 92.61
21 20 2.32 2.635 ok 1.00 0.3 0.30 300 0.829 0.09 93.00 92.91 92.61 0.61 92.15 92.30 92.00
20 19 2.52 2.531 ok 1.00 0.3 0.30 325 0.797 -0.15 92.15 92.30 92.00 0.34 91.83 91.96 91.66
27a 19 3.11 3.474 ok 1.00 0.45 0.45 1500 0.486 0.10 92.00 91.90 91.45 0.08 91.83 91.82 91.37
19 13 7.47 7.767 ok 1.00 0.45 0.45 300 1.087 0.00 91.83 91.82 91.37 0.17 91.83 91.66 91.21
25 13 2.17 3.474 ok 1.00 0.45 0.45 1500 0.486 0.10 91.90 91.80 91.35 0.08 91.77 91.72 91.27
13 5 16.47 11.829 no 1.00 0.6 0.60 600 0.931 0.17 91.77 91.61 91.01 0.01 91.83 91.59 90.99
8a 3 0.40 4.563 ok 1.00 0.3 0.30 100 1.436 0.10 91.67 91.57 91.27 0.43 91.25 91.14 90.84
3 4 10.80 11.747 ok 1.00 0.75 0.75 2000 0.592 0.20 91.25 91.05 90.30 0.02 91.28 91.03 90.28
8b 4 0.58 4.563 ok 1.00 0.3 0.30 100 1.436 0.10 91.73 91.63 91.33 0.54 91.28 91.09 90.79
4 5 12.29 13.133 ok 1.00 0.75 0.75 1600 0.661 0.25 91.28 91.03 90.28 0.02 91.30 91.01 90.26
5 6 30.46 31.378 ok 1.00 1 1.00 1300 0.889 0.29 91.30 91.01 90.01 0.04 91.25 90.97 89.97

7a 29 0.37 1.443 ok 1.00 0.3 0.30 1000 0.454 0.10 91.73 91.63 91.33 0.06 91.67 91.57 91.27
NAME AREA TO Check D/B SECTION OF SLOPE VELOCITY LEVEL AT START FALL LEVEL AT END
OF BE DISCHARG RATI
DRAIN DISCHARG E O DRAIN Drain (m/sec) F.board
ED
From To (Cusec) WIDTH-DEPTH 1 in at Start
Bottom
width B d F.L F.S.L I.L F.L F.S.L I.L
29 6 0.75 4.563 ok 1.00 0.3 0.30 100 1.436 0.10 91.67 91.57 91.27 0.71 91.25 90.86 90.56

28 23 2.13 3.227 ok 1.00 0.3 0.30 200 1.016 0.10 93.30 93.20 92.90 0.54 92.79 92.66 92.36
23 24 4.25 24.487 ok 1.00 0.6 0.60 140 1.927 0.13 92.79 92.66 92.06 0.68 92.08 91.98 91.38
20a 24 7.63 7.744 ok 1.00 0.6 0.60 1400 0.609 0.10 92.15 92.05 91.45 0.20 92.08 91.85 91.25
24 6 15.26 23.493 ok 1.00 0.75 0.75 500 1.183 0.23 92.08 91.85 91.10 0.69 91.25 91.16 90.41
6 Canal 46.46 50.596 ok 1.00 1 1.00 500 1.433 0.39 91.25 90.86 89.86 0.02 91.00 90.84 89.84
FREE
BOARD
AT

END

0.10
0.10
0.09
0.22
0.11
0.16
0.28
0.05
0.20

0.1
-0.2
-0.14
0.00
0.17
0.05
0.23
0.11
0.25
0.18
0.29
0.28

0.10
FREE
BOARD
AT

END

0.39

0.13
0.10
0.23
0.09
SCHEDULE OF ROAD SCHEDULE OF ROAD
Node No Node No
Reduced F.L in m Reduced
distance in distance
m in m

NN 22 0 92.85 0 NN 21 0
30 92.85 30 30
90 92.85 60 90
120 92.85 30 120
150 92.85 30 150
180 92.85 30 NN20 182
210 92.85 30
240 92.85 30
270 92.85 30
NN21 293 92.85 30


ULE OF ROAD SCHEDULE OF ROAD
Node No
F.L in m Reduced F.L in m
distance
in m

92.85 0 NN 20 0 92.30 0
92.76 30 30 92.29 30
92.76 60 90 92.28 60
92.76 30 120 92.27 30
92.76 30 150 92.26 30
92.30 32 180 92.26 30
210 92.25 30
240 92.24 30
270 92.23 30
NN24 282 92.23 12
Name OF DRAIN Length, m

From To Area Sq.mt TOTAL

Upstream
Catchment Catchment Total area Hydraulic Time of Inlet Total Tc, Return
SELF(m2) m2 m2 length m Tin tavel time min period
PROJECT : KARIMNAGAR STORM WATER MANAGEMENT

Check Section of perim


DISCHARGE DRAIN Drain Road Area rter
WIDTH-
m3/s RATIO DEPTH 1 in P

Intensity of Self Upstream Total


ranfall, Runoff Discharge discharge Discharge Bottom
mm/hr Coeffient m3/s m3/s m3/s width B d
DEPTH DEPTH
Velocuty FREE AT AT
(m/sec) F.board LEVEL AT START LEVEL AT END BOARD AT START END

at Start END

F.L F.S.L I.L Drop F.L F.S.L I.L


AVG.
DEPTH

in meters