Sei sulla pagina 1di 6

SESSION PLAN

Sector : Information and Communication Technology


Qualification Title : Computer Systems Servicing NC II
Unit of Competency : Install and Configure Computer Systems
Module Title : Installing and Configuring Computer Systems
Nominal duration : 40 hours
Learning Outcomes:
LO1. Assemble Computer Hardware
LO2. Prepare Installer
L03. Install Operating System & Drivers for Peripherals / Devices
L04. Install the Computer Application Software
LO5. Conduct Testing and Documentation

A. INTRODUCTION
This unit covers the knowledge, skills and attitudes needed to diagnose computer systems and networks
B. LEARNING ACTIVITIES

LO 1: Assemble Computer Hardware

 Self-paced  Read & study Video Clip


 Safety Procedures  Answer Compare to 1HR
 Modular Information answer
Sheet 1.1-1 Self- Information
 Video clip keys
(Safety check Sheet 1.1-1
viewing 1.1-1
Procedures) &
watch the Self-check
1.1-1
video clip
(OHS) Video Clip

 Basic Hand Tools and  Read the  Evaluate Compare to Information


 Self-paced
Materials Information yourself answer Sheet 1.1-2
 Modular keys Self-check 2H
Sheet 1.1-2 by
 Video clip 1.1-2
(Basic Hand answerin
viewing Video Clip
Tools and g the Self
Materials) Check
1.1-2
before
proceedin
g to the
next
activity

 Self - paced Evaluate Information


 Modular Read the  Compare to Sheet 1.1-3
 Computer Hardware yourself by answer 2H
Information Sheet Self-Check
Components
1.1-3 (Computer answering keys 1.1-3
Hardware the Self System
Components) Check 1.1- unit,
3 before monitor,
proceeding keyboard,
to the next mouse and
activity printer
 Self - paced Read the Evaluate Informatio
Perform the
 Bios Configuration  Modular Information Sheet Performan n Sheet
instructions
1.1-4 (BIOS ce using 1.1-4 Task 2H
stated in the
CONFIGURATION) the Sheet
Task sheet
Performan Task Sheet
1.1-4,
ce Criteria 1.1-4
before
Check list System
proceeding
1.1-4 Unit
to the next
activity

 Self - paced Read the Perform the Evaluate Informatio


 PC Assembly / Information Sheet n Sheet 2H
 Modular instructions Performan
Disassembly
1.1-5 (PC Assembly stated in the ce using 1.1-5 Task
/ Disassembly) Task sheet the Sheet
1.1-5, before Performan Task Sheet
proceeding to ce Criteria 1.1-5
the next Check list System
activity 1.1-5 Unit
Screw
Driver
Anti-static
Wrist
Wrap
LO 2. Prepare Installer

 Creating Bootable  Self - paced Read the Perform the Evaluate Informatio 10 H
USB  Modular Information Sheet instructions Performan n Sheet
1.2-1(Creating stated in the ce using 1.2-1 Task
Bootable USB) Task Sheet the Sheet
1.2-1, before Performan Task Sheet
proceeding to ce Criteria 1.2-1
the next Check list System
activity. 1.2-1 Unit
Flash Disk
Drive

LO 3 : INSTALL OPERATING SYSTEM AND DRIVERS FOR PERIPHERALS/ DEVICES

 Structures of  Self - paced Read the Evaluate Compare Informatio 5H


Operating System  Modular Information Sheet yourself by to answer n Sheet
1.3-1(Structures answering keys 1.3-1 Task
of Operating the Self Sheet
System) Check 1.3-1 Self-check
before 1.3-1
proceeding to System
the next Unit
activity

 Computer System  Self - paced Read the Evaluate Evaluate


Configuration  Modular Information Sheet yourself by Performan Informatio
1.3-2 (Computer answering ce using n Sheet 5H
the
System the Task Performan 1.3-2 Task
Configuration) Sheet 1.3-2 ce Criteria Sheet
before Check list Task Sheet
proceeding to 1.3-2 1.3-2
the next System
activity Unit

 Installing operating  Self - paced Read the Evaluate Informatio 5 H


Evaluate
system and peripheral  Modular Information Sheet yourself by n Sheet
Performan
drivers 1.3-3 (Installing answering 1.3-3 Task
ce using
operating system the Task Sheet
the
& Peripheral Sheet1.3-3 Task Sheet
Performan
Drivers) before 1.3-3
ce Criteria
proceeding to System
Check list
the next Unit
1.3-3
activity

LO4: INSTALL THE COMPUTER APPLICATION SOFTWARE

 Installing computer  Self - paced Read the Perform the Read, Informatio 5 H
application software  Modular Information Sheet instructions understan n Sheet
1.4-1(Installing stated in the d the 1.4-1 Task
Computer Task Sheet informatio Sheet
Application 1.4-1, before n sheet Task Sheet
Software) proceeding to and 1.4-1
evaluate System
yourself Unit
the next using Installers
activity. Task
Sheet 1.4-
1.
LO 5: CONDUCT TESTING AND DOCUMENTATION

 Testing and  Self - paced Read the Perform the Evaluate Informatio 1 HR
documentation  Modular Information Sheet instructions Performan n Sheet
1.5-1(Conduct stated in the ce using 1.5-1 Task
Testing and Task Sheet the Sheet
Documentation) 1.5-1, before Performan Task Sheet
proceeding to ce Criteria 1.5-1
the next Check list System
activity. 1.5-1 Unit
Installers

C. ASSESSMENT PLAN
 Written Test
 Demonstration with oral questioning
 Portfolio
D. TEACHER’S SELF-REFLECTION OF THE SESSION

Potrebbero piacerti anche