Sei sulla pagina 1di 1

ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED 23730

Dhaka Mass Rapid Transit Development Project (DMRTDP) CP 03&04


TIME SHEET FORM 1
Date ...............Month ...........Year ............... Section : STEEL ช่างนุภาศพัฒน์
Group : GROUP 01 (AE) QC
Other Work

Total Hours
Hours
No. Local No. Code No. Name IN OUT Signature IN OUT Signature Remarks
(a.m.) (a.m.) (p.m.) (p.m.) A B

AE
1 AE 2590 0OK02590 Mr. Md. Zarin Mahamud 8.00 12:00 01:00 5:00
QC Engineer
2 AE 2591 0OK02591 Mr. Dulal Debnath 8.00 12:00 01:00 5:00
QC Suprevisor

Job Detail Subjob Material Used Used Machinery


A) ............................................................................................................................ ..................................... ..................................... .....................................
B) ............................................................................................................................ ..................................... ..................................... .....................................

Checker .............................................. Foreman .................................... Engineer ....................................... Project Engineer .............................


Procedure : A. Foreman who control abot team record the actual works and actual working hour. C. Unreal of working hour are disloyal.
B. Engineer who control about team must be check time sheet every day. D. Sent time sheet every morning next day (before 9:00 am).
December 22, 2019 Printed By : marisa