DETAILING FOR P O S T- T E N S I O N I N G

As a final comment, sound engineering 2. By design, immediately after lock-off, the load path for the introduction of the tendon
judgement is still the most important ingredient maximum force at the anchorage is at most force into the concrete thereby improving safety
in a good design. Throughout this report you 70 % GUTS. through redundancy. Locating anchorages
may find what might appear to be 3. For bonded systems, the tendon is grouted away from sections of maximum stress, as is
inconsistencies in design values for specific shortly after stressing. For cast-in-place normally done, therefore provides improved
cases. This has been done deliberately to members, the shoring is removed. In the safety. (b) Unbonded systems - Due to the
reinforce the point that the information case of precast members, they are erected. absence of bond, the prestressed
presented is not a set of rigid rules, but rather a 4. The structure is put into service only after the reinforcement does not normally experience the
guide which must be applied with judgement. concrete has reached the full specified same strain as the nonprestressed bonded
strength. reinforcement when actions are applied to the
5. Time dependent losses will reduce the structure. With large structural deformations,
effective prestressing force and hence, the the changes in tendon geometry produce
2.3 Performance Criteria anchorage force will decrease with time to increases in the tendon force, but these are not
about 62 % GUTS. necessarily sufficient to cause tendon yielding.
Before one can adequately detail a post- 6. (a) Bonded systems - Actions (loads and The deformations required to produce the
tensioned structure, one must understand what imposed deformations) applied to the changes in tendon geometry necessary to
the performance requirements are. The general structure which produce tension strains in the develop the realizable capacity of the tendon
objective is obviously to provide a safe and concrete and bonded non-prestressed are enormous and usually can not be sustained by
serviceable structure. The question is "What are reinforcement produce similar strain the concrete.
reasonable ultimate and service design loads increases in the bonded prestressed A satisfactory design is possible if one
for strength and serviceability checks?" reinforcement. In zones of uncracked examines what can go wrong during the
Modern safety theory could be used to concrete, these strains produce negligible construction and use of a structure, along with
determine design loads by considering all of the increases in force at the anchorage. Bond the resulting consequences. By looking at such
relevant parameters as statistical variables and demands (requirements) in uncracked zones fundamentals, one can readily deal with
examining the combined effect of these are small. Once cracks develop, the force in unusual construction and loading histories. For
variations. The net result would be load and the bonded reinforcement (prestressed and anchorages with the typical construction and
resistance factors selected to provide some no n-prestressed) increase via bond. When load histories, one can conclude that the
desired probability of failure. For example, if the maximum bond resistance is reached, anchorage typically receives its maximum force
one took a load factor of 1.3 on the maximum local slip occurs. If the anchorage is located during stressing when the concrete strength is
jacking force, and a resistance factor of 0.75 for further away from the crack than the 80 % f'c. In service, the anchorage forces will be
the anchorage zone, one would get a factored development length of the tendon, again only smaller and the concrete strengths will be
design load greater than realizable strength of insignificant increases in the force of the larger. It is possible to exceed the usual
the tendons - a physical impossibility! More anchorage result. However, for anchorages temporary jacking force of 80 % GUTS during
significantly, the corresponding resistance close to the crack, increases in the stressing but not by very much and certainly not
factors result in unrealistically low predicted anchorage force up to the maximum by a factor of 1.3. First, the operator controls the
design strengths for the concrete. Using such realizable capacity of the tendon assembly stressing jack to prevent excessive
proposed load and resistance factors would may be reached. The realizable capacity is overstressing. Unless an oversized jack is used
render most current anchorage designs the anchorage efficiency times the nominal to stress a tendon, the jack capacity of about 85
unacceptable. Since the current designs have capacity. The maximum tendon capacity % GUTS will automatically govern the
evolved from many years of satisfactory realized is usually about 95 % GUTS. At this maximum jacking force. Finally, if an oversized
experience, one must conclude that it is the point, the wedges may start to slip, but jack is used and the operator blunders (or the
proposed load and resistance factors which are usually individual wires in the strand begin to pressure gage is defective), the anchorage
not satisfactory! break. The strain experienced by the efficiency at the wedges will limit the realizable
Fortunately, by reviewing the construction structure is the strain capacity of the strand tendon force to about 95 % GUTS. This is
and load history of a post-tensioning system, (at least 2 %) less the strain introduced to the accompanied by tendon elongations of at least
one can arrive at reasonable design values in a strand prior to bonding (about 0.6 %) and is 2 % (about 3 times greater than normal) which
rational and practical manner. In typical thus about six times the yield strain for the cannot go unnoticed. For anchorages in service
applications the history is as follows: 1. Post- non-prestressed bonded reinforcement. Note it is possible but not usually probable that the
tensioning is stressed to a maximum temporary that should an anchorage fail, the tendon anchorage force increases as discussed in
jack force of 80 % GUTS when the concrete has force often can be transferred by bond in a point 6 above. In any event, the maximum
a verified compressive strength of 80 f'c, the manner similar to ordinary pre-tensioned realizable force is governed by the anchorage
specified 28 day strength. members. The bond provides an alternative efficiency.