Department of Tourism, Govt. of Karnataka and Opus Laguna Golf & Resort Pvt. Ltd.
====================================================================================================
Form – I for seeking clearance for project attracting CRZ Notification
(II) Activity
====================================================================================================
Forest/National Disaster Management
Authority?
1.6 Whether the area is prone to cyclone, Yes As per India Meteorology Department,
tsunami, tidal surge, subduction, Mangalore is in moderately cyclone
earthquake etc.?
prone zone.
1.7 Whether the area is prone for saltwater No
ingress?
1.8 Clearance of existing land, vegetation and No
buildings?
1.9 Creation of new land uses? No Present land use of the site is unused
and barren without any formal/regular
activity.
1.10 Pre-construction investigations e.g. bore Yes Pre-construction investigation shall be
hole, soil testing? conducted per requirement.
1.11 Construction works? Yes Construction of Resort building with
necessary amenities and utilities.
1.12 Demolition works? No
1.13 Temporary sites used for construction No
works or housing of construction workers?
1.14 Above ground buildings, structures or Yes All buildings will be above grade without
earthworks including linear structures, cut any basement, No excavation, cut and
and fill or excavations
fill, etc. proposed
1.15 Under ground works including mining or No
tunnelling?
1.16 Reclamation works? No
1.17 Dredging/reclamation/land filling/disposal No
of dredged material etc.?
1.18 Offshore structures? No
1.19 Production and manufacturing processes? No
1.20 Facilities for storage of goods or No
materials?
1.21 Facilities for treatment or disposal of solid Yes Municipal solid waste will be segregated
waste or liquid effluents? at source. Non-biodegradable fractions
will be disposed to the nearest dump
skip of MMC. Biodegradable fractions
will be composted at site using pit
composting or in OWC. Maximum
possible recycling will be carried out
from the non-biodegradable fraction.
STP of 150 KLD will be installed for
treatment of domestic waste from urinals
and W/c in the Resort. Treated water
from the STP will be used for toilet
flushing and irrigation of the Golf
Course,
1.22 Facilities for long term housing of No
operational workers?
1.23 New road, rail or sea traffic during No
construction or operation?
1.24 New road, rail, air waterborne or other No
transport infrastructure including new or
altered routes and stations, ports, airports
etc.?
1.25 Closure or diversion of existing transport No
routes or infrastructure leading to changes
====================================================================================
March, 2016 Page 2 of 9
CRZ Application for Construction of Beach Resort and Golf Course, Mangalore
Department of Tourism, Govt. of Karnataka and Opus Laguna Golf & Resort Pvt. Ltd.
====================================================================================================
in traffic movements?
1.26 New or diverted transmission lines or No
pipelines?
1.27 Impoundment, gamming, culver ting, No
realignment or other changes to the
hydrology or watercourses or aquifers?
Operation Phase:
• Approx. 20 people for maintenance
• Visitors during the operation phase
will use self owned/public
transportation facilities.
1.32 Long-term dismantling or No
decommissioning or restoration works?
1.33 On-going activity during decommissioning No
which could have an impact on the
environment?
1.34 Influx of people to an area in either Yes Construction Phase:
temporarily or permanently? Not significant.
Operation Phase:
Approx. 450 people (peak occupancy)
1.35 Introduction of alien species? No
1.36 Loss of native species or genetic diversity? No
1.37 Any other actions? No
2. Use of Natural resources for construction or operation of the Project (such as land,
water, materials or energy, especially any resources which are non-renewable or in
short supply):
Operation phase:
Source: MCC
Requirement: Approx. 138 KLD
freshwater +139 KLD recycled water
====================================================================================
March, 2016 Page 3 of 9
CRZ Application for Construction of Beach Resort and Golf Course, Mangalore
Department of Tourism, Govt. of Karnataka and Opus Laguna Golf & Resort Pvt. Ltd.
====================================================================================================
from the ETP of the Resort.
Approx. 900 KLD of treated water for the
Golf Course.
Steel: 2200 T
Sand: 20000cu.m
====================================================================================================
dwelling units of traditional local
communities etc.
4.2 Municipal waste (domestic and or Yes Total Solid waste: Approx. 482 kg/day,
commercial wastes) of which approx. 241 kg will be
biodegradable,193 kg inorganic and 48
kg of inert waste.
4.6 Sewage sludge or other sludge from Yes Sewage sludge generated from the
effluent treatment proposed activity will be co-composted
with biodegradable solid waste and used
as manure in the Golf Course
4.7 Construction or demolition wastes Yes a. Concrete wastage and wasted mortar
will be crushed, aggregated and mixed
with other road sub-base construction
material.
b. Waste/damaged construction
material, sieved sand, broken brick bats
and chipped plaster will also be used in
the construction of roads and for backfill
and consolidation of surfaces under
podia, under margins/pitching of storm
water drains, periphery curbing of roads
etc.
====================================================================================================
on the floors of parking/parking
approaches for aesthetics and solar
reflection purposes.
5.3 Emissions from material handling including No During construction phase, there may be
storage or transport dust generation due to handling of
construction material and movement of
construction vehicles. Hence, there may
be slight increase in particulate matter
levels during construction phase.
5.4 Emissions from construction activities Yes Fugitive emissions during unloading of
including plant and equipment construction material, concrete mixers and
emission from DG sets.
5.5 Dust or odour from handling of materials Yes Construction phase: There will be some
including construction materials sewage dust generated due to handling of raw
and waste
====================================================================================
March, 2016 Page 6 of 9
CRZ Application for Construction of Beach Resort and Golf Course, Mangalore
Department of Tourism, Govt. of Karnataka and Opus Laguna Golf & Resort Pvt. Ltd.
====================================================================================================
material and movement of vehicles
carrying raw material.
Operation phase: Sometimes odour is
possible from STP.
5.6 Emission from incineration of waste No
5.7 Emissions from burning of waste in open air No
(e.g. slash materials, construction debris)
5.8 Emissions from any other sources No
7. Risks from contamination of land or water from releases of pollutants into the ground
or into sewers, surface waters, groundwater, coastal waters or the sea:
====================================================================================
March, 2016 Page 7 of 9
CRZ Application for Construction of Beach Resort and Golf Course, Mangalore
Department of Tourism, Govt. of Karnataka and Opus Laguna Golf & Resort Pvt. Ltd.
====================================================================================================
8. Risk of accidents during construction or operation of the Project, which could affect
human health or the environment
8.3 Could the project be affected by natural Yes a. Project site is located in moderately
disasters causing environmental damage cyclone prone area as per IMD.
(e.g. floods, earthquakes, landslides,
Project is in Earthquake Zone III. The
cloudburst, etc)?
design of the building will be as per
the IS 1893: Part (1) 2002 (Criteria for
earth quake resistance design of
structures - Part 1 General Provisions
and Buildings).
====================================================================================================
or other related value
2 Areas which are important or sensitive 1. Sultan Battery Fort Approx. 3.2 km*
for ecological reasons – Wetlands, 2. Kadri Park Approx. 4.9 km*
watercourses or other water bodies,
3. Pilikula Biological Approx. 11.5 km*
coastal zone, biospheres, mountains,
forests
Park
(* Aerial Distance)
3 Areas used by protected, important or
sensitive species of flora or fauna for
breeding, nesting, foraging, resting,
-
over wintering, migration
4 Inland, coastal, marine or underground -
waters
5 State, National Boundaries Southern boundary of Approx44km* away
Karnataka
(* Aerial Distance)
6 Routes or facilities used by the public for -
access to recreation or other tourist,
pilgrim areas
7 Defence installations -
8 Densely populated or built-up areas Mangalore City The project site is located
in the limits of Mangalore
City Corporation. The
immediate neighbourhood
is sparsely/moderately
populated.
9 Areas occupied by sensitive man-made - In the Mangalore city
land uses (hospitals, schools, places of
worship, community facilities)
10 Areas containing important, high quality -
or scarce resources(ground water
resources, surface resources, forestry,
agriculture, fisheries, tourism, minerals)
11 Areas already subjected to pollution or Baikampadi Industrial Approx. 5 km
environmental damage. (those where Estate
existing legal environmental standards
are exceeded)
12 Areas susceptible to natural hazard - Project site is located in
which could cause the project to present moderately cyclone prone
environmental problems
area as per IMD.
(earthquakes, subsidence, landslides,
erosion, flooding or extreme or adverse
climatic conditions) Project is in Earthquake
Zone III. The design of the
building will be as per the
IS 1893 - earth quake
resistance design of
structures
====================================================================================
March, 2016 Page 9 of 9
List of Annexure
Annex 1
Water Balance
139 138
Corporation/Municipal
Treated Water
900 100 39 131 7
106
39 Sludge
STP ((150)) (wet basis)
to manuring
139
3