Sei sulla pagina 1di 1

GAC001-PM-0007-E15-0040-05 A8GA-45240-65-DW-5039

Guinea Alumina Corporation S.A. 2020/01/05


Guinea Bauxite Export Project – Phase 1 Page 1 of 1
Contract A8GA

NON-PROCESS INFRASTRUCTURE AND UTILITIES -SEWAGE


TREATMENT - POWER & CONTROL CABLE SCHEDULE WITH
TERMINATION DETAILS
GAC Document number: GAC001-PM-0007-E15-0040-05
PMC document number: A8GA-45240-65-DW-5039
SPCL document number: SP- A8GA-45240-65-DW-5039
WEC document number: P2270-STP-S010
This document has been revised as indicated below:

3 2019/12/19 Issued for J Venter T Kruger Dvan


As-built Rensburg

2 2018/12/11 Re-Issued for J Venter T Kruger D van


Information Rensburg

Rev Date Description Prepared Checked Approved by Appr. by Appr. by


by by discipline PEM
Lead Eng.

Approvals Signatures Date

Area project manager

Client representative

ISSUED FOR Design Construction Other X Information

A8GA-45240-65-DW-5039_R3 Sewage Treatment Plant

Potrebbero piacerti anche