Saudi Aramco 2616-ENG (03/99)

PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL
SLFE
SLFE

SLFE
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

ONSHORE MAINTAIN POTENTIAL PROJECTS DEPARTMENT


ISUED FOR BID (IFB) SUBMITTAL

GAS UPSTREAM PROJECTS DIVISION


DESCRIPTION

BI-10-03041-2001

ELECTRICAL, CIVIL & COMMUNICATION


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

DETAIL DESIGN FOR HARADH SATELLITE FIELD


NO. DATE
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
CONSTRUCTION SPECIFICATION
DATE:
10/09/2013

PROJECT
(MECHANICAL – DIVISION 15)
ENGINEER
M. Abu Sultan

10/09/2013
DATE:
CERTIFIED
Eduardo Lau

10/09/2013
DATE:
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION

Prepared by:
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

OCTOBER 2013
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 1


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
TABLE OF CONTENTS
ENGG CERT

EDL

EDL

EDL
SLFE
SLFE

SLFE

SECTION 15010 - BASIC MECHANICAL REQUIREMENTS ......................................................................... 3 


SECTION 15050 - BASIC MECHANICAL MATERIAL AND METHODS ...................................................... 14 
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

SECTION 15140 - PIPE HANGERS AND SUPPORTS ................................................................................ 21 


ISUED FOR APPROVAL (IFA) SUBMITTAL

SECTION 15151 - PLUMBING SPECIALTIES .............................................................................................. 31 


ISUED FOR BID (IFB) SUBMITTAL

SECTION 15190 – MECHANICAL IDENTIFICATION................................................................................... 34 


DESCRIPTION

SECTION 15241 - VIBRATION ISOLATION ................................................................................................. 40 


SECTION 15290 - DUCT INSULATION ........................................................................................................ 43 
SECTION 15310 - PORTABLE FIRE EXTINGUISHER ............................................................................... 48 
SECTION 15402 – ABOVEGROUND WATER SUPPLY PIPING SYSTEM ................................................. 52 
SECTION 15406 - SEWER DRAIN WASTE AND VENTS ............................................................................ 55 
SECTION 15407 - STORM DRAINAGE SYSTEM ........................................................................................ 57 
SECTION 15440 - PLUMBING FIXTURES ................................................................................................... 58 
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

SECTION 15780 - FAN-COIL SPLIT AIR-CONDITIONING UNIT-DX .......................................................... 64 


SECTION-15781- PACKAGED AIR CONDITIONING UNITS ....................................................................... 67 
DATE

SECTION 15786 - VARIABLE AIR VOLUME UNITS .................................................................................... 71 


SECTION 15870 – EXHAUST FANS ............................................................................................................ 74 
NO.
REV

00
C

SECTION 15891 - METAL DUCTWORK - LOW PRESSURE ...................................................................... 77 


DISCIPLINE
ENGINEER
PLR/MG/AK SECTION 15892 - FLEXIBLE DUCTWORK .................................................................................................. 83 
DATE:
10/09/2013 SECTION 15900 - DDC CONTROLLERS ..................................................................................................... 87 
PROJECT
ENGINEER SECTION 15910 - DUCT ACCESSORIES .................................................................................................... 94 
M. Abu Sultan

10/09/2013 SECTION 15932 - AIR INLETS AND OUTLETS ......................................................................................... 102 


DATE:
CERTIFIED SECTION 15971 - ELECTRIC CONTROL SYSTEM .................................................................................. 106 
Eduardo Lau

10/09/2013 SECTION 15990 - TESTING, ADJUSTING, AND BALANCING ................................................................. 109 


DATE:
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 2


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 - MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15010 - BASIC MECHANICAL REQUIREMENTS


SLFE
SLFE

SLFE

PART 1 – GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. This Section includes the basic mechanical requirements specifically applicable to


Division 15 sections, in addition to Division 1 - General Requirements.
DESCRIPTION

B. The scope of work shall include the following, but not limited to:

1. General Scope of Work Shall Provide:

a. Concrete work.

b. Concrete mounting bases.


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

c. Flashing and sealing of all roof penetrations.

d. Masonry work.
DATE

e. Metal work.
NO.
REV

00
C

DISCIPLINE f. Concrete for equipment inertia bases.


ENGINEER
PLR/MG/AK

10/09/2013
2. Mechanical Scope of Work Shall Provide:
DATE:
PROJECT
ENGINEER
M. Abu Sultan a. Starters for packaged equipment, equipment internal power wiring,
10/09/2013
interlocking and control wiring, for refrigeration, heating and
DATE:
CERTIFIED
ventilating equipment.
Eduardo Lau

DATE:
10/09/2013 b. Utility water, drinking water, air-conditioning system and fire
CONSTRUCTION protection systems.
AGENCY

10/09/2013 c. Compressed air system


DATE:
OPERATIONS
d. Vibration isolation
10/09/2013
DATE:
e. Fire / drinking water tanks and pumps
CONTROL NUMBER
VERIFICATION
EDSD

f. Fuel tanks & dispensing system


DATE:

g. Duct work and specialties.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15010
1 of 11
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 3


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
h. Air devices.
ENGG CERT

EDL

EDL

EDL

i. Fans and motors.


SLFE
SLFE

SLFE

j. Plumbing fixtures and specialties.


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

k. Sewer, drain, waste and vent systems.


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

l. Pipe and duct Insulation.


DESCRIPTION

m. Pipe, duct hangers and supports.

n. Cutting and patching.

o. Testing, adjusting and Air balancing.

1.02 RELATED SECTIONS

A. Division 1 - General Requirements.


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

B. Division 3 - Concrete
DATE

C. Division 9 - Finishes

D. Division 15 - Mechanical
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
E. Division 16 - Electrical
10/09/2013
DATE:
PROJECT
ENGINEER
M. Abu Sultan
1.03 INTENT OF SPECIFICATIONS:
10/09/2013
DATE:
CERTIFIED
A. It is the intent and purpose of these specifications and related documents that all
Eduardo Lau labor, equipment and materials necessary be provided for the completion of all the
10/09/2013 WORK. CONTRACTOR shall provide systems, complete in all details, including all
DATE:
CONSTRUCTION minor items and accessories or devices necessary for complete installation and
AGENCY
proper operation. It shall be the Contractor’s responsibility to provide such
10/09/2013 appurtenances at no additional cost regardless of whether or not they are
DATE:
OPERATIONS
specifically mentioned in the specifications and or drawings to keep the system
functional.
10/09/2013
DATE:
B. In case of any discrepancy between sections of the specification, refer the item in
CONTROL NUMBER
VERIFICATION

writing to the Company Representative for their interpretation.


EDSD

C. If an item is mentioned in the specifications, but not shown on plans, or vice versa,
DATE:

it shall be considered as specified in both document / drawing.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15010
2 of 11
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 4


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
1.04 REGULATORY REQUIREMENTS.
ENGG CERT

EDL

EDL

EDL

A. Codes and Standards:


SLFE
SLFE

SLFE

Comply with all applicable Codes and Standards including, but not limit to those
listed below:
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

ANSI - American National Standard Institute


ISUED FOR BID (IFB) SUBMITTAL

SAES - SAUDI ARAMCO Engineering Standards


SAMSS - SAUDI ARAMCO Materials Systems Specifications
DESCRIPTION

ASTM - American Society for Testing and Materials


ASME - American Society of Mechanical Engineers
ASHRAE - American Society of Heating, Refrigeration and Air Conditioning
Engineers
NEMA - National Electrical Manufacturer’s Association
UL - Underwriter’s Laboratories
NFPA - National Fire Protection Association
IBC - International Building Code
UPC - Uniform Plumbing Code
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

UMC - Uniform Mechanical Code


JO/EWO

SMACNA - Sheet Metal and Air Conditioning Contractors Association


AWWA - American Water Works Association
DATE

NSF - National Sanitation Foundation


HI - Hydraulic Institute
AMCA - Air Moving and Conditioning Association
NO.
REV

00
C

DISCIPLINE
AWS - American Welding Society
ENGINEER
PLR/MG/AK

10/09/2013
B. Notify Saudi Aramco Representative of any materials or apparatus believed to be
DATE:
PROJECT
inadequate, unsuitable or in violation of laws, ordinances, rules or regulations of
ENGINEER
M. Abu Sultan
authorities having jurisdiction ten (10) days before submittal of Bid Proposals, for
10/09/2013
clarification by addendum.
DATE:
CERTIFIED
Eduardo Lau C. Include all items of labor and material required to comply with such codes in
10/09/2013 accordance with the Contract documents. Where quantities, sizes or other
DATE:
CONSTRUCTION requirements indicated on the drawings or herein specified are in excess of Code
AGENCY
requirements, the Specifications and/or drawings shall govern regardless of Code
10/09/2013 requirements.
DATE:
OPERATIONS
1.05 QUALITY ASSURANCE
10/09/2013
DATE:
A. Compliance:
CONTROL NUMBER
VERIFICATION

The construction CONTRACTOR shall bear all expense of correcting WORK


EDSD

performed that does not comply with the following requirements:


DATE:
BY:

1. SAUDI ARAMCO Engineering Standards and Drawings


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15010
3 of 11
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 5


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
2. Welders:
ENGG CERT

EDL

EDL

EDL

All welders shall be certified in accordance with SAEP-324. Tests shall be


SLFE
SLFE

SLFE

conducted by an approved testing laboratory.

3. UL Certificates:
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

All electrical motors, devices, fans, , panels, controls, etc. shall be UL listed,
ISUED FOR BID (IFB) SUBMITTAL

certified and labeled per SAUDI ARAMCO requirements.


DESCRIPTION

4. Receiving Inspection:

Inspect flanges and fittings in accordance with manufacturers' standard


written quality control procedure and in accordance with the standards of
the Manufacturers' Standardization Society of the Valve and Fitting Industry
(MSS).

5. Other Applicable Standards and Codes:


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

Refer to the specifications for additional standards and codes applicable to


JO/EWO

WORK in this Division.


DATE

6. All materials, installation and workmanship shall comply with SAES,


SAMSS and industry standards.
NO.
REV

00
C

DISCIPLINE
B. Materials and Workmanship:
ENGINEER
PLR/MG/AK

10/09/2013
1. All material shall be from SAUDI ARAMCO approved manufacturers.
DATE:
PROJECT
ENGINEER
M. Abu Sultan
2. Materials, style, make or quality of which is specifically designated, shall be
10/09/2013
as specified. Should there be any substitution of material or item of
DATE:
CERTIFIED
equipment or apparatus be made, a written approval from Company
Eduardo Lau Representative must be obtained prior to procurement / installation.
10/09/2013
DATE:
CONSTRUCTION 3. For Aramco supplied materials, prior to placing order of any materials,
AGENCY
CONTRACTOR shall verify with SAUDI ARAMCO Material Stock
10/09/2013 Department for availability of such materials. Such materials shall be
DATE:
OPERATIONS
purchased and stored.

10/09/2013
4. CONTRACTOR shall furnish and store necessary materials in ample
DATE:
quantities as frequently as required to avoid delay in the progress of WORK
CONTROL NUMBER
VERIFICATION

and prevent interference with other WORK.


EDSD

5. All equipment and materials shall be new and shall bear the manufacturer's
DATE:

name, trade name and the UL label in every case where a standard has
BY:

been established for the particular material.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15010
4 of 11
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 6


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

6. Equipment and materials shall be delivered to the site and stored in original
SLFE
SLFE

SLFE

containers, suitably sheltered from the elements, tightly covered and


protected against dirt, water and chemical or mechanical injury and theft but
readily accessible for inspection by the Company Representative until
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

installed. All items subject to moisture damage (such as controls) shall be


ISUED FOR APPROVAL (IFA) SUBMITTAL

stored in dry, climate-controlled spaces. All pipe and conduit ends shall
ISUED FOR BID (IFB) SUBMITTAL

have plastic plugs or caps.


DESCRIPTION

7. Equipment and materials of the same general type shall be of the same
make throughout the WORK to provide uniform appearance, operation and
maintenance.

8. Manufacturers' directions shall be followed completely in the delivery,


storage, protection, installation and operation of all equipment and
materials. The CONTRACTOR shall promptly notify the Company
Representative in writing, of any conflict between any requirement of the
Contract Documents and the manufacturer's directions, and shall obtain the
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

Company Representative written instructions before proceeding with the


JO/EWO

WORK. Should the CONTRACTOR perform any WORK that does not
comply with the manufacturer's directions or such written instructions from
DATE

the SAUDI ARAMCO Representative, he shall bear all costs of correcting


the deficiencies.
NO.
REV

00
C

DISCIPLINE
9. All equipment shall be inherently safe and all moving parts shall be covered
ENGINEER
PLR/MG/AK
with guards, which meet OSHA requirements. UL-labeled equipment and
10/09/2013
materials shall be used where applicable. Materials shall have a maximum
DATE:
PROJECT
flame spread of 25 and smoke development of 50.
ENGINEER
M. Abu Sultan

10/09/2013
10. Protective guards shall be provided for a thermostat, valves, switches which
DATE:
CERTIFIED
are subject to damage or vandalism and /or as determined by Saudi
Eduardo Lau Aramco Representative.
10/09/2013
DATE:
CONSTRUCTION 11. The plans are prepared using the item of equipment first mentioned in the
AGENCY
specification. If other items are used, the CONTRACTOR shall be
10/09/2013 responsible to provide a complete system without any additional cost to the
DATE:
OPERATIONS
ARAMCO.

10/09/2013
12. Performance specifications take precedence over model numbers.
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15010
5 of 11
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 7


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
C. Defective Work and Material:
ENGG CERT

EDL

EDL

EDL
SLFE
SLFE

SLFE

1. All material or work found to be defective or not in strict conformity with the
code or the drawings and specifications or defaced or injured through
negligence of CONTRACTOR or his employees or through action of fire or
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

weather will be rejected and shall be immediately removed from premises


ISUED FOR APPROVAL (IFA) SUBMITTAL

by CONTRACTOR. Satisfactory material and work shall be substituted


ISUED FOR BID (IFB) SUBMITTAL

without delay.
DESCRIPTION

2. Any defective work or non-conforming work shall be corrected immediately


on notice from Saudi Aramco representative. No previous inspection or
approval shall be held to relieve CONTRACTOR from his obligation to
furnish sound material and to perform good and satisfactory work.

1.06 SUBSTITUTIONS

A. It shall be the responsibility of the CONTRACTOR to notify all parties concerned of


any charges or substitutions he has been authorized to make, and he must include,
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

in his notice, a full description including drawings, if necessary, of any deviations


JO/EWO

from dimensions shown on the plans of any trade.


DATE

B. If the CONTRACTOR provides equipment other than that upon which the design is
based, it shall be his responsibility to coordinate its installation with the work of all
other trades and with the space available. He shall also pay for any changes
NO.
REV

00
C

DISCIPLINE
caused to other trades as a result of this substitution.
ENGINEER
PLR/MG/AK

10/09/2013
1.07 INSPECTIONS
DATE:
PROJECT
ENGINEER
M. Abu Sultan
Under each applicable section of the specifications, the CONTRACTOR shall, upon
10/09/2013
completion of the work under that section, obtain a certificate of final inspection from the
DATE:
CERTIFIED
Saudi Aramco Inspection Department.
Eduardo Lau

DATE:
10/09/2013 1.08 EXAMINATION OF SITE
CONSTRUCTION
AGENCY
A. Bidders shall examine carefully the entire site of the work. They shall make all
10/09/2013 investigations necessary to inform themselves thoroughly as to facilities for
DATE:
OPERATIONS deliveries, placing and using the necessary equipment and materials and
difficulties involved in the completion of all work in accordance with the
10/09/2013
specifications and drawings. Failure to do so shall not relieve the construction
DATE:
CONTRACTOR of his contractual obligations, nor justify additional compensation.
CONTROL NUMBER
VERIFICATION

B. Before submitting his bid, CONTRACTOR shall carefully verify exposed, concealed
EDSD

and buried points of connections, as to location, flow, size, type, depth, operating
DATE:

characteristics, and suitability to this project. The CONTRACTOR shall field


BY:

determine all measurements and construction requirements. Failure to be so


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

informed about the site and structures shall not be caused for extra compensation.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15010
6 of 11
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 8


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
1.09 SUBMITTALS
ENGG CERT

EDL

EDL

EDL

A. General: All submittals shall include the following information:


SLFE
SLFE

SLFE

1. Date submitted
2. Name and Location of the project
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

3. ARAMCO JO/EWO NO.


ISUED FOR APPROVAL (IFA) SUBMITTAL

4. Name of equipment manufacturer and supplier


ISUED FOR BID (IFB) SUBMITTAL

5. Specification reference - division, section and paragraph


6. System and area served by the item submitted
DESCRIPTION

7. Plan location (either room name and number or column line cross-
reference) of the item submitted (where applicable)
8. Capacity of item submitted (GPM, HP, MBH, CFM, RPM, etc.)
9. Outline dimensions and weights
10. Operating Clearances
11. Engineering data to indicate substantial compliance with specifications and
required performance

B. Welder Certification - A copy of certification of all welders employed on the project


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

shall be provided to SAUDI ARAMCO. Welds shall be identified in accordance with


JO/EWO

SAES-W-001 recommendations.
DATE

C. Test and Balance Reports - See Section 15990

D. Shop Drawings and Samples shall be submitted promptly and prior to ordering all
NO.
REV

00
C

DISCIPLINE
materials and/or equipment.
ENGINEER
PLR/MG/AK

10/09/2013
1. Construction CONTRACTOR shall be totally responsible for code
DATE:
PROJECT
conformance of equipment, components and systems. Stamping of any
ENGINEER
M. Abu Sultan
shop drawings “Reviewed for Design Compliance” shall not relieve
10/09/2013
CONTRACTOR of responsibility for replacement of equipment and
DATE:
CERTIFIED
materials, which are not in conformance with applicable codes.
Eduardo Lau

10/09/2013 2. Shop Drawings shall include:


DATE:
CONSTRUCTION
AGENCY
a. Acceptance letter from Saudi Aramco for products provided.
10/09/2013
DATE:
OPERATIONS
b. Fabrication, erection, layout, and setting drawings.

10/09/2013
c. Manufacturer’s standard drawings, descriptive literature, catalogs
DATE:
and brochures.
CONTROL NUMBER
VERIFICATION

d. Performance and test data, wiring and control diagrams.


EDSD

DATE:

e. All other drawings and descriptive data pertaining to materials,


BY:

equipment, ductwork and piping systems, including methods of


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

construction.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15010
7 of 11
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 9


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
3. Samples shall be submitted as requested in these specifications.
ENGG CERT

EDL

EDL

EDL

4. Floor Plans: Provide floor plans with necessary elevations and sections of
SLFE
SLFE

SLFE

crowded locations where there is a possibility of conflict among trades. The


drawings shall show the coordinated arrangement of all piping, ductwork,
equipment and adjacent items allowing proper clearances and headroom,
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

with dimensions locating all work in a neat and workmanlike manner.


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

a. Flow plans shall show location of all ductwork, valves, strainers,


gauges, thermometers, etc.
DESCRIPTION

b. Submit details of all concrete bases, isolation bases, and expansion


joints with guides and anchors.

c. Provide sleeve drawings showing dimensioned location of all


sleeves.

d. Submit details of all ductwork construction, elbows, turns, access


doors, etc., with the submission of first shop drawings.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

e. CONTRACTOR shall submit drawing to Saudi Aramco


representative until final approval is obtained.
DATE

f. Plans and details shall be in accordance with Saudi Aramco


Standards drawings.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
E. Large Scale Coordinated Installation Drawings and Field Coordination
10/09/2013
DATE:
PROJECT
1. The CONTRACTORS for each scope of work shall submit large-scale
ENGINEER
M. Abu Sultan
(1:50) installation drawings for the entire project to the Saudi Aramco
10/09/2013
representative for review and comment.
DATE:
CERTIFIED
Eduardo Lau 2. These drawings shall be submitted prior to the installation of any work
10/09/2013 unless otherwise authorized in writing by the Saudi Aramco representative
DATE:
CONSTRUCTION and shall be the same size as bid documents.
AGENCY

10/09/2013 3. Coordinated installation drawings shall indicate sizes, locations, elevations


DATE:
OPERATIONS
and general data for all plumbing, piping, ductwork, electrical work and
equipment to be furnished and installed by each trade.
10/09/2013
DATE:
4. Interferences, locations, sizes and installation requirements affecting all
CONTROL NUMBER
VERIFICATION

scope of work shall be coordinated through the development of these


drawings.
EDSD

DATE:

5. CONTRACTORS shall be responsible to achieve a complete and properly


BY:

fitted installation.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15010
8 of 11
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 10


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
6. In the event that interferences occur between the different scopes of work
ENGG CERT

EDL

EDL

EDL

the Saudi Aramco Representative shall decide which trade shall relocate its
work. No additional compensation will be allowed for the relocation of any
SLFE
SLFE

SLFE

work.

F. As-Built Drawings and Schedules as per general conditions


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

1. The contract set of plans shall be on Intergraph; specifications and large-


ISUED FOR BID (IFB) SUBMITTAL

scale coordinated installation drawings shall be periodically updated by the


CONTRACTOR as the work progresses. They shall be prepared and
DESCRIPTION

maintained on same size sheets as bid documents. Saudi Aramco


Representative shall furnish CAD title blocks to CONTRACTOR.

2. Mylar reproducible copies of updated contract plans and installation


drawings shall be submitted to the Saudi Aramco representative for
approval.

3. Provide complete equipment, duct and piping schematics showing all


devices, gauges, valves, controls and sequence of operation, etc.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

4. Revise all equipment schedules to conform to actual capacities of installed


equipment.
DATE

5. As required by Saudi Aramco Representative provides record sets of plan


CAD Discs per Building for all trades.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
G. Operation and Maintenance Instructions
10/09/2013
DATE:
PROJECT
1. The construction CONTRACTOR shall furnish to the Saudi Aramco
ENGINEER
M. Abu Sultan
Representative three (3) sets of brochures covering model, type, serial
10/09/2013
numbers, capacities, motor horsepower, RPM and voltage, maintenance
DATE:
CERTIFIED
schedules and operation of each item of major equipment and related
Eduardo Lau accessories. Operating instructions shall include all phases of control.
10/09/2013
DATE:
CONSTRUCTION 2. The operating and maintenance instructions shall include the following
AGENCY
items:
10/09/2013
DATE:
OPERATIONS
a. Flow sheets showing sizes and air quantities of all systems,
including exhaust, supply, return and relief.
10/09/2013
DATE:
b. Operating instructions for each system, including diagrams.
CONTROL NUMBER
VERIFICATION

c. Lubrication and maintenance schedule for all types of equipment.


EDSD

DATE:

3. Furnish a competent engineer for an equivalent period of three (3) 8-hour


BY:

days for the building (unless otherwise specified for particular systems or
APPROVAL/CERTIFICATION REQUIREMENTS,

equipment) to instruct representatives of the owner in the operation and


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

maintenance of each system.


(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15010
9 of 11
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 11


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
1.10 CUTTING AND PATCHING
ENGG CERT

EDL

EDL

EDL

A. All cutting, drilling and patching required for installation of WORK related to
SLFE
SLFE

SLFE

Division 15 shall be the responsibility of the installing trade. No cutting or drilling


shall be performed in any structural members without prior approval by the
Company Representative.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

1.11 OBSERVATION:
ISUED FOR BID (IFB) SUBMITTAL

A. The authorized representatives of Saudi Aramco will observe work from time to
DESCRIPTION

time during installation, but representatives assume no responsibility either directly


or indirectly for its proper coordination, connections, installation, location,
accessibility or operation, nor for temporary construction, shoring, scaffolding,
bracing or like methods of any kind, nor for the safety of any person of any
category under any construction condition. Entire construction operation shall be
performed in an entirely safe manner with construction CONTRACTOR solely
responsible for safety of his employees, the public and the authorized
representatives of Saudi Aramco.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

1.12 ACCEPTABLE MANUFACTURERS:


JO/EWO

A. Manufacturers' trade names are listed throughout the specifications to establish


DATE

quality of manufacture. If three (3) or more manufacturers are listed,


CONTRACTORS are advised to limit their selection of equipment to those
manufacturers.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
B. Substitutions shall meet the following requirements:
10/09/2013
DATE:
PROJECT
1. SAUDI ARAMCO acceptance of the manufacturer.
ENGINEER
M. Abu Sultan

10/09/2013
2. Materials and products specified by name of manufacturer, trade name or
DATE:
CERTIFIED
catalog reference should be the basis of the bid. If the Bidder recommends
Eduardo Lau a substitution of any item, article, material, fabrication, assembly or
DATE:
10/09/2013 construction, he shall submit with his bid an add or deduct setting forth the
CONSTRUCTION net difference in price to the Company Representative between the
AGENCY
proposed substitute and the specified WORK.
10/09/2013
DATE:
OPERATIONS
a. The statement shall also include the name, catalog number and
manufacturer of the proposed substitution, together with complete
10/09/2013
performance specifications, descriptive matter and other data that
DATE:
may be required by the Company Representative.
CONTROL NUMBER
VERIFICATION

b. The performance and reliability of the substitution must equal or


EDSD

exceed the specified WORK.


DATE:
BY:

c. Acceptance or rejection of substitution shall be made at the sole


APPROVAL/CERTIFICATION REQUIREMENTS,

discretion of the Company Representative.


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15010
10 of 11
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 12


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
3. Equipment, materials, or systems listed as acceptable in the specifications
ENGG CERT

EDL

EDL

EDL

may be used provided they are equal with respect to performance, capacity,
size, accessories, construction, etc. The drawings have been prepared
SLFE
SLFE

SLFE

using the equipment first mentioned in the specification. Any change in


piping, wiring, mounting, engineering, drawings, space, etc. necessary
because of a substitution shall be done by the CONTRACTOR making
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

substitution with no additional cost.


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

1.13 GUARANTEE
DESCRIPTION

A. Refer to requirements of the General Contract Documents for guarantee


requirements.

B. CONTRACTOR shall provide, as a condition of final payment, written guarantees


against defects in materials and workmanship for twelve (12) months from the date
of written acceptance of the building.

C. CONTRACTOR shall promptly repair or replace any defects within the guarantee
period without cost to Saudi Aramco upon written notice from Saudi Aramco
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

D. Temporary use, testing, trial use or similar other activities shall not begin the
guarantee period.
DATE

E. Guarantee all fluid systems to be leak tight for a period of two (2) years from date
of acceptance and final payment. Pay all consequential damage claims from leaks.
NO.
REV

00
C

DISCIPLINE
Replace all lost refrigerant, oil, etc.
ENGINEER
PLR/MG/AK

10/09/2013
F. Guarantee shall include all requirements to provide operating systems and repair of
DATE:
PROJECT
consequential damages at no cost to Saudi Aramco.
ENGINEER
M. Abu Sultan

10/09/2013
G. All reciprocating compressors shall have an extended five (5) year warranty.
DATE:
CERTIFIED
Eduardo Lau PART 2 - PRODUCTS
10/09/2013
DATE:
CONSTRUCTION Refer to Section 15050 for products used.
AGENCY

10/09/2013
PART 3 - EXECUTION
DATE:
OPERATIONS
A. All work shall be performed by qualified personnel who are thoroughly trained and
10/09/2013
experienced in the particular scope of work to be executed.
DATE:
CONTROL NUMBER
VERIFICATION

B. CONTRACTOR shall ensure that all equipment is erected, properly aligned,


leveled, and adjusted for satisfactory operation.
EDSD

DATE:

C. All equipment shall be installed to locations shown on drawings listed in the project
BY:

drawing control.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

END OF SECTION
(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15010
11 of 11
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 13


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 - MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15050 - BASIC MECHANICAL MATERIAL AND METHODS


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. The work shall be executed in conformity with best practice and shall
accommodate itself to the structure. The CONTRACTOR shall consult the
DESCRIPTION

drawings, shop drawings, and field layout of other trades and shall be coordinated
accordingly in the laying out and installation work.

B. The CONTRACTOR shall coordinate locations and arrangements of equipment


with the requirements of all other trades working on the project. In cases of
interferences between the various items of equipment and building features, or if
simplified construction is made possible by relocation of certain equipment,
changes in arrangements may be made only if authorized by SAUDI ARAMCO.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

C. The drawings are diagrammatic and indicate the general arrangements of systems
and work included in the contract.
DATE

D. The CONTRACTOR shall furnish all labor, material and equipment to install and
successfully test all the mechanical work, complete and in place.
NO.
REV

00
C

DISCIPLINE 1.02 QUALITY ASSURANCE


ENGINEER
PLR/MG/AK

10/09/2013
A. Qualification of Manufacturer: Products used in the work of this Section shall be
DATE:
PROJECT produced by manufacturers regularly engaged in manufacturing of similar items
ENGINEER
M. Abu Sultan and with history of successful production acceptable to SAUDI ARAMCO.
10/09/2013
DATE:
CERTIFIED
B. All materials and equipment required for the work shall be new, of first-class quality
Eduardo Lau and shall be furnished, delivered, erected, connected and finished in every detail
DATE:
10/09/2013 and shall be so selected and arranged as to fit properly into building spaces.
CONSTRUCTION Where no specific kind or quality of material is specified, a first-class standard
AGENCY
material, as approved by SAUDI ARAMCO, shall be furnished.
10/09/2013
DATE:
OPERATIONS C. The CONTRACTOR shall furnish the services of one or more experience
superintendent(s), who shall be constantly in charge of the installation of the work
10/09/2013 together with all skilled workmen, fitters, plumbers, metal workers, electricians,
DATE:
welders, helpers, and laborers required to unload transfer, erect, connect, adjust,
CONTROL NUMBER
VERIFICATION

start, operate and test each system.


EDSD

D. All component parts of each item of equipment or device shall bear the
DATE:

manufacturer’s nameplate, giving name of manufacturer, description, size, type,


BY:

serial number, electrical characteristics, etc., in order to facilitate maintenance or


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

replacement. The nameplate of a subcontractor or distributor will not be


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

acceptable.
(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15050
1 of 7
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 14


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
E. Welding: All welding, welding procedures and welders certification shall be in
ENGG CERT

EDL

EDL

EDL

accordance with SAES-W-011 for work on this project. Welding and welding
materials shall meet the requirements of SAES-W-011, AWS, and ASTM standards
SLFE
SLFE

SLFE

for the type of welding used. All welds shall be sound metal thoroughly fused to the
base metal and penetrating to the bottom of the joints. Welds shall be identified in
accordance with ANSI recommendations.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

F. Where standards or codes are mentioned in these specifications, the latest edition
ISUED FOR BID (IFB) SUBMITTAL

or revision with amendments and supplements thereto, shall be followed.


DESCRIPTION

1. American National Standard Institute (ANSI)

2. SAUDI ARAMCO Engineering Standards (SAES)

3. SAUDI ARAMCO Materials Systems Specifications (SAMSS)

4. American Society for Testing and Materials (ASTM)

5. American Society of Mechanical Engineers (ASME)


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

6. American Society of Heating, Refrigeration and Air Conditioning Engineers


(ASHRAE)
DATE

7. National Electrical Manufacturer’s Association (NEMA)


NO.
REV

00
C

DISCIPLINE
8. Underwriters Laboratories (UL)
ENGINEER
PLR/MG/AK

10/09/2013
9. National Fire Protection Association (NFPA)
DATE:
PROJECT
ENGINEER
M. Abu Sultan
10. International Conference of Building Officials; Whittier, California, U.S.A.,
10/09/2013
codes as follows:
DATE:
CERTIFIED
Eduardo Lau a. SAUDI ARAMCO International Building Code (IBC)
10/09/2013
DATE:
CONSTRUCTION b. SAUDI ARAMCO Plumbing Code (UPC)
AGENCY

10/09/2013
c. Uniform Mechanical Code (UMC)
DATE:
OPERATIONS
11. Sheet Metal and Air Conditioning Contractors Association (SMACNA)
10/09/2013
DATE:
12. American Water Works Association (AWWA)
CONTROL NUMBER
VERIFICATION

13. National Sanitation Foundation (NSF)


EDSD

DATE:

14. Hydraulic Institute (HI)


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

15. Air Moving and Conditioning Association (AMCA)


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15050
2 of 7
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 15


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
16. American Welding Society (AWS) Code D1.1
ENGG CERT

EDL

EDL

EDL

17. International Fire Code (IFC)


SLFE
SLFE

SLFE

G. Where the above listed Codes and Standards are less stringent than these
specifications, these specifications shall govern, otherwise the SAUDI ARAMCO
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

Codes and Standards govern.


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

1.03 SUBMITTALS
DESCRIPTION

A. Refer to Section 01340 Submittals, Substitutions, Schedules and Guarantees

1.04 PRODUCT DELIVERY, STORAGE AND HANDLING

A. Delivery and Storage: Deliver all materials to the WORK Site in their original
unopened containers with all labels intact and readable at time of use. Store
materials in strict accordance with manufacturer’s recommendations as certified by
SAUDI ARAMCO.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

B. Protection: Protect materials before, during, and after installation and protect
JO/EWO

installed work and materials of other trades.


DATE

C. Replacements: In the event of damage, immediately make repairs and


replacements necessary with certification from SAUDI ARAMCO at no additional
cost to SAUDI ARAMCO.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
1.05 JOB CONDITIONS
10/09/2013
DATE:
PROJECT
A. Examination: Verify job conditions by examining all contract documents so as to
ENGINEER
M. Abu Sultan
be fully aware of all work required and examine other work under the contract for
10/09/2013
interferences and conditions affecting this work.
DATE:
CERTIFIED
Eduardo Lau B. Interruptions: Do not shut off, interfere with, or otherwise interrupt flow of utilities
10/09/2013 on the site or to other part of the existing facilities without written approval of
DATE:
CONSTRUCTION SAUDI ARAMCO.
AGENCY

10/09/2013 1.06 SUBSTITUTIONS


DATE:
OPERATIONS
A. It shall be the responsibility of the CONTRACTOR to notify all parties concerned of
10/09/2013
any changes or substitutions he has been authorized to make, and he must
DATE:
include, in his notice, a full description, including drawings, if necessary, of any
CONTROL NUMBER
VERIFICATION

deviations from dimensions shown on the plans of any trade.


EDSD

B. If the CONTRACTOR provides equipment other than that upon which the design is
DATE:

based, it shall be his responsibility to coordinate its installation with the work of all
BY:

other trades and with the space available. He shall also pay for any changes
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

caused to other trades as a result of this substitution.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15050
3 of 7
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 16


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
PART 2 - PRODUCTS
ENGG CERT

EDL

EDL

EDL

2.01 MATERIALS
SLFE
SLFE

SLFE

A. Refer to particular sections(s)


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1. HVAC
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

15140 Pipe Hanger and Supports


15241 Vibration Isolation
DESCRIPTION

15290 Duct Insulation


15781 Packaged Air Conditioning Unit
15870 Ventilating and Exhaust Fans
15891 Metal Ductwork – Low Pressure
15892 Flexible Ductwork
15900 DDC Controllers
15910 Duct Accessories
15932 Air Inlets and Outlets
15971 Electric Control System
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

15990 Testing Adjusting and Balancing

2. Fire Protection
DATE

15310 Portable Fire Extinguisher


NO.
REV

00
C

DISCIPLINE
3. Plumbing
ENGINEER
PLR/MG/AK

10/09/2013
15151 Plumbing Specialties
DATE:
PROJECT
15402 Above Ground Water Supply Piping System
ENGINEER 15406 Sewer Drain, Waste and Vents
M. Abu Sultan
15407 Storm Drainage System
10/09/2013
DATE: 15440 Plumbing Fixtures
CERTIFIED
Eduardo Lau

10/09/2013
DATE: PART 3 - EXECUTION
CONSTRUCTION
AGENCY

DATE:
10/09/2013
3.01 ERECTION
OPERATIONS

A. The CONTRACTOR shall furnish and be responsible for delivery into the premises
DATE:
10/09/2013 and erection of any equipment furnished.
CONTROL NUMBER
VERIFICATION

B. Brackets, hangers, supports, miscellaneous steel, etc., shall be provided, as


EDSD

required, in connection with distributing piping, loads, equipment supports, etc.


DATE:
BY:

C. As far as possible, cutting and patching shall be avoided, but if any such work is
required, shall be performed only by workmen skilled in the type of work involved.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15050
(DCC) NO. BI-10-03041-2001-081
_____________________

4 of 7

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 17


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
D. No structural members shall be cut without the consent of SAUDI ARAMCO and all
ENGG CERT

EDL

EDL

EDL

such cutting works, when authorized, shall be done in strict accordance with the
instructions by SAUDI ARAMCO. Where piping must pass through structural
SLFE
SLFE

SLFE

members and Company Representative has approved the burning of holes in such
members, the CONTRACTOR shall provide approved welded steel reinforcement
of suitable dimensions adjacent into the hole to effectively offset the weakening
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

effect of the hole upon the member.


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

E. The size and location of roof, wall, and floor opening for mechanical equipment
shall be provided by the CONTRACTOR. Cracks and rough edges left following
DESCRIPTION

the installation of the equipment shall be caulked or covered with suitable


escutcheon or framing. Lintels and stiffening members for such openings shall be
furnished and installed by the CONTRACTOR.

F. The CONTRACTOR shall install equipment in such manner to permit service and
shall provide access covers or doors for equipment which are concealed and must
be serviced, operated, or maintained. Equipment shall include, but not be limited
to, valves, traps, fire dampers, cleanouts, controls, filters, volume dampers, water
hammer arrestors, etc.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

G. The CONTRACTOR shall furnish and install access panels of proper style to match
adjacent finish and of approved size. Location shall be approved by SAUDI
DATE

ARAMCO. Use stainless steel access panels in ceramic tiled walls. Access panels
in fire walls or rated ceiling assemblies shall be UL labeled with a rating equal to
that of the wall or ceiling in which is installed.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
H. Provide sleeves for all pipes which pass entirely through the floor, wall, ceiling, or
10/09/2013
partition. Sleeves shall be large enough to accommodate the pipe and its covering.
DATE:
PROJECT
Sleeves in walls or partitions shall be finished flush on both sides, & sleeves in
ENGINEER
M. Abu Sultan
floors shall be 1" above finished floor level, except where escutcheon plates are
10/09/2013
required, then they shall be 1/4" above the floor. Chrome plated escutcheon plates
DATE:
CERTIFIED
are required in all finished areas.
Eduardo Lau

10/09/2013 I. In exterior wall above grade, the space between the sleeves and the pipe or
DATE:
CONSTRUCTION covering shall be packed with a fire-rated material and caulking with an approved
AGENCY
plastic and waterproofing compound suitable for the temperature of the piping.
10/09/2013
DATE:
OPERATIONS
J. Appropriate sized standard weight galvanized steel pipe or 1/4" thick rolled
galvanized steel plate shall be used for sleeves above grade. 20 gauge galvanized
10/09/2013
sheet metal, plastic, or fiber material shall be used for sleeves in interior concrete
DATE:
walls, or approved equal.
CONTROL NUMBER
VERIFICATION

K. Sleeves passing through basement walls and floors shall be cast iron sleeves with
EDSD

anchor flange. Pipes passing through these sleeves shall not be insulated. They
DATE:

shall be caulked with lead and oakum.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15050
(DCC) NO. BI-10-03041-2001-081
_____________________

5 of 7

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 18


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
L. Sleeves passing through fire rated walls and floors requiring one-hour or greater
ENGG CERT

EDL

EDL

EDL

rating shall have space between sleeve and pipe or covering, fully packed with a
fire-rated material.
SLFE
SLFE

SLFE

M. All piping shall be run square and true, parallel to building walls and partitions,
except where otherwise shown on the plans. Piping shall be cleaned by
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

hammering and swabbing, as required, to remove any foreign material. All piping
ISUED FOR APPROVAL (IFA) SUBMITTAL

shall be properly graded and vented so as to insure full and noiseless circulation
ISUED FOR BID (IFB) SUBMITTAL

throughout all parts of the system and to connected equipment. Where piping
materials other than those described above are used, the manufacturer’s
DESCRIPTION

recommendations and/or standard practice shall be followed.

N. The piping system shall be provided with expansion loops or expansion joints
where required and as directed by SAUDI ARAMCO, erected, braced and fastened
to properly allow for all contraction and expansion so that there will be no undue
stress on connected appurtenances and pipe work. Piping shall be anchored near
equipment terminals, as required, to prevent damage to the equipment or to
prevent lifting of pipe from supports upon expansion of piping.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

O. Provide drain valves at all low points in the water piping systems and manual air
JO/EWO

vents at all high points. Fire protections piping shall be provided with drain valves
as shown on the fire protection drawings.
DATE

P. Copper water piping shall be assembled with wrought copper fittings using 95% tin,
5% antimony; using Mueller #50 solders flux, or equal.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
Q. Under floor copper piping where applicable shall be assembled with wrought
10/09/2013
copper fittings using silver solder and non-acid flux.
DATE:
PROJECT
ENGINEER
M. Abu Sultan
R. All pipe cuts shall be thoroughly reamed of burrs before assembly. All screwed
10/09/2013
joints shall be made up with an approved joint compound or tape applied to the
DATE:
CERTIFIED
male thread only and the joints shall be wrench tight.
Eduardo Lau

10/09/2013 S. Bell and spigot joints shall be solidly caulked; each joint shall require one pound of
DATE:
CONSTRUCTION lead and 2 oz. of oakum per nominal inch of pipe diameter. Neoprene gasket joint
AGENCY
shall be made up according to manufacturer’s recommendation. Oakum shall be
10/09/2013 acid resisting type.
DATE:
OPERATIONS
3.02 CLEANING AND LUBRICATION
10/09/2013
DATE:
A. Piping, ductwork and equipment to be painted; all piping hangers, ductwork and
CONTROL NUMBER
VERIFICATION

equipment, exposed to view in completed structure, shall be cleaned by removing


rust, plaster, and dirt by wire brushing. Grease, oil and similar materials shall be
EDSD

removed by wiping with clean rags and suitable solvents. Remove all dust, dirt,
DATE:

debris from interior of ductwork prior to installation.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

B. Motors, pumps and other items with factory finish; remove grease and oil leave
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

with all surfaces clean and polished.


(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15050
6 of 7
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 19


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
C. Upon completion of the work and before turning same over to SAUDI ARAMCO,
ENGG CERT

EDL

EDL

EDL

clean and lubricate all bearings, except sealed and permanently lubricated
bearings. Use only lubricant recommended by the manufacturer.
SLFE
SLFE

SLFE

D. Furnish a framed chart, under glass, with each piece of equipment listed and
itemizing locations for lubrication, lubricant required and recommended periods for
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

lubrication.
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

3.03 PAINTING AND IDENTIFICATION


DESCRIPTION

A. All manufactured mechanical equipment shall be furnished with manufacturer’s


standard shop finish.

B. All equipment furnished and installed by the CONTRACTOR with a factory applied
baked enamel finish shall not be painted, but any damaged spots shall be touched
up to match.

C. Pipes shall be identified by narrow stripes on a background color and by flow


arrows at all valves, at all points no more than 20" between identifications, and on
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

each side of a wall, floor or other surface penetrated by the pipe.


JO/EWO

D. Piping shall be painted in conformance with the color and strip identification band
DATE

per SAES and referenced SAUDI ARAMCO Engineering Standards for Painting.

E. Piping System color coding shall be provided in accordance with SAES-B-067.


NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
F. Provide flow arrows of adequate size at each identification point. Flow arrow is to
10/09/2013
be located within background field.
DATE:
PROJECT
ENGINEER
M. Abu Sultan
G. All valves shall be tagged with 1½ x 1/8-inch minimum thickness diameter chain
10/09/2013
mounted brass tags bearing the valve identification number. The CONTRACTOR
DATE:
CERTIFIED
shall furnish a typewritten chart indicating the fixtures or areas supplied by each
Eduardo Lau numbered valve and shall mount it in a frame, under glass, as directed in the field
10/09/2013 by SAUDI ARAMCO. Include copies of the valve charts in the building operating
DATE:
CONSTRUCTION and maintenance manuals.
AGENCY

10/09/2013 H. Valve numbers shall be pre-fixed with a “FWS” for fire water supply, etc.
DATE:
OPERATIONS
I. All mechanical equipment shall be clearly identified with 2" high-stenciled letters,
10/09/2013
painted on the equipment (i.e. “PACU-01). This includes exterior equipment where
DATE:
the paint shall be weather resistant.
CONTROL NUMBER
VERIFICATION

J. The CONTRACTOR shall refer to the equipment schedules for identification


EDSD

number, location, capacity, and design requirements.


DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

END OF SECTION
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15050
7 of 7
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 20


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 - MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15140 - PIPE HANGERS AND SUPPORTS


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Work Included: This section includes the supply and installation of hangers and
supports for pipe, and equipment, for the following piping systems:
DESCRIPTION

1. Drinking Water

B. Related Work Specified Elsewhere:

1. Section 15050 Basic Mechanical Materials and Methods

2. Section 15402 Aboveground Water Supply Piping System


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

1.02 QUALITY ASSURANCE

The following codes and standards are intended to provide an acceptable level of quality
DATE

for materials and products. The CONTRACTOR may propose alternative codes and
standards provided they give an equivalent degree of quality as the referenced codes and
standards.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
A. ANSI - American National Standards Institute.
10/09/2013
DATE:
PROJECT B 31.1 Power Piping
ENGINEER
M. Abu Sultan

10/09/2013
B. ASTM - American Society for Testing and Materials:
DATE:
CERTIFIED
Eduardo Lau A 36 Structural Steel
10/09/2013
DATE:
CONSTRUCTION A 307 Carbon Steel Externally Threaded Standard Fasteners
AGENCY

10/09/2013 A 325 High-Strength Bolts for Structural Steel Joints


DATE:
OPERATIONS
A 563 Carbon and Alloy Steel Nuts
10/09/2013
DATE:
C. AWS - American Welding Society:
CONTROL NUMBER
VERIFICATION
EDSD

D 1.1 Structural Welding Code Steel


DATE:

D. MSS - Manufacturers Standardization Society of the Valve and Fittings Industry:


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

SP 58 Pipe Hangers and Supports-Materials, Design, and Manufacture


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15140
1 of 10
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 21


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
SP 69 Pipe Hangers and Supports-Selection and Application
ENGG CERT

EDL

EDL

EDL

E. NFPA - National Fire Protection Association


SLFE
SLFE

SLFE

1.03 SUBMITTALS
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

The CONTRACTOR shall submit to SAUDI ARAMCO the following items for review before
ISUED FOR BID (IFB) SUBMITTAL

commencing work:
DESCRIPTION

A. Certificate of compliance stating that the material used and construction of pipe
supports and hangers conforms to all requirements of this Specification.

B. Complete manufacturer’s descriptive literature, including manufacturer’s name,


model number, design load, and intended service, for all propriety items furnished.

C. Trapeze hangers: Fabrication drawings or manufacturer’s literature and proposed


location.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

D. Special installation or fabrication conditions shop drawings and other descriptive


JO/EWO

data detailing proposed methods of welding hangers, supports, and anchors.


DATE

1.04 PRODUCT HANDLING

A. All products shall be delivered in manufacturers’ original, protective packaging.


NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
B. All products shall be inspected at time of delivery for damage and for compliance
10/09/2013
with Specifications.
DATE:
PROJECT
ENGINEER
M. Abu Sultan
C. Any products that are damaged or found not to be in accordance with the
10/09/2013
Specifications shall be immediately repaired or replaced.
DATE:
CERTIFIED
Eduardo Lau D. All products shall be handled and stored as recommended by the manufacturer to
10/09/2013 prevent damage and deterioration.
DATE:
CONSTRUCTION
AGENCY
PART 2 - PRODUCTS
10/09/2013
DATE:
OPERATIONS
2.01 GENERAL

10/09/2013
A. All goods and products covered by these specifications shall be procured, when
DATE:
available, from an in-Kingdom manufacturer. Procurement of all goods and
CONTROL NUMBER
VERIFICATION

products manufactured out-of-Kingdom must be approved by SAUDI ARAMCO.


EDSD

B. Pipe hangers and supports shall be designed and constructed in accordance with
DATE:

the applicable codes and standards listed in Para. 1.02, and shall:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

1. Support pipe so that it will not be abraded or distorted and will allow free
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

movement of pipes,
(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15140
2 of 10
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 22


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
2. Permit vertical adjustment after installation of piping,
ENGG CERT

EDL

EDL

EDL

3. Be designed for support of piping and contents under all conditions or


SLFE
SLFE

SLFE

operation, and

4. Be constructed for compatibility with items supported.


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

2.02 PIPE ATTACHMENTS


ISUED FOR BID (IFB) SUBMITTAL

A. Clevis hangers shall be black steel, oversized to fit on outside of insulation. Clevis
DESCRIPTION

hangers that are in contact with copper pipe shall be copper-plated.

B. Roller hangers shall be either or both of following:

1. Clevis type with swivel, carbon steel yoke, cast iron roller

2. Two rod type, cast iron adjustable sockets and roller

C. Wall hook plates shall be shop or field fabricated from bar stock and “J” hooks or
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

equivalent to suit application.

D. Floor supports shall be either or both of following:


DATE

1. Pipe support saddle, carbon steel, with semi-circular bolt


NO.
REV

00
C

DISCIPLINE 2. Base elbow support, carbon steel


ENGINEER
PLR/MG/AK

DATE:
10/09/2013 E. Trapeze hangers shall be shop or field fabricated from steel channel or angles as
PROJECT required for load and span.
ENGINEER
M. Abu Sultan

10/09/2013 F. Beam clamps for attachments to structure shall be malleable iron or steel,
DATE:
CERTIFIED underside clamp where possible.
Eduardo Lau

DATE:
10/09/2013 G. Concrete fasteners shall be self-drilling, steel shell and expander plug.
CONSTRUCTION
AGENCY
H. Hanger rods shall be hot rolled carbon steel, ASTM A36 of the following sizes:
10/09/2013
DATE:
OPERATIONS Pipe Size (mm) Minimum Rod Diameter (mm)

DATE:
10/09/2013 19 to 50 9.5
CONTROL NUMBER

63.5 to 88 12.5
VERIFICATION
EDSD

100 to 125 16.25


DATE:

150 19
BY:

200 to 300 22.75


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15140
3 of 10
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 23


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
2.03 ATTACHMENTS FOR SEISMIC PROTECTION
ENGG CERT

EDL

EDL

EDL

A. Bolts and Nuts:


SLFE
SLFE

SLFE

1. Square head bolts shall be ASTM A 307, Grade B, with heavy hexagon
nuts, ASTM A 563 Grade A.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

2. Bolts, underground shall be ASTM A 325.


ISUED FOR BID (IFB) SUBMITTAL

B. Sway bracing shall conform to all applicable requirements of MSS SP 58.


DESCRIPTION

C. Couplings shall have same pressure ratings as adjoining pipe, and shall consist of
one or more of the following:

1. Flexible ball joints conforming to the following requirements may be


employed on above ground piping:

a. Joints shall have cast or wrought steel casing and ball parts capable
of 360o rotation plus not less than 15o angular movement.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

b. Joints shall be certified to be suitable for the service intended by the


manufacturer, based on not less than two years satisfactory
DATE

operation in a similar application.

2. Flexible coupling and joints of the mechanical joint type may be used for
NO.
REV

00
C

DISCIPLINE
aboveground or underground piping.
ENGINEER
PLR/MG/AK

10/09/2013
3. Mechanical couplings for steel or cast iron pipe shall be of the sleeve type
DATE:
PROJECT
and shall provide a tight flexible joint under all conditions caused by
ENGINEER
M. Abu Sultan
expansion, contraction, slight settling or shifting of the ground, minor
10/09/2013
variations in trench gradients and traffic vibrations. Where permitted in
DATE:
CERTIFIED
other Sections in this Division, or as indicated on Drawings, joints utilizing
Eduardo Lau split couplings with grooved or shouldered pipe ends may be used.
10/09/2013
DATE:
CONSTRUCTION 4. Sleeve-type couplings shall be used for joining plain end pipe sections. The
AGENCY
coupling shall consist of one middle ring, two followers, two gaskets, and
10/09/2013 the necessary steel bolts and nuts to compress the gaskets. Underground
DATE:
OPERATIONS bolts shall be high strength type as specified.

10/09/2013
5. Couplings for nonmetallic pipe shall be of a type and material suitable for
DATE:
and compatible with nonmetallic pipe. Attachment and securing of coupling
CONTROL NUMBER
VERIFICATION

shall not produce damage or deformation to the pipe or joint. Couplings


producing such damage shall be immediately replaced with new couplings.
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15140
(DCC) NO. BI-10-03041-2001-081
_____________________

4 of 10

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 24


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
PART 3 - EXECUTION
ENGG CERT

EDL

EDL

EDL

3.01 INSPECTION
SLFE
SLFE

SLFE

A. The CONTRACTOR shall inspect all products for damage immediately before
installation. Any products that are damaged or not in accordance with the
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

Specifications shall immediately be repaired or removed from the site and


ISUED FOR APPROVAL (IFA) SUBMITTAL

replaced.
ISUED FOR BID (IFB) SUBMITTAL

3.02 INSTALLATION
DESCRIPTION

A. GENERAL

1. All pipe supports and hangers shall be installed in strict accordance with the
manufacturer’s recommendations and in accordance with all applicable
codes and standards listed in Para. 1.02.

2. All pipe supports and hangers shall be installed as shown on the Contract
drawings and on the approved shop drawings.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

3. Support shall be located as required to limit maximum pipe deflection to 2.5


mm when filled with water and so as not to induce excessive concentrated
DATE

loads on the building structure.

4. Unless specifically indicated otherwise, floor stands, hangers, and supports


NO.
REV

00
C

DISCIPLINE
other than specified herein shall not be used.
ENGINEER
PLR/MG/AK

10/09/2013
5. Vertical piping passing through slabs shall be supported with appropriate
DATE:
PROJECT
pipe clamps installed above slab.
ENGINEER
M. Abu Sultan

10/09/2013
6. All vertical piping shall be supported at intervals not exceeding 300 mm and
DATE:
CERTIFIED
or as shown in the drawings.
Eduardo Lau

DATE:
10/09/2013 7. Oversized hangers shall be installed on all insulated lines to allow for
CONSTRUCTION insulation thickness.
AGENCY

10/09/2013 8. Copper or copper-plated supports shall be installed where contact is with


DATE:
OPERATIONS insulated copper pipe. There shall be no direct contact of steel with copper.

10/09/2013
9. Supports shall be located at all changes of direction.
DATE:
CONTROL NUMBER
VERIFICATION

10. Structural steel anchors shall be installed as indicated on contract drawings


EDSD

and as required to minimize forces and stresses induced by thermal


conditions in the pipe.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15140
(DCC) NO. BI-10-03041-2001-081
_____________________

5 of 10

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 25


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
B. Clevis Hangers:
ENGG CERT

EDL

EDL

EDL

1. In general, all lines operating at temperatures below 93oC shall be


SLFE
SLFE

SLFE

supported with clevis hangers, oversized as necessary to allow for


insulation thickness.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

2. Piping of size 63.5 mm and smaller shall be supported with clevis hangers
ISUED FOR APPROVAL (IFA) SUBMITTAL

unless otherwise indicated on Contract drawings.


ISUED FOR BID (IFB) SUBMITTAL

C. Roller Hangers:
DESCRIPTION

1. Lines operating above 93oC, 75 mm and larger, shall be supported on roller


hangers or roller chairs.

2. Two rod type roller hangers shall be installed when hanger load exceeds
230 Kg.

D. Trapeze Hangers:
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

1. Trapeze hangers shall be used where multiple pipes are run at the same
JO/EWO

elevation and the hanger load does not exceed 450 Kg. per hanger rod.
DATE

2. U-bolts shall be installed at sufficient intervals to maintain pipe alignment,


and so as to restrict movement due to thermal expansion.
NO.
REV

00
C

DISCIPLINE
E. Insulation Protectors:
ENGINEER
PLR/MG/AK

10/09/2013
On cold lines with operating temperatures of 38oC or less, CONTRACTOR
DATE:
PROJECT
1.
ENGINEER
M. Abu Sultan
shall provide and install rigid foam insulating saddle or section of rigid
10/09/2013
closed cellular glass pipe insulation 300 mm long with aluminum jacket
DATE:
CERTIFIED
backed with vapor barrier pipe covering.
Eduardo Lau

DATE:
10/09/2013 2. On carbon steel piping with operating temperatures of 38oC or higher,
CONSTRUCTION CONTRACTOR shall provide and install:
AGENCY

10/09/2013 a. Steel pipe covering protection saddle for pipes supported with clevis
DATE:
OPERATIONS or roller type hangers.

10/09/2013
b. Structural tees. 300 mm long, minimum height of 25 mm more than
DATE:
insulation thickness, for pipes supported on trapeze hangers.
CONTROL NUMBER
VERIFICATION

3. On nonferrous or galvanized steel piping with operating temperature of


EDSD

38oC or higher, CONTRACTOR shall provide and install 360o rigid foam
DATE:

insulating saddle 300 mm long or section of rigid cellular glass pipe


BY:

insulation of 300 mm long with 360o aluminum jacket backed with vapor
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

barrier pipe covering.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15140
6 of 10
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 26


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
F. Supports for horizontal steel piping shall be located at the following maximum
ENGG CERT

EDL

EDL

EDL

spacings:
SLFE
SLFE

SLFE

mm mm mm Mm

Pipe Size 25 38 50 63.5


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

Max. Spacing 2100 2700 3000 3300


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

Pipe Size 75 100 125 150


Max. Spacing 3600 4200 4800 5100
DESCRIPTION

Pipe Size 200 250 300 350


Max. Spacing 5900 6600 6900 7500

Pipe Size 400 450


Max. Spacing 8100 8400

G. Supports for horizontal copper tubing shall be located at the following maximum
spacings:
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

mm mm

Pipe Size 9.5 thru 19 25 thru 50


DATE

Max. Spacing 1500 2400

Pipe Size 63.5 75 and larger


NO.
REV

00
C

DISCIPLINE
Max. Spacing 3000 3000
ENGINEER
PLR/MG/AK

10/09/2013
DATE:
PROJECT
H. Supports for Horizontal Non-Metallic Pipe:
ENGINEER
M. Abu Sultan

10/09/2013
1. Supports for horizontal non-metallic pipe shall be located in accordance
DATE:
CERTIFIED
with the manufacturer’s recommendations.
Eduardo Lau

DATE:
10/09/2013 I. Attachments to Structural Steel:
CONSTRUCTION
AGENCY
1. Pipe and equipment shall be supported from beams or joists with;
10/09/2013
DATE:
OPERATIONS a. Approved top, and adjustable type beam clamps.

10/09/2013 b. C-clamps with dog-pointed locknut and retaining clip, where no


DATE:
other attachment is possible.
CONTROL NUMBER
VERIFICATION
EDSD

2. Attachment to joists or trusses shall support loads from panel point where
necessary, supplementary steel shall be installed as required to bridge two
DATE:

panels or two joists for transmission of load to panel points.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

3. Drilling or cutting building columns or beams for attachment of pipe


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

supports will not be permitted.


(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15140
7 of 10
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 27


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
4. Welding to structural steel will be permitted only where indicated on
ENGG CERT

EDL

EDL

EDL

Contract drawings and where approved by Royal Commission.


SLFE
SLFE

SLFE

J. Attachment to Concrete Structure:

1. Inserts and expansion shields for attaching hangers to concrete slabs shall
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

be located and installed prior to pouring slabs.


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

2. When general patterns of inserts are provided in slab for use by all
construction trades, compatible threaded rods and nuts shall be provided
DESCRIPTION

and installed.

K. Seismic Protection:

1. Sway braces shall be installed on piping not otherwise rigidly anchored to


preclude damage during seismic activity. Piping runs less than 6100 mm in
length consisting of 50 m size pipe and smaller will not require sway
bracing, unless grouped on trapeze type hangers. Provision of this
paragraph applies to all piping within a 2000 mm line around outside of
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

building unless buried in the ground. Piping grouped for support on trapeze
JO/EWO

type hangers shall be braced at the same intervals as hereinafter provided


for individual pipe runs, with details increase in cross sectional area
DATE

proportionate to the increased weight per linear meter of pipe and contents
supported at each trapeze hanger. No trapeze type hanger shall be secured
with less than two 50 mm bolts.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
2. Transverse sway bracing shall be provided at 9100 mm intervals for pipes
10/09/2013
200 mm size and smaller and at 6100 mm intervals for larger pipes except
DATE:
PROJECT
for cast iron waste pipe which shall braced at 3000 mm intervals.
ENGINEER
M. Abu Sultan

10/09/2013
3. Longitudinal sway bracing shall be provided at 12200 mm intervals.
DATE:
CERTIFIED
Eduardo Lau 4. Vertical runs of copper piping 100 mm and smaller and steel or iron piping
10/09/2013 50 mm and smaller, extending between floor levels or between floor and
DATE:
CONSTRUCTION roof shall be braced at midpoint.
AGENCY

10/09/2013 5. Anchor rods, angles and bars shall be bolted to either pipe clamps or pipe
DATE:
OPERATIONS
flanges at one end and cast-in-place concrete or masonry inserts or clip
angles bolted to the steel structure on the other end. Rods may be solid
10/09/2013
metal or pipe as specified hereinafter.
DATE:
CONTROL NUMBER
VERIFICATION

6. Clamps on uninsulated pipes shall be applied directly to the pipe. Insulated


piping shall have clamps applied over the insulation vapor barrier with high
EDSD

density inserts and metal protection shields under each clamp.


DATE:
BY:

7. Bolts used for attachment of anchors to pipe and structure shall be not less
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

than 12.5 mm diameter.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15140
(DCC) NO. BI-10-03041-2001-081
_____________________

8 of 10

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 28


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
8. Anchor braces shall conform to sizes shown on following table depending
ENGG CERT

EDL

EDL

EDL

on length, seismic zone, and other relevant factors.


SLFE
SLFE

SLFE

Type of Anchor Braces

Type of Brace Maximum Actual Length


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

Angles (mm) Mm
ISUED FOR BID (IFB) SUBMITTAL

38 x 38 x 6.2 1470
50 x 50 x 6.2 2000
DESCRIPTION

63 x 63 x 6.2 2130
75 x 63 x 6.2 2700
75 x 75 x 6.2 3000
Rods (mm)
18.75 940
21.9 1100
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

Flat Bars (mm)


38 x 6.2 325
DATE

50 x 9.4 450
NO.
REV

00
C

Pipe (mm) (Schedule 40)


DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013
25 2130
DATE:
PROJECT
ENGINEER
32 2740
M. Abu Sultan

10/09/2013
38 3150
DATE:
CERTIFIED 50 4000
Eduardo Lau

10/09/2013
DATE:
CONSTRUCTION 9. Spreaders shall be provided between racked or adjacent piping runs to
AGENCY
prevent contact during seismic activity whenever pipe or insulated pipe
10/09/2013 surfaces are less than 50 mm apart. Spreaders to be applied at the same
DATE:
OPERATIONS
interval as sway braces. Spreaders shall be applied to the surface of bare
or insulated hot pipe and over insulation utilizing high density inserts and
10/09/2013
pipe protection shields where vapor barrier type insulation is employed
DATE:
CONTROL NUMBER
VERIFICATION

10. Flexible couplings or joints in building piping shall be provided at bottom of


all pipe risers 100 mm size and larger. Flexible bell and spigot pipe joints
EDSD

using rubber gaskets or no-hub fittings may be used adjacent to tees and
DATE:

elbows for underground waste piping inside of buildings to comply with


BY:

these requirements.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

SECTION 15140
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

9 of 10
(DCC) NO. BI-10-03041-2001-081
_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 29


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
3.03 WELDING
ENGG CERT

EDL

EDL

EDL

A. All welding of steelwork shall be in accordance with AWS D.1.1.


SLFE
SLFE

SLFE

3.04 ADJUSTMENTS
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

A. When supported piping is initially brought to operating temperature, hangers shall


ISUED FOR APPROVAL (IFA) SUBMITTAL

be adjusted and aligned to operating load positions and adjusting screws or nuts,
ISUED FOR BID (IFB) SUBMITTAL

locked.
DESCRIPTION

END OF SECTION
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
NO. JO/EWO
DATE
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013
DATE:
PROJECT
ENGINEER
M. Abu Sultan

10/09/2013
DATE:
CERTIFIED
Eduardo Lau

10/09/2013
DATE:
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION

SECTION 15140
10 of 10
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 30


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 - MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15151 - PLUMBING SPECIALTIES


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Furnish all labor, materials, tools, and equipment; design, fabricate, and install
complete and in place, all the cleanout, drains and flashing as shown on the
DESCRIPTION

drawings, specified herein, and as required for a complete and operable


installation.

1.02 QUALITY ASSURANCE

A. Codes and Standards: Comply with all applicable codes and standards including,
but not limited to, those listed below:

1. UPC Uniform Plumbing Code


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

2. ANSI A112.21.1 Floor Drains.


DATE

1.03 SUBMITTALS

A. Submit for approval manufacturer’s literature and certified prints in accordance with
NO.
REV

00
C

DISCIPLINE Section 15050 Para. 1.03.


ENGINEER
PLR/MG/AK

10/09/2013
DATE:
PROJECT 1.04 PRODUCT DELIVERY, STORAGE AND HANDLING
ENGINEER
M. Abu Sultan

10/09/2013
A. Shall be in accordance with Section 15050 Para. 1.04.
DATE:
CERTIFIED
Eduardo Lau

DATE:
10/09/2013 PART 2 - PRODUCTS
CONSTRUCTION
AGENCY
2.01 MATERIALS AND EQUIPMENT
10/09/2013
DATE:
OPERATIONS A. Cleanouts

10/09/2013 1. GENERAL AREA: Cast iron body with inside caulk outlet, internal coated
DATE:
cleanout plug with seal, with adjustable polish rim and polished brass scoriated
CONTROL NUMBER
VERIFICATION

cover plate and mark “C.O.” cast in top secured to plug by countersunk screw.
EDSD

Cleanout cover plate and rim to be installed flush with finish floor; for pipe sizes
as shown on design drawings
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15151
(DCC) NO. BI-10-03041-2001-081
_____________________

1 of 3

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 31


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
2. BATTERY ROOM/Chemical Waste: Same as Item 1, except acid resistant epoxy
ENGG CERT

EDL

EDL

EDL

coated finish
SLFE
SLFE

SLFE

3. EXTERIOR: Concrete Surfaces, Floor cleanout, cast iron body with gas and water
tight ABS tapered threaded plug. for light traffic areas outside building
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

4. CLEAN OUT: Wall cleanout tee, cast iron body with gas and water tight ABS
ISUED FOR APPROVAL (IFA) SUBMITTAL

tapered threaded plug.


ISUED FOR BID (IFB) SUBMITTAL

5. Acceptable Manufacturers: Zurn, J.R. Smith, Josam or Approved equal.


DESCRIPTION

B. Floor Drains

1. Toilet Room/General Area Floor Drains: Coated Cast iron drain body with
bottom outlet, Adjustable collar with seepage holes and round adjustable
light duty polished nickel bronze strainer with square heel-proof openings,
as manufactured by ZURN, Model No.ZN-415 or approved equal. P-trap
shall be 80 mm.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

2. BATTERY RM/Chemical Waste: Same as item 1 except acid resistant


JO/EWO

coated interior as manufactured by ZURN, Model No.ZN-415-AR or


approved equal. P-trap shall be 80 mm.
DATE

C. Roof Vent Cap: Vandal proof duco cast iron body & hooded dome cap, vandal
NO.
REV

00
C

DISCIPLINE
proof securing device, ZURN model Z-193 or approved equal
ENGINEER
PLR/MG/AK

10/09/2013
D General: Provide Josam or approved equal stainless steel water hammer arrestors
DATE:
PROJECT
on both cold and hot waterlines. Install in an upright position at all quick closing
ENGINEER
M. Abu Sultan
valves, solenoids and plumbing fixtures operated by flush valves. Size in
10/09/2013
accordance with Plumbing and Drainage Institute Standard No WH201.P.D.I.
DATE:
CERTIFIED
rating.
Eduardo Lau Model Series 75000 as manufactured by JOSAM or approved equal is acceptable.
10/09/2013
DATE:
CONSTRUCTION E. Vacuum Breaker: Pressure Vacuum Breaker, ASTM-100, bronze body, plastic
AGENCY
float and disc, ASSE Std. 1001, for hot and cold water, Max. service pressure, 200
10/09/2013 psi @ 70 ºF and 105 psi @ 210 ºF, ANSI B2.1 taper threaded female connections.
DATE:
OPERATIONS
2.02 MOLDED PIPE FLASHING
10/09/2013
DATE:
A. E.P.D.M. pipe flashing which shall be compatible with built-up roofing system.
CONTROL NUMBER
VERIFICATION

2.03 MANUFACTURER / VENDOR


EDSD

DATE:

A. JOSAM
BY:

USA
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15151
(DCC) NO. BI-10-03041-2001-081
_____________________

2 of 3

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 32


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
B. Zurn ind., inc.
ENGG CERT

EDL

EDL

EDL

1801 pittsburg ave.


ERIE PA 16514
SLFE
SLFE

SLFE

USA

C. Jay R. Smith Manufacturing Co.,


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

Montgomery, Alabama, USA


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

D. MIFAB
Eastern Province Trading Est.
DESCRIPTION

AL-Jubail / Telfax:03-361-7792

PART 3 - EXECUTION

3.01 INSTALLATION

A. Install in accordance with manufacturer's instructions.


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

B. Extend cleanouts to finished floor or wall surface. Ensure clearance at cleanouts


JO/EWO

for rodding of drainage system.


DATE

C. Unless indicated otherwise, all floor drains and floor cleanouts shall be flush with
finished floor.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013
DATE:
PROJECT
ENGINEER
M. Abu Sultan

10/09/2013
SECTION 15151
DATE:
CERTIFIED
3 of 3
Eduardo Lau

10/09/2013
DATE:
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 33


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15190 – MECHANICAL IDENTIFICATION


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 SECTION INCLUDES


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Nameplates.
DESCRIPTION

B. Tags.

C. Stencils

D. Pipe Markers

1.02 RELATED WORK


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

A. Section 09900 Painting

B. Section 15010 Basic Mechanical Requirements


DATE

C. Section 15050 Basic Materials & Methods


NO.
REV

00
C

DISCIPLINE D. Section 15310 Fire House System and Portable Fire Extinguishers
ENGINEER
PLR/MG/AK

10/09/2013
1.03 REFERENCES
DATE:
PROJECT
ENGINEER
M. Abu Sultan A. SAES-B-067 Safety identification and color coding.
10/09/2013
DATE:
CERTIFIED
B. SAES-M-100 SAUDI ARAMCO Building Code (Signs within buildings)
Eduardo Lau

DATE:
10/09/2013 C. ASME A 13.1 Scheme for the Identification of Piping Systems.
CONSTRUCTION
AGENCY
1.04 SUBMITTALS
10/09/2013
DATE:
OPERATIONS A. Submit under provisions of General Conditions and Section 15010.

10/09/2013 B. Submit list of wording, symbols, letter size and color coding for mechanical
DATE:
identification.
CONTROL NUMBER
VERIFICATION
EDSD

C. Submit valve chart and schedule, including valve tag number, location, function,
and valve manufacturer’s name and model number. Submit the tag schedule for
DATE:

Machines & Equipment.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

D. Product Data: Provide manufacturers catalog literature for each product required.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15190
1 of 6
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 34


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
E. Samples: Submit two labels, and tags of each type.
ENGG CERT

EDL

EDL

EDL

F. Manufacturer’s Installation Instructions: Indicate special procedures, and


SLFE
SLFE

SLFE

installation.

1.05.1 PROJECT RECORD DOCUMENTS


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

A. Submit under provisions of General Conditions and Section 15010.


ISUED FOR BID (IFB) SUBMITTAL

B. Record actual locations of tagged valves.


DESCRIPTION

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. EMED Company, 330 Green Street, Box 369, Buffalo, NY 14240.

B. Seton Name Plate Corporation, New Haven, CT 06505.


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

C. R.K. Industries, Inc; P.O. Box # 280, Lagrange, TX 78945

D. Approved Equal
DATE

2.02 MECHANICAL SYSTEM COLOR IDENTIFICATION


NO.
REV

00
C

DISCIPLINE A. Safety Color Code


ENGINEER
PLR/MG/AK The colors red, green, orange, and blue shall be reserved for safety uses described
DATE:
10/09/2013 herein.
PROJECT
ENGINEER
M. Abu Sultan For purposes of Identification and accident prevention, equipment and facilities
10/09/2013 shall be color-coded in accordance with the following:
DATE:
CERTIFIED
Eduardo Lau 1. Red shall be used as the color indicator for fire protection equipment and
DATE:
10/09/2013 piping, as well as emergency stop push button devices and signs. Specific
CONSTRUCTION requirements are as follows:
AGENCY

DATE:
10/09/2013 a. Fire protection equipment: portable and fixed fire extinguishment
OPERATIONS systems, the mounting background for fire extinguisher, portable
fire-fighting equipment shall be painted red.
10/09/2013
DATE:
b. Red shall be used for the background of “danger” signs, “emergency
CONTROL NUMBER
VERIFICATION

room” signs and arrows, and “emergency shutdown” signs. The


EDSD

lettering shall be white.


DATE:
BY:

2. Green shall be used as the background color indicator for locations of


emergency safety equipment. Specific requirements are as follows:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15190
(DCC) NO. BI-10-03041-2001-081
_____________________

2 of 6

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 35


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
a. Locations of emergency safety equipment (first aid equipment, safety
ENGG CERT

EDL

EDL

EDL

showers, eye-wash units) shall be identified by green backgrounds


with 100 mm (4 inch) border beyond the equipment outline and with
SLFE
SLFE

SLFE

white lettering 50 mm (2 inch) high within the border.

b. Where wall mounting is used, locations of permanently installed


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

boxes for emergency equipment such as field boxes for breathing


ISUED FOR APPROVAL (IFA) SUBMITTAL

apparatus shall be marked by a green border or background.


ISUED FOR BID (IFB) SUBMITTAL

c. Locations of safety instructions shall be marked by a green border of


DESCRIPTION

background.

3. Orange shall be used as the color indicator for the following:

a. Inlet and outlet block valves for pressure relief valves shall be
painted orange.

b. Valves for isolating Emergency Shutdown (ESD) instruments shall


be painted orange.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

4. Blue shall be used as the color indicator for drinking water and utility water.
Specific requirements: Above ground potable water piping in plant areas
DATE

shall be painted blue:


NO.
REV

Indicate on locations where drinking water is available as “DRINKING


00
C

DISCIPLINE WATER”.
ENGINEER
PLR/MG/AK

DATE:
10/09/2013 Indicate on locations where utility water is provided as “NON-DRINKING
PROJECT
ENGINEER
WATER”.
M. Abu Sultan

DATE:
10/09/2013 B. Piping Identification
CERTIFIED
Eduardo Lau
Piping shall be identified as follows:
10/09/2013
DATE:
CONSTRUCTION
AGENCY
1. A label in English shall be used as the primary and explicit means of
identification for the contents of all aboveground piping. A lettered label
DATE:
10/09/2013 shall give the name of the contents in full or abbreviated form. Arrows shall
OPERATIONS be used to indicate direction of flow. Additional details such as temperature
or pressure shall be added as necessary to highlight the degree of hazard.
10/09/2013
DATE:
2. Labels shall be applied close to valves or flanges and adjacent to changes
CONTROL NUMBER
VERIFICATION

in direction, branches, and where pipes pass over or through walls, floors,
EDSD

and on straight pipe runs, sufficient for identification. Firewater system


sectionalizing block valves shall be identified by their firewater system
DATE:
BY:

identification number.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15190
(DCC) NO. BI-10-03041-2001-081
_____________________

3 of 6

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 36


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
3. The size of the label letters shall not be less than 13mm (1/2 inch), nor
ENGG CERT

EDL

EDL

EDL

greater than 89mm (3-1/2 inches), varying in size depending on the outside
diameter of the pipe. For pipes 52 mm (2 inches) and smaller, use stamped
SLFE
SLFE

SLFE

metal tags or signs clamped to the pipe.

4. For piping 52 mm (2 inches) and smaller running between equipment where


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

the total length is less than 2 meters (6 feet), no labeling is necessary. For
ISUED FOR APPROVAL (IFA) SUBMITTAL

piping on pipe racks, labels shall be oriented so as to be visible from grade


ISUED FOR BID (IFB) SUBMITTAL

level as well as from any nearby platform.


DESCRIPTION

5. Unless otherwise specified herein, the color of the label letters shall be
black (FS 14084; RAL 9005) or white (FS 17925; RAL 9010), whichever
provides the greater contrast to the background color.

C. Valve Identification: Identify the following with tags:


1. Valves in equipment areas.
2. Shut-off valves in piping.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

3. Control Valves.
4. Safety devices
DATE

5. Keys for enclosures


NO.
REV

00
C

D. Tags: 50 mm round, 1.3 mm thick (18 gage) brass or aluminum identification tags.
DISCIPLINE
ENGINEER Stamp with 10 mm high identification letters or fill numbers with black paint. Attach
PLR/MG/AK
tags to, or mount adjacent to, valves with 4 mm (8 gage) brass wire loop with
10/09/2013
DATE: brazed joint.
PROJECT
ENGINEER
M. Abu Sultan
E. Charts: Provide 5 charts/ diagrams designating identification number, or letter
10/09/2013
DATE: service, or function and location of each tagged item. Frame one chart in metal
CERTIFIED frame with glass front. Secure to walls where directed.
Eduardo Lau

10/09/2013
DATE:
CONSTRUCTION
AGENCY F. Piping Identification: Identify all above ground piping including piping located in
suspended ceiling spaces and accessible shafts.
10/09/2013
DATE:
OPERATIONS
1. Markers: Identify with pipe markers similar to Westline “Tel-A-pipes” tape
markers complying with ANSI A 13.1 color standards, with size of the letters
10/09/2013
DATE: determined by the outside diameter of pipe or, if insulated, by outside
CONTROL NUMBER

diameter of insulation as follows:


VERIFICATION
EDSD

a. Up to 2” Diameter: Style 18 for specific service with 13mm letter


DATE:

size.
BY:

b. 2-1/2” Diameter and Over: Style 8X for specific service, with 25mm
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

letter size.
(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15190
4 of 6

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 37


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
c. Location: Space markers at 6 meters on center, at each take off,
ENGG CERT

EDL

EDL

EDL

and at each side of wall. Provide flow direction arrows at each


marker. Style and size to correspond to the marker style and size.
SLFE
SLFE

SLFE

PART 3 - EXECUTION
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

3.0 INSTALLATION
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Install plastic nameplates with Stainless Steel Screws.


DESCRIPTION

B. Install tags with corrosion resistant chain.

C. Install plastic pipe markers in accordance with manufacturer’s instructions.

D. Install plastic tape pipe markers completely around pipe in accordance with
manufacturer’s instructions.

E. Identify air handling units, pumps, heat transfer equipment, and water treatment
devices with plastic nameplates. Small device, such as in-line pumps, may be
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

identified with tags.


JO/EWO

F. Identify control panels and major control components inside and outside panels
DATE

with nameplates.

G. Identify thermostats relating to terminals boxes or valves with nameplates.


NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
H. Identify valves in main and branch piping with tags.
10/09/2013
DATE:
PROJECT
I. Identify air terminal units with numbered tags.
ENGINEER
M. Abu Sultan

10/09/2013
J. Tag automatic controls, instruments, and relays. Key to conform with control
DATE:
CERTIFIED
schematic.
Eduardo Lau

10/09/2013 K. Identify piping, concealed or exposed, with plastic pipe markers. Use tags on
DATE:
CONSTRUCTION piping (3/4 inch) 20 mm diameter and smaller. Identify services, flow direction, and
AGENCY
pressure. Install in clear view and align with axis of piping. Locate identification
10/09/2013 not to exceed (6 feet) 2 m on straight runs including risers and drops, adjacent to
DATE:
OPERATIONS
each valve and tee, at each side of penetration of structure or enclosure, and at
each obstruction.
10/09/2013
DATE:
L. Provide ceiling tacks to locate valves or dampers above T-bar type panel ceilings.
CONTROL NUMBER
VERIFICATION

Locate in corner of panel closest to equipment.


EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

SECTION 15190
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

5 of 6
(DCC) NO. BI-10-03041-2001-081
_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 38


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
M. Attach to each valve an engraved, plastic identification tag indicating valve
ENGG CERT

EDL

EDL

EDL

manufacturer, style, size, normal position, contents of pipe and sequential ID


number.
SLFE
SLFE

SLFE

Tag Identifications to be as follows:


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

Service Abbreviation
ISUED FOR BID (IFB) SUBMITTAL

Raw Water RW
DESCRIPTION

Drinking Water DW
Hot Water HW
Fire Water FW

END OF SECTION
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
NO. JO/EWO
DATE
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013
DATE:
PROJECT
ENGINEER
M. Abu Sultan

10/09/2013
DATE:
CERTIFIED
Eduardo Lau

10/09/2013
DATE:
CONSTRUCTION
AGENCY

10/09/2013 SECTION 15190


DATE:
OPERATIONS
6 of 6

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 39


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 - MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15241 - VIBRATION ISOLATION


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Work Included: The work under this section includes, but is not necessarily limited
to, furnishing and installation of the required vibration isolation for the air
DESCRIPTION

conditioning system.

1.02 QUALITY ASSURANCE

A. Codes and Standards

1. SAUDI ARAMCO Engineering Standards (SAES) and SAUDI ARAMCO


Material Systems Specifications (SAMSS) :
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

SAES-K-001 Heating, Ventilating and Air Conditioning (HVAC)

2. International Codes and Standards :


DATE

ASHRAE handbook. HVAC Applications, Systems and Equipment,


Fundamentals and Refrigeration.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
B. PERFORMANCE:
10/09/2013
DATE:
PROJECT 1. Vibration isolation equipment for the A/C units shall be provided by the
ENGINEER
M. Abu Sultan manufacturer of the equipment.
10/09/2013
DATE:
CERTIFIED
1.03 SUBMITTALS
Eduardo Lau

DATE:
10/09/2013 A. Submit manufacturer’s literature and certified prints in accordance with the
CONSTRUCTION requirements of the specification.
AGENCY
B. Required data shall include but shall not be limited to the following:
10/09/2013
DATE:
OPERATIONS 1. Performance data including loading, static deflection, and isolation
efficiency.
10/09/2013
DATE:
2. Materials of construction
CONTROL NUMBER
VERIFICATION
EDSD

3. Physical dimensions and weights.


DATE:

1.04 PRODUCT HANDLING


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

A. Product delivery, handling and storage shall be in accordance with section 15050,
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Para. 1.04.
(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION - 15241
1 of 3
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 40


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
PART 2 - PRODUCTS
ENGG CERT

EDL

EDL

EDL

2.01 GENERAL
SLFE
SLFE

SLFE

A. Vibration isolators shall be used between equipment and foundation and/or


building structures to minimize transmitted vibration.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

B. Fan casing and air handling units shall be attached to ducts with flexible
ISUED FOR BID (IFB) SUBMITTAL

connectors.
DESCRIPTION

C. Reciprocating compressors shall be vibration isolated from the unit and frame shall
have vibration isolation (such as a vibration pad) between equipment and
equipment base.

D. All fans shall be isolated from their ducts by flexible connection.

E. Air handling units or rotating equipment within the housing of the units shall be
mounted on vibration isolators.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

F. All spring isolators shall be selected in accordance with ASHRAE


JO/EWO

recommendations.
DATE

2.02 MATERIALS

A. Vibration Isolators: Vibration isolators shall be type R - single deflection or type RD


NO.
REV

00
C

DISCIPLINE
- double deflection, or approved equal as required for the necessary static
ENGINEER
PLR/MG/AK
deflection.
10/09/2013
DATE:
PROJECT
The vibration isolators shall consist of a steel top plate and base-plate completely
ENGINEER
M. Abu Sultan
embedded in color coded neoprene stock.
10/09/2013
DATE:
CERTIFIED
Steel top plate shall have a tapped hole as required for bolting isolator to
Eduardo Lau equipment. Steel base-plate shall have bolt holes as required for bolting isolator to
10/09/2013 equipment pad or support.
DATE:
CONSTRUCTION
AGENCY
2.03 ACCEPTABLE MANUFACTURER/VENDOR:
10/09/2013
DATE:
OPERATIONS
A. Vibration Mounting and Controls Inc.
B. Mason Industries USA
10/09/2013
C. Or approved equal.
DATE:
CONTROL NUMBER
VERIFICATION

PART 3 EXECUTION
EDSD

3.01 GENERAL
DATE:
BY:

A. All vibration isolation equipment and materials specified in this section shall be
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

installed as recommended by the manufacturer.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION - 15241
2 of 3
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 41


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
B. Upon completion of installation of all vibration isolation equipment and before start
ENGG CERT

EDL

EDL

EDL

up of isolated equipment, all debris shall be removed from area surrounding and
beneath all isolated equipment.
SLFE
SLFE

SLFE

C. All connections to isolated equipment shall be made so as to allow free motion of


the isolation equipment.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

END OF SECTION
DESCRIPTION

07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
NO. JO/EWO
DATE
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013
DATE:
PROJECT
ENGINEER
M. Abu Sultan

10/09/2013
DATE:
CERTIFIED
Eduardo Lau

10/09/2013
DATE:
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

SECTION - 15241
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

3 of 3
(DCC) NO. BI-10-03041-2001-081
_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 42


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 – MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15290 - DUCT INSULATION


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Work Included: The work under this section includes, but is not necessarily limited
to, furnishing and installation of duct insulation as specified herein and as indicated
DESCRIPTION

on the design drawings.

B. Related Sections:

Section 15891 Metal Ductwork- Low Pressure

Section 15892 Flexible Ductwork

1.02 QUALITY ASSURANCE


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

A. Codes and Standards


DATE

1. SAUDI ARAMCO Engineering Standards (SAES) and SAUDI ARAMCO


Material Systems Specifications (SAMSS) :
NO.
REV

00
C

DISCIPLINE
SAES-K-001 Heating, Ventilating and Air Conditioning (HVAC)
ENGINEER
PLR/MG/AK

10/09/2013
SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code
DATE:
PROJECT
ENGINEER
M. Abu Sultan
2. International Codes and Standards :
10/09/2013
DATE:
CERTIFIED
ASHRAE handbook. HVAC Applications, Systems and Equipment,
Eduardo Lau Fundamentals and Refrigeration.
10/09/2013
DATE:
CONSTRUCTION ASTM American Society for Testing Materials
AGENCY

10/09/2013 NFPA National Fire Protection Association


DATE:
OPERATIONS
UL Underwriters Laboratories, Inc.
10/09/2013
DATE:
UMC Uniform Mechanical Code
CONTROL NUMBER
VERIFICATION

B. Guarantee:
EDSD

DATE:

The insulating systems herein specified shall be free from defects in workmanship
BY:

and material under normal use and service. If within twelve (12) months from the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

date of completion, any of the insulation systems herein described are proved to be
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15290
1 of 5
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 43


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
defective in workmanship or materials, it shall be replaced or repaired free of
ENGG CERT

EDL

EDL

EDL

charge.
SLFE
SLFE

SLFE

C. Fire Resistance

Insulation, adhesive, sealer, vapor-barrier coatings and vapor-barrier materials


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

shall be non combustible as defined in Chapter 4, of Uniform Building Code; shall


ISUED FOR APPROVAL (IFA) SUBMITTAL

have a flame-spread rating of not more than 25 and a smoke developed rating of
ISUED FOR BID (IFB) SUBMITTAL

not more than 50. Materials that are factory applied shall be tested as assembled
and certified by manufacturer to meet standards. Materials which are field applied
DESCRIPTION

may be tested individually. No fugitive or corrosion treatments shall be employed


to impart flame resistance.

1. Flame Spread and Smoke Development Rating: Shall be determined by


Method of Test of Surface Burning Characteristics of Building Materials,
NFPA No. 255, ASTM E48; Underwriter' Laboratories, Inc. Standard No.
723. Such materials are listed in Underwriters Laboratories, Inc. Building
Materials List under Heading "Hazard Classification (Fire)".
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

1.03 SUBMITTALS
JO/EWO

A. Submit manufacturers literature in accordance with the requirements of these


DATE

specifications. The submittal data shall include but shall not be limited to the
following:
NO.
REV

00
C

DISCIPLINE
1. Thickness of Insulation
ENGINEER
PLR/MG/AK

10/09/2013
2. Density
DATE:
PROJECT
ENGINEER
M. Abu Sultan
3. Maximum Temperature Limit
10/09/2013
DATE:
CERTIFIED
4. Fire and Smoke Hazard Rating
Eduardo Lau

10/09/2013 5. Thermal conductivity


DATE:
CONSTRUCTION
AGENCY
6. Permeability of Insulation and Finishes
10/09/2013
DATE:
OPERATIONS
7. Moisture Absorption Data

10/09/2013
8. External Facing or Covering
DATE:
CONTROL NUMBER
VERIFICATION

9. Description of:
EDSD

a. Adhesives
DATE:

b. Mechanical Fasteners
BY:

c. Application, finishing and flashing materials and methods.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15290
(DCC) NO. BI-10-03041-2001-081
_____________________

2 of 5

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 44


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
1.04 PRODUCT HANDLING
ENGG CERT

EDL

EDL

EDL

A. Product delivery, handling and storage shall be in accordance with section 15050,
SLFE
SLFE

SLFE

Para. 1.04.

PART 2 - PRODUCTS
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

The material specified for interior and exterior ducts are as per Uniform Mechanical Code-1997
ISUED FOR BID (IFB) SUBMITTAL

(UMC), Section 604 (Table 6-D).


DESCRIPTION

2.01 INTERIOR DUCT INSULATION

A. Thermal Insulation: Fiberglass faced duct wrap:

1. Density: 24 kg/m³ (1.5 lb/ft³)

2. Thickness: 50 mm (2-inch)

3. Thermal Conductivity: .0.035 W/M². °C (0.24 Btu.in /ft². Hr.°F) at 24°C


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

(75°F)
JO/EWO

4. Exterior Facing: Foil-Reinforced-Kraft (FRK)


DATE

5. Maximum Air Temperature: 121°C


NO.
REV

00
C

DISCIPLINE
6. Adhesive: Foster STIC-SAFE Adhesive 85.15
ENGINEER
PLR/MG/AK

10/09/2013
7. Tape: Reinforced Kraft Tape with pressure sensitive adhesive
DATE:
PROJECT
ENGINEER
M. Abu Sultan
8. U.L. Requirements: Flame spread rating of 25 or less and smoke
10/09/2013
developed rating of 50 or less
DATE:
CERTIFIED
Eduardo Lau B. Vapor Barrier: Material with a perm rating not exceeding .5 perm on all joints to be
10/09/2013 sealed.
DATE:
CONSTRUCTION
AGENCY
2.02 EXTERIOR DUCT INSULATION
10/09/2013
DATE:
OPERATIONS
A. Thermal Insulation: Fiberglass faced duct wrap:

10/09/2013
1. Density: 24 kg/m³ (1.5 lb/ft³)
DATE:
CONTROL NUMBER
VERIFICATION

2. Thickness: 50 mm (2 inch)
EDSD

3. Thermal Conductivity: 0.035 W/M² °C ( 0.24 Btu.in/ft² Hr. °F) at 24 °C (75 °F)
DATE:
BY:

4. Exterior Facing: Foil-Reinforced-Kraft (FRK)


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

5. Maximum Air Temperature: 121°C


(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15290
3 of 5
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 45


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

6. Adhesive: Foster STIC-SAFE Adhesive 85.15


SLFE
SLFE

SLFE

7. Tape: Reinforced Kraft Tape with pressure sensitive adhesive

8. U.L. Requirements: Flame spread rating of 25 or less and smoke


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

developed rating of 50 or less


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

B. Vapor Barrier: Material with a perm rating not exceeding .5 perm. All joints to be
sealed.
DESCRIPTION

C. Approved weather proof paint

2.03 ACCEPTABLE MANUFACTURER:

Arabian Fiber Glass Insulation Co. or approved equal for thermal insulation.

PART 3 - EXECUTION
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

3.01 GENERAL
JO/EWO

A. Limitations: Materials specified shall be applied subject to their temperature limits.


DATE

Any methods of application of insulating materials or finishes not specified in detail


herein shall be in accordance with the particular manufacturers published
recommendations.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
B. The application of all insulation materials shall be supervised by a competent, well-
10/09/2013
qualified person and the work shall be performed by mechanics skilled in the trade.
DATE:
PROJECT
ENGINEER
M. Abu Sultan
C. All insulation and finishes shall be installed according to the manufacturers
10/09/2013
recommendations and workmanship shall be first class in every aspect. Joints
DATE:
CERTIFIED
shall be tightly butted and the insulation materials securely attached to the duct.
Eduardo Lau Duct shall be clean and dry before any insulation is applied. The insulation shall
10/09/2013 be cut and fitted around irregular surfaces, and the covering applied tight and
DATE:
CONSTRUCTION smooth.
AGENCY

10/09/2013 D. Adhesive, sealers, vapor barrier coatings etc. shall be compatible with the
DATE:
OPERATIONS
materials to which they are applied, and shall not corrode, soften or otherwise
attack such material in either the wet or dry state.
10/09/2013
DATE:
3.02 INSTALLATION
CONTROL NUMBER
VERIFICATION

A. Notify the Company Representative of insulation schedule so that he may observe


EDSD

all duct insulation before it is concealed from view.


DATE:
BY:

B. Apply adhesive to the ductwork in 10.2 cm strips on 20.3 cm centers and allow
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

drying time as necessary.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15290
4 of 5
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 46


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

C. Tightly wrap insulation around duct with all circumferential joints butted and with
facing overlapped at least 2 inches.
SLFE
SLFE

SLFE

D. Longitudinal joints shall overlap at least 5 cm


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

E. Secure all joints with 1.43 cm flare-door staples applied 6 inches on center.
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

F. On rectangular ductwork in excess of 60.9 cm wide, apply stick clips to the bottom
DESCRIPTION

of the duct at 45.7 cm on center, apply washers to the stick clips and clip the pins
flush with the washers.

G. All joints as well as all penetrations in the facing of the insulation shall be taped
with 7.6 cm wide foil reinforced Kraft tape.

3.03 LABEL

A. Duct insulation shall be labeled or identified as per IMC – Section 604.7.


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

B. Insulation shall be marked at max 36” internal with:


 Name of manufacturer
DATE

 Thermal resistance (R-Value)


 Flame spread indices
 Smoke developed indices
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013
DATE:
PROJECT END OF SECTION
ENGINEER
M. Abu Sultan

10/09/2013
DATE:
CERTIFIED
Eduardo Lau

10/09/2013
DATE:
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:

SECTION 15290
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

5 of 5
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 47


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 - MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15310 - PORTABLE FIRE EXTINGUISHER


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Furnish all labor, material, tools, and equipment; fabricate, furnish and install all
portable fire extinguishers complete and in place, including all associated hardware
DESCRIPTION

as specified herein, and as indicated on drawings for a complete and proper


installation. Items required for this work include, but are not necessarily limited to:

1. Portable fire extinguisher cabinets.

2. Portable fire extinguishers

3. Preparations of complete shop drawings for the entire protection systems


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

and approvals.

4. All required patent rights satisfaction; and inspections.


DATE

5. Protection of materials and protective coatings.


NO.
REV

00
C

DISCIPLINE 6. Cleaning, testing, and adjusting.


ENGINEER
PLR/MG/AK

10/09/2013
7. Record Drawings of work installed.
DATE:
PROJECT
ENGINEER
M. Abu Sultan B. Related Section : Section 15050 - Basic Material and Methods.
10/09/2013
DATE:
CERTIFIED
Eduardo Lau 1.02 QUALITY ASSURANCE
10/09/2013
DATE:
CONSTRUCTION A. Codes and Standards: Comply with all applicable codes and standards including,
AGENCY
but not limited to, those listed below:
10/09/2013
DATE:
OPERATIONS
1. NFPA 10 Standard for Portable Fire Extinguisher

10/09/2013
2. SAES-B-019 Portable Mobile and Special Fixed Fire Fighting Equipment.
DATE:
CONTROL NUMBER

1.03 SUBMITTALS
VERIFICATION
EDSD

A. General: In compliance with requirements in Section 01340 and Section 15010,


DATE:

and submit the followings items for Company Representative’s review and
BY:

approval.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15310
(DCC) NO. BI-10-03041-2001-081
_____________________

1 of 4

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 48


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

B. Manufacturer’s Data:
1. Complete material list of items proposed to be furnished and installed under
SLFE
SLFE

SLFE

this Section.

2. Manufacturer’s specifications and other data required to demonstrate


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

compliance with the specified requirements including: catalog numbers,


ISUED FOR APPROVAL (IFA) SUBMITTAL

trade names, illustrations, and descriptive data for each article proposed.
ISUED FOR BID (IFB) SUBMITTAL

All pertinent data for each article shall be underlined in each copy of each
catalog or brochure in which it is described.
DESCRIPTION

3. Names and addresses of the service and maintenance organizations


nearest the WORK Sites that readily stocks repair parts.

4. Manufacturer’s recommended installation procedures which, when


approved by SAUDI ARAMCO, shall become the basis for inspecting and
accepting or rejecting actual installation procedures used on the work.

C. Fire Systems Shop Drawings: Submit complete and accurate construction shop
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

drawings, to scale, of all fire systems, as follows:


JO/EWO

1. Working drawings for the portable fire extinguisher installation in


accordance with NFPA 10.
DATE

2. Verify job conditions by examining all contract documents so as to be fully


cognizant of all work required under this Section, and examine the work of
NO.
REV

00
C

DISCIPLINE
other Divisions or Sections for interferences and conditions affecting the
ENGINEER
PLR/MG/AK
work of this Section.
10/09/2013
DATE:
PROJECT
3. Drawings shall show other major piping, ductwork, lighting fixtures,
ENGINEER
M. Abu Sultan
structural elements, and equipment that shall be coordinated with the fire
10/09/2013
system(s) arrangement(s).
DATE:
CERTIFIED
Eduardo Lau 1.04 PRODUCT DELIVERY, STORAGE AND HANDLING
10/09/2013
DATE:
CONSTRUCTION A. General: Shall be in conformance with Section 15050 Para. 1.04.
AGENCY

10/09/2013 PART 2 - PRODUCTS


DATE:
OPERATIONS
2.01 MATERIALS
10/09/2013
DATE:
A. Portable Fire Extinguisher Cabinets
CONTROL NUMBER
VERIFICATION

1. Cabinets shall be of sufficient size to accommodate 11.4 Kg Multipurpose


EDSD

Dry Chemical portable Fire Extinguisher, and so designed as to not


DATE:

interfere with the prompt use of the equipment at the time of fire. The
BY:

cabinet shall be conspicuously identified in both English and Arabic with the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

Arabic above or to the right of English. Height of lettering shall be between


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

50mm and 75mm.


(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15310
2 of 4
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 49


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

2. Materials
SLFE
SLFE

SLFE

a. Sheet steel for cabinet body shall be cold rolled annealed, stretcher
leveled, bonderized or equivalent treatment and cleaned for the
finish specified.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

b. Stainless steel for door and frame shall be type 304.


ISUED FOR BID (IFB) SUBMITTAL
DESCRIPTION

3. Construction

a. Body shall be sheet steel not less than 1.5mm (16 gauge) thick,
one piece full welded with square corners, or seamless front full
welded to back and at corners. Welds shall be continuous in full
depth and width dressed smooth and flushes on exposed interior
and exterior surfaces. Sides shall be blanked or counter sunk for
hardware.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

b. Door and frame shall be hollow metal rigid tubular stainless steel
JO/EWO

construction, welded and ground smooth not less than 1.5mm (16
gauge) thick.
DATE

4. Finish
NO.
REV

00
C

DISCIPLINE
a. Prime concealed exposed metal surfaces of cabinet body with one
ENGINEER
PLR/MG/AK
coat of baked enamel primer. Ground smooth exposed surfaces.
10/09/2013
DATE:
PROJECT
b. Exposed interior surfaces, in addition to the prime coat, shall have
ENGINEER
M. Abu Sultan
not less than two coats of baked enamel finish, color shall be white.
10/09/2013
DATE:
CERTIFIED
5. Hardware
Eduardo Lau

10/09/2013 a. Cabinets shall have hinges and latch.


DATE:
CONSTRUCTION
AGENCY
b. Hinges shall be continuous stainless steel permitting door to open
10/09/2013 180 degrees.
DATE:
OPERATIONS

10/09/2013
B. Fire Extinguishers:
DATE:
CONTROL NUMBER
VERIFICATION

1. Portable Carbon Dioxide Type: CO2, Class B & C, SAMSS 21-102-223


EDSD

2. Dry Chemical MultipurposeType: Class A, B & C SAMSS 21-102-775.


DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15310
(DCC) NO. BI-10-03041-2001-081
_____________________

3 of 4

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 50


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
PART 3 - EXECUTION
ENGG CERT

EDL

EDL

EDL

3.01 INSTALLATION
SLFE
SLFE

SLFE

A. General:
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1. Examine the areas and conditions under which work of this Section shall be
ISUED FOR APPROVAL (IFA) SUBMITTAL

performed. Correct conditions detrimental to the proper and timely


ISUED FOR BID (IFB) SUBMITTAL

completion of the work. Do not proceed until unsatisfactory conditions have


been correct.
DESCRIPTION

2. Install equipment where indicated on the approved shop drawings.

3. Avoid interference with structure and the work of other trades. Do not make
changes from approved drawings unless acceptable to SAUDI ARAMCO.

3.02 INSPECTION
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

Check each piece of equipment in the system for defects, verifying that all parts are
JO/EWO

properly furnished and installed and in proper operating conditions.


DATE

All new Fire Extinguishers shall be delivered to concerned area Fire protection Department
(Fr’ PD) for inspection prior to being placed in service, in compliance with G.I 1791
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013
END OF SECTION
DATE:
PROJECT
ENGINEER
M. Abu Sultan

10/09/2013
DATE:
CERTIFIED
Eduardo Lau SECTION 15310
DATE:
10/09/2013 4 of 4
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 51


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 - MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15402 – ABOVEGROUND WATER SUPPLY PIPING SYSTEM


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Description of System: Potable water piping up to 80 psig and 140ºF, installed


above floor inside building and underground up to the tie-in point outside the
DESCRIPTION

building

1.02 QUALITY ASSURANCE

A. Applicable Codes and Standards: Conform to the codes and standards listed but
not limited:

UPC Uniform Plumbing Code (Latest Edition)


ASTM American Society of Testing & Materials
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

MSS SP 80 Bronze Gate, Globe, Angle and Check Valves.


JO/EWO

1.03 SUBMITTALS
DATE

A. Submittals shall be in accordance with Section 15050 Para. 1.03.


NO.
REV

00
C

DISCIPLINE
1.04 PRODUCT DELIVERY, STORAGE AND HANDLING
ENGINEER
PLR/MG/AK

10/09/2013
A. Shall be in accordance with Section 15050 Para. 1.04.
DATE:
PROJECT
ENGINEER
M. Abu Sultan
PART 2 - PRODUCTS
10/09/2013
DATE:
CERTIFIED
2.01 MATERIALS
Eduardo Lau

10/09/2013 A. 3” and Smaller Cold & Hot water Piping Systems


DATE:
CONSTRUCTION
AGENCY
1. Pipe material as mentioned in UPC Chapter 6 for plastic pipe and fittings.
10/09/2013
DATE:
OPERATIONS
2. Cold : CPVC Sch 80, ASTM F441, GR-4120.

10/09/2013
3. Fittings for solvent cement joints: CPVC Sch. 80, ASTM F439, GR-4120.
DATE:
CONTROL NUMBER
VERIFICATION

4. Solvent Cement: ASTM 493 CPVC to PVC or CPVC


EDSD

5. All cPVC pipes exposed to return air plenum shall be fire proofed to comply with
DATE:

NFPA-90A
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15402
(DCC) NO. BI-10-03041-2001-081
_____________________

1 of 3

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 52


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
B. Valves
ENGG CERT

EDL

EDL

EDL

1. Gate Valves:
SLFE
SLFE

SLFE

2” and below: Class 150, threaded, Bronze body and trim ASTM B61/B62,
MSS-SP-80
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

3” and Above: Class 150, FF flanged, Bronze ASTM B61/62 or AL-BR


ISUED FOR APPROVAL (IFA) SUBMITTAL

body, trim ASTM B61/B62, or Monel or AL-BR, BB


ISUED FOR BID (IFB) SUBMITTAL

2. Globe Valves:
DESCRIPTION

2” and below: Class 150, threaded, Bronze body and trim ASTM B61/B62,
MSS-SP-80

3” and Above: Class 150, FF flanged, Bronze ASTM B61/62 or AL-BR


body, trim ASTM B61/B62, or Monel or AL-BR, BB

3. Check Valves:
2” and below: Class 150, threaded, Bronze body and trim ASTM B61/B62,
MSS-SP-80
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

3” and Above: Class 150, FF flanged, Bronze ASTM B61/62 or AL-BR


body, trim ASTM B61/B62, or Monel or AL-BR, BC
DATE

C. Piping Insulation
NO.
REV

00
C

DISCIPLINE
Hot water piping exposed and concealed: Fibrous glass, 1-inch thick preformed
ENGINEER
PLR/MG/AK
pipe insulation with nominal minimum density of 4 pounds per cubic foot, with all
10/09/2013
joints tightly butted; with overlapping longitudinal joints integral with jacket, and with
DATE:
PROJECT
3-inch wide separate butt strips; tightly sealed with adhesive.
ENGINEER
M. Abu Sultan

10/09/2013
2.02 MANUFACTURER/VENDOR
DATE:
CERTIFIED
Eduardo Lau A. Pipes
10/09/2013
DATE:
CONSTRUCTION 1. SAPPCO (Manufacturer)
AGENCY
Dammam
10/09/2013 Tel: 857-5784 / 857-3323
DATE:
OPERATIONS
2. NEPRO (Manufacturer)
10/09/2013
Jeddah
DATE:
Tel: 636-3558 / 636-1596 Fax: 636-2364
CONTROL NUMBER
VERIFICATION

3. BINEX (Vendor)
EDSD

Al-Khobar/Tel: 857-2080
DATE:
BY:

4. Saudi Pan Gulf (Vendor)


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

Tel: 857-2025/857-9366 Fax: 857-5067


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15402
2 of 3
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 53


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

B. Fittings
SLFE
SLFE

SLFE

1. LASCO (Manufacturer)
USA
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

2. Charlotte (Manufacturer)
North Carolina
DESCRIPTION

USA

C. Valves

1. NIBCO Inc. (Manufacturer)


500 Simpson
Elkhart Indiana
USA
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

2. Saudi Pan Gulf (Vendor)


JO/EWO

Tel: 857-2025/857-9366 Fax: 857-5067


DATE

PART 3 - EXECUTION

3.01 INSTALLATION
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
A. Follow manufacturer’s instructions and Uniform Plumbing Code (UPC) Latest
10/09/2013
Edition.
DATE:
PROJECT
ENGINEER
M. Abu Sultan
B. Tests: Hydrostatic test conforming to Uniform Plumbing Code (UPC) Latest Edition
10/09/2013
DATE:
CERTIFIED
D. Disinfection: When complete, flush and sterilize in accordance with the
Eduardo Lau requirements of Uniform Plumbing Code (UPC) Latest Edition.
10/09/2013
DATE:
CONSTRUCTION
AGENCY

10/09/2013 END OF SECTION


DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

SECTION 15402
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

3 of 3
(DCC) NO. BI-10-03041-2001-081
_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 54


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

DIVISION 15 - MECHANICAL
SLFE
SLFE

SLFE

SECTION 15406 - SEWER DRAIN WASTE AND VENTS


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

PART 1 - GENERAL
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

1.01 DESCRIPTION OF SYSTEM


DESCRIPTION

A. Gravity flow sanitary waste drain and vent piping, 6” and smaller, installed inside
building up to the tie-in point

B. Acid waste and vent piping installed inside building up to the tie-in point.

1.02 QUALITY ASSURANCE

A. Applicable Codes and Standards: Conform to the codes and standards listed but
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

not limited:
JO/EWO

UPC Uniform Plumbing Code (Latest Edition)


DATE

ASTM American Society of Testing & Materials


NO.
REV

00
C

1.03 SUBMITTALS
DISCIPLINE
ENGINEER
PLR/MG/AK
A. Submittal shall be in accordance with Section 15050 Para. 1.03.
10/09/2013
DATE:
PROJECT
ENGINEER
1.04 PRODUCT DELIVERY, STORAGE AND HANDLING
M. Abu Sultan

10/09/2013 A. Shall be in accordance with Section 15050 Para. 1.04.


DATE:
CERTIFIED
Eduardo Lau

DATE:
10/09/2013 PART 2 - PRODUCTS
CONSTRUCTION
AGENCY
2.01 MATERIALS
10/09/2013
DATE:
OPERATIONS A. Drain, waste, Vent Pipe and Fittings: Shall conform to UPC Chapter 7.

DATE:
10/09/2013 1. PVC Sch. 40, ASTM D2665 and ASTM D3311 Pattern Fittings.
CONTROL NUMBER
VERIFICATION

2. Joining of pipes and fittings shall be by use of solvent weld sockets carried
EDSD

out in accordance with the manufacturer’s instructions. Solvent weld cement


shall be as per manufacturer’s recommendation for the pipes being joined.
DATE:
BY:

3. All PVC pipes exposed to return air plenum shall be fire proofed to comply with
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

NFPA-90A.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15406
(DCC) NO. BI-10-03041-2001-081
_____________________

1 of 2

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 55


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

B. Acid, Chemical Wastes: Acid Resistant Drainage – Vent Pipes and Fittings
SLFE
SLFE

SLFE

1. All underground and aboveground acid-resistant drainage drain and vent


lines for Battery room and other locations noted on the plumbing drawings
or required by code shall be provided with flame retardant, non-pressure
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

polypropylene schedule 40 pipe and fittings conforming to ASTM D4101


ISUED FOR APPROVAL (IFA) SUBMITTAL

and ASTM F1412. The jointing method for providing permanent leak proof
ISUED FOR BID (IFB) SUBMITTAL

joints for the polypropylene pipe and fittings shall be heat fusion.
DESCRIPTION

2. Contractor shall supply all fusion equipment pipe and fittings necessary to
provide a complete acid waste drain and vent system.

C. All pipes exposed to return air plenum shall be fire proofed to comply with NFPA-
90A

2.02 MANUFACTURER/VENDOR

A. Plastic Pipe
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

1. SAPPCO (Manufacturer)
Dammam
DATE

Tel: 857-5784/857-3323 Fax: 857-1969

2. NEPRO (Manufacturer)
NO.
REV

00
C

DISCIPLINE
Jeddah
ENGINEER
PLR/MG/AK
Tel: 636-3558/636-1596 Fax: 636-2364
10/09/2013
DATE:
PROJECT
B. Fittings
ENGINEER
M. Abu Sultan

10/09/2013
1. LASCO (Manufacturer)
DATE:
CERTIFIED
USA
Eduardo Lau

10/09/2013 2. Charlotte
DATE:
CONSTRUCTION North Carolina
AGENCY
USA
10/09/2013
DATE:
OPERATIONS
PART 3 - EXECUTION

10/09/2013
3.01 INSTALLATION
DATE:
CONTROL NUMBER
VERIFICATION

A. Installation shall be in accordance with Uniform Plumbing Code UPC (Latest


Edition).
EDSD

DATE:

B. All conduit penetrating fire rated walls shall be concealed in 1-hour fire rated
BY:

construction.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15406
(DCC) NO. BI-10-03041-2001-081
_____________________

2 of 2

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 56


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 - MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15407 - STORM DRAINAGE SYSTEM


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Description of System
DESCRIPTION

1. Storm drainage piping. Installed interior of building

1.02 QUALITY ASSURANCE

A. Applicable Standards: Comply with Uniform Plumbing Code (UPC) Latest Edition

B. Installation: Installation shall be in accordance with the requirements of Uniform


Plumbing Code (UPC) Latest Edition
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

PART 2 - PRODUCTS

2.01 MATERIALS
DATE

A. Storm Drainage Pipe (Placed within the Interior of Building)


NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
1. PVC Sch40 DWV or approved equal.
10/09/2013
DATE:
PROJECT PART 3 - EXECUTION
ENGINEER
M. Abu Sultan

10/09/2013
A. All storm drainage shall be installed in accordance with the requirements Uniform
DATE:
CERTIFIED
Plumbing Code (UPC) Latest Edition
Eduardo Lau

DATE:
10/09/2013 END OF SECTION
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15407
(DCC) NO. BI-10-03041-2001-081
_____________________

1 of 1

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 57


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 - MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15440 - PLUMBING FIXTURES


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Furnish all labor, materials, tools and equipment; design, fabricate, and install
complete and in place all the plumbing systems as shown on the drawings,
DESCRIPTION

specified herein, and as required for a complete and operable installation. Items
required for this work include, but are not necessarily limited to:

1. Water Closets
2. Lavatories
3. Electric Water Heaters
4. Hose Bibs
5. Janitor Sink
6. Pantry Sink
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

1.02 QUALITY ASSURANCE


DATE

A. Codes and Standards: Comply with all applicable codes and standards including,
but not limited to, those listed below:
NO.
REV

00
C

DISCIPLINE
ANSI A112.6.1 Supports for Off-The-Floor Plumbing Fixtures for Public Use.
ENGINEER
PLR/MG/AK

10/09/2013
ANSI A112.18.1 Finishes and Rough Brass Plumbing Fixture Fittings.
DATE:
PROJECT
ENGINEER
M. Abu Sultan
ANSI A112.19.1 Enameled Cast Iron Plumbing Fixtures.
10/09/2013
DATE: ANSI A112.19.2 Vitreous China Plumbing Fixtures.
CERTIFIED
Eduardo Lau

10/09/2013 ANSI A112.19.5 Trim for Water Closet Bowls, Tanks and Urinals.
DATE:
CONSTRUCTION
AGENCY ANSI Z358.1 Emergency Shower And Eyewash Equipment
10/09/2013
DATE:
OPERATIONS
1.03 SUBMITTALS

10/09/2013
A. Submit manufacturer’s data in accordance with 15050 Para. 1.03 on each item
DATE:
complete with all dimensions including rough-in location of final connections,
CONTROL NUMBER
VERIFICATION

details of setting, interrelation with elements supplied by others, etc.


EDSD

B. Certificates of compliance with standards cited.


DATE:
BY:

1.04 PRODUCT DELIVERY, STORAGE AND HANDLING


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

A. Submit in accordance with Section 15050 Para. 1.04.


(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15440
1 of 5
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 58


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
PART 2 - PRODUCTS
ENGG CERT

EDL

EDL

EDL

2.01 FIXTURE SUPPORTS


SLFE
SLFE

SLFE

A. Plumbing fixture supports shall conform to ANSI A112.6.1.


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

2.02 VITREOUS CHINA FIXTURES


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. All fixtures specified as vitreous china shall be of the best quality, non-absorbent
and burned so that the whole mass is thoroughly fused and vitrified, producing a
DESCRIPTION

material white in color which when fractured will show a homogeneous mass, close
grained and free from pores.

B. Glazing shall be white, thoroughly fused and united to body without discoloration,
chips of flaws, and shall be free from craze.

C. Warped or otherwise imperfect fixtures shall not be acceptable.

D. Vitreous china fixtures shall comply with ANSI A112.19.2. Fixtures shall be of
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

institutional types.
JO/EWO

2.03 FIXTURE TRIM


DATE

A. Exposed fixture trim which includes faucets, strainers, escutcheons, shower heads,
water closet supplies, stops, waste, trap and all trimmings below lavatories, etc.
NO.
REV

00
C

DISCIPLINE
shall be made of brass and shall be polished chrome-plated.
ENGINEER
PLR/MG/AK

10/09/2013
B. Brass for chrome plating shall conform to ANSI A112.18.1 and shall be thoroughly
DATE:
PROJECT
cleaned and polished before plating.
ENGINEER
M. Abu Sultan

10/09/2013
C. Plating shall be thoroughly and evenly applied and guaranteed not to strip or peel.
DATE:
CERTIFIED
Eduardo Lau D. Fixture trims shall be chromium-plated, electro-deposited.
10/09/2013
DATE:
CONSTRUCTION E. Trim shall comply with ANSI A112.19.5.
AGENCY

10/09/2013
DATE:
OPERATIONS
2.04 SCHEDULE FIXTURES

10/09/2013
A. Water Closet, Western Type (WWC)
DATE:
CONTROL NUMBER
VERIFICATION

1. Western Water Closet- Floor mounted, white vitreous china, elongated BOWL:
MADERA™ ELONGATED 10” ROUGH, 2234.015 Top spud By American Standard
EDSD

or approved equal
DATE:
BY:

Flush Valve: Sloan Royal #111 Or Approved Equal


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15440
2 of 5
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 59


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
2. Seat: Water closet, elongated open front seat less cover, solid plastic, complete
ENGG CERT

EDL

EDL

EDL

with post & pintle hinges washers & nuts white, olsonite 95, American Standard
or approved equal.
SLFE
SLFE

SLFE

3. Spray, perennial: Using angle valve with lever handle, SLO compression unit,
in-line backflow preventer, flexible stainless steel hose, and hand spray outlet
with wall hook. Ideal standard Model # N9651AA or approved equal.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

4. EASTERN WATER CLOSET


ISUED FOR BID (IFB) SUBMITTAL

Bowl: Wash-down, eastern type, 430 mm wide x 535 mm length x 220mm


DESCRIPTION

deep min. 38.1 mm (1-1/2 in) inlet, elongated bowl, white vitreous china, 100
mm (4 in) P-trap outlet. The water closet bowl shall be Al Wadi 600

Flush Valve: Exposed Water Closet Flushometer, for top inlet squat toilets
Model 136-1.6 Low Consumption (1.6 gpf/6.0 Lpf) By Sloan Or Approved Equal

B. Lavatory:

1. Lavatory (Under Counter Type): White, vitreous china with unglazed rim
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

21-1/4" x 17-1/4" with P-trap, angle stop and 5821.962 faucet. American
JO/EWO

Standard Ovalyn 0497.012 or approved equal.


DATE

2. Wall-hung lavatory, white vitreous China, front overflow, D-shaped bowl,


self-draining deck are with contoured back and side splash shields. 20-1/2”
x 18-1/4” with P-trap, angle-stop and faucet 4801.862 amarilis heritage.
NO.
REV

00
C

DISCIPLINE
American Standard Lucerne 0356.015 or approved equal.
ENGINEER
PLR/MG/AK

10/09/2013
DATE:
PROJECT
C. Hose Bib: ANSI/ASSE 1011; cast bronze hose bib with laceable hexagonal disc,
ENGINEER
M. Abu Sultan
¾” HPT outlet, vacuum breaker. Acceptable Manufacturers
1. J. R. Smith
10/09/2013
DATE: 2. Josam
CERTIFIED
Eduardo Lau 3. Zurn
10/09/2013 OR Approved equal is acceptable.
DATE:
CONSTRUCTION
AGENCY

10/09/2013
D. Pressure Temperature Relief Valves
DATE:
OPERATIONS
1. General: ASME rated and labeled for 150 psi factory set at 160 ºF and 100
10/09/2013
psig opening pressure.
DATE:
CONTROL NUMBER
VERIFICATION

E. Emergency eyewash:
Emergency Eyes Wash shall be Manufactured by Bradley or approved equal.
EDSD

Emergency Eyes Wash shall be complete with self-closing valve, eyes wash
DATE:

fountain, chain and ring. The base support material shall be toxic and corrosion
BY:

resistant. Emergency Eyes Wash shall be in accordance with ANSI Z358.1. All
APPROVAL/CERTIFICATION REQUIREMENTS,

components shall have rough nickel plate finish.


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

F. Service/Janitor Sink:
LAKEWELL SERVICE SINK Model 7692.008 with Exposed yoke Wall-Mount utility
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 60


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
faucet model 8350.243 and trap model 7798.030 manufactured by American
ENGG CERT

EDL

EDL

EDL

standard or Approved Equal.


SLFE
SLFE

SLFE

G. Pantry Sink

Stainless steel single bowl top mount sink Model 7501.103 with single faucet hole
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

by American Standard or approved equal. Nominal dimensions shall be 25” long x


ISUED FOR APPROVAL (IFA) SUBMITTAL

22” width x 9” high. Faucet shall be 4137.001.


ISUED FOR BID (IFB) SUBMITTAL

H. URINAL
DESCRIPTION

Vitreous china, top spud, low consumption(1.0GPF), flushing rim, blowout flush action,
1-1/4 inlet spud American Standard Model #6601.012, Flush valve, SLOAN model
180-1.0 manual top spud.

I. Electric Water Heater (EWH):

Heaters shall have a maximum working pressure of 150 psi, 22 Gal. storage tank with
a separate 3/4" tapping for relief valve installation and a rigidly supported anode rod
07/01/2013 10-03041

for maximum cathodic protection. All integral surfaces of the heaters exposed to
10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

water shall be glass-lined with an alkaline borosilicate composition fused-to-steel.


Electric heating element shall be zinc plated copper sheath, screw-in design. The
control shall include a thermostat with high temperature cutoff. The jacket shall
DATE

provide full size control compartment for performance of service and maintenance
thru front panel opening and enclosed the tank with foam insulation. Inlet/outlet
NO.
REV

00
C

connections shall be located in the front foe easy installation. Outer jacket shall be
D

DISCIPLINE
ENGINEER
baked enamel finish. Heaters shall have a 5 year limited warranty. Heaters shall
PLR/MG/AK meet ASHRAE Standard 90A-1980 for energy efficiencies and the minimum energy
DATE:
10/09/2013 factor required by the Federal “National Appliance Energy Conservation Act of 1987
PROJECT (NAECA)”. Heaters shall be as manufactured by A. O. Smith Model or approved
ENGINEER
M. Abu Sultan equal.
10/09/2013
DATE:
CERTIFIED Heaters shall be rated according to ratings asshown on the plumbing drawings and
Eduardo Lau shall be listed by Underwriters Laboratories, Inc. (U.L.).
10/09/2013
DATE:
CONSTRUCTION
AGENCY
PART 3 – EXECUTION
10/09/2013
DATE:
OPERATIONS 3.01 INSPECTION

DATE:
10/09/2013 Examine the areas and conditions under which work of this Section will be
performed. Correct conditions detrimental to the proper and timely completion of
CONTROL NUMBER
VERIFICATION

the work. Do not proceed until unsatisfactory conditions have been corrected.
EDSD

3.02 INSTALLATION
DATE:
BY:

A. General:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15440
(DCC) NO. BI-10-03041-2001-081
_____________________

3 of 5

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 61


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

1. Install all plumbing fixtures as indicated on the contract documents, and in


accordance with manufacturer’s recommendations.
SLFE
SLFE

SLFE

2. Avoid interference with structure and with the work of other trades. Do not
make changes from drawings without approval of the Company
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

Representative
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

B. Inspection: Check each piece of fixture in the system for defects, verifying that all
parts are properly furnished and installed.
DESCRIPTION

C. Plumbing Fixture and Equipment Installation:

1. Each fixture or other plumbing item shall be installed at the exact height and
location shown on the approved architectural drawings, or, in the absence
of such drawings, in accordance with the manufacturer’s rough-in drawings.
Water closets shall be centered between toilet partitions. Other groups of
identical fixtures shall be equally spaced unless otherwise noted.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

2. Fixture supplies, trap and trap arm shall be securely anchored and set
squarely with wall, in line with fixture outlets, without any offsets, angles or
bends. Fixture connections shall be properly aligned to prevent any undue
DATE

strain on equipment or fixture.

3. Each fixture shall be set level and in continuous contact with floor or wall.
NO.
REV

00
C

DISCIPLINE Fixtures in batteries shall be aligned, equally spaced and present a uniform
ENGINEER
PLR/MG/AK appearance.
10/09/2013
DATE:
PROJECT 4. Joint between fixture and walls or floors shall be adequately grouted with
ENGINEER
M. Abu Sultan Medusa, or approved equal cement, forming a smooth, even, water-tight
10/09/2013 joint. Porcelain plaster caps shall be securely cemented into place over
DATE:
CERTIFIED floor or wall flange bolts, entirely covering washer and bolt hole.
Eduardo Lau

10/09/2013
DATE:
CONSTRUCTION 5. Connections between fixtures and flanges on soil pipe shall be made
AGENCY
absolutely gastight and watertight with a closet-setting compound, or with a
10/09/2013 neoprene gasket and seal.
DATE:
OPERATIONS
6. Mounting bolts shall be brass and shall not have less than 1/4" diameters,
10/09/2013 and shall be equipped with chrome-plated nuts and washers.
DATE:
CONTROL NUMBER
VERIFICATION

6. Fixtures with outlets flanges shall be set the proper distance from the floor
EDSD

or wall in order to make a first class joint with the closet setting compound
or gasket, and the fixture used. Fixtures shall be sealed with the gasket
DATE:

furnished by the fixture manufacturer.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15440
(DCC) NO. BI-10-03041-2001-081
_____________________

4 of 5

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 62


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
8. Exposed plated, polished, or enameled connections from fixtures shall be
ENGG CERT

EDL

EDL

EDL

installed with special care showing no tool marks or threads.


SLFE
SLFE

SLFE

9. Supports shall be as specified with each fixture.

END OF SECTION
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

SECTION 15440
5 of 5
DESCRIPTION

07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
NO. JO/EWO
DATE
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013
DATE:
PROJECT
ENGINEER
M. Abu Sultan

10/09/2013
DATE:
CERTIFIED
Eduardo Lau

10/09/2013
DATE:
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 63


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 – MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15780 - FAN-COIL SPLIT AIR-CONDITIONING UNIT-DX


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Work Included: The work under this section includes, but is not limited to, the
furnishing and installation of direct expansion fan-coil (split-type) air conditioning
DESCRIPTION

units as specified herein and indicated on design drawings.

B. The unit consists of indoor fan-coil unit, outdoor air-cooled condensing unit,
refrigerant piping and associated accessories.

C. Related Sections:

Section 15530 Refrigerant Piping


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

1.02 QUALITY ASSURANCE

A. Codes and Standards


DATE

1. SAUDI ARAMCO Engineering Standards (SAES) and SAUDI ARAMCO


Material Systems Specifications (SAMSS) :
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
SAES-K-001 Heating, Ventilating and Air Conditioning (HVAC)
10/09/2013
DATE:
PROJECT SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code.
ENGINEER
M. Abu Sultan

10/09/2013
2. International Codes and Standards :
DATE:
CERTIFIED
Eduardo Lau ANSI/ASHRAE STD 15 Safety Code for Mechanical Refrigeration
DATE:
10/09/2013 ASHRAE Handbooks HVAC Applications, Systems and Equipment,
CONSTRUCTION Fundamentals and Refrigeration
AGENCY
ASHRAE STD 52-76 Filters, Testing Air Cleaning Devices
10/09/2013 NFPA 90A Installation of Air Conditioning and Ventilating
DATE:
OPERATIONS Systems
NFPA 101 Life Safety Code
10/09/2013 SMACNA Sheet metal and Air Conditioning Contractors
DATE:
National Association
CONTROL NUMBER
VERIFICATION

IMC International Mechanical Code


EDSD

DATE:

1.03 SUBMITTALS
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

A. Submit manufacturer’s literature in accordance with the requirements of the


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

specification.
(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15780
1 of 3
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 64


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
B. Required data shall include but shall not be limited to the following:
ENGG CERT

EDL

EDL

EDL

1. Performance data
SLFE
SLFE

SLFE

2. Physical dimensions and weights.

1.04 PRODUCT HANDLING


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

A. Product delivery, handling and storage shall be in accordance with section 15050,
ISUED FOR BID (IFB) SUBMITTAL

Para. 1.04.
DESCRIPTION

PART 2 - PRODUCTS

2.01 AIR CONDITIONING SYSTEM FOR TER/ TELECOM ROOMS

A. Precision, Direct Expansion (DX) type Fan Coil Units with matching Air Cooled
Condensing Units (ACCU) shall be provided to serve as stand-by and back up unit
to maintain temperature and humidity in TER/Telecom Rooms.

B. Precision FCU/ACCU shall include the following:


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

1. EVAPORATOR COIL- Constructed of copper tubes in a staggered tube


pattern. Tubes are expanded into continuous corrugated aluminum plate
DATE

type fins. Galvanized steel condensate drain pan is located under the coil.
NO.
REV

2. REFRIGERATION SYSTEM- Single refrigeration circuit, includes an


00
C

DISCIPLINE externally equalized expansion valve, filter drier, liquid line solenoid valve,
ENGINEER
PLR/MG/AK and quick-connect female couplings on both the suction and liquid lines.
DATE:
10/09/2013 Each female coupling is provided with an access valve connection. The
PROJECT module is precharged with refrigerant and sealed.
ENGINEER
M. Abu Sultan

DATE:
10/09/2013 3. FAN ASSEMBLY - is a quiet, direct drive two-speed fan assembly with
CERTIFIED centrifugal type, double width, double inlet blowers, and includes
Eduardo Lau
permanently lubricated bearings.
10/09/2013
DATE:
CONSTRUCTION
AGENCY
4. CONTROLS - Micro Processor based design includes an 8-key membrane
keypad for set point and program control, unit on/off mounted in a
DATE:
10/09/2013 decorative enclosure for wall mounting.
OPERATIONS
5. CABINET AND CHASSIS- the chassis is constructed of galvanized steel for
DATE:
10/09/2013 strength and corrosion resistance, and is designed for easy installation and
service access. Painted removable exterior panels allow access to the
CONTROL NUMBER
VERIFICATION

electric box or refrigeration components for service or maintenance. Return


EDSD

and discharge air grilles are heavy duty steel with baked enamel finish.
Discharge grille can easily be reversed to change air direction. Evaporator
DATE:
BY:

module is designed for either floor or wall mounting.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

SECTION 15780
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

2 of 3
(DCC) NO. BI-10-03041-2001-081
_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 65


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
6. REHEAT- Electric low watt tubular reheat element with non-corrosive metal
ENGG CERT

EDL

EDL

EDL

sheath provides one stage of non ionizing reheat to maintain room dry bulb
temperature.
SLFE
SLFE

SLFE

7. FILTERS- Cleanable filters, located within the cabinet and serviceable


without shutting down the system.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

8. HUMIDITY CONTROL PACKAGE (if required) - Provides humidification


ISUED FOR APPROVAL (IFA) SUBMITTAL

and dehumidification control and consists of a steam generator, steam


ISUED FOR BID (IFB) SUBMITTAL

distribution tube, fill valve, drain valve and electronic controls, located within
the evaporator module. Maximum humidifier water supply pressure is 150
DESCRIPTION

PSIG.

9. Temperature and Humidity Sensors- include sensors mounted in standard


case with 30 ft. (9m) of cable.

2.03 ACCEPTABLE MANUFACTURER/VENDOR

A. Liebert (A/C system of TER/Telecom rooms)


B. or approved Equal
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

PART 3 - EXECUTION
DATE

3.01 INSTALLATION
NO.
REV

00
C

DISCIPLINE
A. Equipment and components shall be completely installed to insure proper and
ENGINEER
PLR/MG/AK
sequential operation of the equipment and its controls.
10/09/2013
DATE:
PROJECT
B. The CONTRACTOR shall install, test and commission, the air-conditioning units to
ENGINEER
M. Abu Sultan
the manufacturer's guidelines and recommendations.
10/09/2013
DATE:
CERTIFIED
C. Unit performance shall be verified by the CONTRACTOR in the presence of the
Eduardo Lau Company Representative.
10/09/2013
DATE:
CONSTRUCTION END OF SECTION
AGENCY

10/09/2013 SECTION 15780


DATE:
OPERATIONS
3 of 3

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 66


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 – MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION-15781-PACKAGED AIR CONDITIONING UNITS


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

The work under this section included, but is not limited to, detailed design with all required
calculations, furnishing and installing of Packaged Air Conditioning Units complete with
DESCRIPTION

accessories as mentioned below.

1.02 RELATED SECTIONS

A. Section 15010 Basic Mechanical Requirements

B. Section 15050 Basic Materials and Methods.

C. Section 15190 Mechanical Identification


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

D. Section 15245 Vibration Isolation


DATE

E. Section 15900 DDC Controllers

F.. Section 15990 Testing and balancing of mechanical systems.


NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013 1.03 REFERENCES


DATE:
PROJECT
ENGINEER
M. Abu Sultan A. SAES-K-001 Heating, Ventilating and Air Conditioning (HVAC)
10/09/2013
DATE:
CERTIFIED
B. SAES-K-100 Saudi Aramco Mechanical (HVAC) Code
Eduardo Lau

DATE:
10/09/2013 C. ARI American Refrigeration Institute.
CONSTRUCTION
AGENCY
D. NFPA 90A Air Conditioning and Ventilation System.
10/09/2013
DATE:
OPERATIONS E. ASHRAE American Society of Heating Refrigerating and Air
Conditioning Engineers
10/09/2013
DATE:
F. 17-SAMSS-503 NEMA Frame Motors
CONTROL NUMBER
VERIFICATION
EDSD

1.04 SUBMITTALS
DATE:

A. Submit detailed design and shop drawing under provisions of Sections 15010
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

SECTION 15781
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

1 of 4
(DCC) NO. BI-10-03041-2001-081
_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 67


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
B. Submit shop drawings indicating components, assembly, dimensions, weights and
ENGG CERT

EDL

EDL

EDL

loading, required clearances, and location and sizes of field connections and
accessories required for complete system.
SLFE
SLFE

SLFE

C. Vendor to submit product data under provisions of Sections 15010


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

E. Vendor to submit product indicating rated capacities weights accessories electrical


ISUED FOR APPROVAL (IFA) SUBMITTAL

requirements, and wiring diagrams.


ISUED FOR BID (IFB) SUBMITTAL

F. Vendor to submit manufacturer's installation instruction under provisions of


DESCRIPTION

Sections 15010.

1.05 QUALITY ASSURANCE

A. All work shall be done in accordance with Section 15050.

1.06 OPERATION AND MAINTENANCE DATA

A. Vendor to submit operation and maintenance data under provisions of Section


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

15010.
JO/EWO

B. Vendor to include start-up instructions, maintenance instructions, parts lists,


DATE

controls, and accessories.

1.07 DELIVERY, STORAGE AND HANDLING


NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
A. Unit shall be shipped as a single package only.
10/09/2013
DATE:
PROJECT
B. Vendor to deliver products to site under provisions of Section 15010.
ENGINEER
M. Abu Sultan

10/09/2013
C. HVAC contractor to store, protect & maintain (where applicable) products under
DATE:
CERTIFIED
provisions of Section 15010.
Eduardo Lau

10/09/2013 D. HVAC contractor to comply with manufacturer's installation instruction for rigging,
DATE:
CONSTRUCTION unloading and transporting units.
AGENCY

10/09/2013
DATE:
OPERATIONS
PART 2 - PRODUCTS

10/09/2013
2.01 PACKAGED AIR CONDITIONING UNIT
DATE:
CONTROL NUMBER
VERIFICATION

A. Packaged Air Conditioning Unit (PACU) shall be Single Packaged type, complete
with cooling coils, filters as shown on the drawings.
EDSD

DATE:

B Unit shall be factory-charged and tested, shall comply with ARI Standard 360.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

SECTION 15781
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

2 of 4
(DCC) NO. BI-10-03041-2001-081
_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 68


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
C. Unit casing shall be heavy-gauge galvanized steel with baked on electrostatic
ENGG CERT

EDL

EDL

EDL

polyester dry powder coat. Weatherproof access panels shall be provided for
access to all parts requiring services.
SLFE
SLFE

SLFE

D. Compressor(s) shall be scroll or reciprocating type with hermetic construction and


shall be resiliently mounted to avoid vibration and noise. Compressor shall be
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

provided with anti slugging protection, crankcase heater, and time delay on
ISUED FOR APPROVAL (IFA) SUBMITTAL

recycling of the compressor. Internal compressor motor thermal cutouts, high & low
ISUED FOR BID (IFB) SUBMITTAL

pressure switches, oil pressure switches and other safeties shall be provided.
Standard controls shall permit operation down to 37°F (2.8oC) and up to 125°F
DESCRIPTION

(52oC).

E. Condenser fan(s) shall be direct-drive propeller type with upward discharge and
complete with protective grilles.

F. Condenser coils shall be copper tubes mechanical bonded to copper fins and have
a subcooling section.

G. Refrigerant circuit shall include filter dryer, moisture indicator, sight glass, and
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

gauge ports.
JO/EWO

H. Mixing box shall be complete with filter racks suitable for 2 in. (50 mm) thick filters
DATE

and shall filter both outdoor air and return air. Mixing box shall be provided with
Return Air and Outside Air dampers.
NO.
REV

00
C

DISCIPLINE
I. The Evaporator coil and condensing coils shall be made of copper tubes
ENGINEER
PLR/MG/AK
mechanically bonded to copper fins suitable for industrial application. All coils shall
10/09/2013
conform to ARI 210 standard.
DATE:
PROJECT
ENGINEER
M. Abu Sultan
J. Evaporator section shall be complete with cooling coil, insulated stainless steel
10/09/2013
drain pan, centrifugal forward curved evaporator fan complete with belt drives and
DATE:
CERTIFIED
motor. The fan shall be provided with adjustable pitch pulley drive for adjusting the
Eduardo Lau fan speed. Fan wheels, shafts and bearing shall be selected to operate 25% below
10/09/2013 the first critical speed. The bearings shall have and average life of 200,000 hours.
DATE:
CONSTRUCTION Fan motor shall comply with the requirements of Saudi Aramco Standard 17-
AGENCY
SAMSS-503. Evaporator fan shall be quiet-type centrifugal blower directly
10/09/2013 connected to a belt driven motor with an adjustable pitch pulley on the motor.
DATE:
OPERATIONS
K. The packaged A/C unit shall be provided with an electronic control panel suitable
10/09/2013
for outdoor installation.
DATE:
CONTROL NUMBER
VERIFICATION

2.02 ACCESSORY EQUIPMENT


EDSD

DATE:

A. Condenser coil guards shall be provided for all units mounted within reach of the
BY:

public.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15781
(DCC) NO. BI-10-03041-2001-081
_____________________

3 of 4

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 69


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
B. Provide outside air and return air dampers in a factory provided enclosure. All air
ENGG CERT

EDL

EDL

EDL

shall be filtered and bird screen shall be installed.


SLFE
SLFE

SLFE

C. Provide necessary controls for operation of the compressor below the normal
temperature of the compressor cutout. Operation shall be permitted down to
temperature specified on drawings.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

E. Provide factory trained service person to check out the system, calibrate the
ISUED FOR BID (IFB) SUBMITTAL

controls, and see that the PACU is operating. The service person making the
settings shall make a written report to the engineer and the owner with all set
DESCRIPTION

points listed for future reference.

F. Provide thermostat and other controls required to produce the control functions
called for.

2.03 ACCEPTABLE MANUFACTURER’S


A. Zamil Air conditioners.
B. Carrier
C. Goldenstar
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

D. Petra
JO/EWO

E. or Approved Equal
DATE

PART 3 - EXECUTION

3.01 INSTALLATION
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
A. Install the unit on the concrete pads as required by the job conditions and as
10/09/2013
recommended by the manufacturer.
DATE:
PROJECT
ENGINEER
M. Abu Sultan
B. Set the unit in place on spring isolators and connect the supply and return
10/09/2013
ductwork and Outside Air intakes.
DATE:
CERTIFIED
Eduardo Lau C. Make electrical connections, taking care that these do not block access to any part
10/09/2013 of the equipment requiring service.
DATE:
CONSTRUCTION
AGENCY
D. Have the factory service person check out the unit and make a written report
10/09/2013 before start-up and commissioning.
DATE:
OPERATIONS
3.02 BALANCING AND TEST
10/09/2013
DATE:
A. Operate the PACU and check for proper supply air quantity, noise, and correct
CONTROL NUMBER
VERIFICATION

operation.
EDSD

B. Report the airflow, static pressure, voltage and current draw of each item,
DATE:

refrigerant pressure readings, etc., as required by Section 15990 of these


BY:

specifications.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

END OF SECTION
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15781
4 of 4
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 70


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 – MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15786 - VARIABLE AIR VOLUME UNITS


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Work Included: The work under this section includes, but is not limited to, the
furnishing and installation of variable air volume units as specified herein and
DESCRIPTION

indicated on design drawings.

B. Related Sections:

Section 15971 Electric Control System


Section 15990 Testing, Adjusting And Balancing

1.02 QUALITY ASSURANCE


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

A. Codes and Standards

1. SAUDI ARAMCO Engineering Standards (SAES) and SAUDI ARAMCO


DATE

Material Systems Specifications (SAMSS) :

SAES-K-001 Heating, Ventilating and Air Conditioning (HVAC)


NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code
10/09/2013
DATE:
PROJECT SAES-K-101 Regulated Vendor List for HVAC Equipment
ENGINEER
M. Abu Sultan

10/09/2013
2. International Codes and Standards :
DATE:
CERTIFIED
Eduardo Lau AMCA 210 Test Code for Air Moving Devices
DATE:
10/09/2013 ANSI/ASHRAE STD 15 Safety Code for Mechanical Refrigeration
CONSTRUCTION ARI 410 Forced Circulation Air Cooling Coils
AGENCY
ASHRAE Handbooks HVAC Applications, Systems and Equipment,
10/09/2013 Fundamentals and Refrigeration
DATE:
OPERATIONS NFPA 70 National Electric Code
NFPA 90A Installation of Air Conditioning and Ventilating
10/09/2013 Systems
DATE:
NFPA 101 Life Safety Code
CONTROL NUMBER
VERIFICATION

SMACNA Steel metal and Air Conditioning Contractors


EDSD

National Association.
UMC Uniform Mechanical Code
DATE:
BY:

3. In the event of conflict between the codes and Standards, the more
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

stringent shall govern.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15786
(DCC) NO. BI-10-03041-2001-081
_____________________

1 of 3

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 71


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
1.03 SUBMITTALS
ENGG CERT

EDL

EDL

EDL

A. Unit specifications including weights and dimensions.


SLFE
SLFE

SLFE

B. Electrical data, including wiring diagrams.


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

C. Description of materials and methods of construction including finishes for units


ISUED FOR APPROVAL (IFA) SUBMITTAL

and all components.


ISUED FOR BID (IFB) SUBMITTAL

D. Description of cooling and/or heating sequence of operation.


DESCRIPTION

E. Complete air data including air volumes at design, external static pressure and
sound rating.

F. Description of all auxiliary equipment.

G. Installation recommendations including support arrangement, etc.

H. Submit recommended spare parts list for each unit under this section. List shall
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

include part numbers, and description of each part, and the price of each part.
JO/EWO

1.04 PRODUCT HANDLING


DATE

A. Product delivery, handling and storage shall be in accordance with section 15050,
Para. 1.04.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
B. Units shall ship fully assembled on factory installed base rails/mounting legs up
10/09/2013
to practical shipping and rigging limitations. Unit not shipped fully assembled shall
DATE:
PROJECT
have tags and airflow arrows on each direction of airflow. Each section shall
ENGINEER
M. Abu Sultan
have lifting lugs or shipping skid to allow for field rigging and final placement of
10/09/2013
section.
DATE:
CERTIFIED
Eduardo Lau C. Store units in clean dry place and protect from weather and construction traffic.
10/09/2013 Handle unit carefully to avoid damage to components, enclosure and finish.
DATE:
CONSTRUCTION
AGENCY
PART 2 - PRODUCTS
10/09/2013 2.01 GENERAL
DATE:
OPERATIONS
A. Refer to Contract Drawing for VAV Unit Technical Data.
10/09/2013
DATE:
B. The VAV units are Single Duct, By-Pass type, electric/electronic controlled with
CONTROL NUMBER
VERIFICATION

Electric Heaters and shall comply with AHRI -880, ANSI/UL -1996, SAES-K-101.
EDSD

C. Casing shall be 22 gauge galvanized steel.


DATE:
BY:

D. Interior surface of unit casing is acoustically and thermally lined with 1” with R-
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

Value of 4.3, 1.9 lb./cu.ft. foil face insulation. Meets NFPA-90A, UL 181 and
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

bacteriological standard ASTM C 665.


(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15786
2 of 3
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 72


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
E. Primary Air Volume Damper: Shall be of nominal sizes 300, 600, 1100, 1700,
ENGG CERT

EDL

EDL

EDL

2400, 3200 and 4200 CFM on all unit types. The air damper shall be cylindrical
flow control device with an integral electronic actuator. Damper inlet is die cast
SLFE
SLFE

SLFE

aluminum and tapered to fit standard round flexible ductwork. Maximum leak rate
is 1% at 4” wg. inlet static pressure. Integral multiple point, averaging flow sensing
ring to provide primary air flow measurement within + 5% of unit rated airflow with
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1-1/2 diameters of straight duct upstream of unit, integral flow taps and calibration
ISUED FOR APPROVAL (IFA) SUBMITTAL

chart provided on each unit.


ISUED FOR BID (IFB) SUBMITTAL

Outlet connection: Straight flange, flanged, slip and drive or integral outlet - sheet
DESCRIPTION

metal connection at unit discharge to facilitate ductwork installation.

F. Factory-mount and wire controls. Mount electrical components in control box with
removable cover. Incorporate single point electrical connection to power source.

G. All analog electronic controllers shall be factory set to within 5% of scheduled


maximum and minimum settings.

PART 3 - EXECUTION
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

3.01 INSTALLATION
DATE

A. VAVU shall be installed where shown on the drawing. Installation is to be neat,


workmanlike and in accordance with the instructions of the VAVU manufacturer.
NO.
REV

00
C

DISCIPLINE
B. Reset volume with damper operator attached to assembly allowing flow range
ENGINEER
PLR/MG/AK
modulation from 100 percent of design air flow to 25 percent nominal air flow.
10/09/2013
DATE:
PROJECT
ENGINEER
M. Abu Sultan

10/09/2013
END OF SECTION
DATE:
CERTIFIED
Eduardo Lau

10/09/2013
DATE:
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

SECTION 15786
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

3 of 3
(DCC) NO. BI-10-03041-2001-081
_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 73


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 – MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15870 – EXHAUST FANS


SLFE
SLFE

SLFE

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

A. Work Included: The work under this section includes, but is not limited to, the
ISUED FOR BID (IFB) SUBMITTAL

furnishing and installation of the required ventilating and exhaust fans as specified
herein and indicated on design drawings.
DESCRIPTION

1.02 QUALITY ASSURANCE

A. Codes and Standards

1. SAUDI ARAMCO Engineering Standards (SAES) and SAUDI ARAMCO


Material Systems Specifications (SAMSS) :

SAES-K-001 Heating, Ventilating and Air Conditioning (HVAC)


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code


DATE

2. International Codes and Standards :

AMCA 210-67 Test Code for Air Moving Devices


NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
ASME PTC 11-46 Test Code for Fans
10/09/2013
DATE:
PROJECT AMCA 99 Standards Handbook
ENGINEER
M. Abu Sultan

10/09/2013
AMCA 300 Standard Test Code for Sound Rating
DATE:
CERTIFIED
Eduardo Lau UL 507-1961 Underwriters' Laboratories Standard for Safety for
DATE:
10/09/2013 Electric Fans
CONSTRUCTION
AGENCY
AMCA A5401 Fans, Standard Classification for Spark Resistant
10/09/2013 Construction
DATE:
OPERATIONS
B. Tests:
10/09/2013
DATE:
Conduct factory tests to determine capacity, efficiency and brake horsepower at
CONTROL NUMBER
VERIFICATION

design conditions, and at other conditions to establish performance curves.


EDSD

C. Seals: All fans must bear the AMCA certified rating seal.
DATE:
BY:

D. Equipment Number: Stamp equipment number on Manufacturer's standard,


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

permanent attached to nameplate fan.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15870
1 of 3
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 74


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
1.03 SUBMITTALS
ENGG CERT

EDL

EDL

EDL

A. Test Reports: Submit 4 sets of data showing test reading and calculated results of
SLFE
SLFE

SLFE

factory tests of fans. The data shall include:

1. Description of Fan and Drive - (Make - size - type - arrangement).


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

2. Motor nameplate data - (Volts - phase - Hertz - FLA - LRA - synchronous


ISUED FOR BID (IFB) SUBMITTAL

and full load speeds - hp).


DESCRIPTION

3. Calculated results - ft3/min. head pressures, efficiency at design conditions.

B. Shop Drawings:

1. Submit shop drawings in accordance with the requirements of the


Specification.

2. Required data includes but is not limited to:


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

a. Fan performance data showing ft3/min. and kW, HP at the specified


static pressure.
b. Fan tip speed.
DATE

c. Sound rating information.


d. Methods and materials of construction.
NO.
REV

e. Arrangement of unit.
00
C

DISCIPLINE f. Installation recommendations.


ENGINEER
PLR/MG/AK g. Complete description of drive components.
DATE:
10/09/2013 h. Performance curves to show fan capacity, in ft3/min. plotted against
PROJECT
ENGINEER
total pressure, HP, kW input to fan, fan efficiency.
M. Abu Sultan

DATE:
10/09/2013 C. Recommended Spare Parts List: Provide a list of recommended spare parts
CERTIFIED showing name, part number, and price for each spare part.
Eduardo Lau

10/09/2013
DATE: 1.04 PRODUCT HANDLING
CONSTRUCTION
AGENCY
A. Product delivery, handling and storage shall be in accordance with section 15050,
DATE:
10/09/2013
Para. 1.04.
OPERATIONS

PART 2 - PRODUCTS
10/09/2013
DATE:
2.01 EQUIPMENT
CONTROL NUMBER
VERIFICATION
EDSD

A. Performance: Each fan capacity, speed and motor shall be as indicated on design
drawings.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15870
2 of 3
(DCC) NO. BI-10-03041-2001-081
_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 75


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
B. Centrifugal Wall Exhaust Fans (direct or V-belt drive):
ENGG CERT

EDL

EDL

EDL

1. Ventilator housing shall be of heavy gauge spun aluminum construction and


SLFE
SLFE

SLFE

shall be weatherproof and reinforced.

2. Fan wheels shall be backwardly curved non-overloading centrifugal design,


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

statically and dynamically balanced.


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

3. Tip speed, rpm, and motor horsepower shall not exceed listing in
manufacturer’s catalog for unit specified.
DESCRIPTION

4. Housing shall be provided with rubber grommet internal wiring passage and
shall be designed to discharge air in a 360 degree pattern, away from the
building.

5. Each fan shall be equipped with the following accessories: back draft
damper, wall grille, wheel guard and disconnect switch.

6. For Battery Room exhaust fans, motors shall be explosion proof and
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

construction suitable for handling air laden with acid fume/hydrogen


JO/EWO

released from battery.


DATE

2.03 ACCEPTABLE MANUFACTURER:

Green Heck
NO.
REV

00
C

DISCIPLINE
Carnes
ENGINEER
PLR/MG/AK
Coolaire
10/09/2013
Penn Ventilator Co., Inc.,
DATE:
PROJECT
Or approved equal.
ENGINEER
M. Abu Sultan

10/09/2013
PART 3 - EXECUTION
DATE:
CERTIFIED
Eduardo Lau 3.01 INSTALLATION
10/09/2013
DATE:
CONSTRUCTION A. General:
AGENCY

10/09/2013 1. The equipment shall be shipped as nearly completely assembled as


DATE:
OPERATIONS
possible.

10/09/2013
2. Equipment shall be installed as shown on the drawings in accordance with
DATE:
the manufacturer's recommendations.
CONTROL NUMBER
VERIFICATION
EDSD

END OF SECTION
DATE:

SECTION 15870
BY:

3 of 3
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 76


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 – MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15891 - METAL DUCTWORK - LOW PRESSURE


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Work Included: The work under this section includes, but not necessarily limited to
the furnishing and installation of metal ductwork, Low Pressure as specified herein
DESCRIPTION

and indicated on design drawings.

B. The ductwork shall include the supply, return, fresh air intake and exhaust ducts.

C. Related Sections:

Section 15290 Duct Insulation

Section 15892 Flexible Ductwork


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

Section 15910 Duct Accessories


DATE

Section 15932 Air Inlets and Outlets

1.02 QUALITY ASSURANCE


NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
A. Codes and Standards
10/09/2013
DATE:
PROJECT 1. SAUDI ARAMCO Engineering Standards (SAES) and SAUDI ARAMCO
ENGINEER
M. Abu Sultan Material Systems Specifications (SAMSS) :
10/09/2013
DATE:
CERTIFIED
SAES-K-001 Heating, Ventilating and Air Conditioning (HVAC)
Eduardo Lau

DATE:
10/09/2013 SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code
CONSTRUCTION
AGENCY
2. International Codes and Standards:
10/09/2013
DATE:
OPERATIONS ASHRAE Handbooks HVAC Applications, Systems and
Equipment, Fundamentals and
10/09/2013 Refrigeration
DATE:
SMACNA 2008 Accepted Industry Practice for Industrial
CONTROL NUMBER
VERIFICATION

Duct Construction
EDSD

SMACNA 2009 Round Industrial Duct Construction


Standard
DATE:

SMACNA 2004 Rectangular Industrial Duct Construction


BY:

Standard
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

SMACNA 2006 HVAC Duct System Design


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15891
1 of 6
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 77


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

SMACNA 2005 HVAC Duct Construction Standard, Metal


and Flexible
SLFE
SLFE

SLFE

SMACNA 2005 HVAC Air Duct Leakage Test Manual

IMC 2009 International Mechanical Code


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

B. Observation: Inform the Company Representative of duct erection schedule so


ISUED FOR BID (IFB) SUBMITTAL

that he may inspect all ductwork during installation. Ductwork shall not be
concealed in any manner prior to inspection by the Company Representative.
DESCRIPTION

1.03 SUBMITTALS

A. Shop Drawings

1. Submit shop drawings in accordance with the requirements of these


specifications.

2. Required data shall include, but is not necessarily limited to:


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

a. Overall two-line layout, dimensioned with respect to the building and


connections to equipment.
DATE

b. Equipment and duct elevations and sections as required to show


clearances, methods of support, and details of installation.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
c. Distance from bottom of ducts or equipment to finished floor.
10/09/2013
DATE:
PROJECT
d. Dimensions of each duct section.
ENGINEER
M. Abu Sultan

10/09/2013
e. Location of duct supports.
DATE:
CERTIFIED
Eduardo Lau f. Details of duct supports, including hanger locations, hanger types,
10/09/2013 connections to duct and to building, auxiliary steel, etc.,
DATE:
CONSTRUCTION manufacturer's name and model number for hangers.
AGENCY

10/09/2013 g. Location and details of auxiliary equipment including grilles,


DATE:
OPERATIONS
registers, diffusers, volume dampers, smoke and fire dampers,
access doors, turning vanes, thermometer and pressure sensing
10/09/2013
connections, smoke detectors, test openings for pilot readings,
DATE:
control instruments, duct drains and flexible connections.
CONTROL NUMBER
VERIFICATION

1.04 PRODUCT HANDLING


EDSD

DATE:

A. Product delivery, handling and storage shall be in accordance with section 15050,
BY:

Para. 1.04.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15891
(DCC) NO. BI-10-03041-2001-081
_____________________

2 of 6

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 78


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
PART 2 - PRODUCTS
ENGG CERT

EDL

EDL

EDL

2.01 GENERAL
SLFE
SLFE

SLFE

A. Ductwork
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1. Ductwork shall be constructed in the sizes and configuration as shown on


ISUED FOR APPROVAL (IFA) SUBMITTAL

the drawings. Details of construction shall conform to the applicable Codes


ISUED FOR BID (IFB) SUBMITTAL

and Standards listed under paragraph 1.02 of this section.


DESCRIPTION

2. Duct Fittings - Rectangular Duct: All changes in duct size or elevation, tee
connections, connections for grilles, registers or diffusers, transition for
elbows, casings, etc. shall be fabricated in accordance with applicable
Codes and Standards listed in paragraph 1.02 of this section.

3. Mitered fittings shall not be allowed.

B. Sealants
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

1. All joints and seams in ductwork and casing are to be thoroughly sealed to
JO/EWO

prevent air leakage. This applies to all transverse joints between duct
sections, duct tap-ins, branch duct connections or access door installations.
DATE

Longitudinal seams need not be sealed unless the duct or casing section
contains more than two seams along its perimeter.
NO.
REV

00
C

DISCIPLINE
2. Sealant is to be a fast-setting, thixotropic paste that remains flexible after
ENGINEER
PLR/MG/AK
drying. Product is to be Foster's 32-14 Duct Sealant, United Sheet Metal's
10/09/2013
Duct-Seal or approved equal.
DATE:
PROJECT
ENGINEER
M. Abu Sultan

10/09/2013
2.02 MATERIALS
DATE:
CERTIFIED
Eduardo Lau A. Sheet Metal
10/09/2013
DATE:
CONSTRUCTION Galvanized Steel Sheet: Material shall be lock forming quality (LFQ), with
AGENCY
minimum galvanized coating of 25.6 g total for both sides of one square foot of a
10/09/2013 sheet; ASTM A527, Coating G90.
DATE:
OPERATIONS

10/09/2013
B. Fasteners
DATE:
CONTROL NUMBER
VERIFICATION

1. Steel Ductwork: Unless otherwise noted, all screwed fasteners used in


galvanized ductwork shall be constructed of cadmium plated or galvanized
EDSD

steel. All riveted connections in galvanized ductwork must be made with


DATE:

0.48 cm dia. steel pop rivets or flat-head, tinned iron rivets. Rivets and
BY:

fasteners used in stainless steel ductwork shall be stainless steel.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15891
3 of 6
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 79


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
C. Reinforcing: Reinforcing bars and angles shall be of the same material as the
ENGG CERT

EDL

EDL

EDL

ducts or casing on which they are used.


SLFE
SLFE

SLFE

PART 3 - EXECUTION

3.01 INSTALLATION
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

A. Install ducts in a neat and workmanlike manner in locations shown on the


ISUED FOR BID (IFB) SUBMITTAL

drawings. If interferences occur which require changes in locations, size, or design


of the ductwork, such changes are to be made only after approval of the Company
DESCRIPTION

Representative.

B. CONTRACTOR shall install all duct heaters and units where indicated on the
drawing per manufacturer’s instructions and recommendation.

C. Ducts are to be independently supported from building structure only, and not from
other equipment or other equipment supports unless specifically shown on the
drawings or approved by SAUDI ARAMCO Representative.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

D. Duct shall be fabricated in accordance with the following Table and Applicable
JO/EWO

Portions of Figure 1-5 through 1-8 of the L.P. Duct Manual. Values given in the
following Table are for Steel Duct and Steel Reinforcing Angels, aluminum
DATE

equivalents are shown on page 1-24 of L.P. Duct Manual.

E. Duct Construction Table


NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013
Max. Duct Min. Metal Max. Joint Joint Intermediate Bracing
DATE:
PROJECT
Dimensions Thickness Length Type Angle
ENGINEER
M. Abu Sultan
(mm) (ga. USS) (mm)
10/09/2013
Up to 305 24 2130 A None
DATE:
CERTIFIED 330 - 457 24 2130 B None
Eduardo Lau

DATE:
10/09/2013 483 - 914 22 1170 B None
CONSTRUCTION
AGENCY 940 - 1370 20 1170 C None

DATE:
10/09/2013 1400 - 1524 20 1170 D None
OPERATIONS
1550 - 2133 18 1170 D 50 x 50 x 4.8

DATE:
10/09/2013 2160 - 2440 18 1170 E 50 x 50 x 6.4
CONTROL NUMBER

Over 2440 18 1170 F 64 x 64 x 6.4


VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15891
(DCC) NO. BI-10-03041-2001-081
_____________________

4 of 6

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 80


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

Legend for the Joint Types:


SLFE
SLFE

SLFE

Type A : Drive Slip and Plain "S' Slip (24 ga.) or Companion Angles (25 x
25 x 3.2 mm).
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

Type B : 25 mm Pocket Lock (24 ga.) or Drive Slip and 25 mm Standing


ISUED FOR APPROVAL (IFA) SUBMITTAL

"S" Slip (24 ga.) or Companion Angles (25 x 25 x 3.2 mm).


ISUED FOR BID (IFB) SUBMITTAL

Type C : 38 mm Pocket Lock (22 ga.) or companion Angles (38 x 38 x 4.8


DESCRIPTION

mm).

Type D : 38 mm Pocket Lock (20 ga.) with Joint Reinforcing Angle (50 x 50
x 4.8 mm) or Companion Angles (50 x 50 x 4.8 mm).

Type E : 38 mm Pocket Lock (30 ga.) with Joint Reinforcing Angle (50 x 50
x 6.4 mm) or Companion Angles (50 x 50 x 6.4 mm).

Type F : 38 mm Pocket Lock (20 ga.) with Joint Reinforcing Angle (64 x 64
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

x 4.8 mm) or Companion Angles (64 x 64 x 4.8 mm).


JO/EWO

E. Longitudinal seams at the corners of duct sections shall be Pittsburgh lock


DATE

construction. No snap lock seams will be allowed when size of cut panel requires
intermediate longitudinal seams 38 mm inside standing seams shall be used and
secured with 4.8 mm dia. rivets or bolts spaced on no greater than 204 mm
NO.
REV

00
C

DISCIPLINE
centers. Where duct construction requires companion angles, packet locks and/or
ENGINEER
PLR/MG/AK
bracing angles, these are to be used on all four sides of straight duct and transition
10/09/2013
pieces or elbows. Elbows in duct sizes requiring bracing must be reinforced with
DATE:
PROJECT
similar angle iron so that the unbraced space does not exceed 762 mm. The
ENGINEER
M. Abu Sultan
bracing angles must be fastened together at the intersecting corners and attached
10/09/2013
to the sheet metal duct work on no greater than 305mm centers with 4.8 mm dia
DATE:
CERTIFIED
rivets or bolts, duct sizes greater than 2134 mm in width must be internally
Eduardo Lau reinforced in addition to external bracing. Internal reinforcement shall consist of 25
10/09/2013 mm. diameter steel pipe or 50 x 50 x 4.8 mm angle iron struts placed equidistant
DATE:
CONSTRUCTION across the duct width but on no greater than 1524 mm centers. Each internal strut
AGENCY
shall be fabricated with a 100 x 100 x 4.8 mm steel bearing plate on each end for
10/09/2013 attachment to the intermediate bracing angles through the sides of the sheet metal
DATE:
OPERATIONS
duct.

10/09/2013
F. All duct panels over 457 mm shall be beaded or cross broken, unless noted
DATE:
otherwise. Duct panels in which grillers or access doors are to be installed shall
CONTROL NUMBER
VERIFICATION

not be beaded or cross broken unless the distance from the edge of the grille or
unless the distance from the edge of the grille or access to the edge of the panel
EDSD

exceeds 457 mm. In which case, only this portion of the panel shall be beaded or
DATE:

Cross broken and the area to which the grille or access door is attached shall be
BY:

left flat. Insulated ducts shall not be beaded or cross broken when rigid insulation
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

is used, but shall be beaded or cross broken when non rigid insulation is used.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15891
5 of 6
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 81


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

G. DISSIMILAR METAL
SLFE
SLFE

SLFE

1. Separate connections between dissimilar metals by dielectric insulation.

2. Make joints between dissimilar metal duct sections with companion flanges
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

separated by a compressed asbestos gasket.


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

3. Construct all nuts, bolts, screws, and other hardware used in the sheet
DESCRIPTION

metal construction of materials identical or similar to the duct material to


prevent galvanic corrosion.

H. Any deviations from the Contract Documents concerning duct construction, duct
routing or duct support systems committed by the CONTRACTOR, with the
Company Representative's prior approval, shall be removed and replaced with
approved material or methods at the CONTRACTOR's expense, if so directed by
the Company Representative.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

END OF SECTION
NO. DATE
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013
DATE:
PROJECT
ENGINEER
M. Abu Sultan

10/09/2013
DATE:
CERTIFIED
Eduardo Lau

10/09/2013
DATE:
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15891
(DCC) NO. BI-10-03041-2001-081
_____________________

6 of 6

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 82


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 – MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15892 - FLEXIBLE DUCTWORK


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR BID (IFB) SUBMITTAL

A. Work Included: The work under this section includes, but is not necessary limited
DESCRIPTION

to, the furnishing and installation of flexible ducts as specified here in and indicated
on design drawings.

B. This Section also provides the required specifications if it is decided during


construction to replace some rigid ducts with flexible ones due to interference with
existing facilities,

C. Related Sections:
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

Section 15290 Duct Insulation

Section 15891 Metal Ductwork - Low Pressure


DATE

Section 15910 Duct Accessories


NO.
REV

00
C

DISCIPLINE Section 15932 Air Inlets and Outlets


ENGINEER
PLR/MG/AK

10/09/2013 1.02 QUALITY ASSURANCE


DATE:
PROJECT
ENGINEER
M. Abu Sultan A. Codes and Standards
10/09/2013
DATE:
CERTIFIED
1. SAUDI ARAMCO Engineering Standards (SAES) and SAUDI ARAMCO
Eduardo Lau Material Systems Specifications (SAMSS) :
10/09/2013
DATE:
CONSTRUCTION SAES-K-001 Heating, Ventilating and Air Conditioning (HVAC)
AGENCY

10/09/2013 SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code


DATE:
OPERATIONS
2. International Codes and Standards :
10/09/2013
DATE:
NFPA-90A National Fire Protection Association.
CONTROL NUMBER
VERIFICATION
EDSD

SMACNA 1981 HVAC Duct System Design


DATE:

SMACNA 1985 HVAC Duct Construction Standards - Metal and


BY:

Flexible
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

UL 181 Factory Made Duct Materials


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15892
1 of 4
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 83


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
B. Limitations
ENGG CERT

EDL

EDL

EDL

The length of the flexible duct should not exceed 5 feet.


SLFE
SLFE

SLFE

1.03 SUBMITTALS
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

A. Manufacturer's Literature
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

1. Submit manufacturer's literature in accordance with this Specification.


DESCRIPTION

2. Required data shall include:

a. Complete description of duct, insulation and fittings.

b. Complete performance data.

d. Temperature and pressure limitations.

e. Installation recommendations.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

B. Shop Drawings
DATE

1. Submit shop drawings.

2. Required data shall include:


NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
a. Overall one-line duct layout.
10/09/2013
DATE:
PROJECT
b. Elevations and sections as required to show clearly clearances,
ENGINEER
M. Abu Sultan
methods of installation and support details.
10/09/2013
DATE:
CERTIFIED
c. Size of each duct section.
Eduardo Lau

10/09/2013 d. Locations and details of all auxiliary equipment.


DATE:
CONSTRUCTION
AGENCY
1.04 PRODUCT HANDLING
10/09/2013
DATE:
OPERATIONS
A. Product delivery, handling and storage shall be in accordance with section 15050,
Para. 1.04.
10/09/2013
DATE:
PART 2 - PRODUCTS
CONTROL NUMBER
VERIFICATION

2.01 MATERIALS
EDSD

DATE:

A. Low Pressure Systems


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

1. Flexible Duct shall be Metallic, Aluminum, non-metallic or approved equal in


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

compliance with UL 181 and SMACNA.


(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15892
2 of 4
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 84


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

2.02 ACCEPTABLE MANUFACTURER / VENDOR


SLFE
SLFE

SLFE

1. ATCO/ Mariam Trading Co. & Partner


2. SAFID/ Saudi Air Distribution Systems Co.
3. Arabian Thermal Aire Industries Co.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

4. or approved equal
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

PART 3 - EXECUTION
DESCRIPTION

3.01 INSTALLATION

A. General

1. Flexible ducts are used for indoor installation. Flexible Ducts and
connectors shall be tested in accordance with UL 181 and shall be labeled
as class 0 or class 1
2. Install ductwork in a fully extended condition free of kinks and sags.
3. Flexible duct and connector shall be installed with minimum clearances
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

from appliances as per manufacturer’s instructions.


JO/EWO

B. Supports
DATE

1. Flexible duct shall be supported at manufacturer’s recommended intervals


but at no greater distance than 5 feet. Maximum permissible sag is 1/2 inch
NO.
REV

00
C

DISCIPLINE
per foot of spacing between supports. A connection to another duct or
ENGINEER
PLR/MG/AK
equipment is deemed support point.
10/09/2013
DATE:
PROJECT
2. Hanger or saddle material in contact with the flexible duct shall be of
ENGINEER
M. Abu Sultan
sufficient width to prevent any restriction of the internal diameter of the duct
10/09/2013
when the weight of the supported section rests on the hanger of saddle
DATE:
CERTIFIED
material. In no case will the material contacting the flexible duct be less
Eduardo Lau than 1 inch wide. Narrower hanger material may be used in conjunction with
10/09/2013 a sheet metal saddle. This saddle must be formed to cover one-half the
DATE:
CONSTRUCTION circumference of the outside diameter of the flexible duct and must be
AGENCY
rolled to fit neatly around the lower half of the duct’s outer circumference.
10/09/2013
DATE:
OPERATIONS
3. Factory installed suspension systems integral to the flexible duct are an
acceptable alternative hanging method when manufacturers’ recommended
10/09/2013
procedures are followed.
DATE:
CONTROL NUMBER
VERIFICATION

4. hangers shall be adequately attached to the building structure.


EDSD

5. To prevent tearing of vapor barrier, do not support entire weight of flexible


DATE:

duct on any one hanger during installation. Avoid contact of flexible duct
BY:

with sharp edges of hanger material. Damage to vapor barrier may be


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

repaired with approved tape. If internal core is penetrated, replace flexible


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

duct or treat as a connection.


(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15892
3 of 4
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 85


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

6. Terminal devices connected by flexible duct shall be supported


independently of the flexible duct.
SLFE
SLFE

SLFE

C. Joints and Attachments


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1. The end of ducts shall be trimmed squarely prior to installation.


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

2. Collars to which flexible duct is attached shall be a minimum of 2” in length.


Sleeves used for joining two sections of flexible duct shall be a minimum of
DESCRIPTION

4” in length.

3. Collars and sleeves shall be inserted into flexible duct a minimum of 1”


before fastening.

4. Metallic flexible duct shall be attached using a minimum of three #8 sheet


metal screws equally spaced around the duct’s circumference; ducts larger
than 12” diameter shall have a minimum of fire #8 sheet metal screws.
Screws shall be located at least 1/2 inch from the duct end.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

5. Insulation and vapor barriers present on factory-fabricated ducts shall be


fitted over the core connection and shall be supplementally secure with a
DATE

draw band.

D. Dampers
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
1. Adjustable butterfly dampers shall be included with spring loaded,
10/09/2013
retractable bearing and positive locking regulator.
DATE:
PROJECT
ENGINEER
M. Abu Sultan

10/09/2013
DATE:
CERTIFIED
Eduardo Lau END OF SECTION
10/09/2013
DATE:
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:

SECTION 15892
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

4 of 4
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 86


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 - MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15900 - DDC Controllers


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Work Included: The work under this section includes, but is not necessarily limited to,
furnishing and installation of direct digital control DDC and it shall be programmable
DESCRIPTION

and capable of taking extensive measuring, control and monitoring functions consistent
to manage the global strategies described in the system software section. As a back
up. The operating system of each DDC controller shall manage communication signals
to allow distributed controllers to share real and pseudo point information, and allow
central work station monitoring and alarms.

B. Related Sections:

Section 15990 Testing, Adjusting A and Balancing


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

1.02 QUALITY ASSURANCE


DATE

A. Codes and Standards

1. SAUDI ARAMCO Engineering Standards (SAES) and SAUDI ARAMCO


NO.
REV

00
C

DISCIPLINE
Material Systems Specifications (SAMSS) :
ENGINEER
PLR/MG/AK

10/09/2013
SAES-K-001 Heating, Ventilation and Air Conditioning (HVAC)
DATE:
PROJECT
ENGINEER
M. Abu Sultan
SAES-K-003 Air Conditioning Systems for Communication Buildings
10/09/2013
DATE:
CERTIFIED
SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code
Eduardo Lau

DATE:
10/09/2013 2. International Codes and Standards :
CONSTRUCTION
AGENCY
AMCA 210 Test Code for Air Moving Devices
10/09/2013 ANSI/ASHRAE STD 15 Safety Code for Mechanical Refrigeration
DATE:
OPERATIONS ARI 410 Forced Circulation Air Cooling Coils
ARI 430 Standard for Central Station Air Handling
10/09/2013
Units
DATE:
ASHRAE Handbooks HVAC Applications, Systems and Equipment,
CONTROL NUMBER
VERIFICATION

Fundamentals and Refrigeration


ASHRAE STD 52-76 Filters, Testing Air Cleaning Devices
EDSD

ASHRAE STD 62 Ventilation for Acceptable Indoor Air Quality


DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15900
1 of 7
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 87


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
NFPA 1 National Fire Prevention Association
ENGG CERT

EDL

EDL

EDL

NFPA 70 National Electric Code


NFPA 90A Installation of Air Conditioning and Ventilating
SLFE
SLFE

SLFE

Systems
NFPA 101 Life Safety Code
SMACNA 1983 HVAC Systems-Testing, Adjusting and
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

Balancing
ISUED FOR APPROVAL (IFA) SUBMITTAL

SMACNA 1987 HVAC Systems Applications


ISUED FOR BID (IFB) SUBMITTAL

SMACNA 1988 Indoor Air Quality


UMC Uniform Mechanical Code
DESCRIPTION

UL 465 Central Air Conditioners


UL 984 Hermetic Refrigerant Motor Compressors

1.03 SUBMITTALS

A. DDC specifications.

B. Electrical data, including control diagrams.


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

C. Description of materials and methods of construction including finishes for all


JO/EWO

components.
DATE

D. Description of sequence of operation.

E. Installation recommendations including support arrangement, etc.


NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013
1.04 PRODUCT HANDLING
DATE:
PROJECT
ENGINEER
M. Abu Sultan
A. Product delivery, handling and storage shall be in accordance with section 15050,
10/09/2013
Para. 1.04.
DATE:
CERTIFIED
Eduardo Lau B. Store DDC and its related sensors from weather and construction traffic.
10/09/2013 Handle it carefully to avoid damage to components, enclosure and finish
DATE:
CONSTRUCTION
AGENCY
PART 2 - PRODUCTS
10/09/2013
DATE:
OPERATIONS
2.01 General Purpose DDC Controllers

10/09/2013
A. GPC Hardware:
DATE:
CONTROL NUMBER
VERIFICATION

1. General Purpose DDC Controllers (GPC) shall be minimum 16-bit


EDSD

microprocessor based with EPROM operating system and sufficient


memory to support its operating system, database and programming
DATE:
BY:

requirements.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15900
2 of 7

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 88


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
The devices shall be programmable and capable of taking extensive
ENGG CERT

EDL

EDL

EDL

measuring, control and monitoring functions consistent to manage the


global strategies described in the system software section. As a back up,
SLFE
SLFE

SLFE

store DDC programs and data files on non-volatile EEPROM or flash


memory to allow simple and reliable additions and changes.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

The operating system of each DDC controller shall manage communication


ISUED FOR BID (IFB) SUBMITTAL

signals to allow distributed controllers to share real and pseudo point


information, and allow central work station monitoring and alarms. Each
DESCRIPTION

GPC shall have 30-day battery backed real-time clock. GPCs shall be
provided where shown and specified with capacity to accommodate
input/output (I/O) points required for the application plus spare points
specified.

Each panel shall be provided with a socket for a Portable Operators


Terminal (POT), and a port for network communications at no less than 78K
baud. Each panel shall have optional port available for modem remote to
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

central communications. GPC outputs shall be binary for On-Off control and
JO/EWO

true variable voltage (0-l0v) for driving analog or pneumatic transducer


devices. Analog outputs shall have a minimum incremental resolution of
DATE

one percent of the operating range of the controlled device.


NO.
REV

00

GPCs shall have LEDs for continuous indication of all bus communications,
C

DISCIPLINE
ENGINEER
power and operational status. If diagnostics detect a controller abnormality
PLR/MG/AK
the controller defaults to a predetermined failure mode and alarm
10/09/2013
DATE: notification is initiated. All panel electronics shall be installed in NEMA
PROJECT
ENGINEER enclosures suitable for the environment in which they are located. Cabinets
M. Abu Sultan

10/09/2013
shall utilize one master key. Provide a 12OV duplex convenience outlet at
DATE:
CERTIFIED
each panel supplied from the same circuit as the DDC panel.
Eduardo Lau

DATE:
10/09/2013 B. GPC Application SOFTWARE
CONSTRUCTION
AGENCY
1. Control Software:
10/09/2013
DATE:
OPERATIONS a. Time Programs. Each GPC shall contain up to 20 unique user
modifiable time programs (TP). Each TP shall consist of daily,
10/09/2013 weekly, and annual programs plus a “TODAY” temporary function.
DATE:
DAILY programs shall be definable for day types such as working
CONTROL NUMBER
VERIFICATION

day, half day, holiday, weekend, etc. Each daily program shall allow
EDSD

a list of time based (or optimum time based) analog and digital
commands to be issued to USC selected plant elements and points.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15900
(DCC) NO. BI-10-03041-2001-081
_____________________

3 of 7

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 89


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
WEEKLY programs shall allow a user selected set of daily programs
ENGG CERT

EDL

EDL

EDL

to be defined for each day of the week (Monday through Sunday).


The ANNUAL program shall initially be an automatic compilation of
SLFE
SLFE

SLFE

52 weekly programs. Selecting a date of the ANNUAL program shall


allow modification of the daily selection entered into the weekly
program (such as changing Dec. 25 from a working day to a
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

holiday).
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

To eliminate power surges and to ensure stable system operation,


an operated adjustable time delay shall be provided between
DESCRIPTION

consecutive start commands and between consecutive stop


commands for electrical loads.

b. Control Application Software shall be customized to meet the


detailed requirements of the “Sequence of Operation”. GPCs and
UC network management devices shall be programmable. All GPC
control software shall be designed via a symbolic programming
facility, the flow chart output of which shall be provided as system
documentation.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

c. In addition to Proportional, Proportional-Plus-Integral (PI), and


Proportional-Plus-Integral-Plus-Derivative (PID) algorithms, an
DATE

HVAC enhanced Adaptive Neural PID (ANPID) real time adaptive


tuning algorithm shall be provided and implemented where
specified. The ANPID shall be a full PID, but modified and enhanced
NO.
REV

00
C

DISCIPLINE
to perform as follows:
ENGINEER
PLR/MG/AK

10/09/2013
•. The loop performance is modeled for various loads and PID
DATE:
PROJECT
gains. The performance results of the model are entered into the
ENGINEER
M. Abu Sultan
ANPID as a training function. Subsequently the trained ANPID is
10/09/2013
applied to the loop. The ANPID then monitors the PID (error, PI
DATE:
CERTIFIED
and D gains; and output) and continuously auto adjusts the final
Eduardo Lau output to prevent repeating the error learned during the training
10/09/2013 process.
DATE:
CONSTRUCTION
AGENCY
2. Energy Management Software:
10/09/2013
DATE:
OPERATIONS
a. Optimum start-stop program: provide software to start and stop
equipment on a sliding schedule based on indoor and outdoor air
10/09/2013
conditions. The program shall take into account the thermal
DATE:
characteristics of the structure, indoor and outside conditions using
CONTROL NUMBER
VERIFICATION

prediction software to determine the minimum time of system


operation needed to satisfy space environmental requirements at
EDSD

the start of the occupied cycle, and determine the earliest time for
DATE:

stopping equipment at the day’s end. The program shall


BY:

automatically modify the calculation constants based on its past


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

performance.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15900
(DCC) NO. BI-10-03041-2001-081
_____________________

4 of 7

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 90


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
b. Demand limiting program: provide software to shed electrical loads
ENGG CERT

EDL

EDL

EDL

to prevent exceeding an electrical demand peak value (target). The


program shall continuously monitor power demand, and with
SLFE
SLFE

SLFE

prediction software, calculate a predicted power demand. When the


predicted power demand exceeds a preset desired target, the
program shall shutoff or adjusts operation of electrical loads on a
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

prescheduled priority basis to reduce the connected load before the


ISUED FOR APPROVAL (IFA) SUBMITTAL

actual peak exceeds the target. The demand limiting program shall
ISUED FOR BID (IFB) SUBMITTAL

provide several priority levels of loads. Loads in the lowest priority


level shall be shed before loads in the next higher priority level.
DESCRIPTION

Loads shed within a priority level shall be rotated automatically,


subject to equipment constraints to avoid any one load from always
being shed first. Loads shed in the highest priority level shall be
restored before loads in lower priority levels. The demand program
shall be compatible with time-of-day metering. The program shall
permit a minimum of 6 individually resettable time-of-day demand
periods in 24 hours.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

The start and stop time of each time-of-day demand program shall
allow different daily schedules for 3 types of days (weekday,
DATE

weekend, holiday). A time-of-day metering calendar shall be


established by the program which shall define daily time-of-day
metering schedules.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
c. Day-night setback program; provide software to limit the rise or drop
10/09/2013
of space temperature during unoccupied hours. Whenever the
DATE:
PROJECT
space temperature is above (or below for heating) the operator
ENGINEER
M. Abu Sultan
assigned temperature limit, the system shall be enabled until the
10/09/2013
temperature is within the assigned temperature limit.
DATE:
CERTIFIED
Eduardo Lau d. Power fail-auto restart: on power failure, the DDC panel shall
10/09/2013 shutdown without damage to the DOC panel or controlled systems,
DATE:
CONSTRUCTION and without loss of programmed information. If power is restored
AGENCY
within the time specified herein for battery back-up of DDC panel
10/09/2013 clock operation, the DDC system shall automatically restart, adjust
DATE:
OPERATIONS
operating parameters according to the proper time of day, and
resume full normal operation within no longer than 5 minutes
10/09/2013
following restoration of power. Each controlled item of equipment,
DATE:
37 kW or greater, shall be sequentially restarted or returned to
CONTROL NUMBER
VERIFICATION

proper operation as appropriate for the time-of-day.


EDSD

e. Event initiated sequences: based on programmable values of either


DATE:

digital or analog inputs or outputs, the DDC panel shall be able to:
BY:

open or close any output contacts or combination of contact outputs;


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

and adjust any analog output over its normal range.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15900
5 of 7
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 91


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

3. Trending. In addition to supporting OWS trending specified elsewhere, each


GPC shall be provided with a trend archive of at least the last 200 events
SLFE
SLFE

SLFE

(digital transitions or analog value changes) of any user selected group of


up to 20 points. A stored event shall include date and time, and value or
status. Events occurring in excess of 200 shall overwrite the oldest events.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

4. Alarms. Each GPC shall monitor and report all analog input points and
ISUED FOR BID (IFB) SUBMITTAL

specified digital points for off-normal conditions. Each alarm shall have an
alarm delay” attribute which shall determine how long (in seconds) a point
DESCRIPTION

must be off-normal prior to being considered in an alarm state.

5. Alarms-Limits For each analog input or pseudo analog point, two maximum
limits and two minimum limits (alarm and pre-alarm) shall be set for a
particular value. Each time this limit value is reached an alarm shall be
triggered.

6. Run-Time Totalization. Provide monitoring and totalization of the run-times


for all digital status inputs. Totalization shall be selectable on a per-point
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

basis, for either open or closed condition of the status input.


JO/EWO

7. Short Cycling. All binary output points shall be protected from short cycling.
DATE

This feature shall allow minimum on-time and off-time to be selected.

8. On/Off Control with Differential. Provide an algorithm that allows a binary


NO.
REV

00
C

DISCIPLINE
output to be cycled based on a controlled variable and set point. The
ENGINEER
PLR/MG/AK
algorithm shall be direct-acting or reverse-acting, and incorporate an
10/09/2013
adjustable differential
DATE:
PROJECT
ENGINEER
M. Abu Sultan
9. Calculated Point. Provide a program that will create an on-line pseudo-point
10/09/2013
as a result of a series of calculations. The calculations may use operator-
DATE:
CERTIFIED
entered constants, values of other points in the system, or values of other
Eduardo Lau calculated points as variables in the equations. Provide the means for the
10/09/2013 calculated points to be used in loops for control purposes. Pseudo-points
DATE:
CONSTRUCTION shall assume the same attributes as physical system points.
AGENCY

10/09/2013
DATE:
OPERATIONS
2.04 ACCEPTABLE MANUFACTURER/VENDOR:

10/09/2013
Honeywell, Siemens or approved equal
DATE:
CONTROL NUMBER
VERIFICATION

PART 3 - EXECUTION
EDSD

3.01 GENERAL
DATE:
BY:

A. Contractor shall install DDC panels in each mechanical room strictly in accordance
APPROVAL/CERTIFICATION REQUIREMENTS,

with manufacturer’s printed instructions.


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15900
6 of 7
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 92


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

3.02 INSPECTION
SLFE
SLFE

SLFE

A. At the worksite, the CONTRACTOR shall remove any shipment fixtures of


corrosion protection if so required in accordance with manufacturer's instructions.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

B. The CONTRACTOR shall check the DDC for damage and/or warpage, which may
ISUED FOR APPROVAL (IFA) SUBMITTAL

have occurred during transit.


ISUED FOR BID (IFB) SUBMITTAL

3.03 INSTALLATION
DESCRIPTION

A. DDC shall be installed, tested and commissioned in accordance with the relevant
drawings, project scope of work, construction specifications and manufacturer's
instructions to insure proper sequential operation of the unit and its control.

B. DDC shall be verified by the CONTRACTOR in the presence of the Company


Representative. The CONTRACTOR shall carry out any fault corrections or final
adjustment.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
NO. JO/EWO
DATE
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013
DATE:
PROJECT
ENGINEER
M. Abu Sultan

10/09/2013
DATE:
CERTIFIED
Eduardo Lau

10/09/2013
DATE: END OF SECTION
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15900
(DCC) NO. BI-10-03041-2001-081
_____________________

7 of 7

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 93


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 – MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15910 - DUCT ACCESSORIES


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Work Included: The Work under this section includes, but is not limited to, the
furnishing and installation and testing of the required duct accessories as specified
DESCRIPTION

herein and indicated on design drawings.

B. Related Sections:

Section 15290 Duct Insulation

Section 15891 Metal Ductwork - Low Pressure

Section 15892 Flexible Ductwork


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

Section 15932 Air Inlets and Outlets


DATE

Section 15990 Testing, Adjusting and Balancing

1.02 QUALITY ASSURANCE


NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
A. Codes and Standards
10/09/2013
DATE:
PROJECT 1. SAUDI ARAMCO Engineering Standards (SAES) and SAUDI ARAMCO
ENGINEER
M. Abu Sultan Material Systems Specifications (SAMSS) :
10/09/2013
DATE:
CERTIFIED
SAES-K-001 Heating, Ventilating and Air Conditioning (HVAC)
Eduardo Lau

DATE:
10/09/2013 SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code
CONSTRUCTION
AGENCY
SAES-K-101 Regulated Vendor List for HVAC Equipment
10/09/2013
DATE:
OPERATIONS 2. International Codes and Standards :

10/09/2013 ADC: Air Diffusion Council


DATE:
CONTROL NUMBER
VERIFICATION

SMACNA 1986 Sheet Metal and Air Conditioning Contractors


EDSD

National Association : Fire, Smoke and Radiation


Damper Installation Guide for HVAC System
DATE:
BY:

UBC STD.43-7 Test Standard for Fire Dampers and Ceiling Dampers
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15910
(DCC) NO. BI-10-03041-2001-081
_____________________

1 of 8

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 94


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
1.03 SUBMITTALS
ENGG CERT

EDL

EDL

EDL

A. Shop Drawings
SLFE
SLFE

SLFE

1. Submit shop drawings in accordance with the requirements of these


Specifications.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

2. Make shop drawings to a scale large enough to show clearly all required
ISUED FOR BID (IFB) SUBMITTAL

data.
DESCRIPTION

3. Damper data shall include but not necessarily be limited to:

a. Damper locations, required opening sizes and mounting details.

b. Dimensions of dampers, mounting attachments and all accessories.

c. Complete description of materials and methods of construction.

d. Complete description of damper operators, linkage, bearings.


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

e. Performance curves showing air volume delivered at various


pressure drops.
DATE

B. Manufacturer's Literature: Manufacturer's literature may be submitted as additional


information for the selected product.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
1.04 PRODUCT HANDLING
10/09/2013
DATE:
PROJECT
A. Product delivery, handling and storage shall be in accordance with section 15050,
ENGINEER
M. Abu Sultan
Para. 1.04.
10/09/2013
DATE:
CERTIFIED
PART 2 - PRODUCTS
Eduardo Lau

10/09/2013 2.01 MATERIALS


DATE:
CONSTRUCTION
AGENCY
A. Manual Volume Dampers
10/09/2013
DATE:
OPERATIONS
Manually Operated Multi-blade Dampers (Rectangular Ductwork):

10/09/2013
1. Configuration: Manually operated dampers shall be of the opposed blade
DATE:
type. Single blade dampers are not acceptable. Where required, duct-
CONTROL NUMBER
VERIFICATION

mounted dampers shall be fabricated with blades parallel to the longest


side of the ductwork in which they are installed.
EDSD

DATE:

2. Frames: Frames shall be fabricated of 7.6 cm. wide by 18 ga. USS


BY:

(minimum) roll-formed galvanized steel or 5 cm. x 1.27 cm. (min.)


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

galvanized structural channel with integral reinforcing ribs and counting


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

flanges for ease of installation.


(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15910
2 of 8
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 95


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
3. Blades: Blades shall be fabricated of 16 ga. USS (minimum) galvanized
ENGG CERT

EDL

EDL

EDL

steel and sized no greater than 15.2 cm. in width or 121.9 cm. in length.
SLFE
SLFE

SLFE

4. Blade Shafts and Bearings: Blade shafts shall be 1.27 cm. round, hex or
square, cadmium plated steel and shall operate in nylon or oil impregnated
bronze bearing mounted in the damper frame. Round blade shafts are to
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

be thru-bolted or thru-pinned to the damper blades.


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

5. Linkage: Linkage shall be cadmium plated steel assembly of


interconnecting crank arms attached to the shaft of each damper blade.
DESCRIPTION

This Linkage is to be mounted external to the airstream.

6. Seals: Dampers shall be provided with flexible metal or elastomeric jamb


seals. Additionally, an extruded vinyl or elastomeric edge seal is required
along the length of each blade.

7. Accessories: Each damper shall be furnished with an extra shaft extension,


hat channel bracket, manual lever and locking quadrant.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

8. Motorized Volume Dampers: All Motorized Volume Dampers, (Electrical or


JO/EWO

Pneumatic type), shall be certified in accordance with AMCA 500D, UL


60730 and SAES-K-101.
DATE

9. All volume dampers shall be AMCA certified and procured from SAUDI
ARAMCO approved Vendor/Supplier/ Company/Manufacturer.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
B. Fire Dampers
10/09/2013
DATE:
PROJECT
1. Damper Frame: Frame shall be fabricated of no less than 18 gauge USS
ENGINEER
M. Abu Sultan
galvanized steel, roll-formed for structural rigidity and equipped with slots or
10/09/2013
holes for mounting to wall sleeve. Damper frames designed to function as
DATE:
CERTIFIED
a wall sleeve are not acceptable. Separate wall sleeves must be furnished.
Eduardo Lau

10/09/2013 2. Damper Blades: Blades shall be fabricated of no less than 20 gage USS
DATE:
CONSTRUCTION galvanized or stainless steel and designed for positive closure upon
AGENCY
actuation.
10/09/2013
DATE:
OPERATIONS
3. Actuation Mechanism: Devices shall be equipped with U.L. Listed fusible
links that are rated and marked for 73.9°C unless noted otherwise on the
10/09/2013
drawings. Fire dampers for horizontal air flow installations shall be
DATE:
designed for gravity-operated closure upon actuation.
CONTROL NUMBER
VERIFICATION

4. Free Area: Unless otherwise noted, fire dampers for use in ducted
EDSD

applications shall be constructed so that in the open position, the damper


DATE:

has a clear opening equal dimensionally to the duct size. The blade stack
BY:

must be recessed into a pocket in the damper frame so that it is completely


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

out of the airstream when the damper is open.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15910
3 of 8
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 96


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

5. Fire Rating: All dampers shall be U.L. labeled in accordance with 27-
SAMSS-011, ANSI/UL Standard 555 of the Underwriter's Laboratories, Inc.,
SLFE
SLFE

SLFE

and bear the label of an approved testing agency indicating compliance to


2003 IBC section 716.3. Fire dampers rating shall be one and a half (1 ½)
hours if penetration is less than 3 hours; fire damper ratings shall be 3
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

hours, if penetration is 3 hours or more.


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

C. Turning Vanes
DESCRIPTION

1. Vanes: Turning vanes shall be double walled type constructed of 22 gage,


galvanized steel, spaced at 2.5 inch center to center. In multiple vane
installation or ducting system with more than 1000 fpm airflow, every sixth
(6) vane shall be welded to rails or a tie-rod shall be provided through the
center vane.

2. Rails: Steel rails shall be push-in type, 22 gage galvanized steel.

D. Duct Smoke Detector


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

Duct smoke detector Measuring interval shall be continuous for smoke and
one (1) hour during service period. Smoke detector shall have an operating
temperature range from 0 to 50 C.
DATE

E. Electronic Sensing Head:


NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
a. Enclosure shall be U-profile, extruded aluminum finished in ruby red
10/09/2013
lacquer. The u-profile enclosure shall be formed with channels to fit a
DATE:
PROJECT
printed circuit board.
ENGINEER
M. Abu Sultan

10/09/2013
b. Electronic controls shall have function switches, test switches, LED
DATE:
CERTIFIED
indication lamps and reset buttons.
Eduardo Lau

DATE:
10/09/2013 F. Duct Probe
CONSTRUCTION
AGENCY
a. Duct probe shall be extruded aluminum in matt black non-reflective finish
10/09/2013 with channels for support.
DATE:
OPERATIONS
b. Sensing element shall be retractable type with emitter and receiver.
10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION

G. Access Doors
EDSD

1. General: Access doors are to be installed in ducts, casings, and housings


DATE:

as specified below. Unless otherwise noted, access doors are to be made


BY:

of the same material as ducts, casings, or housings in which they are


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

SECTION 15910
(DCC) NO. BI-10-03041-2001-081
_____________________

4 of 8

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 97


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
installed. Insulate access door with an equal amount of insulation as
ENGG CERT

EDL

EDL

EDL

required for the ductwork or housings in which they are installed.


SLFE
SLFE

SLFE

H. Access Doors for Rectangular Ducts

a. Access doors are to be installed in ducts at each vaned elbow or tee,


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

volume damper, fire damper, smoke damper, duct-mounted coil, fan, air
ISUED FOR APPROVAL (IFA) SUBMITTAL

flow measuring station, and any duct-mounted instrumentation.


ISUED FOR BID (IFB) SUBMITTAL

b. Access doors shall be installed in the largest duct side unless this location
DESCRIPTION

provides poor access or is obstructed by surrounding conditions. Doors


shall be furnished in accordance with SMACNA.

I. Flexible Connections

1. Duct connections to fans, VAVs joints between ferrous and non-ferrous


metals or locations so noted on the drawings shall be provided with a fire
retardant, flexible connection, unless specifically noted otherwise.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

2. For indoor service, material shall be Ventglass, manufactured by


JO/EWO

Ventfabrics, Inc. or an approved equal. Material shall consist of a heavy


glass fabric, coated on both sides with neoprene.
DATE

3. For outdoor service, material shall be Ventlon, manufactured by


Ventfabrics, Inc., or an approved equal. Material shall consist of a heavy
NO.
REV

00
C

DISCIPLINE
glass fabric, coated on both sides with DuPont Hyalon to retard
ENGINEER
PLR/MG/AK
deterioration from sunlight or ozone.
10/09/2013
DATE:
PROJECT
4. Flexible connections shall be installed with a minimum 1-inch slack in the
ENGINEER
M. Abu Sultan
material. Braided copper jumpers shall be furnished around the connections
10/09/2013
to provide for continuous electrical grounding. CONTRACTOR is to attach
DATE:
CERTIFIED
jumpers to the ductwork in such a manner as not to bind the flexible
Eduardo Lau connection.
10/09/2013
DATE:
CONSTRUCTION J. Hangers and Support Systems
AGENCY

10/09/2013 1. Duct hangers and support systems shall be sized and installed in
DATE:
OPERATIONS
accordance with SMACNA.
2. Sway bracing shall be fabricated to insure proper rigidity of the duct.
10/09/2013
DATE:
3. Duct support should be installed to handle a proper portion of the load.
CONTROL NUMBER
VERIFICATION

K. Duct Connections to Equipment


EDSD

DATE:

1. Duct connections to air conditioning equipment shall be angle reinforced,


BY:

flanged connections secured by 0.64 cm. dia. bolts on 20.3 cm centers


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

(maximum). Joints are to be gasketed with red rubber on high density


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

neoprene and sealed air-tight.


(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15910
5 of 8
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 98


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

2. This requirements applies to such equipment as air handling units, fans,


packaged units, cooling coils, automatic dampers, filtration equipment,
SLFE
SLFE

SLFE

airflow measuring devices, sound attenuators, etc. unless specifically noted


otherwise.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

L. Duct Heaters
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

Duct heaters (including built-in Electric Heaters in VAV boxes), shall be Slip-in or
Flanged type as shown on drawings and shall be UL listed for zero clearance to
DESCRIPTION

combustible surfaces and shall bear a UL label.


Electric Duct Heater shall be tested and labeled in accordance with ANSI/UL 1996
and comply with SAES-K-101.

Standard terminal box, recessed terminal box, standard control cabinet, remote
control cabinet as well as element housing and racks all to be made of heavy
gauge galvanized steel. All heating coils shall be made of high grade
nickle/chromium resistance wire and terminated by means of a loop of wire
sandwiched between stainless steel or nickle plated washers and terminal
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

hardware.
JO/EWO

1. Element Assembly
DATE

a. Element assembly shall be of Modular design with each module


independently and easily removable from the terminal box or control
NO.
REV

00
C

DISCIPLINE
cabinet.
ENGINEER
PLR/MG/AK

10/09/2013
b. Module shall contain not more than 2 layers of element coils so that
DATE:
PROJECT
any one coil may be replaced without disturbing other module.
ENGINEER
M. Abu Sultan

10/09/2013
c. Element coils of each module shall be staggered spacing so that all
DATE:
CERTIFIED
coils per module will be the air stream preventing overheating.
Eduardo Lau

10/09/2013 2. Element Housing


DATE:
CONSTRUCTION
AGENCY
a. Housing shall be No. 18 Gauge galvanized steel and shall be roll
10/09/2013 formed construction with multiple brakes and ribs for stiffness and
DATE:
OPERATIONS
rigidity.

10/09/2013
b. Each housing module shall not be more than 121 mm wide in the
DATE:
direction of airflow and contain 2 layers of element coils on
CONTROL NUMBER
VERIFICATION

staggered spacing.
EDSD

3. Element Rack
DATE:
BY:

a. Element rack shall be constructed of No. 20 gauge galvanized steel


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

and formed with multiple brakes and ribs for stiffness and rigidity.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15910
6 of 8
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 99


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

b. Ceramic coil insulators shall be on staggered spacing per rack to


eliminate blank areas in the air pattern thru the heater and provide
SLFE
SLFE

SLFE

uniform heating over the entire cross section of the element.

4. Terminal Box or Control Cabinet


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

a. Terminal box shall be constructed of heavy gauge galvanized steel.


ISUED FOR BID (IFB) SUBMITTAL

All boxes shall have a solid cover of the same gauge complete with
piano type hinge on the longest side. Covers over 1200 mm long
DESCRIPTION

shall be provided with two (2) latches and pull rings.

b. Insulation consisting of 13 mm thk. shall be provided between the


cabinet and the heating section.

5. Safety Controls

a. Primary over temperature protection shall be provided by built in


disc type automatic reset thermal cutouts.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

b. Overcurrent protection incorporating fuses or circuit breakers shall


be provided for all heaters rated more than 48 amperes, factory
DATE

installed and within the heater enclosure. The main conductors


supplying these overcurrent protective devices shall be in
conformance with NEC.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
6. Wiring Diagrams
10/09/2013
DATE:
PROJECT
a. A separate, complete and specific wiring diagram shall be
ENGINEER
M. Abu Sultan
permanently attached to each heater. Typical wiring diagrams are
10/09/2013
not acceptable.
DATE:
CERTIFIED
Eduardo Lau b. Control and line terminals in each heater shall be marked identical
10/09/2013 to the wiring diagram.
DATE:
CONSTRUCTION
AGENCY

10/09/2013 c. Additional diagrams, instructions, etc. shall be firmly held in position


DATE:
OPERATIONS
by a metallic snap clip or pocket inside the cover.

10/09/2013
2.02 ACCEPTABLE MANUFACTURER/VENDOR
DATE:
CONTROL NUMBER
VERIFICATION

A. Goldenstar
B. SAFID
EDSD

C. KBE
DATE:

D. Saudi Euro Register


BY:

E. Titus, Hart and Cooley


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

F. or approved equal.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15910
7 of 8
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 100


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

PART 3 - EXECUTION
SLFE
SLFE

SLFE

3.01 INSTALLATION

A. Install all duct accessories in accordance with manufacturer's instructions and


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

recommendations.
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

B. Protection of Ceiling, Walls and Partitions: CONTRACTOR shall take all necessary
precautions when installing the duct accessories in order not to damage the ceiling,
DESCRIPTION

walls and partitions. Any such damage will be the responsibility of CONTRACTOR
to repair and/or replace.

END OF SECTION

SECTION 15910
8 of 8
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
NO. JO/EWO
DATE
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013
DATE:
PROJECT
ENGINEER
M. Abu Sultan

10/09/2013
DATE:
CERTIFIED
Eduardo Lau

10/09/2013
DATE:
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 101


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 – MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15932 - AIR INLETS AND OUTLETS


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Work Included: The Work under this section includes, but is not limited to the
furnishing and installation of the required air inlets and outlets as specified herein
DESCRIPTION

and indicated on design drawings.

B. Related Sections:

Section 15891 Metal Ductwork - Low Pressure

Section 15892 Flexible Ductwork

Section 15910 Duct Accessories


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

Section 15990 Testing, Adjusting and Balancing


DATE

1.03 QUALITY ASSURANCE

A. Codes and Standards


NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
1. SAUDI ARAMCO Engineering Standards (SAES) and SAUDI ARAMCO
10/09/2013 Material Systems Specifications (SAMSS) :
DATE:
PROJECT
ENGINEER
M. Abu Sultan SAES-K-001 Heating, Ventilating and Air Conditioning (HVAC)
10/09/2013
DATE:
CERTIFIED
SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code
Eduardo Lau

DATE:
10/09/2013 2. International Codes and Standards :
CONSTRUCTION
AGENCY
NFPA-90A National Fire Protection Association.
10/09/2013
DATE:
OPERATIONS SMACNA Sheet Metal and Air Conditioning Contractors National
Association
10/09/2013
DATE:
ASHRAE American Society of Heating, Refrigerating and Air-
CONTROL NUMBER
VERIFICATION

conditioning Engineers
EDSD

ADC: Air Diffusion Council


DATE:
BY:

1.03 SUBMITTALS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

A. Shop Drawings
(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15932
1 of 4
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 102


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
1. Submit shop drawings in accordance with the requirements of these
ENGG CERT

EDL

EDL

EDL

Specifications.
SLFE
SLFE

SLFE

2. Make shop drawings to a scale large enough to show clearly all required
data.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

B. Manufacturer's Literature: Manufacturer's literature may be submitted as shop


ISUED FOR APPROVAL (IFA) SUBMITTAL

drawings.
ISUED FOR BID (IFB) SUBMITTAL

1.04 PRODUCT HANDLING


DESCRIPTION

A. Product delivery, handling and storage shall be in accordance with section 15050,
Para. 1.04.

PART 2 - PRODUCTS

2.01 MATERIALS

The sound level ratings of the supply air outlets shall not exceed NC 35 at the specified
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

performance. Performance ratings shall be certified by ADC. Dimensions of all Air


JO/EWO

Devices mentioned herein are shown on drawings.


DATE

A. Diffuser:

1) Ceiling air diffusers are stepped-down core and shall be constructed of


NO.
REV

00
C

DISCIPLINE
extruded Aluminum, square face with square neck. Standard finish shall be
ENGINEER
PLR/MG/AK
anodized or other color matching with Architectural ceiling finish. Lay-in type
10/09/2013
diffusers shall be used in acoustical tile ceilings having inverted tee bar
DATE:
PROJECT
exposed suspension system.
ENGINEER
M. Abu Sultan
2) Linear slot diffuser mainly for installation into ceiling shall be constructed of
10/09/2013
extruded aluminum, multi slots and air deflection blades shall be adjusted to
DATE:
CERTIFIED
one-way parallel air deflation pattern. Bracket type secret fastening with
Eduardo Lau optional plenum box assembly.
10/09/2013
DATE:
CONSTRUCTION B. Registers:
AGENCY

10/09/2013 Registers shall be Aluminum or Stainless steel with two sets of airfoil louvers. The
DATE:
OPERATIONS
front set shall be parallel to long dimension, rear set shall be parallel to short
dimension. All louvers shall be individually adjustable for any degree of deflection,
10/09/2013
opposed blade damper, screwdriver-operated from face. Register shall be
DATE:
constructed of Stainless steel or extruded aluminum with standard anodized finish
CONTROL NUMBER
VERIFICATION

or other color matching with Architectural wall finish.


EDSD

C. Grilles:
DATE:
BY:

Grilles shall be a double deflection type consisted with two sets of individually
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

adjustable deflection blades. Front set shall be parallel to long dimension and rear
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15932
2 of 4
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 103


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
set to short dimension. Grilles shall be constructed of Stainless steel or aluminum
ENGG CERT

EDL

EDL

EDL

frame and blades with anodized finish and provided with rubber gasket to prevent
smudging.
SLFE
SLFE

SLFE

D. Outside Air Louver:


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

Louvers shall be constructed of galvanized steel (with epoxy coating), stainless


ISUED FOR APPROVAL (IFA) SUBMITTAL

steel or extruded aluminum frame and blades, flanged frame type. Blades shall be
ISUED FOR BID (IFB) SUBMITTAL

fastened in frame with stainless steel screws with rear operated opposed blade
damper. Louvers shall be provided with galvanized steel, stainless steel or
DESCRIPTION

aluminum insect screen, 18-14 mesh. Standard finish shall be anodized or other
color matching with Architectural wall finish.

E. Door Louver:

Door louver shall be fixed type aluminum horizontal blades, inverted Y-shape on
5/8” centers. Louver face shall be mounted by countersunk screw. Louver shall be
of aluminum frame and blades with standard anodized finish or other color
matching with Architectural door schedules.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

F. Sand Trap Louver:


DATE

Sand Trap Louver shall be of galvanized steel (with epoxy coating), construction
provided with self emptying sand drain holes from the base. Louver shall have an
80% efficiency on 20 to 200 micron test dust distribution and 50% on 1 to 70
NO.
REV

00
C

DISCIPLINE
microns test dust distribution. Louver shall be provided with galvanized steel,
ENGINEER
PLR/MG/AK
stainless steel or Aluminum wire, 1/2” x 1/2” in., 0.063 in. diameter, bird screen.
10/09/2013
All Sand Trap Louvers shall be AMCA certified and procured from SAUDI
DATE:
PROJECT
ARAMCO approved Vendor/Supplier/ Company/Manufacturer
ENGINEER
M. Abu Sultan

10/09/2013
DATE:
CERTIFIED
2.02 ACCEPTABLE MANUFACTURER/VENDOR
Eduardo Lau

10/09/2013 A. Saudi Euro Register


DATE:
CONSTRUCTION B. Titus, Hart and Cooley
AGENCY
C. Golden Star
10/09/2013 D. Ruskin
DATE:
OPERATIONS
E. SAFID
F. or Approved Equal
10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION

PART 3 - EXECUTION
EDSD

3.01 INSTALLATION
DATE:
BY:

A. Install, as shown on drawings, all air inlets and outlets in accordance with
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

manufacturer's instructions and recommendations.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15932
3 of 4
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 104


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ENGG CERT

EDL

EDL

EDL

B. Air inlets and outlets shall be securely attached to finish surfaces or structural
members behind finish surfaces.
SLFE
SLFE

SLFE

C. CONTRACTOR shall coordinate with other work, including ductwork and duct
accessories, as necessary to install air inlets and outlets.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

D. Protection of Ceiling, Walls and Partitions: CONTRACTOR shall take all necessary
ISUED FOR BID (IFB) SUBMITTAL

precautions when installing the air inlets and outlets in order not to damage the
ceiling, walls and partitions. Any such damage will be the responsibility of
DESCRIPTION

CONTRACTOR to repair and/or replace.

E. Testing of installed inlets and outlets shall be as indicated in Section- 15990


(Testing, Adjusting and Balancing).

END OF SECTION

SECTION 15932
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

4 of 4
NO. JO/EWO
DATE
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013
DATE:
PROJECT
ENGINEER
M. Abu Sultan

10/09/2013
DATE:
CERTIFIED
Eduardo Lau

10/09/2013
DATE:
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 105


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 – MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15971 - ELECTRIC CONTROL SYSTEM


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION OF WORK


ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Work Included: The work under this section includes, but is not limited to, the
furnishing and installation of automatic temperature control as specified herein and
DESCRIPTION

indicated on design drawings.

B. Related Sections:

Section 15990 Testing, Adjusting and Balancing

1.02 QUALITY ASSURANCE

A. Codes and Standards


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

1. SAUDI ARAMCO Engineering Standards (SAES) and SAUDI ARAMCO


Material Systems Specifications (SAMSS) :
DATE

SAES-K-001 Heating, Ventilating and Air Conditioning (HVAC).


NO.
REV

00
C

DISCIPLINE SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code.


ENGINEER
PLR/MG/AK

10/09/2013 2. International Codes and Standards :


DATE:
PROJECT
ENGINEER
M. Abu Sultan ASHRAE: American Society of Heating, Refrigerating and Air-
10/09/2013
conditioning Engineers
DATE:
CERTIFIED
Eduardo Lau ARI: Air-conditioning and Refrigeration Institute.
10/09/2013
DATE:
CONSTRUCTION ASME: American Society of Mechanical Engineers.
AGENCY

10/09/2013 ANSI: American National Standards Institute.


DATE:
OPERATIONS
NEC: National Electric Code.
10/09/2013
DATE:
NFPA: National Fire Protection Association.
CONTROL NUMBER
VERIFICATION

UL: Underwriters Laboratories.


EDSD

B. Guarantee
DATE:
BY:

1. The control system herein specified shall be free from defects in


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

workmanship and material under normal use and service. If within a period
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

of twelve (12) months from the date of completion any of the equipment
(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15971
1 of 3
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 106


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
herein described is proved to be defective in workmanship or materials, it
ENGG CERT

EDL

EDL

EDL

will be replaced or repaired free of charge.


SLFE
SLFE

SLFE

2. After completion, CONTRACTOR shall provide any service incidental to the


proper performance of the control system under guarantees outlined above
for the period of one (1) year.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL
ISUED FOR APPROVAL (IFA) SUBMITTAL

1.03 SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Shop Drawings: Submit Shop Drawings.


DESCRIPTION

B. Manufacturer's Literature and Certified Prints: Submit manufacturer's literature and


certified prints on each control component in the control system. The information
submitted shall contain at least the following information:

1. Part number, physical dimensions and weight of each component.

2. Materials of construction.
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

3. Mode of operation.
JO/EWO

4. Electrical ratings.
DATE

5. Recommended start-up and operating spare parts list.


NO.
REV

00
C

DISCIPLINE
C. System Drawings:
ENGINEER
PLR/MG/AK

10/09/2013
1. Electrical System Wiring Diagrams
DATE:
PROJECT
ENGINEER
M. Abu Sultan
a. Elementary Wiring Diagrams: Submit complete electrical wiring
10/09/2013
diagrams of the entire control system.
DATE:
CERTIFIED
Eduardo Lau b) Interconnection Wiring Diagram: Shall show all field wiring required
10/09/2013 between the various controllers. Starter, panels and remote
DATE:
CONSTRUCTION mounted devices, with conductor and terminal identification.
AGENCY

10/09/2013 D. Operation and Maintenance Instructions: Submit operation and maintenance


DATE:
OPERATIONS
instructions on all components of the control systems. Instructions shall be
sufficiently detailed so that an average mechanic can install, operate and perform
10/09/2013
minor maintenance operation when necessary.
DATE:
CONTROL NUMBER
VERIFICATION

1.04 PRODUCT HANDLING


EDSD

DATE:

A. Product delivery, handling and storage shall be in accordance with section 15050,
BY:

Para. 1.04.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15971
2 of 3
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 107


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
PART 2- PRODUCT
ENGG CERT

EDL

EDL

EDL

2.01 CONTROL DEVICES


SLFE
SLFE

SLFE

A. Temperature Controller - Electric with see thru metal protection cover:


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1. Type - two-position, single pole, single throw, line voltage electric


ISUED FOR APPROVAL (IFA) SUBMITTAL

thermostat.
ISUED FOR BID (IFB) SUBMITTAL

2. Element - bimetal.
DESCRIPTION

3. Sensitivity - non adjustable, fixed differential. 1°C.

4. Range - span of 5°C (minimum).

5. Cover - concealed adjustments, external indicating thermometer.

6. Configuration - wall mounted.


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

PART 3-EXECUTION
JO/EWO

A. All control system components and their installation shall conform to the practices,
DATE

methods, or standards prepared by the applicable technical societies and


associations.
NO.
REV

00
C

DISCIPLINE
B. Install all components of the control system in strict accordance with the
ENGINEER
PLR/MG/AK
manufacturer's recommendations.
10/09/2013
DATE:
PROJECT
C. In unfinished area, electrical conduit shall be neatly fastened to the ceiling, walls or
ENGINEER
M. Abu Sultan
columns with approved hangers, brackets or straps and shall not be placed on or
10/09/2013
supported by ductwork. In finished areas, wiring shall be concealed.
DATE:
CERTIFIED
Eduardo Lau D. All components of the control system shall be installed to allow ample space on all
10/09/2013 sides for maintenance of components and to permit installation of wiring by others.
DATE:
CONSTRUCTION
AGENCY
E. Check and verify location of thermostats and other exposed control sensors with
10/09/2013 plans and room details before installation.
DATE:
OPERATIONS
F. Locate thermostats 1.52 m (60") above finished floor or otherwise instructed by
10/09/2013
SAUDI ARAMCO Representative.
DATE:
CONTROL NUMBER
VERIFICATION

G. Calibrate all thermostats and verify the operation of all controls.


EDSD

END OF SECTION
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15971
3 of 3
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 108


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
DIVISION 15 – MECHANICAL
ENGG CERT

EDL

EDL

EDL

SECTION 15990 - TESTING, ADJUSTING, AND BALANCING


SLFE
SLFE

SLFE

PART 1 - GENERAL
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1.01 DESCRIPTION
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

A. Work Included: Perform HVAC testing, adjusting and balancing, to meet the
specified conditions. This portion of the work includes, but is not necessarily
DESCRIPTION

limited to:

1. Analyzing the installation and prepare a procedure for performing the work
of this Section.

2. Indicating deficiencies in the system that would preclude proper adjusting,


balancing, and testing of the new ducting system.

3. Securing the Company Representative's review and approval of the


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
JO/EWO

proposed procedure.

1.02 QUALITY ASSURANCE


DATE

A. Codes and Standards


NO.
REV

00
C

DISCIPLINE 1. SAUDI ARAMCO Engineering Standards (SAES) and SAUDI ARAMCO


ENGINEER
PLR/MG/AK
Material Systems Specifications (SAMSS) :
10/09/2013
DATE:
PROJECT SAES-K-001 Heating, Ventilating and Air Conditioning (HVAC)
ENGINEER
M. Abu Sultan

10/09/2013
SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code
DATE:
CERTIFIED
Eduardo Lau 2. International Codes and Standards :
10/09/2013
DATE:
CONSTRUCTION AABC National Standards for Field Measurements and
AGENCY
Instrumentation, Total System Balance Vol. I.
10/09/2013
DATE:
OPERATIONS NEBB National Environmental Balancing Bureau
"Procedural Standards for Testing, Adjusting and
10/09/2013 Balancing of Environmental Systems"
DATE:
CONTROL NUMBER
VERIFICATION

AMCA 210 Test Code for Air Moving Devices.


EDSD

ANSI/ASHRAE STD III Practice for Measurement, Testing, Adjusting and


DATE:

Balancing of HVAC Systems.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

ASHRAE Hand Book HVAC Application, Systems and Equipment,


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

Fundamentals and Refrigeration.


(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15990
1 of 5
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 109


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
ASHRAE STD 52-76 Filters, Testing Air Cleaning Devices.
ENGG CERT

EDL

EDL

EDL

SMACNA 1983 HVAC Systems- Testing, Adjusting and Balancing.


SLFE
SLFE

SLFE

B. Qualification of the Balancing Personnel: The Balancing personnel shall be:


ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

1. Qualified personnel who are experienced and trained specifically in the


ISUED FOR APPROVAL (IFA) SUBMITTAL

balancing of air-conditioning systems.


ISUED FOR BID (IFB) SUBMITTAL

2. Qualified personnel who have satisfactorily balanced at least three (3)


DESCRIPTION

systems of comparable type and shape.

In the event the CONTRACTOR fails to comply with the above provision, SAUDI
ARAMCO reserves the right to designate a professional testing agency and deduct
the cost from the CONTRACTOR.

1.03 SUBMITTALS

Upon completion of the work, or before final acceptance, the CONTRACTOR shall submit
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

to the Company Representative six (6) copies of a complete report of the balancing work
JO/EWO

containing but not limited to the following items:


DATE

A. Drawings: All of HVAC systems drawings made from the latest available revised
set of drawings with original design and field balancing data clearly recorded for
each system. The drawings shall be known as the "Corrected Testing, Adjusting
NO.
REV

00
C

DISCIPLINE
and Balancing Drawings".
ENGINEER
PLR/MG/AK

10/09/2013
B. Reports: Typewritten test, adjust and balance reports as recommended by the
DATE:
PROJECT
referenced codes and standards indicating design and actual data and including,
ENGINEER
M. Abu Sultan
but not necessarily limited to, the following:
10/09/2013
DATE:
CERTIFIED
1. Unit Data
Eduardo Lau

10/09/2013 a. Manufacturer and model.


DATE:
CONSTRUCTION b. Type and size.
AGENCY
c. Arrangement, class and discharge
10/09/2013 d. Sheave manufacturer, diameter and bore.
DATE:
OPERATIONS
e. Number of belts, manufacturer and size.
f. Number of filters, type and size.
10/09/2013
g. Air quantities in CFM for total, fresh and return air.
DATE:
h. Total and external static pressure.
CONTROL NUMBER
VERIFICATION

i. Fan RPM.
EDSD

2. Motor Data
DATE:
BY:

a. Manufacturer and frame.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

b. Motor hp and rpm.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

c. Motor voltage, frequency, phase and full load current.


(DCC) NO. BI-10-03041-2001-081
_____________________

SECTION 15990
2 of 5
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 110


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
d. Sheave manufacturer, diameter, bore and center distance.
ENGG CERT

EDL

EDL

EDL

3. Coil Data
SLFE
SLFE

SLFE

a. Location and type.


b. Number of rows/fins.
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

c. Manufacturer and model number.


ISUED FOR APPROVAL (IFA) SUBMITTAL

d. Face area in SQ FT., pressure drop, air volumes and velocity.


ISUED FOR BID (IFB) SUBMITTAL

e. DB/WB temperatures for fresh air, return air, entering and leaving
air.
DESCRIPTION

4. Air Outlets

a. Manufacturer, location, type and size.


b. Air volumes.

5. Duct system:.

a. Sizes of supply and return Air ducts.


07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

b. Number of Pitot tube pressure measurements.


JO/EWO

c. Sum of velocity measurements.


d. Average velocity.
DATE

e. Duct air quantities.

6. Condensing Unit
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
a. Location and type,
10/09/2013
b. Unit manufacturer, model number, serial number
DATE:
PROJECT
c. Compressor manufacturer, model number, serial number.
ENGINEER
M. Abu Sultan
d. Refrigerant.
10/09/2013
e. Number of fans, rpm, fan motor hp and manufacturer.
DATE:
CERTIFIED
Eduardo Lau C. Sound Level Data: Include in the report, data on sound levels taken at each
10/09/2013 location, selected as directed by Company Representative.
DATE:
CONSTRUCTION
AGENCY
D. Test Apparatus: A complete list of all test apparatus used in performing the work
10/09/2013 with serial numbers and verification of latest calibration data.
DATE:
OPERATIONS
1.04 PRODUCT HANDLING
10/09/2013
DATE:
A. Product delivery, handling and storage shall be in accordance with section 15050,
CONTROL NUMBER
VERIFICATION

Para. 1.04.
EDSD

PART 2 - PRODUCTS
DATE:
BY:

2.01 INSTRUMENTATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15990
3 of 5
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 111


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
A. Test Equipment: The CONTRACTOR shall provide all the test instrument and
ENGG CERT

EDL

EDL

EDL

equipment required to perform the work.


SLFE
SLFE

SLFE

B. Calibration: The test equipment to be used in the balancing work shall have been
calibrated within the previous three months. SAUDI ARAMCO Representative has
the right to request instrument recalibration or the use of other instruments and test
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

methodology where accuracy of readings is questionable. Do not permanently


ISUED FOR APPROVAL (IFA) SUBMITTAL

install instruments used for tests (e.g. gauges and thermometers) until just prior to
ISUED FOR BID (IFB) SUBMITTAL

the test to avoid damage and changes in calibration.


DESCRIPTION

PART 3 - EXECUTION

3.01 INSPECTION

A. Examine the areas and conditions under which work of this section will be
performed. Correct conditions detrimental to the proper and timely completion of
the work. Do not proceed until satisfactory conditions have been corrected.

B. Perform any system changes that are required prior to the final balance, as
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041

determined by the initial system check. Such changes may encompass, but not
JO/EWO

necessarily be restricted to, changing of pulleys, belts, dampers or addition of


dampers or access doors.
DATE

C. Make sufficient inspection during progress of installation to verify that essential


components are installed in a manner to permit optimum balancing.
NO.
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK
3.02 PROCEDURE AND INSTRUMENTS
10/09/2013
DATE:
PROJECT
A. Requirements: Adjust all system and components to perform as required by the
ENGINEER
M. Abu Sultan
layout drawing and the construction specifications, using the procedures described
10/09/2013
in the AABC Manual except as otherwise directed by the Company Representative.
DATE:
CERTIFIED
Eduardo Lau B. Use measurements and test procedures in accordance with and applicable codes
10/09/2013 and standards listed in Para. 1.02 of this Section.
DATE:
CONSTRUCTION
AGENCY
3.03 FINAL TESTS, INSPECTION, AND ACCEPTANCE
10/09/2013
DATE:
OPERATIONS
A. Make all necessary tests to demonstrate that capacities and general performance
of air systems.
10/09/2013
DATE:
B. At the time of final inspection, recheck in the presence of the Company
CONTROL NUMBER
VERIFICATION

Representative, random selections of data, air quantities, air motion and sound
levels recorded in the report. Points and area for recheck shall be selected by the
EDSD

Company Representative.
DATE:
BY:

C. If random tests elicit a measured flow deviation of 10% or more from that recorded
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

in the report listings, automatically reject the report. In the event the report is
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. BI-10-03041-2001-081


_____________________

SECTION 15990
4 of 5
B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 112


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

-
SAUDI ARABIAN OIL COMPANY
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
-
-

-
rejected, readjust all systems, retest, record new data, submit a new report, and
ENGG CERT

EDL

EDL

EDL

make new inspection tests, all at no additional cost.


SLFE
SLFE

SLFE

D. After final acceptance of certified reports by the Company Representative,


permanently mark the settings and other adjustment devices so that adjustment
can be restored if disturbed at any time. Do not mark devices until after final
ISUED FOR CONSTRUCTION (IFC) SUBMITTAL

acceptance.
ISUED FOR APPROVAL (IFA) SUBMITTAL
ISUED FOR BID (IFB) SUBMITTAL

E. Seal all test holes with metal snap-in plugs by Browman Products Division of
Associated Spring Corp. of Atlanta, Georgia. The use of duct tape to seal the
DESCRIPTION

holes will not be permitted or accepted.

F. Protect installed work and materials of all other trades. In the event of damage,
immediately make all repairs and replacements necessary for acceptance by the
Company Representative and at no additional cost.

END OF SECTION
07/01/2013 10-03041

10/09/201 10-03041
02/23/2013 10-03041
NO. JO/EWO
DATE
REV

00
C

DISCIPLINE
ENGINEER
PLR/MG/AK

10/09/2013
DATE:
PROJECT
ENGINEER
M. Abu Sultan

10/09/2013
DATE:
CERTIFIED
Eduardo Lau

10/09/2013
DATE:
CONSTRUCTION
AGENCY

10/09/2013
DATE:
OPERATIONS

10/09/2013
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

SECTION 15990
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

5 of 5
(DCC) NO. BI-10-03041-2001-081
_____________________

B CONSTRUCTION SPECIFICATIONS – DIV 15 DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ELECTRICAL, CIVIL AND COMMUNICATION DETAIL DESIGN DOC 113


D57 A BE-958823
HARADH SATELLITE FIELDS OF 00
HARADH SAUDI ARABIA JO / EWO: BI- BI-10-03041-2001 113
EDSD/2616-0399.doc