Availability #VALUE!
Reliability #VALUE!

SHUTDOWN HISTORY =F+G

SHUTDOWN SHUTDOWN SHUTDOWN


NO STATION PLANT UNIT DATE TIME DATE & TIME

1 PSGAS EXTRACTION FEED B 15-Jan-2016 8:00 1/15/16 8:00


2 PSGAS EXTRACTION FEED A 1-Mar-2016 8:00 3/1/16 8:00
3 PSGAS EXTRACTION COMMON C 11-Mar-2016 10:00 3/11/16 10:00
4 PSGAS EXTRACTION LEAN A 27-Mar-2016 8:00 3/27/16 8:00
5 PSGAS EXTRACTION LEAN B 11-Apr-2016 8:00 4/11/16 8:00
6 PSGAS EXTRACTION COMMON C 19-Apr-2016 20:00 4/19/16 20:00
7 PSGAS EXTRACTION COMMON C 21-Apr-2016 14:00 4/21/16 14:00
8 PSGAS EXTRACTION FEED B 9-May-2016 2:00 5/9/16 2:00
9 PSGAS EXTRACTION LEAN A 9-May-2016 2:00 5/9/16 2:00
10 PSGAS EXTRACTION LEAN B 9-May-2016 2:00 5/9/16 2:00
11 PSGAS EXTRACTION FEED B 28-May-2016 13:00 5/28/16 13:00
12 PSGAS EXTRACTION FEED A 28-May-2016 13:00 5/28/16 13:00
13 PSGAS EXTRACTION LEAN A 28-May-2016 13:00 5/28/16 13:00
14 PSGAS EXTRACTION LEAN B 28-May-2016 13:00 5/28/16 13:00
15 PSGAS EXTRACTION FEED B 5-Jun-2016 16:30 6/5/16 16:30
16 PSGAS EXTRACTION COMMON C 20-Jun-2016 22:00 6/20/16 22:00
17 PSGAS EXTRACTION FEED A 16-Jul-2016 10:00 7/16/16 10:00
18 PSGAS EXTRACTION FEED B 16-Jul-2016 10:00 7/16/16 10:00
19 PSGAS EXTRACTION LEAN A 16-Jul-2016 10:00 7/16/16 10:00
20 PSGAS EXTRACTION LEAN B 16-Jul-2016 10:00 7/16/16 10:00
21 PSGAS EXTRACTION LEAN B 2-Aug-2016 14:00 8/2/16 14:00
22 PSGAS EXTRACTION COMMON C 6-Aug-2016 8:00 8/6/16 8:00
23 PSGAS EXTRACTION FEED A 7-Aug-2016 0:00 8/7/16 0:00
24 PSGAS EXTRACTION FEED B 7-Aug-2016 0:00 8/7/16 0:00
25 PSGAS EXTRACTION LEAN A 7-Aug-2016 0:00 8/7/16 0:00
26 PSGAS EXTRACTION LEAN B 7-Aug-2016 0:00 8/7/16 0:00
27 PSGAS EXTRACTION FEED A 18-Aug-2016 11:30 8/18/16 11:30
28 PSGAS EXTRACTION FEED B 18-Aug-2016 11:30 8/18/16 11:30
29 PSGAS EXTRACTION LEAN A 18-Aug-2016 11:30 8/18/16 11:30
30 PSGAS EXTRACTION LEAN B 18-Aug-2016 11:30 8/18/16 11:30
31 PSGAS EXTRACTION LEAN B 29-Aug-2016 18:00 8/29/16 18:00
32 PSGAS EXTRACTION COMMON C 30-Aug-2016 17:30 8/30/16 17:30
33 PSGAS EXTRACTION FEED A 8-Sep-2016 8:00 9/8/16 8:00
34 PSGAS EXTRACTION FEED A 20-Sep-2016 0:00 9/20/16 0:00
35 PSGAS EXTRACTION COMMON C 20-Sep-2016 0:00 9/20/16 0:00
36 PSGAS EXTRACTION LEAN A 20-Sep-2016 0:00 9/20/16 0:00
37 PSGAS EXTRACTION LEAN B 20-Sep-2016 0:00 9/20/16 0:00

38 PSGAS EXTRACTION COMMON C 30-Sep-2016 17:30 9/30/16 17:30


39 PSGAS EXTRACTION COMMON C 1-Oct-2016 17:30 10/1/16 17:30
40 PSGAS EXTRACTION FEED B 26-Oct-2016 8:00 10/26/16 8:00
41 PSGAS EXTRACTION LEAN B 9-Nov-2016 8:00 11/9/16 8:00

42 PSGAS EXTRACTION COMMON C 21-Nov-2016 21:00 11/21/16 21:00

43 PSGAS EXTRACTION FEED A 28-Nov-2016 12:00 11/28/16 12:00


44 PSGAS EXTRACTION LEAN A 3-Dec-2016 8:00 12/3/16 8:00

← BARIS INI JANGAN DI ISI, DI INSERT ROW SAJA

DATA ENTRY JANUARY FEBRUARY

Planned S/D Unplanned S/D Planned S/D


NO STATION PLANT UNIT (Total Hours) (Total Hours) (Total Hours)

1 PSGAS EXTRACTION FEED A 0.00 0.00 0.00


2 PSGAS EXTRACTION FEED B 128.00 0.00 96.00
3 PSGAS EXTRACTION COMMON C 0.00 0.00 0.00
4 PSGAS EXTRACTION LEAN A 0.00 0.00 0.00
5 PSGAS EXTRACTION LEAN B 0.00 0.00 0.00
TOTAL DAYS AT MONTH : 31 28

DATA ENTRY JULY AUGUST

Planned S/D Unplanned S/D Planned S/D


NO STATION PLANT UNIT (Total Hours) (Total Hours) (Total Hours)

1 PSGAS EXTRACTION FEED A 0.00 4.00 0.00


2 PSGAS EXTRACTION FEED B 0.00 4.00 0.00
3 PSGAS EXTRACTION COMMON C 0.00 0.00 144.00
4 PSGAS EXTRACTION LEAN A 0.00 4.00 0.00
5 PSGAS EXTRACTION LEAN B 0.00 4.00 0.00
TOTAL DAYS AT MONTH : 31 31

RELIABILITY & AVAILABILITY


JANGAN MERUBAH FORMULA !!! DATA AKAN TERISI OTOMATIS
RELIABILITY & AVAILABILITY 2016 JANUARY FEBRUARY
NO STATION PLATFORM UNIT TAG NO AVAILABILITY RELIABILITY AVAILABILITY
1 ECHO EXTRACTION FEED A 100.00% 100.00% 100.00%
2 ECHO EXTRACTION FEED B 82.80% 100.00% 85.71%
3 ECHO EXTRACTION COMMON C 100.00% 100.00% 100.00%
4 ECHO EXTRACTION LEAN A 100.00% 100.00% 100.00%
5 ECHO EXTRACTION LEAN B 100.00% 100.00% 100.00%
AVERAGE 96.56% 100.00% 97.14%

RELIABILITY & AVAILABILITY 2016 JULY AUGUST


NO STATION PLATFORM UNIT TAG NO AVAILABILITY RELIABILITY AVAILABILITY
1 ECHO EXTRACTION FEED A 99.46% 99.46% 100.00%
2 ECHO EXTRACTION FEED B 99.46% 99.46% 100.00%
3 ECHO EXTRACTION COMMON C 100.00% 100.00% 80.31%
4 ECHO EXTRACTION LEAN A 99.46% 99.46% 100.00%
5 ECHO EXTRACTION LEAN B 99.46% 99.46% 99.33%
AVERAGE 99.57% 99.57% 95.93%
=I+J =K-H = L * 24
SHUTDOWN SHUTDOWN
STARTUP STARTUP STARTUP DURATION DURATION NOTE
DATE TIME DATE & TIME (DAYS) (HOURS)
12-Feb-2016 8:00 2/12/16 8:00 28.00 224.00 PLANNED S/D PM 8000Hrs
25-Mar-2016 8:00 3/25/16 8:00 24.00 192.00 PLANNED S/D PM 8000 Hrs
12-Mar-2016 10:00 3/12/16 10:00 1.00 24.00 PLANNED S/D Repair L/O cooler
8-Apr-2016 8:00 4/8/16 8:00 12.00 144.00 PLANNED S/D PM 8000Hrs
23-Apr-2016 8:00 4/23/16 8:00 12.00 144.00 PLANNED S/D PM 8000Hrs
19-Apr-2016 21:00 4/19/16 21:00 0.04 1.00 UNPLANNED S/D Vent valve Limit Sw
21-Apr-2016 19:00 4/21/16 19:00 0.21 5.00 UNPLANNED S/D Vent valve Limit Sw
10-May-2016 2:00 5/10/16 2:00 1.00 24.00 OTHER PLANNED S/D Blowing Activi
10-May-2016 3:00 5/10/16 3:00 1.04 25.00 OTHER PLANNED S/D Blowing Activi
10-May-2016 4:00 5/10/16 4:00 1.08 26.00 OTHER PLANNED S/D Blowing Activi
28-May-2016 15:00 5/28/16 15:00 0.08 2.00 UNPLANNED S/D Lo Suct. Due to pig
28-May-2016 15:30 5/28/16 15:30 0.10 2.50 UNPLANNED S/D Lo Suct. Due to pig
28-May-2016 17:30 5/28/16 17:30 0.19 4.50 UNPLANNED S/D Lo Suct. Due to pig
28-May-2016 18:00 5/28/16 18:00 0.21 5.00 UNPLANNED S/D Lo Suct. Due to pig
6-Jun-2016 9:00 6/6/16 9:00 0.69 16.50 UNPLANNED S/D BOP Panel fail
21-Jun-2016 14:00 6/21/16 14:00 0.67 16.00 UNPLANNED S/D Vent valve Limit Sw
16-Jul-2016 14:00 7/16/16 14:00 0.17 4.00 OTHER UNPLANNED S/D due to GEG
16-Jul-2016 14:00 7/16/16 14:00 0.17 4.00 OTHER UNPLANNED S/D due to GEG
16-Jul-2016 14:00 7/16/16 14:00 0.17 4.00 OTHER UNPLANNED S/D due to GEG
16-Jul-2016 14:00 7/16/16 14:00 0.17 4.00 OTHER UNPLANNED S/D due to GEG
2-Aug-2016 16:00 8/2/16 16:00 0.08 2.00 UNPLANNED S/D due to TTZ2313 Fa
18-Aug-2016 8:00 8/18/16 8:00 12.00 144.00 PLANNED S/D PM 8000Hrs
7-Aug-2016 4:30 8/7/16 4:30 0.19 4.50 OTHER UNPLANNED S/D due to GEG
7-Aug-2016 4:00 8/7/16 4:00 0.17 4.00 OTHER UNPLANNED S/D due to GEG
7-Aug-2016 5:00 8/7/16 5:00 0.21 5.00 OTHER UNPLANNED S/D due to GEG
7-Aug-2016 5:30 8/7/16 5:30 0.23 5.50 OTHER UNPLANNED S/D due to GEG
18-Aug-2016 13:00 8/18/16 13:00 0.06 1.50 OTHER UNPLANNED S/D due to GEG
18-Aug-2016 13:00 8/18/16 13:00 0.06 1.50 OTHER UNPLANNED S/D due to GEG
18-Aug-2016 13:00 8/18/16 13:00 0.06 1.50 OTHER UNPLANNED S/D due to GEG
18-Aug-2016 13:00 8/18/16 13:00 0.06 1.50 OTHER UNPLANNED S/D due to GEG
29-Aug-2016 21:00 8/29/16 21:00 0.13 3.00 UNPLANNED S/D Controlnet Card Fa
30-Aug-2016 20:00 8/30/16 20:00 0.10 2.50 UNPLANNED S/D Vent valve Limit Sw
19-Sep-2016 8:00 9/19/16 8:00 11.00 132.00 PLANNED S/D PM 4000Hrs
30-Sep-2016 8:00 9/30/16 8:00 10.33 248.00 OTHER PLANNED S/D TA 2016
30-Sep-2016 8:00 9/30/16 8:00 10.33 248.00 OTHER PLANNED S/D TA 2016
30-Sep-2016 8:00 9/30/16 8:00 10.33 248.00 OTHER PLANNED S/D TA 2016
30-Sep-2016 8:00 9/30/16 8:00 10.33 248.00 OTHER PLANNED S/D TA 2016

1-Oct-2016 11:00 10/1/16 11:00 0.73 17.50 UNPLANNED S/D Vent valve Limit Sw
1-Oct-2016 20:00 10/1/16 20:00 0.10 2.50 UNPLANNED S/D Vent valve Limit Sw
7-Nov-2016 8:00 11/7/16 8:00 12.00 144.00 PLANNED S/D PM 4000Hrs
21-Nov-2016 8:00 11/21/16 8:00 12.00 144.00 PLANNED S/D PM 4000Hrs
UNPLANNED S/D RTD Outboard Thr
21-Nov-2016 22:00 11/21/16 22:00 0.04 1.00 Upper fail
UNPLANNED S/D RTD Outboard Thr
28-Nov-2016 12:15 11/28/16 12:15 0.01 0.25 Upper fail
15-Dec-2016 8:00 12/15/16 8:00 12.00 144.00 PLANNED S/D PM 4000Hrs

FEBRUARY MARCH APRIL MAY

Unplanned S/D Planned S/D Unplanned S/D Planned S/D Unplanned S/D Planned S/D
(Total Hours) (Total Hours) (Total Hours) (Total Hours) (Total Hours) (Total Hours)

0.00 192.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00
0.00 24.00 0.00 0.00 6.00 0.00
0.00 48.00 0.00 96.00 0.00 0.00
0.00 0.00 0.00 144.00 0.00 0.00
28 31 30 31

AUGUST SEPTEMBER OCTOBER NOVEMBER

Unplanned S/D Planned S/D Unplanned S/D Planned S/D Unplanned S/D Planned S/D
(Total Hours) (Total Hours) (Total Hours) (Total Hours) (Total Hours) (Total Hours)

0.00 132.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 144.00 0.00 0.00
2.50 0.00 6.50 0.00 13.50 0.00
0.00 0.00 0.00 0.00 0.00 0.00
5.00 0.00 0.00 0.00 0.00 144.00
31 30 31 30
FEBRUARY MARCH APRIL MAY
RELIABILITY AVAILABILITY RELIABILITY AVAILABILITY RELIABILITY AVAILABILITY
100.00% 74.19% 100.00% 100.00% 100.00% 99.66%
100.00% 100.00% 100.00% 100.00% 100.00% 99.73%
100.00% 96.77% 100.00% 99.17% 99.17% 100.00%
100.00% 93.55% 100.00% 86.67% 100.00% 99.40%
100.00% 80.00% 100.00% 99.33%
100.00% No Data No Data 93.17% 99.83% 99.62%

AUGUST SEPTEMBER OCTOBER NOVEMBER


RELIABILITY AVAILABILITY RELIABILITY AVAILABILITY RELIABILITY AVAILABILITY
100.00% 81.67% 100.00% 100.00% 100.00% 99.97%
100.00% 100.00% 100.00% 80.65% 100.00% 100.00%
99.66% 99.10% 99.10% 98.19% 98.19% 99.86%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
99.33% 100.00% 100.00% 100.00% 100.00% 80.00%
99.80% 96.15% 99.82% 95.77% 99.64% 95.97%
NOTE ACTION ROOT CAUSE

NED S/D PM 8000Hrs


NED S/D PM 8000 Hrs
NED S/D Repair L/O cooler Replace bearing
NED S/D PM 8000Hrs
NED S/D PM 8000Hrs
ANNED S/D Vent valve Limit Switch fail Check and clean up limit switch
ANNED S/D Vent valve Limit Switch fail Replace solenoid
R PLANNED S/D Blowing Activity
R PLANNED S/D Blowing Activity
R PLANNED S/D Blowing Activity
ANNED S/D Lo Suct. Due to pigging Act.
ANNED S/D Lo Suct. Due to pigging Act.
ANNED S/D Lo Suct. Due to pigging Act.
ANNED S/D Lo Suct. Due to pigging Act.
ANNED S/D BOP Panel fail Replace redundant card
ANNED S/D Vent valve Limit Switch fail Replace regulator, Replace tubing to 3/8"
R UNPLANNED S/D due to GEG Trip
R UNPLANNED S/D due to GEG Trip
R UNPLANNED S/D due to GEG Trip
R UNPLANNED S/D due to GEG Trip
ANNED S/D due to TTZ2313 Fail Replace RTD and Transmitter
NED S/D PM 8000Hrs
R UNPLANNED S/D due to GEG Trip
R UNPLANNED S/D due to GEG Trip
R UNPLANNED S/D due to GEG Trip
R UNPLANNED S/D due to GEG Trip
R UNPLANNED S/D due to GEG Trip
R UNPLANNED S/D due to GEG Trip
R UNPLANNED S/D due to GEG Trip
R UNPLANNED S/D due to GEG Trip
ANNED S/D Controlnet Card Fail Replace controlnet card
ANNED S/D Vent valve Limit Switch fail Add timer
NED S/D PM 4000Hrs
R PLANNED S/D TA 2016
R PLANNED S/D TA 2016
R PLANNED S/D TA 2016
R PLANNED S/D TA 2016
Continuity cable limit switch and solenoid.
ANNED S/D Vent valve Limit Switch fail Replace transistor and relay
ANNED S/D Vent valve Limit Switch fail Replace solenoid ASCO
NED S/D PM 4000Hrs
NED S/D PM 4000Hrs
ANNED S/D RTD Outboard Thrust Bearing
r fail Add AFI
ANNED S/D RTD Outboard Thrust Bearing
r fail Add AFI
NED S/D PM 4000Hrs

MAY JUNE

Unplanned S/D Planned S/D Unplanned S/D


(Total Hours) (Total Hours) (Total Hours)

2.50 0.00 0.00


2.00 0.00 16.50
0.00 0.00 16.00
4.50 0.00 0.00
5.00 0.00 0.00
31 30

NOVEMBER DECEMBER

Unplanned S/D Planned S/D Unplanned S/D


(Total Hours) (Total Hours) (Total Hours)

0.25 0.00 0.00


0.00 0.00 0.00
1.00 0.00 0.00
0.00 144.00 0.00
0.00 0.00 0.00
30 31
MAY JUNE
RELIABILITY AVAILABILITY RELIABILITY
99.66% 100.00% 100.00%
99.73% 97.71% 97.71%
100.00% 97.78% 97.78%
99.40% 100.00% 100.00%
99.33% 100.00% 100.00%
99.62% 99.10% 99.10%

NOVEMBER DECEMBER
RELIABILITY AVAILABILITY RELIABILITY
99.97% 100.00% 100.00%
100.00% 100.00% 100.00%
99.86% 100.00% 100.00%
100.00% 80.65% 100.00%
100.00% 100.00% 100.00%
99.97% 96.13% 100.00%
OT CAUSE REMARK
UNIT DATE DEFECT
FEED A 28-Nov-16 RTD TE4437 Outboard thrust bearing upper spike

FEED B 1-Apr-16 Ethernet card error

2015 Fire detector fault


19-Apr-16 Vent valve command dissagre

Apr-16 Level transmitter L/O tank error


COMMON C
Apr-16 PDS1500 broken need replace

21-Nov-16 RTD TE4437 Outboard thrust bearing upper spike

14-Dec-16 Ethernet card error

14-Dec-16 Communication Card Error


LEAN A
secondary vent suction was high when unit standby,
2015 caused unit not ready
secondary vent suction was high when unit standby,
2015
LEAN B caused unit not ready
20-Dec-16 Lube oil cooler rotation slow
ACTION Status Complete date
Temporary install AFI at TE4437 Fail and HH for bypass, value was max.

On progress pembelian
Material sudah datang, dipakai di Lean A. (Repeat Order)
On progress pembelian
Replace solenoid valve Completed 16-Oct-16
On progress pembelian, temporary install AFI at Transmitter Fail and
level LL
On progress pembelian
Temporary install AFI at TE4437 Fail and HH for bypass, value was
normal and covered with RTD outboard Thrust bearing lower
Replace with new ones Completed 17-Dec-16
Replace with ex-used Lean B Completed
On Progress pembelian 16-Dec-16
Open drain valve venting line when standby.
Suspect dry gas seal leakage
Open drain valve venting line when standby.
Suspect dry gas seal leakage
Resetting tension v-belt after unit standby