200 1500 500 CARRIAGE WAY 11000 500 1500 200 LIST OF STANDARD NOTES FOR GAD OF RUB/SUBWAYS
FOOTPATH FOOTPATH
12000 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS WRITTEN OTHERWISE.
RAILING 2. NO DIMENSIONS SHALL BE SCALED FROM THIS. DRAWING ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED.
R.C.C CRASH 3. EXISTING TRACK SHOWN IN BLACK.
12000 11000
BARRIER M:40 4. PROPOSED WORK SHOWN IN RED, ASSETS BEING DISMANTLED SHOWN IN GREEN AND FUTURE
WORKS/TRACKS SHOWN IN ORANGE.
11000 22.418 R.C.C CRASH BARRIER COMPOSITE 5. PROPOSED ROAD OVER BRIDGE (RAILWAY PORTION) SHOWN IN RED, AND R&B PORTION SHOWN IN
GIRDER MAGENTA IN SITE PLAN.
26.418 P.S.C T BEAM DECK SLAB 6. EXISTING RAILWAY LAND BOUNDARY SHOWN IN GREEN AND LEVEL CROSSING SHOWN IN BLUE.
BEARING 7. ACTUAL LOCATION OF ROB SHALL BE DECIDED BY RLY. ENGINEER-IN-CHARGE, IN CONSULTATION WITH ROAD
IN DMC M:45 AUTHORITIES AT THIS TIME OF ITS CONSTRUCTION.
2500 2500 2500 2500 2500 PIER CAP
IN M:30 8. ACTUAL DEPTH OF FOUNDATION SHALL BE DECIDED BY ENGINEER-IN-CHARGE TO SUIT THE SOIL STRATA MET
ELASTOMERIC BEARING WITH AT THE SITE.
1650 1650 9. VERTICAL CLEARANCE FROM HIGHEST RAIL LEVEL TO BOTTOM OF GIRDER SHALL BE NOT LESS THAN 6.525
ABUTMENT TOP 7600
METERS FROM A.C. TRACTION AREA AND 8.325 IN CASE OF DFC/FEEDER/DOUBLE STACK CONTAINER ROUTE.
2650 2650 2650
10. GUARD RAIL SHALL BE PROVIDED AS PER STANDARD DRAWING.
R.C.C ABUTMENT CAP 11. SHAPES AND SIZE OF GIRDERS, POT-PTFE BEARINGS PEDESTALS, SHOWN IN THE DRAWING ARE TENTATIVE
PIER TOP
10750 IN DMC M:35 AND ARE SUBJECT TO CHARGE IN FINAL DESIGN & DRAWINGS.
R.C.C ABUTMENT 12. SHAPES AND DIMENSIONS OF ABUTMENTS, PIERS, PIER CAP, PIER SHAFT SHOWN IN THE DRAWINGS ARE
12000 TENTATIVE AND ARE SUBJECT TO CHARGE IN FINAL DESIGN & DRAWINGS.
IN DMC M:30 13. WEEP HOLES SHALL BE PROVIDED IN ABUTMENT AND RETURN WALLS.
0.925
14. ANTI CRASH BARRIER SHALL BE PROVIDED AS PER MOST STD.
R.C.C PIER 15. ONLY CONTROLLED CEMENT CONCRETE MIX IS TO BE PROVIDED GRADE OF CONCRETE FOR MASS CONCRETE
G.L 18.750 IN M:30 AND RCC WORK SHALL NOT BE LEANER THAN M-20 AND M-25 RESPECTIVELY.
R.L 18.25 16. WEARING COAT OF THICKNESS 130mm PROVIDED ROAD SURFACE BE MAINTAINED BY ROAD AUTHORITY.
17. PILE FOUNDATION HAS BEEN DECIDED BY CE-INCHARGE OF THE WORK CONSIDERING ALL ASPECTS
7400 MENTIONED IN CAO(C)'S LETTER NO. (AOG) DEN-208 -YOL-11 DATED 11.08.2014.
R.C.C PILE CAP
18. EXCAVATION OF ROB WORK SHALL BE DONE ONLY IN PRESENCE OF AUTHORIZED RAILWAY REPRESENTATIVE
12300 IN DMC M:35 TO ENSURE THE SAFETY OF RUNNING TRAIN PROPER PRECAUTION SHALL BE TAKEN DURING EXCAVATION OF
R.L 16.450
OPEN FOUNDATION NEAR THE TRACK PROPER SHORING SHALL BE DONE TO PROTECT SLOPE FAILURE OF
3600 3600 3600 R.C.C PILE SOIL.
CAP IN M:30 19. ADDITIONAL LOAD TRANSFERRED FROM FUTURE TRACK SHALL BE CONSIDERED WHILE DESIGNING OPEN
6 MM M.S. STEEL LINER 4MT DEPTH FOUNDATION ON EITHER SIDE.
22000
700 3000 3000 20. IN ORDER TO OFFER ADEQUATE RESISTANCE AGAINST CORROSION, THE REINFORCEMENT BARS SHALL BE
R.C.C. 1.20 M DIA PROVIDED WITH SUITABLE PROTECTIVE COATING DEPENDING UPON THE ENVIRONMENT CONDITION AS PER
8700 BORED CAST IN SITU PARA 7.1.5 OF CONCRETE BRIDGE CODE CORRECTION SL.NO.2DT.26.04.2000.
21. OFFICE FOR RAILWAY ENGINEERS AT SITE OR AT NEAR BY LOCATION DECIDED BY THE RAILWAY SHALL BE
0.15
PILE IN DMC M:35 PROVIDED BY SPONSORING ROAD AUTHORITY AND MAINTAINED DURING THE PERIOD OF CONSTRUCTION
R.C.C BORED CAST
3600 3600 0.75
OF THE PROJECT.
IN SITU PILE 1200
mm DIA IN M:35 22. DRAWING AND DESIGN OF ROB SHALL BE PROOF CHECKED BY IIT/NIIT .
23. LONG DURABILITY ANTI-CORROSIVE PROTECTION SHOULD BE APPLIED TO THE STEEL STRUCTURE.
24. INSPECTION LADDER AND PLATFORM FOR INSPECTION OF BEARING SHOULD BE PROVIDED AT EVERY PIER.
CROSS SECTION OF PIER OF RAILWAY PORTION 25. ALL TECHNICAL RECORD I.E. CUBE STRENGTH, PRESTRESSING DETAILS ETC SHALL BE HANDED OVER TO
RAILWAY ENGINEER IN CHARGE.
TYPICAL CROSS SECTION OF ABUTMENT 26. BEFORE OPENING OF ROB COMPLETION DRAWING AND COMPLETE COST OF ROB IN HARD COPY AND SOFT
RP1 RP2 RP3 RP4 RP5
VP1 COPY DULY APPROVAL OF ROAD AUTHORITY SHALL BE HANDED OVER OF RAILWAY ENGINEERING CHARGE.
VP2
24922 37081 18877 18898 20000
VP3
DP1 20000
VP4 27. BEFORE OPENING OF ROB (WITHIN RAILWAY PORTION) FOR ROAD TRAFFIC,APPROVAL OF RAILWAY
20000
VP5
DP2 VP6 END
DP3 20000 20000
20000
VP7
VP8 ENGINEER IN CHARGE IS TO BE OBTAINED BY ROAD AUTHORITY.
DP4 20000 20000 VP9
DP5 20000 20000
20000 120000 28. GRADE OF CONCRETE
DP6 20000 20000
DP7 20000 - RCC ABUTMENT M-30
DP8 20000
DP9 20000 - RCC PIER M-30
DP10 20000
TYPICAL CROSS SECTION OF PIER (VP1) DP11 20000 - RCC CRASH BARRIER M-40
20000
20000 - RCC DECK SLAB M-35
- BEARING PEDESTALS M-40
29. STOPPER SHOULD BE PROVIDED AT END ON THE TOP OF PIER/ABUTMENT CAP TO REDUCE POSSIBILITIES OF
TOPING OF GIRDER DURING LAUNCHING OF GIRDER.
12000
30. CRS SANCTION SHALL BE OBTAINED BEFORE COMMENCEMENT OF WORK.
7000
220000
31.
12000
COMBINATION.FOOTHPATH LOADING SHALL BE CONSIDERED AS PER IRC6.
7000
END
32. AS PER RAILWAY BOARD LETTER NO.2007/RE/161/5-FTS-774 DATED 12.10.2011 TRACK LEVEL SHOULD BE
FROZEN.
33. THIS COST OF MEDIATION OF THE OHE TO BE CHARGEABLE TO ESTIMATE.
34. DIMENSIONS OF ALL STRUCTURAL MEMBER i.e. PILE, PILE CAP, PIER, ABUTMENT, PIER CAP ETC. SHOWN ARE
TENTATIVE AND APPROVED BY RAILWAY.
35. STRUCTURAL STEEL OF COMPOSITE GIRDER CONFIRM TO IS:2062-2006 E 250 BO OTHERWISE SPECIFIED IN
DESIGN.
36. FOR STEEL COMPOSITE GIRDER REFER DRG.NO.RDSO/D-11756/R,B-11757/R B-11755/R DULY MODIFIED FOR
7000
39. THE QAP BEARING AS PER RDSO FORM AT (CIRCULATED BY RDSO VIDE LETTER NO.CBS/PBEJ/REG DATED
16.05.2014) SHALL BE ENSURED BY INSPECTING ENGINEER.
40. CONCERN LETTER FROM DISTRICT COLLECTOR BHARUCH FOR CLOSING OF LEVEL CROSSING NO.173 HAS BEEN
OBTAINED VIDE LETTERS DATE-9-4-2015.
41. LEVEL CROSSING WILL BE CLOSED PERMANENTLY OR ROAD TRAFFIC AFTER COMMISSIONING OF PRP. ROAD
OVER BRIDGE.
42. FOR LAUNCHING OF COMPOSITE GIRDER OVER THE EXISTING TRACK REFER SEPARATE DRAWING SUBMITTED
BY TENDERER PARTY AND DULY APPROVED BY RAILWAY BLOCK SHALL BE IMPOSED DURING.
43. WORK SHOULD BE CARRIED OUT BY THE PARTY UNDER THE SUPERVISION OF RLY. ENGINEER WITHIN RLY.
LAND LIMIT.
44. SEPARATE ENGINEERING PLAN IS TO BE PREPARED FOR CLOSING OF LEVEL CROSSING NO.173.
45. STORM WATER DRAIN TO BE PROVIDED UP TO GROUND LEVEL.
46. EPOXY PAINT ON PIERS & ABUTMENTS.
47. SUITABLE S.R. TO BE IMPOSED ON EXISTING B.G.MAIN LINE WHILE CASTING HER IF REQUIRED.
48. THE CABLE LAID PARALLEL TO THE TRACK SHALL NORMALLY BE BURIED AT A DEPTH OF 0.80 METERS FROM
GROUND LEVEL WITH WHILE THOSE LAID ACROSS THE TRACK MUST BE 1.0 METER BELOW THE RAIL PLAN GES
BEFORE CUTTING THE WORKS WRITTEN INFORMATION WILL BE GIVEN TO CONCERN 55E(5IG)& 53E (TELE)
ALL PRECAUTIONS TO BE TAKEN WHILE CARING OUT THE WORKS .
49. AS PER RLY BOARDS LETTER NO.2003/TELE/RCIL/1/PARS IX OT 4.5 2007 CIRCULATED BY CSTE CCG V-1-DE
LETTER NO SG/245/7 FLAT PENALTY OF R9 ONE LAKH WILL BE IMPOSED AND WILL BE LOGGED AS PER RPF
ACT IF CABLE DAMAGED.
50. INSPECTION LADDER WILL BE PROVIDED ON EACH PIER.
51. DURING THE CONSTRUCTION OF ROB TRACK WILL BE PROTECTED SUITABLY IMPOSING SUITABLE SR.
52. ONE MAST NO. 318/7 AND 318/8 ARE INFRINGING HENCE NECESSARY ONE MODIFICATION IS INVOLVED FOR
WHICH TRD ESTIMATE IS REQUIRED
53. EXISTING S&T CABLE SHOULD MARKED ON O.T. AFTER JOINT SITE SURVEY.
RP1 RP2 RP3 RP4 RP5
54. THE GAD HAS BEEN PROPOSED WITH STILTED APPROACHES INSTEAD OF REINFORCED EARTH WALL TYPE
APPROACHES MORE EVER ON ANKLESHWAR CITY SIDE TWO LEGS OF APPROACHES BEEN PROPOSED RLY.
SHALL SHARE COST OF ONE LEG EACH ON EITHER SIDE OF THE TRACKS.ADDITIONAL COST ON ACCOUNT OF
3RD LEG OF APPROACHES AND ON ACCOUNT OF PROVIDING STILT APPROACHES SHALL BE BORNE BY THE
STATE GOVT GAD IS BEING APPROVED WITH THIS STIPULATION.
55. BORE LOG DETAIL HAS BEEN PROVIDED BY STATE GOVT. AUTHORITY.
RAILWAY BOUNDARY
RAILWAY BOUNDARY
DFCC BOUNDARY
PROPOSED
EXISTING
EXISTING
L OF BRIDGE
GOVERNMENT OF GUJARAT
ROADS AND BUILDING DEPARTMENT
END TO DAMAN DP11 DP10 DP9 DP8 DP7 DP6 DP5 DP4 DP3 DP2 DP1 RP1 RP2 RP3 RP4 RP5 VP1 VP2 VP3 VP4 VP5 VP6 VP7 VP8 VP8 TO NH-8 END
DRG No.
839778 STK/LC-88/01
440000 99778 (RAILWAY PORTION) 300000
220000 20000 20000 20000 20000 20000 20000 20000 20000 20000 20000 20000 24922 37081 18877 18898 20000 20000 20000 20000 20000 20000 20000 20000 120000
40
30
20
GENERAL ARRANGEMENT DRAWING
10
G.L. G.L.
Datum: 00 DATE: SUPERINTENDING ENGINEER
15.940
21.440
21.940
22.440
22.940
23.440
23.940
24.440
24.940
25.440
25.940
26.440
26.932
26.932
26.932
26.932
26.932
26.418
25.918
25.418
24.918
24.418
23.918
23.418
22.918
19.418
22.418
260.000
240.000
220.000
200.000
180.000
160.000
140.000
120.000
100.000
100.000
120.000
140.000
160.000
180.000
200.000
220.000
360.000
240.000
40.323
60.880
59.455
80.000
60.000
80.000
Chainage
Of structure R0 EXECUTIVE ENGINEER
PANCHAYAT R& B DIVISION
VALSAD
20.096
20.207
20.086
20.137
20.305
15.883
15.636
15.583
15.753
15.861
15.932
15.780
15.836
16.176
15.913
15.942
15.926
16.925
16.285
16.323
16.281
16.260
16.380
16.464
16.326
16.350
16.416
16.451
16.618
16.656
16.950
16.850
17.125
17.462
17.832
18.021
18.043
17.906
18.094
18.298
18.162
18.429
18.739
18.703
18.623
18.750
19.377
19.753
Elevation
TYPICAL CROSS SECTION FOR CRUST DY. EXECUTIVE ENGINEER
PANCHAYAT (R& B) SUB DIVISION
PARDI