List of works completed from March 2013 to 21st October 2013 under Joint Director, Canals

S.No Name of Work Date of forwarding

Construction of weir across Kadalundi river at Thayyilkadavu-Nedugad in Oorakam


1 17/7/2013
Panchayath

KIP - LBMC - Permanent measures to the collapsed embankment portion between ch


2 10/4/2013
37600 m and 37800 m at Ponmannoor - Earth filling and road construction

NABARD RIDFXVI - Construction of a VCB cum bridge across Kanjirapuzha at


3 9/10/2013
Nambooripotty Kalikadavu in Chaliyar Grama Panchayat
Construction of a vented cross weir across Iruvanipuzha in Pulikkayam in Kodenchery
4 15/3/2013
Panchayath
MVIP-Construction of a bridge at Malankara near damaged submersible bridge - d/s of
5 18/5/2013
dam - (Revised design of foundation for pier)

Construction of a checkdam across Muvattupuzha river d/s of Ramamangalam bridge at


6 30/9/2013
Puthumana LI Scheme

Kuttanad Package-Flood management programme - Cutting & Opening of Kochar in


7 19/6/2013
between C&D block-Protecting the outer bund of C&D Block
8 KDSA - Sabarimala master plan - Stability analysis of checkdam at Nilakkal 26/7/2013
Improvements to KSRTC DPO Link road km0/000 to 0/400, Racket court road km 0/000 to
9 30/9/2013
0/300 and DPO link road km 0/000 to 0/950 km in Palakkad district

WRD-KyIP -Most urgent demolishing and reconstruction of existing aqueduct at


10 Vallikkadu in Azhiyoor branch canal between ch.6/500 km and 7/200 km - Revision of 25/9/2013
hydraulic particulars and submission of revised estimate

11 Technical sanction for Tourism Development Project - Chamravattom Puzhayora 12/7/2013


Snehapatha at right bank of Chamravattom RCB across Bharathapuzha(LAC-ADF)

12 Sanctioning of revised estimates for Renovation and Modernisation of Malampuzha


garden - Phase II

13 Pambar basin-Chengalar scheme-Pattissery dam- Non Overflow Section

14 Stability analysis of Peechi dam

15 Stability analysis of Kanjirapuzha dam

16 Stability analysis of Kallada dam

17 Stability analysis of Malampuzha dam

18 Stability Analysis of Pamba barrage

19 Pambar basin-Chengalar scheme-Pattissery dam-Guide wall and Training wall 6/7/2013


Technical sanction for reservoir based Tourism - RCB at Chamravattom-Providing Fencing
4 19/2/2013
and allied works on Right bank U/s -First reach from ch0/000 to 0/300m

Construction of Training centre at Irrigation compound, Thrissur(Revision No.1)