DEDICATION

We express our sincere thanks to Engr. Waqas Malik for his support and guidance for doing the
project.
We express our indebtness and gratitute to our guide Engr. Khawar, lab engineer, Department of
Civil Engineering, Abasyn University Islamabad, for his guidance and care taken by him in
helping us to complete the project work successfully.
We express our deep gratitude to Mr. Zeeshanullah, assistant professor, for his valuable
suggestions and guidance rendered in giving shape and coherence to this endeavor. We are also
thankful to his team members for their support and guidance throughout the period of project.

i
INTRODUCTION
We have Chosen hostel Building for our Complex Engineering Problem.

The main road which is near to site leads to factory hospital. A branch road of 10m which is
near is existing road connected very near to the hostel. The total area of the site is about
25080sq ft. The hostel building consists of 25 rooms, and sports area. The building consists of
total 3 stories.

The engineer has to keep in mind the municipal conditions, building bye laws, environment,
financial capacity, water supply, sewage arrangement, provision of future, aeration, ventilation
etc., in suggestion a particular type of plan to any client.

Arrangement of Rooms
 Living Room
 Kitchen
 Store Room
 Dining Room
 Office Room
 Bathrooms
 Store Rooms
 Corridors
 Stair Case
 Sport Area
 Visitor Room
 Warden Room
Table 1: Room Area and height of Rooms.

Rooms Floor Area Height (Ft.)


Living Room 234 Sft 11’

Kitchen 468 Sft 11’

Bath Rooms 487 Sft 11’

Sport Area 733 Sft 11’

Stair Case 96 Sft 11’

Dining Room 1938 Sft 11’

Store Rooms 234 Sft 11’

Thickness Of Wall 9” ------

ii
WORK DISTRIBUTION
Group Members Duties
Saeed Ayeen ETABS Designing
Atta-ur-Rehman AutoCAD Drawings Presentation Making
Usama Bin Malik Report Making
Irfan Khattak Nil
Habib Khattak Nil

iii
DESCRIPTION AND SIGNIFICANCE
The hostels are the first unit of the society and it is the primary unit of student society. The hostel
is built to grant the protection against wind, weathers, and to give insurance against physical
insecurity of all kinds to the student.
The basics needs of hostel students are food, environment & shelter. From times immemorial man
has been making efforts in improving their standard of living. The point of his efforts has been to
provide an economic and efficient shelter. The possession of shelter besides being a basic, used,
gives a feeling of security, responsibility and shown the social status of man, such a place for
comfortable and pleasant living requires considered and kept in view.

 A Peaceful environment
 Safety from all natural source & climate conditions
 General facilities for community of his residential area

Selection of plot is very important for buildings a hostel. Site should be in good place where there
community but service is convenient but not so closed that becomes a source of inconvenience or
noisy. The conventional transportation is important not only because of present need but for
retention of property value in future closely related to are transportation, shopping, facilities also
necessary. One should observe the road condition whether there is indication of future
development or not in case of undeveloped area.
The factor to be considered while selecting the building site are as follows:-
• Access to park & playground.
• Agriculture polytonality of the land.
• Availability of public utility services, especially water, electricity & sewage disposal.
• Contour of land in relation the building cost. Cost of land.
• Distance from places of work.
• Ease of drainage.
• Location with respect to school, collage & public buildings.
• Nature of use of adjacent area.
• Transport facilities.
• Wind velocity and direction.

iv
Table of Contents
DEDICATION ............................................................................................................................................... i
INTRODUCTION ........................................................................................................................................ ii
WORK DISTRIBUTION ............................................................................................................................ iii
DESCRIPTION AND SIGNIFICANCE ..................................................................................................... iv
1 Details of Constructed Members........................................................................................................... 2
2 Design Steps.......................................................................................................................................... 3
3 Steps of Designing in ETABS .............................................................................................................. 4
3.1 Grids spacing ...................................................................................................................................... 4
3.2 Story details ........................................................................................................................................ 4
3.3 Grids.................................................................................................................................................... 5
3.4 Define materials properties ................................................................................................................. 5
3.5 Dimensions of members ..................................................................................................................... 6
3.6 Assign loads ........................................................................................................................................ 6
3.6 Assign load combinations ................................................................................................................... 7
3.7 Draw members (beams, column, walls) .............................................................................................. 7
3.8 Assign loads on members ................................................................................................................... 8
3.9 Meshing the slabs................................................................................................................................ 8
3.10 Assign diaphragm ............................................................................................................................. 9
3.11 Analysis............................................................................................................................................. 9
3.12 Deformed shape after analysis ........................................................................................................ 10
3.13 Moment diagram details.................................................................................................................. 10
3.14 Reinforcement details after Designing ............................................................................................ 11
Conclusion .................................................................................................................................................. 26

v
List of Figures
Figure 1: Spacing the Grids ......................................................................................................................... 4
Figure 2: Giving the Story details................................................................................................................. 4
Figure 3: Defining the material properties................................................................................................... 5
Figure 4: Giving Dimensions to Members. ................................................................................................... 6
Figure 5: Assigning the Loads. ..................................................................................................................... 6
Figure 6: Assigning Load Combinations. ..................................................................................................... 7
Figure 7: Drawing Members ........................................................................................................................ 7
Figure 8: Assigning load on Members.......................................................................................................... 8
Figure 9: Meshing of Slab ............................................................................................................................ 8
Figure 10: Assigning the Diaphragm. .......................................................................................................... 9
Figure 11: 3-D View of Hostel Structure. ..................................................................................................... 9
Figure 12: Deformed Shape After Analysis. ............................................................................................... 10
Figure 13: Moment Diagram Details. ........................................................................................................ 10
Figure 14: Reinforcement Design. .............................................................................................................. 11
Figure 15: Lateral Load to Stories - X ....................................................................................................... 14
Figure 16: Lateral Load to Stories - Y ........................................................................................................ 16

List of Tables
Table 1: Room Area and height of Rooms. ................................................................................................... ii
Table 2: Distribution of Loads. ..................................................................................................................... 1
Table 3: Detail of Concrete Covering........................................................................................................... 2
Table 4: Structural Members and Their Dimensions.................................................................................... 2
Table 5: Strengths and Values. ..................................................................................................................... 2
Table 6: Story Data..................................................................................................................................... 12
Table 7: Load Patterns. .............................................................................................................................. 12
Table 8: Base Shear Forces. ....................................................................................................................... 14
Table 9: Applied Story Loads in X- direction. ............................................................................................ 14
Table 10: Base Shear Forces ...................................................................................................................... 16
Table 11: Applied Story Loads in Y direction. ............................................................................................ 16
Table 12: Load Cases Summary. ................................................................................................................ 17
Table 13: Structure Results. ........................................................................................................................ 18

vi
1 LOADS
The loads we used in this designs are
1. Super imposed dead load(finishes load)
2. Dead load
3. Live load
4. Earth-quake(EQX)
5. Earth-quake(EQY)

Table 2: Distribution of Loads.

S.No Place Of Load Load (Psf) Load Type


1 Living Rooms 75 Live Load
2 Stair Case 100 Live Load
3 Roof 25 Live Load
4 Sports Area 120 Live Load
5 Store Rooms 80 Live Load
6 Dining Room And Kitchen 80 Live Load
7 Bathrooms 30 Live Load
8 Corridors 40 Live Load
9 Walls 1080 Super Imposed Loads
10 Roofs 25 Super Dead Load

 The live load are we taken from ASCE (Chapter # 04).


 The all slabs are we designed by excel file sheets.
 Seismic load factor are we taken from UBC 97(Chapter # 16-01).
 The modifiers for Beams, Columns, Slabs and Walls are taken from ACI-318-
11(Chapter # 10).

1
1 Details of Constructed Members

Table 3: Detail of Concrete Covering.

No Cover Place Cover Dimensions

1 Slab 1" bottom and 1.5" top

2 Beam 2.5" All sides

3 Column 2.5" All sides

4 R.C.C Wall (Shear wall) 2" All sides

Table 4: Structural Members and Their Dimensions.

Member Dimensions

Beams 18" X 22"

Column 18" X 20"

Wall Thickness 9"

Slab Thickness 6"

Shear Wall 6"

Table 5: Strengths and Values.

Strengths Value

fc'(for beams, slab) 3000 psi

fc'(for column) 3500 psi

fy 60000 psi

2
2 Design Steps
Our design consist of two types
 Design on ETABS for frame structure.
 Design on excel for slabs.

1. Modeling
 units
 Grids
 Story height

2. Define
 Beams dimensions
 column dimensions
 slabs dimensions
 wall dimensions

3. assign load combinations


 dead load
 live load
 finishes load
 seismic loads
4. draw members layout of
 beams
 column
 Walls
 Slabs.
5. Assign loads on walls and slabs
6. Analysis to Show
 shear forces
 BMD
 deflections
7. Design to show reinforcement
8. Detailing about beams, column and walls.

3
3 Steps of Designing in ETABS

3.1 Grids spacing

Figure 1: Spacing the Grids

3.2 Story details

Figure 2: Giving the Story details.

4
3.3 Grids

3.4 Define materials properties

Figure 3: Defining the material properties.

5
3.5 Dimensions of members

Figure 4: Giving Dimensions to Members.

3.6 Assign loads

Figure 5: Assigning the Loads.

6
3.6 Assign load combinations

Figure 6: Assigning Load Combinations.

3.7 Draw members (beams, column, walls)

Figure 7: Drawing Members

7
3.8 Assign loads on members

Figure 8: Assigning load on Members.

3.9 Meshing the slabs

Figure 9: Meshing of Slab

8
3.10 Assign diaphragm

Figure 10: Assigning the Diaphragm.

3.11 Analysis

Figure 11: 3-D View of Hostel Structure.

9
3.12 Deformed shape after analysis

Figure 12: Deformed Shape After Analysis.

3.13 Moment diagram details

Figure 13: Moment Diagram Details.

10
3.14 Reinforcement details after Designing

Figure 14: Reinforcement Design.

11
4 Results (summary report generated by ETAB)
Structure Data
This chapter provides model geometry information, including items such as story levels, point
coordinates, and element connectivity.

4.1 Story Data


Table 6: Story Data.

Height Elevation Master


Name Similar To Splice Story
ft Ft Story
Story3 11 44 No None No
Story2 11 33 No GF No
Story1 11 22 No GF No
GF 11 11 Yes None No
Base 0 0 No None No
Story3 11 44 No None No
Story2 11 33 No GF No
Story1 11 22 No GF No
GF 11 11 Yes None No
Base 0 0 No None No
Story3 11 44 No None No
Story2 11 33 No GF No
Story1 11 22 No GF No
GF 11 11 Yes None No
Base 0 0 No None No

4.2 Loads
This chapter provides loading information as applied to the model.
4.2.1 Load Patterns

Table 7: Load Patterns.

Self-Weight
Name Type Auto Load
Multiplier
Dead Dead 1
Live Live 1
Masonry Superimposed Dead 1
EQX Seismic 0 UBC 97
EQY Seismic 0 UBC 97

12
4.2 UBC 97 Auto Seismic Load Calculation
This calculation presents the automatically generated lateral seismic loads for load pattern EQX
according to UBC 97, as calculated by ETABS.

4.3.1 Direction and Eccentricity


Direction = X + Eccentricity Y
Eccentricity Ratio = 5% for all diaphragms

4.3.2 Structural Period


Period Calculation Method = Program Calculated

Coefficient, Ct [UBC 1630.2.2] Ct = 0.035ft


Structure Height Above Base, hn hn = 44 ft
Approximate Fundamental Period, Ta
Ta = Ct (hn Ta = 0.598 sec
[UBC 1630.2.2 Eq. 30-8]
Program Calculated Period, T [UBC
T ≤ 1.4Ta
1630.2.2.2]

4.3.4 Factors and Coefficients


Response Modification Factor, R [UBC Table 16-N] R = 8.5
Importance Factor, I [UBC Table 16-K] I=1
Seismic Zone Factor, Z [UBC Table 16-I] Z = 0.15
Soil Profile [UBC Table 16-J] = SC
Site Coefficient, Ca [UBC Table 16-Q] Ca = 0.18
Site Coefficient, Cv [UBC Table 16-R] Cv = 0.25

4.3.5 Equivalent Lateral Forces


Cv I
Base Shear Coefficient [UBC 1630.2.1, Eq. 30-4] =
RT
2.5Ca I
maximum [UBC 1630.2.1, Eq. 30-5] = = 0.052941
R
minimum [UBC 1630.2.1, Eq. 30-6] = 0.11Ca I = 0.0198
min ≤ Vcoeff ≤ max
4.3.6 Calculated Base Shear
Table 8: Base Shear Forces.

Period Used W V Ft
Direction Vcoeff
(sec) (lb) (lb) (lb)
X + Ecc. Y 0.1 0 9511883.39 503570.3 0

4.3.7 Applied Story Forces

Figure 15: Lateral Load to Stories - X

Table 9: Applied Story Loads in X- direction.

Story Elevation X-Dir Y-Dir


Ft lb lb
Story3 44 121294.06 0
Story2 33 186289.38 0
Story1 22 124192.92 0
GF 11 71793.93 0
Base 0 0 0
4.4 UBC 97 Auto Seismic Load Calculation
This calculation presents the automatically generated lateral seismic loads for load pattern EQY
according to UBC 97, as calculated by ETABS.
4.4.1 Direction and Eccentricity
Direction = Y + Eccentricity X
Eccentricity Ratio = 5% for all diaphragms

4.4.2 Structural Period


Period Calculation Method = Program Calculated

Coefficient, Ct [UBC 1630.2.2] Ct = 0.035ft


Structure Height Above Base, hn hn = 44 ft
Approximate Fundamental Period, Ta
Ta = Ct (hn Ta = 0.598 sec
[UBC 1630.2.2 Eq. 30-8]
Program Calculated Period, T [UBC
T ≤ 1.4Ta
1630.2.2.2]

4.4.3 Factors and Coefficients


Response Modification Factor, R [UBC Table 16-N] R = 8.5
Importance Factor, I [UBC Table 16-K] I=1
Seismic Zone Factor, Z [UBC Table 16-I] Z = 0.15
Soil Profile [UBC Table 16-J] = SC
Site Coefficient, Ca [UBC Table 16-Q] Ca = 0.18
Site Coefficient, Cv [UBC Table 16-R] Cv = 0.25

4.4.4 Equivalent Lateral Forces


Cv I
Base Shear Coefficient [UBC 1630.2.1, Eq. 30-4] =
RT
2.5Ca I
maximum [UBC 1630.2.1, Eq. 30-5] = = 0.052941
R
minimum [UBC 1630.2.1, Eq. 30-6] = 0.11Ca I = 0.0198
min ≤ Vcoeff ≤ max
4.4.5 Calculated Base Shear
Table 10: Base Shear Forces

Period Used W V Ft
Direction Vcoeff
(sec) (lb) (lb) (lb)
Y + Ecc. X 0.1 0 9511883.39 503570.3 0

4.4.6 Applied Story Forces

Figure 16: Lateral Load to Stories - Y

Table 11: Applied Story Loads in Y direction.

Story Elevation X-Dir Y-Dir


Ft lb lb
Story3 44 0 121294.06
Story2 33 0 186289.38
Story1 22 0 124192.92
GF 11 0 71793.93
Base 0 0 0
4.4.7 Load Cases

Table 12: Load Cases Summary.

Name Type
Dead Linear Static
Live Linear Static
SUPERDEAD Linear Static
EQX Linear Static
EQY Linear Static
4.5 Analysis Results
This chapter provides analysis results.

4.5.1 Structure Results

Table 13: Structure Results.

P VX VY T MX MY
Story Load Case/Combo Location
Lb lb lb lb-ft lb-ft lb-ft
Story
Dead Top -77412.5 0 0 0 -5394812.5 5401240.63
3
Story -
Dead Bottom 410162.5 0 0 0 29407812.5
3 31287334.3
Story
Live Top 0 0 0 0 0 0
3
Story
Live Bottom 0 0 0 0 0 0
3
Story
SUPERDEAD Top 0 0 0 0 0 0
3
Story
SUPERDEAD Bottom 0 0 0 0 0 0
3
Story
EQX Top 0 0 0 0 0 0
3
Story
EQX Bottom 0 0 0 0 0 0
3
Story
EQY Top 0 0 0 0 0 0
3
Story
EQY Bottom 0 0 0 0 0 0
3
Story
UDCon1-NL Max Top -10.86 0 0 0 -756.66 757.56
3
Story
UDCon1-NL Max Bottom 57.53 0 0 0 4124.63 -4388.24
3
Story
UDCon1-NL Min Top -10.86 0 0 0 -756.66 757.56
3
Story
UDCon1-NL Min Bottom 57.53 0 0 0 4124.63 -4388.24
3
Story
masonary Top 0 0 0 0 0 0
3
Story
masonary Bottom 0 0 0 0 0 0
3

18
Story
UDCon1 Top -108377.5 0 0 0 -7552737.5 7561736.88
3
Story -
UDCon1 Bottom 574227.5 0 0 0 41170937.5
3 43802268.1
Story
UDCon2 Top -92895 0 0 0 -6473775 6481488.75
3
Story -
UDCon2 Bottom 492195 0 0 0 35289375
3 37544801.2
Story -
UDCon3 Top -110699.8 0 0 0 7723774.09
3 7714581.88
Story -
UDCon3 Bottom 586532.3 0 0 0 42053171.8
3 44740888.1
Story -
UDCon4 Top -110699.8 0 0 0 7723774.09
3 7714581.88
Story -
UDCon4 Bottom 586532.3 0 0 0 42053171.8
3 44740888.1
Story -
UDCon5 Top -110699.8 0 0 0 7723774.09
3 7714581.88
Story -
UDCon5 Bottom 586532.3 0 0 0 42053171.8
3 44740888.1
Story -
UDCon6 Top -110699.8 0 0 0 7723774.09
3 7714581.88
Story -
UDCon6 Bottom 586532.3 0 0 0 42053171.8
3 44740888.1
Story
UDCon7 Top -68123 0 0 0 -4747435 4753091.75
3
Story -
UDCon7 Bottom 360943 0 0 0 25878875
3 27532854.2
Story
UDCon8 Top -68123 0 0 0 -4747435 4753091.75
3
Story -
UDCon8 Bottom 360943 0 0 0 25878875
3 27532854.2
Story
UDCon9 Top -68123 0 0 0 -4747435 4753091.75
3
Story -
UDCon9 Bottom 360943 0 0 0 25878875
3 27532854.2
Story
UDCon10 Top -68123 0 0 0 -4747435 4753091.75
3
Story -
UDCon10 Bottom 360943 0 0 0 25878875
3 27532854.2
Story
Comb11 Max Top -68123 0 0 0 -4747435 7723774.09
3
Story 42053171.8 -
Comb11 Max Bottom 586532.3 0 0 0
3 8 27532854.2
Story -
Comb11 Min Top -110699.8 0 0 0 4753091.75
3 7714581.88
Story -
Comb11 Min Bottom 360943 0 0 0 25878875
3 44740888.1
Story
Dead Top -77412.5 0 0 0 -5394812.5 5401240.63
2
Story -
Dead Bottom 410162.5 0 0 0 29407812.5
2 31287334.3
Story
Live Top 0 0 0 0 0 0
2
Story
Live Bottom 0 0 0 0 0 0
2
Story
SUPERDEAD Top 0 0 0 0 0 0
2
Story
SUPERDEAD Bottom 0 0 0 0 0 0
2
Story
EQX Top 0 0 0 0 0 0
2
Story
EQX Bottom 0 0 0 0 0 0
2
Story
EQY Top 0 0 0 0 0 0
2
Story
EQY Bottom 0 0 0 0 0 0
2
Story
UDCon1-NL Max Top -10.86 0 0 0 -756.66 757.56
2
Story
UDCon1-NL Max Bottom 57.53 0 0 0 4124.63 -4388.24
2
Story
UDCon1-NL Min Top -10.86 0 0 0 -756.66 757.56
2
Story
UDCon1-NL Min Bottom 57.53 0 0 0 4124.63 -4388.24
2
Story
masonary Top 0 0 0 0 0 0
2
Story
masonary Bottom 0 0 0 0 0 0
2
Story
UDCon1 Top -108377.5 0 0 0 -7552737.5 7561736.88
2
Story -
UDCon1 Bottom 574227.5 0 0 0 41170937.5
2 43802268.1
Story
UDCon2 Top -92895 0 0 0 -6473775 6481488.75
2
Story -
UDCon2 Bottom 492195 0 0 0 35289375
2 37544801.2
Story -
UDCon3 Top -110699.8 0 0 0 7723774.09
2 7714581.88
Story -
UDCon3 Bottom 586532.3 0 0 0 42053171.8
2 44740888.1
Story -
UDCon4 Top -110699.8 0 0 0 7723774.09
2 7714581.88
Story -
UDCon4 Bottom 586532.3 0 0 0 42053171.8
2 44740888.1
Story -
UDCon5 Top -110699.8 0 0 0 7723774.09
2 7714581.88
Story 586532.3 -
UDCon5 Bottom 0 0 0 42053171.8
2 8 44740888.1
Story -
UDCon6 Top -110699.8 0 0 0 7723774.09
2 7714581.88
Story 586532.3 -
UDCon6 Bottom 0 0 0 42053171.8
2 8 44740888.1
Story
UDCon7 Top -68123 0 0 0 -4747435 4753091.75
2
Story -
UDCon7 Bottom 360943 0 0 0 25878875
2 27532854.2
Story
UDCon8 Top -68123 0 0 0 -4747435 4753091.75
2
Story -
UDCon8 Bottom 360943 0 0 0 25878875
2 27532854.2
Story
UDCon9 Top -68123 0 0 0 -4747435 4753091.75
2
Story -
UDCon9 Bottom 360943 0 0 0 25878875
2 27532854.2
Story
UDCon10 Top -68123 0 0 0 -4747435 4753091.75
2
Story -
UDCon10 Bottom 360943 0 0 0 25878875
2 27532854.2
Story
Comb11 Max Top -68123 0 0 0 -4747435 7723774.09
2
Story -
Comb11 Max Bottom 586532.3 0 0 0 42053171.8
2 27532854.2
Story -
Comb11 Min Top -110699.8 0 0 0 4753091.75
2 7714581.88
Story -
Comb11 Min Bottom 360943 0 0 0 25878875
2 44740888.1
Story
Dead Top -74112.5 0 0 0 -5126687.5 5319565.63
1
Story -
Dead Bottom 401362.5 0 0 0 28692812.5
1 31069534.3
Story
Live Top 0 0 0 0 0 0
1
Story
Live Bottom 0 0 0 0 0 0
1
Story
SUPERDEAD Top 0 0 0 0 0 0
1
Story
SUPERDEAD Bottom 0 0 0 0 0 0
1
Story
EQX Top 0 0 0 0 0 0
1
Story
EQX Bottom 0 0 0 0 0 0
1
Story
EQY Top 0 0 0 0 0 0
1
Story
EQY Bottom 0 0 0 0 0 0
1
Story
UDCon1-NL Max Top -10.39 0 0 0 -719.05 746.1
1
Story
UDCon1-NL Max Bottom 56.29 0 0 0 4024.34 -4357.69
1
Story
UDCon1-NL Min Top -10.39 0 0 0 -719.05 746.1
1
Story
UDCon1-NL Min Bottom 56.29 0 0 0 4024.34 -4357.69
1
Story
masonary Top 0 0 0 0 0 0
1
Story
masonary Bottom 0 0 0 0 0 0
1
Story
UDCon1 Top -103757.5 0 0 0 -7177362.5 7447391.88
1
Story -
UDCon1 Bottom 561907.5 0 0 0 40169937.5
1 43497348.1
Story
UDCon2 Top -88935 0 0 0 -6152025 6383478.75
1
Story -
UDCon2 Bottom 481635 0 0 0 34431375
1 37283441.2
Story -
UDCon3 Top -105980.8 0 0 0 7606978.84
1 7331163.13
Story -
UDCon3 Bottom 573948.3 0 0 0 41030721.8
1 44429434.1
Story -
UDCon4 Top -105980.8 0 0 0 7606978.84
1 7331163.13
Story -
UDCon4 Bottom 573948.3 0 0 0 41030721.8
1 44429434.1
Story -
UDCon5 Top -105980.8 0 0 0 7606978.84
1 7331163.13
Story -
UDCon5 Bottom 573948.3 0 0 0 41030721.8
1 44429434.1
Story -
UDCon6 Top -105980.8 0 0 0 7606978.84
1 7331163.13
Story -
UDCon6 Bottom 573948.3 0 0 0 41030721.8
1 44429434.1
Story
UDCon7 Top -65219 0 0 0 -4511485 4681217.75
1
Story -
UDCon7 Bottom 353199 0 0 0 25249675
1 27341190.2
Story
UDCon8 Top -65219 0 0 0 -4511485 4681217.75
1
Story -
UDCon8 Bottom 353199 0 0 0 25249675
1 27341190.2
Story
UDCon9 Top -65219 0 0 0 -4511485 4681217.75
1
Story -
UDCon9 Bottom 353199 0 0 0 25249675
1 27341190.2
Story
UDCon10 Top -65219 0 0 0 -4511485 4681217.75
1
Story -
UDCon10 Bottom 353199 0 0 0 25249675
1 27341190.2
Story
Comb11 Max Top -65219 0 0 0 -4511485 7606978.84
1
Story -
Comb11 Max Bottom 573948.3 0 0 0 41030721.8
1 27341190.2
Story -
Comb11 Min Top -105980.8 0 0 0 4681217.75
1 7331163.13
Story -
Comb11 Min Bottom 353199 0 0 0 25249675
1 44429434.1
-
GF Dead Top -277913.2 0 0 0 20552938.1
19606781.8
-
GF Dead Bottom 536413.2 0 0 0 38336516.2
40892797.5
GF Live Top 0 0 0 0 0 0
GF Live Bottom 0 0 0 0 0 0
GF SUPERDEAD Top 0 0 0 0 0 0
GF SUPERDEAD Bottom 0 0 0 0 0 0
GF EQX Top 0 0 0 0 0 0
GF EQX Bottom 0 0 0 0 0 0
GF EQY Top 0 0 0 0 0 0
GF EQY Bottom 0 0 0 0 0 0
GF UDCon1-NL Max Top -38.98 0 0 0 -2749.97 2882.68
GF UDCon1-NL Max Bottom 75.24 0 0 0 5376.93 -5735.47
GF UDCon1-NL Min Top -38.98 0 0 0 -2749.97 2882.68
GF UDCon1-NL Min Bottom 75.24 0 0 0 5376.93 -5735.47
GF masonary Top 0 0 0 0 0 0
GF masonary Bottom 0 0 0 0 0 0
-
GF UDCon1 Top -389078.5 0 0 0 28774113.3
27449494.5
-
GF UDCon1 Bottom 750978.5 0 0 0 53671122.6
57249916.5
-
GF UDCon2 Top -333495.9 0 0 0 24663525.7
23528138.1
-
GF UDCon2 Bottom 643695.9 0 0 0 46003819.4
49071357.0
-
GF UDCon3 Top -397415.9 0 0 0 29390701.5
28037698.0
-
GF UDCon3 Bottom 767070.9 0 0 0 54821218.1
58476700.4
-
GF UDCon4 Top -397415.9 0 0 0 29390701.5
28037698.0
-
GF UDCon4 Bottom 767070.9 0 0 0 54821218.1
58476700.4
-
GF UDCon5 Top -397415.9 0 0 0 29390701.5
28037698.0
-
GF UDCon5 Bottom 767070.9 0 0 0 54821218.1
58476700.4
-
GF UDCon6 Top -397415.9 0 0 0 29390701.5
28037698.0
-
GF UDCon6 Bottom 767070.9 0 0 0 54821218.1
58476700.4
-
GF UDCon7 Top -244563.6 0 0 0 18086585.5
17253968.0
-
GF UDCon7 Bottom 472043.6 0 0 0 33736134.2
35985661.8
-
GF UDCon8 Top -244563.6 0 0 0 18086585.5
17253968.0
-
GF UDCon8 Bottom 472043.6 0 0 0 33736134.2
35985661.8
-
GF UDCon9 Top -244563.6 0 0 0 18086585.5
17253968.0
-
GF UDCon9 Bottom 472043.6 0 0 0 33736134.2
35985661.8
-
GF UDCon10 Top -244563.6 0 0 0 18086585.5
17253968.0
-
GF UDCon10 Bottom 472043.6 0 0 0 33736134.2
35985661.8
-
GF Comb11 Max Top -244563.6 0 0 0 29390701.5
17253968.0
-
GF Comb11 Max Bottom 767070.9 0 0 0 54821218.1
35985661.8
-
GF Comb11 Min Top -397415.9 0 0 0 18086585.5
28037698.0
-
GF Comb11 Min Bottom 472043.6 0 0 0 33736134.2
58476700.4
Conclusion
We have assigned the Complex Engineering Problem to get to know about the practical knowledge
about building design and its bylaws and applying that knowledge to design the structure on
ETABS.
We came to know from doing this Project (Complex Engineering Problem) about all the processes
involved in the structural design of the building and to apply this knowledge in Practical life and
in field.