Sei sulla pagina 1di 2

Trouble

Trouble shooting
shooting guide
guide
Important information Cleaning
Cleaning&&maintenance
Your
YourQuartz
maintenance
QuartzElectric
Electricunit
unitshould
shouldbe
becleaned
cleanedusing
usingonly
onlyaasoft
softcloth
clothand
andwashing
washingup
upliquid.
liquid.
Symptom
Symptom Possible
Possiblecause
cause Action
Action DO
DONOT
NOTUSE
USEABRASIVE
ABRASIVECLEANERS.
CLEANERS.
Safety information Connections No
Noflow
floworornot
not Power
Powerfailure
failure(light
(light Check
Checkpower
powersupply,
supply,consult
consultelectrician
electrician To
Toreduce
reducethe
therequirement
requirementfor
forchemical
chemicaldescaling
descalingininhard
hardwater
waterareas,
areas,the
theshower
showerhead
headincorporates
incorporatesrub
rubclean
clean
This appliance can be used by children aged from 3 years and above and Quartz Electric is suitable for use with 15mm British Standard pipe and should be connected using a 15mm

Important information
enough
enoughflow
flow does
doesnot
notilluminate)
illuminate) teats.
teats.Any
Anyscale
scalebuild
buildup
upthat
thatmay
mayoccur
occurininany
anyofofthe
theholes
holescan
canbe
bebroken
brokendown
downby
bygently
gentlyrubbing
rubbingthe
theflexible
flexible
compression fitting (not supplied). Quartz Electric is suitable for top, bottom or rear entry pipe work and top
persons with reduced physical, sensory or mental capabilities or lack of tips
tipsofofthe
thejets
jetsduring
duringuse.
use.This
Thisprocedure
procedureshould
shouldbe
becompleted
completedregularly,
regularly,asasoften
oftenasasonce
onceaaweek
weekininsome
somehard
hard
bottom or rear entry cable. Supply lines should be flushed clear of any debris prior to installation of the unit. Water
Watercontrol
controlknob
knobisis Turn
Turnflow
flowcontrol
controlknob
knobanticlockwise.
anticlockwise.
experience and knowledge if they have been given supervision or instruction turned
turnedfully
fullyclockwise.
clockwise. water
waterareas
areasasasscale
scalebuild
buildup
upcan
canaffect
affectthe
thespray
spraypattern
patternand
andcause
causethe
theshower
showertotoperform
performpoorly.
poorly.
concerning use of the appliance in a safe way and understand the hazards
Isolating valves Water
Waterturned
turnedoff
offatat Ensure
Ensurewater
waterisisturned
turnedfully
fullyon
onatatthe
themains
mainsand
andatat
involved.
Introduction Connections A suitable full bore isolation valve must be fitted to the incoming supply in accordance with the current Water mains
Should
Shouldchemical
chemicaldescaling
descalingofofthe
thehead
headbecome
becomenecessary,
necessary,remove
removethe
theshower
showerhead
headand
andfully
fullyimmerse
immerseininaamild
mild
mainsororservicing
servicing servicing
servicingvalve
valveininsupply.
supply. proprietary
proprietarydescalent.
descalent.
Children shall
Quartz Electric not mounted
is a surface play with the appliance.
instantaneous electric shower unit which is Quartz Electric is suitable for use with 15mm
Supply British Standard
Regulations pipe and
and our terms should be
of warranty. valve.
valve.
available in a choice of performance ratings – 8.5kW and 9.5kW available in connected using a 15mm compression fitting (not supplied). Quartz Electric is suitable ! !ITITISISIMPERATIVE
IMPERATIVETHAT
THATDESCALING
DESCALINGISISCARRIED
CARRIEDOUT
OUTSTRICTLY
STRICTLYIN
INACCORDANCE
ACCORDANCEWITH
WITHTHE
THE
Cleaning and user maintenance shall not be made by children
White/chrome and 8.5kW, 9.5kW and 10.5kW available in Satin chrome and
without
for top, bottom or rear entry pipeSiting
work and top bottom or rear entry cable. Supply
SHOWER
SHOWERUNIT
UNIT IfIfso,so,DO
DONOT
NOTUSE.USE.
SUSPECTED
SUSPECTEDOF
OFBEING
BEING i)i) Switch
Switch offimmediately
off immediatelyatatelectrical
electricalisolating
isolatingswitch. MANUFACTURERS
MANUFACTURERSINSTRUCTIONS.
INSTRUCTIONS.SUBSTANCES
SUBSTANCESTHAT
THATARE
ARENOT
NOTSUITABLE
SUITABLEFOR
FORPLASTICS
PLASTICSAND
AND
supervision.
Graphite/chrome. Thedebris
lines should be flushed clear of any Quartz Electric
prior unit mustof
to installation bethe
mounted
unit. on a flat, vertical finished wall with the hose outlet pointing
switch.
FROZEN.
FROZEN. ii)ii)Turn
Turn water off at servicing valve (if fitted)ororatat
water off at servicing valve (if fitted) ELECTROPLATED
ELECTROPLATEDSURFACES
SURFACESMUST
MUSTNOT
NOTBE
BEUSED.
USED.
The spray head must be descaled regularly.
Quartz Electric’s patented Over Temperature Protection (OTP) device ensures safer
downwards. Any distortion of the back plate may result in the unit not working. Spacers are provided fitted to stop
stopcock.
cock.
the service tunnel to enable the unit to be fitted to an uneven wall surface.
WARNING: Do not
comfortable showering whilstswitch
the showeron if there
provides endlessis a possibility
economical showering that
Isolating valves
as it the water in the
iii)
iii) Contactour
Contact ourCustomer
CustomerService
ServiceDepartment.
Department. Cleaning
Cleaningthe
thefilter
filter
DO NOT tile up to or use sealants around the Quartz Electric unit. The shower is spaced off the wall by integral
A suitable full bore isolation valve must be fitted to the incoming supply in accordance
imposes noisdemand
heater frozen. on stored hot water. pillars to allow air circulation around the unit. There
Theremay
maybebean
an Disconnecthandset
Disconnect handsetfrom
fromhose
hoseandandrunrunthe
theshower.
shower. Cleaning
Cleaningthe
thefilter
filtershould
shouldonly
onlybe
becompleted
completedby
byaaqualified
qualifiedperson.
person.
with the current Water Supply Regulations and our terms of warranty.
outlet blockage.
outlet blockage. i)i) IfIfwater
water flows, then handset is blockedwith
flows, then handset is blocked withscale
scaleoror
Fit only
Quartz shower
Electric heads
is supplied with a 2recommended
year guarantee. by the manufacturer and never fit any The casing must not be sited where it is subjected to continuous spray from the shower head.
debris. Clean the handset and spray plate thoroughly.
1.1.Turn
Turnthe
theshower
showerelectrical
electricalisolating
isolatingswitch
switchoff.
off.
Installation guide debris. Clean the handset and spray plate thoroughly.
additional device to restrict the water outlet flow.
If you have any questions at any stage during installation please contact the Aqualisa Siting The Quartz Electric should not be sited in any situation where it is likely to freeze. ii)ii)IfIfthe
thewater
waterdoes
doesnot
notflow,
flow,remove
removethe thehose
hosefrom
fromthethe 2.2.Isolate
Isolatethe
thewater
watersupply
supplytotothe
theshower.
shower.
The outlet
customer must
helpline not560010
on 01959 be connected
for advice. to any tap or fitting other
Thethan thoseunit must be mounted
Quartz Electric on a flat, vertical finished wall with the hose
! WARNING. DO NOT SWITCH THE SHOWER ON IF THERE IS A POSSIBILITY THAT THE SHOWER COULD BE
shower outlet.
shower outlet. Fig.2
Fig.2
a)a)IfIfthethewater
waterflows,
flows,the
thehose
hoseisisblocked.
blocked.This
Thiscould
couldbe be 3.3.Carefully
Carefullyremove
removefixing
fixingscrews
screwsfrom
fromthe
thetop
topand
andbottom
bottomofofthe
thefront
frontcover.
cover.
specified. outlet pointing downwards. Any distortion of the back plate may result in the unit not
FROZEN. If you have switched the shower on, SWITCH OFF IMMEDIATELY. Please refer to the trouble shooting due to damage, severe kinking or even an obstruction.
due to damage, severe kinking or even an obstruction. Carefully
Carefullypull
pullthe
thefront
frontcover
coveraway
awayfrom
fromthe
theunit
unitensuring
ensuringthe
thesolenoid
solenoid
Safety
This information
appliance is intended to be permanently connected tofitted thetowater
working. Spacers are provided fitted to the service tunnel to enable the unit to be
mains guide overleaf. Replace
Replacewith
withaanew
newhose.
hose.
an uneven wall surface. connector
connectorblock
blockisisdetached.
detached. Quartz Electric shower with adjustable
This product must be installed by a competent person in accordance with all relevant
and not connected by a hose set. DO NOT tile up to or use sealants around the Quartz Electric unit. The shower is
b)b)IfIfthethe water doesnot
water does notflow,
flow,there
thereisisaablockage
blockageininthe
the
height head in Satin chrome
Electric
Electric current Water Supply Regulations. Pressures plumbing
plumbing to the shower, the filter or theshower
to the shower, the filter or the showeritself.
itself. 4.4.Unscrew
Unscrewthe
thetwo
twoscrews
screwson
onthe
thefilter
filterprotective
protectivecover
coverand
andremove
removethe
the
A suitable double pole isolation switch for supply disconnections spaced offmust
the wallbeby integral pillars
Checkto that
allowthe
airdynamic
circulation around water
(running) the unit.
pressure to the Quartz Electric is adequate. A pressure test adaptor is Contact
ContactourourCustomer
CustomerService
ServiceDepartment
Departmentififthethe filter
filterassembly.
assembly.(Fig.2).
(Fig.2).
incorporated in theANfixed
ALL SHOWERS REQUIRING wiring
ELECTRICAL circuit,MUST
CONNECTION in accordance
BE INSTALLED BYwith current wiring provided, fitted to the inside of the front cover. Follow the pressure test adaptor fitting instructions opposite to
The casing must not be sited where it is subjected to continuous spray from the
shower is considered to be the problem.
shower is considered to be the problem.
rules. SeePERSON
Electrical Installation sectionOFfor further details.his product must ensure the water pressure to the shower is within the minimum and maximum requirements. 5.5.Remove
Removethe
thefilter
filterassembly
assemblyand
andclean
cleanasasnecessary.
necessary.(Fig.3).
(Fig.3). Fig.3
Fig.3

Quartz A QUALIFIED
be

ALL
installedAND
REGULATIONS)
Water
FOLLOWING
byCERTIFIED
a competent
SupplyTORegulations.
WITH REFERENCE
THE LATEST REVISION
TO CURRENTperson
BUILDING
BS 7671
inREGULATIONS.

SHOWERS REQUIRING AN ELECTRICAL CONNECTION! WARNING.


(WIRING

BUILDING REGULATION PART P, ANY NEW INSTALLATION


OR REPLACEMENT PRODUCT INSTALLATION WHICH IS NOT IDENTICAL TO THE
PRODUCT BEING REPLACED, THE CABLE SIZES, CIRCUIT PROTECTIVE DEVICES,
INSTALLED BY A QUALIFIED PERSON FOLLOWING THE LATEST
EARTH BONDING AND ALL OTHER REQUIREMENTS OF THE BUILDING REGULATION
OF BS 7671 (WIRING REGULATIONS) AND CERTIFIED TO IMMEDIATELY.
MUST BE ASSESSED BY A (REGISTERED) QUALIFIED ELECTRICIAN AND INSTALLED
shower head.
accordance with all relevant current
The Quartz Electric

MUST BE
should not be
Quartz Electric requires:
Max:

DO NOT SWITCH THE


REVISION
sited 1.0MPa

CURRENTPlease refer to the0.3MPa


TheSHOWER
(10 bar) where it is likely to freeze.
in any situation
Min: 0.09MPa (0.9 bar) at a flow rate of 8 litres per minute

Quartz Electric showerIS


ON IF THERE is designed
pressure
to control
A POSSIBILITY THAT
reducing
static pressure up to 1.0MPa (10 bar). Where pressures are likely
THE SHOWER COULD BE FROZEN. If you have switched the shower on, SWITCH OFF must be fitted into the incoming mains supply. A setting of
to exceed 1.0MPa (10 bar), a valve
(3 bar) is recommended. It should be noted that daytime pressures approaching 8 bar can rise above the
trouble shooting guide overleaf.
stated maximum overnight. A suitable pressure reducing valve is available from Aqualisa. Flow
Flowadequate
adequate
Blocked
Blockedinlet
inletfilter

Restricted
filter

Restrictedoperation
flow
flowcontrol

Water
Waterflow
operationofof
controlknob
knob

flowisistoo
toohigh
high
Remove
Removethe

Reduce
thefilter
INSPECTION

Remove
Removefront

Reducethe
filterfor
AND

frontcover

theflow
flowby
forinspection.
inspection.PLEASE
MAINTENANCE
INSPECTION AND MAINTENANCE SECTION

coverand
andcheck

byturning
turningthe
PLEASEREFER

thewater
REFERTO
SECTION

checkoperation
operationofofknob

watercontrol
knob
TO

controlknob
knob
6.6.Refit

Pressure
thefilter
Refitthe

Pressuretest
Quartz
filterassembly

testadaptor
QuartzElectric
assemblyand

adaptorfitting
andprotective
protectivecover.

fittinginstructions
Electricrequires
requiresthe
instructions
thefollowing
followingdynamic
cover.Reassemble
Reassemblethe

dynamic(running)
(running)water
theunit
unitininreverse

waterpressure:
pressure:
reverseofofthe
theabove
aboveprocedure.
procedure. Quartz Electric shower with adjustable
height head in chrome

BUILDING REGULATIONS. but


butwater
watertoo
too towards
towardsthe
thehot
hottemperature
temperaturemarkings
markings(clockwise)
(clockwise)slowly
slowly
Maximum:
Maximum:1.0MPa
1.0MPa(10bar)
(10bar)
IN CONSIDERATION TO THE SITE CONDITIONS (see table below).
WITH REFERENCE TO BUILDING REGULATION PART P, ANY NEW
Pressures The use of other services connected to the water supply to the shower unit may cause the water pressure to drop
cold
cold
a)a)Check
Checkisolator
isolatorswitch
switchisison Minimum:
Minimum:0.09MPa
0.09MPa(0.9bar)
(0.9bar)atataaflow
flowrate
rateofof8lpm
8lpm
INSTALLATION OR REPLACEMENT PRODUCT INSTALLATION WHICH
Check IS (running)below
that the dynamic
the minimum required. This should therefore be taken into consideration.
water pressure to the Quartz Electric is adequate.
No
Nopower
powertotounit
unit on
Quartz Electric shower with adjustable height
Shower rating @ 240V 8.5kW 9.5kW 10.5kW
NOT IDENTICAL TO THE PRODUCT BEING REPLACED, THE CABLE
A pressure testSIZES,
adaptor is provided, fitted to the inside of the front cover. Follow the b)b)Check
CheckMCB
MCBororfuse
fuseatatconsumer
consumerunit
unit To
Toensure
ensurethe
thewater
waterpressure
pressuretotothe
theshower
showerisisadequate,
adequate,we
werecommend
recommendadopting
adoptingthe
thefollowing
followingprocedure:
procedure: head in White/chrome
CIRCUIT PROTECTIVE
Nominal current @ 240V DEVICES, EARTH
35.4A 39.6A
BONDING 43.8A
AND ALL OTHER Pressure relief device (PRD)
pressure test adaptor fitting instructions opposite to ensure the water pressure to the c)c)Check
CheckRCD
RCD(if(iffitted)
fitted)
To meet European standards, the shower unit features an integral pressure relief device (PRD). The PRD provides 1.1. Isolate
Isolatethe
theelectrical
electricalsupply
supplytotothe
theshower.
shower.
REQUIREMENTS
MCB rating OF THE40A BUILDING 40AREGULATION 45/50AMUST BE ASSESSED
shower BY
is within the minimum and maximum
a degree requirements.
of shower unit protection should an excessive build up of pressure occur within the shower.
ACartridge
(REGISTERED)
fuse QUALIFIED
40/45A ELECTRICIAN
40/45A AND INSTALLED
45A IN
Quartz Electric requires:
d)d)Check
Check230/240V
230/240Vatatterminal
terminalblock
block 2.2. Isolate
Isolatethe
thewater
watersupply
supplytotothe
theshower.
shower.
(Electrician only)
(Electrician only)
CONSIDERATIONMinTO cableTHE SITE
Max cable MinCONDITIONS (seeMaxtable
cable Max cable Min cable cable below).
Max: 1.0MPa (10 bar)
DO NOT operate the shower with a damaged or kinked hose or blocked shower head, as this can cause the PRD
size mm2 size mm2 size mm2 run in m to operate. Failure to follow this instruction will invalidate 3.3. Remove
Removethe
thefixing
fixingscrews
screwsfrom
fromthe
thetop
topand
andbottom
bottomofofthe
thefront
frontcover.
cover.Carefully
Carefullydetach
detachthe
thesolenoid
solenoid
run in m run in m Second
Secondstage
stagethermal
thermal This
Thisisisaanon
nonserviceable
serviceablepart,
part,shower
showermust
mustbe
bereplaced
replaced
Min: 0.09MPa (0.9 bar) at a flowthe
rateguarantee.
of 8 litres per minute
trip
tripoperated
operated connector
connectorand
andpull
pullthe
thefront
frontcover
coverclear.
clear.
Introduction
Installed in 10 61 10 55 10 50
insulated wall The Quartz Electric shower is designed to control
The shower staticfunction
will only pressurecorrectly
up to 1.0MPa (10hose
with the bar).and
Quartz
Type Electric is a surface mounted instantaneous electric shower unit which is available in a choice of performance 4.4. Remove
Removethe
thepressure
pressuretest
testadaptor
adaptorfrom
fromthe
theinside
insideofofthe
thefront
frontcover.
cover.
Where pressures
of – 8.5kW and 9.5kW available in White/chrome and 8.5kW, 9.5kW and 10.5kW available in Satin chrome and
ratings are likely to handset
exceed 1.0MPaprovided
(10 (see
bar), a shower
pressurehead installation
reducing valve must Water
Watertoo
toohot
hot Water
Waterflow
flowtoo
toolow
low Increasethe
a)a)Increase theflow
flowby
byturning
turningthe
thewater
watercontrol
controlknob
knob
6 37 10 55 10 50
cable Conduit or trunking
Graphite/chrome.
run be fitted into the incoming mainsinstructions overleaf).
supply. A setting Failure (3
of 0.3MPa to bar)
do soismay result in the
recommended. towards
towardsthe
thecold
coldtemperature
temperaturemarkings
markings 5.5. Unscrew
Unscrewthe
thetwo
twofixing
fixingscrews
screwson
onthe
thefilter
filterand
andremove
removethe
thefilter
filterassembly.
assembly.
Clipped direct operation of the PRD and will invalidate the guarantee.
It should be noted that daytime pressures approaching 8 bar can rise above the (anticlockwise)
(anticlockwise)slowly.
slowly.
or buried in
Quartz Electric’s patented Over6 Temperature
37 6
Protection 33device ensures
(OTP) 10 50comfortable
safer showering whilst the 6.6. Replace
Replacethe
thefilter
filterassembly
assemblywith
withthe
thepressure
pressuretest
testadaptor
adaptorand
andsecure
secureinto
intoplace
placeusing
usingthe
thefilter
filter
uninsulated wall Pleasepressure
fully commission the shower prior to use following
shower provides endless economical showering as it imposes no demand on stored hot water.stated maximum overnight. A suitable reducing valve is available from b)b)Ensure
Ensurethat
thatthe
thestop
stopcock
cockand
andservicing
servicingvalve
valveare
are assembly
assemblyfixings.
fixings.
Aqualisa. the shower commissioning procedure detailed overleaf. fully
fully open. If so, ask the installer or the localwater
open. If so, ask the installer or the local water Quartz Electric shower with adjustable
Quartz Electric is supplied with a 2 year guarantee. Quartz Electric shower with adjustable
Failure to do so could cause the PRD to operate and will authority
authoritytotocheck
checkthat
thatthe
therunning
runningpressure
pressureisisabove
above height head in white/chrome
7.7. Connect
Connectaapressure
pressuretesting
testingdevice
devicetotothe
theadaptor
adaptor(not
(notsupplied).
supplied). height head in Graphite/chrome
The use of other services connected to the water
invalidate supply to the shower unit may cause
the guarantee.
If you have any questions at any stage during installation please contact the Aqualisa customer helpline on the
the minimum requirement (see Pressuressection
minimum requirement (see Pressures section
01959 560010 for advice. the water pressure to drop below the minimum required. This should therefore be overleaf).
overleaf).This
Thismay
maybebeapparent
apparentduring
duringperiods
periodsofof 8.8. Ensuring
Ensuringthe
theelectrical
electricalsupply
supplyremains
remainsisolated,
isolated,turn
turnon
onthe
thewater
watersupply
supplytotothe
theshower.
shower.
The shower unit must be sited over a bath or shower tray

Shower rating @ 240V 8.5kW 9.5kW 10.5kW


taken into consideration. as in the event of the PRD operating, water will drain high demand or when other outlets are
high demand or when other outlets are used. used.
9.9. Push
Pushthe
thesolenoid
solenoidpiston
pistonup
upuntil
untilwater
waterruns
runsthrough
throughtotothe
theshower
showerunit.
unit. Components
Components
from the bottom of the shower unit. Customer helpline
Customer helpline
Nominal current @ 240V 35.4A 39.6A 43.8A Pressure relief device (PRD) Spray
Sprayplate
plateblocked
blocked Clean
Cleanthe
thehandset
handsetspray
sprayplate.
plate. 10.
10.Check
Checkthe
thereading
readingon
onthe
thepressure
pressuretesting
testingdevice
deviceisiswithin
withinthe
theminimum
minimumand
andmaximum
maximumrequirements
requirements
MCB rating 40A 40A 45/50A To meet European standards, theInspection & maintenance
shower unit features an integral pressure relief 01959
01959560010
560010 with
withscale
scaleorordebris.
debris. stated
statedabove.
above.
device (PRD). The PRD provides aIn the interests
degree of showerof safety, we recommend
unit protection theexcessive
should an Quartz Got a query? Need a stockist? Our helpline is open
Cartridge fuse 40/45A 40/45A 45A Got a query? Need a stockist? Our helpline is 11.
Electric and its electrical installation are checked by a from 8.00am to 5.30pm Mondays to Thursdays Water
Waterpressure
pressuretoo
toolow.
low. Check
Checkwith
withthe
theinstaller
installerororlocal waterauthority
localwater authority 11.Isolate
Isolatethe
thewater
watersupply
supplytotothe
theshower.
shower.
build up of pressure occur within the shower. open from 8.30am to 5.00pm Monday to Friday
Min cable Max cable Min cable Max cable Min cable Max cable qualified electrician at least every 2 years.
The
TheWaste
WasteElectrical
Electricaland
andElectronic
ElectronicEquipment
Equipment(Producer
(ProducerResponsibility)
Responsibility)Regulation
Regulation2004
2004 size mm2 run in m size mm2 run in m size mm2 run in m and 8.00am to 5.00pm on Fridays to answer any 12.
12.Detach
Detachthe
thepressure
pressuretest
testdevice
deviceand
andremove
removethe
theadaptor.
adaptor.
DO NOT operate the shower with a damaged or kinked hose or blocked shower head, to answer any questions, guide you through any
questions, guide you through any aspect of your Water
Waterruns
runsfrom
from Pressure
Pressurerelief
reliefdevice
device Turn
Turnoff
offelectrical
electricalisolating
isolatingswitch
switchand
andwater
waterservicing
servicing
This
Thisproduct
productisisoutside
outsidethe
thescope
scopeofofthe
theEuropean
EuropeanWaste
WasteElectrical
Electricaland
andElectronic
ElectronicEquipment
EquipmentDirective
Directiveasasinterpreted
interpretedwithin
withinthe
theUK.
UK. Cleaning the filter should only be completed by a aspect of your shower installation or advise you
Installed in as this can cause the PRD to operate. Failure to follow this instruction will invalidate around
aroundhose
hose (PRD)
(PRD) hasoperated
has operated valve
valve and contact our Customer servicesdepartment.
and contact our Customer services department.
InInthe
10 61 10 55 10 50 qualified person. Please refer to the instructions opposite shower installation or advise you of your local 13.
13.Refit
Refitthe
thefilter
filterassembly
assemblyand
andsecure
secureusing
usingthe
thefixings.
fixings.
theUK
UKthis
thisproduct
productcan
cantherefore
thereforebe
bedisposed
disposedofofthrough
throughcommercial
commercialnon-WEEE
non-WEEEwaste
wastefacilities.
facilities. insulated wall of your local stockist.
Type the product guarantee. due
duetotoexcess
excesspressure
pressure
The
Theoriginal
originalmanufacturer
manufacturerdoes
doesnot
notaccept
acceptany
anyliability
liabilityunder
underthe
theWEEE
WEEEdirective
directivewithin
withinthe
theUK.
UK. of how to clean the filter. stockist.
of
cable Conduit or trunking
6 37 10 55 10 50 build up.
build up. 14.
14.Refit
Refitthe
thepressure
pressuretest adaptorinto
testadaptor intothe
thefixing
fixingposition
positionwithin
withinthe
thefront
frontcover.
cover.
InInother
otherEU
EUcountries
countriesthe
theWEEE
WEEEdirective
directivemay
mayapply
applyand,
and,atatend
endofoflife,
life,product
productmust
mustbe
bedisposed
disposed The shower will only function correctly with the hose and handset provided Product literature
run
CablesClipped
which are chased into the wall must be protected by the use of conduit or
direct After installation Product literature Ensure
Ensurehose
hosewasher
washerisisfitted
fittedand
andhose
hoseisisconnected
connected
0800652
6523669
3669
ofofatataasuitable
suitableWEEE
WEEErecycling
recyclingcentre
centre
(see shower head installation instructions overleaf). Failure to do so may result in the Hose
Hoseincorrectly
incorrectlyfitted.
fitted. 15.
15.Reassemble
Reassemblethe
theunit
unitininreverse
reverseofofthe
theabove
aboveprocedure
procedureand
andturn
turnon
onthe
thewater
waterand
andelectrical
electricalsupplies
suppliestoto
or buried in 6 37 6 33 10 50
sheathing. Surface mounted cables must also be protected by a suitable approved
uninsulated wall
conduit.
Familiarise the end user with the Quartz Electric operation
operation of the PRD and will invalidate the product guarantee.
and hand them this guide. 0800
Call our literature hotline to receive the latest
Water
correctly
correctlyand

Check
Checkinlet
andtightly
tightly

inletrequirements
requirements––see
seePressures
Pressuressection,
section,and
the
theshower
showerunit.
unit.

Call our literature hotline to receive the latest Waterpressure


pressuretoto and
Please fully commission the shower prior to use following the shower commissioning Aqualisa product brochure containing details of
Complete and post the Quartz Electric guarantee card shower
showerisislow
loworor ensure
ensureno
noother
othermain
mainwater
waterdevices
devicesare
arebeing
beingused
usedwhile
while
Before removing the shower heater cover, ensure the heater is isolated from the procedure detailed overleaf. Failure to do so could cause the PRD to operate and will Aqualisa product brochure containing details of
and optional guarantee extension agreement document. our full range of domestic products. Commercial showering
unstable
unstable showering
electric mains. our full range of domestic products. Commercial
invalidate the product guarantee. product brochures are also available on request.
product brochures are also available on request.
Please
Pleaseplace
placeproduct
productserial
serial This appliance is not intended for use by persons (including children) with reduced Declaration of Conformity
The shower unit must be sited over a bath or shower tray as in the event of the PRD Website Thermal
Thermalcut-out
cut-outisis Increase
Increasethe
theflow
flowbybyturning
turningthe
thewater
watercontrol
controlknob
knobinin
Aqualisa
AqualisaProducts
ProductsLimited
Limited number
numberlabel
labelhere.
here. physical, sensory or mental capabilities or lack of experience and knowledge unless Aqualisa Products Limited declares that the Quartz Website operating,
operating,normally
normally the
thecold
coldtemperature
temperaturedirection
direction(anticlockwise).
(anticlockwise).Clean
Cleanthe
the
The
TheFlyer’s
Flyer’sWay
Westerham
Way
Westerham Kent
Kent TN16
TN161DE
1DE
they have been given initial supervision or instruction concerning the use of the
operating, water will drain from the bottom of the shower unit.
electric shower, complies with the essential requirements
and other relevant provisions of the Low Voltage Directive
www.aqualisa.co.uk
www.aqualisa.co.uk making
makingaa‘click’
‘click’sound
sound handset
handsetand
andspray
sprayplate.
plate.
Visit our website for comprehensive product
appliance by a person responsible for their safety. Inspection & maintenance (2014/35/EU) and the EMC Directive (2014/30/EU). Visit our website for comprehensive product Poor
Customer
Customerhelpline:
helpline:01959
01959560010
560010 information, details of your nearest stockist and Poorspray
spray Scald
Scaldprotection
protectiondevice
device Increase
Increasethe
theflow byturning
flowby turningthethewater
watercontrol
controlknob
knobinin
Children should be supervised to ensure that they do not play with the appliance. In the interests of safety, we recommend the Quartz Electric and its electrical
Brochure information, details of your nearest stockist and pattern
pattern has
hasactivated the cold temperature direction (anticlockwise). Clean
BrochureHotline:
Hotline:0800
0800652
6523669
3669 installers, technical advice and more. activated the cold temperature direction (anticlockwise). Clean
Website:
Website:www.aqualisa.co.uk
www.aqualisa.co.uk Quartz Electric is suitable for household use only. installation are checked by a qualified electrician at least every 2 years. installers, technical advice and more. the
thehandset
handsetandandspray
sprayplate.
plate.
Cables which are chased into the wall must be protected by the use of conduit or sheathing. Surface mounted cables
Email:
Email:enquiries@aqualisa.co.uk
enquiries@aqualisa.co.uk Republic of Ireland
must also be protected by a suitable approved conduit. Cleaning the filter should only be completed by a qualified person. Please refer to the Republic of Ireland
Republic
RepublicofofIreland
Ireland Flushing instructions opposite of how to clean the filter.
Before removing the shower heater cover, ensure the heater is isolated from the electric mains.
Our products are also available in the Republic
Our products are also available in the Republic
Multi
Multipattern
patternhandset
handset Adjust
Adjustspray
sprayplate
platetotoimprove
improvepattern
pattern
Some modern fluxes can be extremely corrosive and, if left in contact, will attack of Ireland. If you need any technical advice, incorrectly
incorrectlyset
set
Sales
Salesenquiries:
enquiries:01-864-3363
01-864-3363
Quartz Electric is suitable for household use only. of Ireland. If you need any technical advice,
Service
Serviceenquiries:
enquiries:01-844-3212
01-844-3212 details of local stockists or have any other queries, Low
Lowwater
waterinlet
inlet Flow
Flowrate
ratewill
willnaturally
naturallybe
belower
lowerwhen
whenthetheinlet
inlet
Part
Part No:438301
No:438301 Issue
Issue 205
Oct 07
Nov18
the working parts of this unit. All soldering must be completed and the pipe work After installation details of local stockists or have any other queries,
please phone: temperature temperature
thoroughly flushed out in accordance with current Water Supply Regulations prior to temperature temperatureisislow,
low,this
thisapplies
appliestotoall
allelectric
electricshowers
showers
Flushing Familiarise the end user with the Quartz Electric operation and hand them this guide. please phone:
Please
Pleasenote
notethat
thatcalls
callsmay
maybe
berecorded
recordedfor
fortraining
trainingand
andquality
qualitypurposes
purposes
connection
Some modern offluxes
the product.
can be extremely corrosive and, if left in contact, will attack the working parts of this unit. Sales enquiries: 01-864-3363
Complete and post the Quartz Electric guarantee card and optional guarantee Sales enquiries:
Service 01-864-3363
enquiries: 01-844-3212 Low
Lowvoltage
voltage Consult
Consultelectrician
electrician
Literature
The
Thecompany
companyreserves
reservesthe
theright
righttotoalter,
alter,change
changeorormodify
modifythe
theproduct
productspecifications
specificationswithout
withoutprior
priorwarning
warning All soldering must be completed and the pipe work thoroughly flushed out in accordance with current Water Supply Literaturenot
notshown.
shown.
®®Registered
RegisteredTrademark
TrademarkAqualisa
AqualisaProducts
ProductsLimited
Limited Regulations prior to connection of the product.
extension agreement document. Service enquiries: 01-844-3212
Quartz
®

Electric
Pipe work installation Electrical installation 4 Check that the consumer unit (main fuse box):
A has a main switch rating of 80A or above and B has a spare fuse way which will
3 Unclip the earth terminal block and reposition it into the holder on the
service tunnel.
4 Fit the rail into the rail end bodies taking care
to engage the location slot onto the lugs.
1 Without fitting the shower head, fit the hose
washer into the hose and attach to the
10 Slowly turn the flow control knob towards the hot direction. The heater
elements should now be hotter and the temperature of the spray should
take the fuse/mcb (miniature circuit breaker) you need to fit. shower outlet to allow the water to discharge increase.
If so you can wire the shower direct to the consumer unit (please refer to the safely to waste.

! In addition to the guide below it is essential that the written instructions


overleaf are read and understood and that you have all the necessary ! BEFORE ANY ELECTRICAL CONNECTION IS ATTEMPTED, THE ELECTRICITY
SUPPLY MUST BE TURNED OFF AT THE MAIN SWITCH. FAILURE TO DO SO
typical system diagram below).
(Not all consumer units accept a 35/40/45A sized fuse).
components (shown overleaf) before commencing installation. Failure to
install the product in accordance with these instructions may adversely affect
COULD RESULT IN ELECTROCUTION.

The electrical installation should be carried out by a qualified person in


11 Adjust the flow control knob to provide the desired temperature. Allow a few
seconds after each adjustment for the temperature to stabilise. A cool shower
the warranty terms and conditions. Do not undertake any part of this
accordance with IEE (Institution of Electrical Engineers) wiring regulations can be achieved with the flow control knob set towards the cold direction.
installation unless you are qualified to do so. Prior to starting, ensure that
you are familiar with the necessary plumbing and electrical regulations and
legislation required to install the product correctly and safely.
(BS 7671).

THIS APPLIANCE MUST BE EARTHED.


5 If the consumer unit has a rating below 80A or if there is no spare fuse way,
then the installation will not be straightforward. It may be necessary to install 5 Secure the rail assembly to wall using the fixings provided, if suitable,
ensuring the rail and rail end bodies remain firmly engaged. 2 Ensuring the electric supply remains isolated
The temperature achieved will depend on the incoming water temperature
and pressure.
turn on the water supplies. Push the solenoid
a new consumer unit to service the whole house or just the shower. This
The Quartz Electric is supplied with universal fittings intended to secure the
unit to a suitable wall.
IN THE INTERESTS OF ELECTRICAL SAFETY, A 30mA RESIDUAL CURRENT
DEVICE (RCD) MUST BE INSTALLED IN ALL UK 230-240V ELECTRIC
should be installed by a qualified person. It may be necessary to contact the 4 Any cable MUST NOT have the outer insulation stripped back beyond the
bottom of back plate or service tunnel (if used) and must be protected from
piston up until water runs through and out of
the hose for a few seconds before releasing

12
SHOWERS AND PUMPED CIRCUITS. THIS MAY BE PART OF A CONSUMER electricity supplier to upgrade the incoming supply. When the unit is fully commissioned please remove the red warning label
Aqualisa reserves the right to revoke the terms of the warranty should access water as shown. the piston.

6
UNIT OR A SEPERATE UNIT. from the front of the shower casing.
to service connections be denied by the use of solid setting infill material. Place the rail end caps into the rail ends and
A suitably rated double-pole isolating switch for supply disconnection must push firmly into position.
be incorporated in the fixed wiring circuit in accordance with current wiring
RCD (can be part of consumer unit)
rules. This must have a mechanical indicator showing when the switch is in

1 Carefully remove the red outlet plug assembly. the OFF position. A neon lamp alone is not sufficient. (See the electrical
rating chart for minimum switch rating). If it is fitted in the bathroom it must
Recommended
80A or 100A
mains switch 3 Attach the hose to the shower handset as detailed above after passing it
User Instructions
be the cord-operated type. The switch must be readily accessible and clearly through the hose restraint/gel hanger (if required) and place in the handset
identifiable in zone 3, i.e. at 0.6metres horizontally from the shower cubicle or holder in a position where it can spray safely. Push the solenoid piston up until To turn on and set the temperature
Double pole isolating
edge of the bath, or located above zone 2 (i.e. adjacent to the shower cubicle switch - pull cord water sprays through the handset for a few seconds before releasing the 1 Turn on the isolating switch.
or bath, but at least 2.25metres from the floor) as detailed below. This or wall mounted in piston. 2 Press the start/stop button, the blue light ring should
Please complete the commissioning procedure detailed below prior to connecting the
requirement does not apply to the pull cord from the switch. accordance with
handset and hose. illuminate.
BS7671
Where shower cubicles are located in rooms other than bathrooms, any 3 Rotate the control knob to give the desired temperature;

2 Remove the securing screws at the top and bottom socket outlet in the room must be situated at least 3 metres from the shower
Shower unit Earth bonding
7 Ensuring the hose washers are in the correct
clockwise for warmer and anticlockwise for cooler. Allow a

4
of the Quartz Electric front casing and carefully lift cubicle and protected by 30mA RCD. few seconds after each adjustment for the temperature to
Turn the flow control valve on the shower
the casing away from the back plate assembly. position, depress the anti-swivel locking
unit to the full cold (6 o’clock position). Turn stabilise.
Carefully detach the solenoid connector and pull button on the handset and secure the

the front casing clear. ! The installation must be earth bonded in accordance with current regulations

Where earth bonding of the premises is not evident, it may be necessary to


handset to the hose. Place the handset
into the handset holder.
the flow control lever on the front casing to
the full cold position (9 o’clock). The flow
! WARNING: ALWAYS CHECK THE SHOWERING
TEMPERATURE BEFORE STEPPING INTO THE SHOWER.
Switch must run bonding cable back to the earth terminal at the consumer unit. control valve and lever are keyed and must
IT WILL TAKE APPROXIMATELY 20 SECONDS TO REACH A STABLE TEMPERATURE.
be outside be correctly positioned in order for the cover
Switch must Zone 2

3 Carefully unscrew and remove the service Zone 2


be outside to fit. To turn the shower off
Zone 2
tunnel and set aside. (This may be required if Zone 2
retrofitting this shower to an existing shower Zone 1
Electrical rating ! THE TENSION OF THE HANDSET STATION OF THE
1 Press the start/stop button.

site). Zone 1
Zone 1 Zone 2 2.25m Shower head installation HANDSET HOLDER IS FACTORY SET. HOWEVER, IT
2 Turn off your isolating switch.

5
Zone 2 Zone 3 MAY BE NECESSARY, TO TIGHTEN THE TENSION AS Hold the cover next to the shower unit on N.B. The phased shutdown feature of this shower requires the shower to run on for
Zone 1 2.25m Zone 2 Zone 0 Refer to the electrical rating diagram (shown overleaf) to determine the nominal current
Zone 2 REQUIRED. TIGHTEN THE SCREW INSIDE THE the wall and carefully attach the two sole- a few seconds after the shower is turned off. This is a safety feature which flushes
of the shower. The current rating of the supply cable must be at least that of the shower The shower head should be sited close to the shower unit, not necessarily on the same
Zone 0 Zone 3
Zone 2
HANDSET STATION TAKING CARE NOT TO noid connectors. Place the solenoid connec- any residual hot water out of the shower unit to protect the next user.
itself. Use the rating chart to choose a fuse or mcb with a rating of less than that of wall, but not so that the unit is subjected to continuous spray. The shower head should
Zone 2
OVER-TIGHTEN. tor block into the saddle within the shower
4 Tape the template provided onto the finished wall
surface in the desired position and mark the 3 fixing 0.6m 0.6m
your chosen cable.

! WE STRONGLY RECOMMEND NOT USING REWIRABLE FUSES.


be sited so that it is no more than 610mm (2ft) above the bottom of the unit or no lower
than 305mm (1ft) below the unit, when in its normal position in the shower head holder.
unit and neatly tuck the wires into the
Shower head operation

! NEVER ATTEMPT TO MAKE ANY ADJUSTMENT TO THE


0.6m 0.6m recess provide.
points. Drill and prepare the fixings holes using the The current rating will be reduced if the cable is to be: SHOWER HEAD BY PULLING ON THE SHOWER HOSE.
! THE SHOWER OUTLET, HOSE AND HANDSET ACT AS A VENT. THEY MUST NOT BE
fixing kit provided, if suitable.
A. Bunched with others BLOCKED, OBSTRUCTED OR HAVE CONNECTED TO THEM ANY FITTING NOT
B. In an ambient temperature above 40ºC APPROVED BY US. THE USE OF UNAPPROVED ACCESSORIES MAY INVALIDATE THE
Front cover preparation 1 To select the preferred height for the shower head, depress

Mains voltage connection C. In an insulating wall or within thermal insulation, e.g. loft insulation.
D. In any other unusual position
GUARANTEE AND MAY AFFECT THE PERFORMANCE AND SAFETY OF THE UNIT.
When the pipe work and electrical connections have been completed the front cover can
6 With the self tapping screws partially fitted
to the fixing locations in the front casing,
the handset holder button fully to enable the slider to be
moved up or down the rail.

5
carefully offer it onto the back plate
1
If using top or bottom entry pipe work connection, fix the unit to the wall be prepared to be fitted prior to beginning the commissioning procedure.
If in doubt about any aspect of electrical installation, consult a qualified electrical Prepare two fixing points 465 – 470mm vertically apart using the fixings
using the screws provided, if suitable. assembly ensuring the wires are not

!
provided, if suitable.
1
Please refer to the typical system diagram opposite. engineer or the electricity supplier. Remove the relevant pipe work and cable trapped. The control knob, in the fully cold
The following notes are for guidance only – the installation must comply with entry point from the relevant section of the position, may have to be slightly adjusted 2 Angular adjustment is made by carefully but firmly pulling
current regulations. front cover if required, using a suitable tool. to enable the keyways to align. forwards or pushing back the shower head against the

6 Flush through the water supply pipe allowing it to discharge safely to


Wiring installation
We recommend making good the cut out knuckle in the holder.
waste.
2 Pass the rail through the handset holder
whilst keeping the slider button depressed.
section using a round file. Ensure the cover
fits over cables and pipe correctly.

1 The shower unit must only be connected to a 230-240V ac supply.


7 Secure the front cover to the base plate

1 For most installations the removable service using the 3 fixing screws taking care not to

7 Pipe work connection must be made using a 15mm


compression elbow for top, bottom or rear entry (not
tunnel will not be required, enabling the
earth connection to be made in the top right 2 Fix the self tapping screws a couple of turns
overtighten. 3 To select the desired spray pattern rotate the shower spray
plate clockwise or anti-clockwise.
supplied). A copper olive is supplied located on the into the fixing points at the top and bottom
hand corner of the unit as illustrated.

2
shower inlet stub and should be fitted into the Before making electrical connections within the installation make sure that no of the unit to aid locating the fixing points
when securing the front casing to the back
!
compression elbow prior to the elbow being connected. terminal is live. If in doubt, switch off the whole installation at the consumer If retro-fitting the unit to an existing shower

! Rear entry
The wall must be sufficiently chased out around the pipe and cable to allow
unit or switch fuse (where fitted). where the wiring cannot be connected as
above, it may be necessary to utilise the
3 To comply with current water supply regulations,
the handset should not be able to pass a point
plate.

room for the nut on the compression elbow to be recessed into the wall. The service tunnel and alternative earth
25mm above the spill over level of the bath or
tray. If this is not achieved, then the hose
8 Turn the flow control knob to ensure it moves smoothly. If not, the knob may
be fitted incorrectly. The shower should be commissioned with the knob in
pipe work must be connected to the elbow prior to fitting the shower unit to
the wall. 3 The shower unit must be connected to its own independent electrical circuit. It
MUST NOT be connected to a ring main, spur, socket outlet or lighting circuit,
connection position.
restraint/gel hanger must be used Slide this the mid position (12 o’clock).

otherwise the circuit will overheat..


onto the rail under the handset holder. Front cover installation and shower commissioning

8 Turn on the water supply to the shower unit and check for leaks up stream of 2 Replace the service tunnel and secure using the fixing screw provided.

the shower unit. If all is sound turn off the water supply to the shower unit.
! This shower must be fully commissioned following the procedure detailed 9 Turn on the electrical isolation switch. Press the start stop button and ensure

!
the blue light surround illuminates.
If required, ensure the water pressure to the shower unit is within the below before use. Failure to do so could damage the shower and invalidate
minimum and maximum requirements by following the pressure testing the guarantee.
procedure overleaf.

Potrebbero piacerti anche