Mechanic/Field Operator

Name : Abhijit Arun Chavan

Date of Birth : 25th February 1984

Nationality : Indian
Passport Details : Passport No : Z2084431
Validity : 01/02/2020

Contact Details : E-mail Id: abhijit_chavan_1984@yahoo.com


Contact No: +91- 9930358102 INDIA
+91- 2357235496 INDIA
+ 7 778 450 5167 Kazakhstan

Education :  S.S.C Pune university (1999 passed out)

 HSC-Pune university(2002 passed out)

 ITI-Diesel Mechanic Ratnagiri, Maharashtra (2000


passed out)-India

Training :

 Weatherford Health & Safety Induction,


 Process & Instrumentation Drawing
 Standard Field reporting paper work
 Pigs &Pigging Module-1
 Confined space
 Work at Height
 Pressure Safety
 Pipeline Hoses
 Fittings
 Pressure Testing Fundamentals and safety
 Risk Assessment Course.
 Volvo engine (model-TAD943VE)
 Undergone in plant training on NH/NT ENGINES in
Cummins India, Pune.
 Training on ELGI COMPRESSORS in Coimbatore
Tamil Nadu, India.
Computer Skills:  Microsoft Office Programs

Languages Known:  Uk -English, Hindi, Marathi


 Marathi
 Hindi

Responsibilities:

 Operation of All Pipeline & Process Related Equipment’s in both Onshore & Offshore fields
as (Filling Pumps, Pressure Pumps, Compressor, nitrogen pump, Vacuum Pump, Air Dryer
etc.).

 Effective Participant in All Pipeline Pre-Com activities as from Cleaning, Gauging, Filling,
Pressurization, De-watering, Drying, Nitrogen Purging, Pneumatic Services etc.

 Effective participant in all the executing activity as from rig up to de-rig up.
 Diesel engine, Centrifugal Pump, Reciprocating Pump, Compressors, Air Dryer, Vacuum
Pump etc. Operating and Maintenance and Overhauling.
 Nitrogen pump cold end and boosting pump seal replacement.

 Participating in tool box talk and completing the preferred job for the day as per plan.

 Preparing equipment break down report, Service report, Maintenance report, Equipment
function test report and check list.

 Tagging the equipment as per performance.

 Giving requisition for equipment’s spare parts as per requirement.

 Participating in post and pre job meeting for the project.

 Report near miss report and suggesting safety factors to control that in future.

Experience and Expertise Summary:


Over 11years of experience in oil field equipment’s operating, overhauling, trouble
shouting and other field related activities in pipeline& piping pre-commissioning,
commissioning and process pneumatic testing services.

1) Infra Del Projects. Kazakhstan

Position : Mechanic
Job Function : Carry out Diesel engine, Centrifugal Pump, Reciprocating Pump, Diesel
Generator, Diaphragm pumps, vacuum pump, Air Dryer.

Duration : august 2017 to at present.

Projects : Worked at Kaz Minerals Bozshakol Kazakhstan power plant.


Activity : 23 MW power plant maintenance, troubleshooting, overhauling,
And commissioning.

2) Rouge LLC- Pipeline Services Dubai

Position : Mechanic/operator
Job Function : Carry out Diesel engine, Centrifugal Pump, Reciprocating Pump,
Compressors, Dryer, Vacuum Pump etc. Operating, Maintenance,
Trouble shouting and overhauling and field related activities.
Duration : May2016 to January 2017

Projects completed : Worked at TANAP project Turkey (Erzurum)

Activity : 56”390km gas Pipeline Flooding, Cleaning, Gauging,


Hydro-Testing De-watering, Swabbing, Drying

3) Weatherford International (P&SS) Iraq:

Position : Mechanic2.
Job Function : Carry out Diesel engine, Centrifugal Pump, Reciprocating Pump,
Compressors, Dryer, Vacuum Pump, nitrogen pump etc. Maintenance,
Trouble shouting and overhauling and field related activities.
Duration : Feb. 2013 to Aug. 2015.

Projects completed : Worked at Exxon/Fluor Weatherford water injection IRAQ.

Activity : Water injecting to the Well, HD 500 Pump operating,


Maintenance.

4) Trans-Asia Pipeline Services Fzc- Sharjah U.A.E.

Position : Mechanic/Pipeline/Process services field operator


Job Function : Carry out Diesel engine, Centrifugal Pump, Reciprocating Pump,
Compressors, Dryer, and Vacuum Pump etc. Operating, Maintenance,
Trouble shouting and overhauling and field related activities.
Commissioning and process pneumatic testing services in both
Offshore & Onshore Fields.
Set up and preparation/mobilise of equipment for testing
Operations such as pigging, flooding, cleaning, hydro testing,
Dewatering Drying, vacuum drying, nitrogen packing.
Duration : July 2008 to Feb 2013.
1)
Projects completed : IOCL Paradip SPM Project India. (2012)
Clint : Hyundai Heavy Industries
Activity : 48” 58 km Pipeline Flooding, Cleaning, Gauging, Hydro testing,
Leak Testing, Calliper EGP Survey, Leak Testing of SPM Systems.

2)
Projects completed : Alliance LNG Re-Gasification Project Malaysia. (2012)
Clint : Stone House/ Maser Offshore, Alliance LNG/ PETRONAS
Activity : 30” 4 km pipeline Flooding, Cleaning, Gauging, Hydro testing,
Dewatering and Drying.

3)
Projects completed : VHFL Tank Farm Project Fujairah U.A.E.(2012)
Clint : Vopak Horizon Terminals Limited, Cylingas LLC
Activity : Hydro testing of Crude and Product Storage Tanks

4)
Projects completed : Jalilah Field Development Project, Dubai. (2012)
Clint : Dubai Petroleum, Technip (Abu Dhabi)
Activity : 12”, 6” pipeline Flooding, Cleaning, Gauging, Hydro-testing,
De-Watering with Nitrogen.

5)
Projects completed : North Tapti Gas Field Development Project India (2011)
Clint : Oil and Natural Gas Corporation (ONGC), Swiber Offshore
Constructions Pte Ltd
Activity : 18”, 12” pipeline Flooding, Cleaning, Gauging, Hydro-testing,
De-watering, Swabbing, Drying, Nitrogen Purging.

6)
Projects completed : Dahej –Viajypur (Phase-II) Pipeline Project India (2011)
Clint : Gas Authority of India Limited, Fernas Constructions
Activity : 48” 290 km Bulk Dewatering, Swabbing, Drying, Calliper survey
And Vacuum Drying.
7)
Projects completed : Gas Supply Pipeline Abu-Dhabi U.A.E. (2010)
Clint : Abu Dhabi Gas Industries (GASCO), AL Fannar Contracting.
Activity : 24” 2.7 km Flooding, Cleaning, Gauging, Hydro-testing, De-
Watering, Swabbing, Drying, Nitrogen Purging.
8)
Projects completed : Muthurajawela Tank Farm Project, Sri Lanka (2010)
Clint : Ceylon Petroleum, Leighton Contractors Pvt Ltd.
Activity : 16”1.9 km Flooding, Cleaning, Gauging, Calliper Pigging
And Hydro-Testing.
10)
Projects completed : Salman pipeline project (2010-2009) Iran Shiri Island
Activity : 32”150 km 290 km pipeline Flooding, Cleaning, Gauging,
Hydro-Testing De-watering, Swabbing, Drying, Nitrogen
Purging.

11)
Projects completed : South Pars 9 & 10 – POGC Iran (2008-2009)
Clint : IOEC, SPEC LLC.
Activity : 30”177 km and 4” 193 km Pipeline Flooding, Cleaning, Gauging,
Hydro-Testing De-watering, Swabbing, Drying.

5) Narmada Offshore Construction Pvt. Ltd-Navy Mumbai. India.

Position : Mechanic/Pipeline/Process services field operator


Job Function : Carry out Diesel engine, Centrifugal Pump, Reciprocating Pump,
Compressors, Dryer, Vacuum Pump etc Operating, Maintenance,
Trouble shouting and overhauling and field related activities.
Commissioning and process pneumatic testing services in both
Offshore & Onshore Fields.
Set up and preparation/mobilise of equipment for testing
Operations such as pigging, flooding, cleaning, hydro testing,
Dewatering Drying, vacuum drying, nitrogen packing.
Duration : August 2004 to June 2008.

1)
Projects completed : Reliance Gas Transportation EWPL Project Narmada /
Weatherford /Narmada Offshore India (2008)
Clint : Reliance
Activity : 48” 300 km Vacuum Drying.

2)
Projects completed : Reliance Gas Transportation 48" EWPL Project, India. (2007)
Clint : Reliance
Activity : 48” 200 km Pipeline Flooding, Cleaning, Gauging, Hydro testing,
Leak Testing.

3)
Projects completed : Global Industries Offshore L&TONGC (Phase 2) India (2007)
Clint : Global industries, ONGC
Activity : 6” to 16” 10 Segments Pigging, Hydro- testing.
4)
Projects completed : Panna Field Development project India (2006)
Clint : British gas
Activity : 4” to 16” 35 km Pipeline Flooding, Cleaning, Gauging, Hydro-
Testing, Dewatering

5)
Projects completed : ONGC RSPPM India (2006)
Clint : IOEC, ONGC
Activity : 4" to 16" 36 Segments 150 km pigging hydro-testing.

6)
Projects completed : MUT Pipeline Project India (2005)
Clint : Hyundai heavy industries / ONGC
Activity : 26”28” 12”102 km Pipeline Flooding, Cleaning, Gauging,
Hydro-Testing

Declaration
I hereby declare that all the above furnished information is true to the best of my
knowledge.

Place: Mumbai yours truthfully


(Abhijit Arun Chavan)