Quality Assurance:

The design will be performed in accordance with all contractual requirements, client
specifications, and international /local standards necessary for achieving a cost effective
quality installation.
During the design phase and early construction effort associated with all projects, there is a
continuous flow of purchased materials. The quality assurance group will be responsible for
assuring all materials meet applicable standards and adhere to the approved design. This
effort will be performed in the following manner;

Our will utilize material suppliers and fabricators which have experience in achieving the
quality standards our company represents.
Our quality department will inspect, audit and monitor all suppliers’ internal quality
control/assurance systems. This will be performed prior to award of purchase orders,
periodically during fabrication, and upon final completion before shipment.
Our quality department will secure recommendations and necessary witness/hold points
from the supplier for field erection. This information will be incorporated into our quality
control plan and implemented at jobsite.
Our quality department assures that all materials are new in nature and have never been
previously utilized.

Quality Control:
Under the direction of the Quality Control Manager a full service laboratory will be
established at the jobsite. The laboratory will perform all the ASTM testing necessary for
completing a project in accordance with all applicable engineering standards and per ASTM
requirements. This is achieved as follows;
The field Q/C department will inspect all locally utilized materials at the point of origin, prior
to purchase and shipment.
The field Q/C department will assure that all engineered mix designs for concrete or asphalt
are strictly adhered too. Utilization of 3rd party testing will be performed in order to verify
compliance accordingly if necessary.
An Independent (3rd party) calibration and certification of all laboratory equipment, batch
equipment and scales will be performed prior to issuance of purchase order or utilization of
company owned batch plants.
A geotechnical / soils investigation will be performed by a third party in order to establish
proper soils procurement and establish proctors for compaction.
High potting of all high voltage cable
Di-electric Testing of all step up and step down transformers
Megger testing cables
Pressure testing of all tanks, underground catch basins, and associated piping systems.
Verifying Witness/Hold Points recommended by suppliers for large package systems, such
as Generators, Treatment Units, RO Units, Central A/C systems, etc…