Sei sulla pagina 1di 71

Method Of Procedure.

E-BAND WAVENECE NOKIA LINK


Customer :Zain – Saudi Arabia
Project :MEGA Project

6/24/2019 ZAIN - NOKIA MEGA Project 1


Contents

1 Introduction

1.1 Nokia E-BAND WAVENECE NOKIA LINK Overview::...............................................................


1.2 MSS-8 Version .....................................................................................................................
1.3 MSS-4 Version .....................................................................................................................
1.4 NOKIA Wavenece COREVO...................................................................................................
1.5 NOKIA Wavenece EAC -10G Capacity………………………………………………………………………………
1.6 NOKIA Wavenece EAC – Connection ………………………………………………………………………………
1.7 Next Generation MBH Router 7250 IXR-e………………………………………………………………………..
1.8 Wavence Full information 10Gbps…………………………………………………………………………………..
1.9 1.9 Nokia Wavence UBT-(UBT-T – UBT-m 80)……………………………………………………………….
1.9.1 UBT-m80 Transceiver in details………………………………………………………………………………
1.9.2 UBT-T Transceiver Sub-Band Free and Shifter Free……………………………………………….
1.9.3 UBT-T: AIM-T in details………………………………………..………………………………………………..
1.9.4 Nokia Wavence Wideband Transceivers………………………………………………………………..
1.9.5 Modem Profiles…………………………………………………………………………………………………….
1.9.6 UBT-m80: 2+0 E-BanXPIC……………………………………………………………………………............
1.9.7 UBT-m80: XPIC and OMT……………………………………………………………………………………….
1.9.8 Best in Class Outdoor Connectors…………………………………………………………………………
ZAIN - NOKIA MEGA Project 2
Contents
2- MW Antenna’s
2.1 E-Band UBT-m 80 /UBT-T Carrier Aggregation Antenna::....................................................
2.2 Carrier Aggregation 2+2 deployment scenarios……………………………………………………………….
2.3 Microwave Link Acceptance Criteria....................................................................................
3- Link Configuration
3.1 Site configuration 1 direction tail site 2+0 E-Band..............................................................
3.1.1 Site configuration 1 direction tail site 2+0 E-Band..............................................................
3.2 Site configuration 2 direction/Ring 2+0 E-Band...................................................................
3.2.1 Site configuration 2 direction/Ring 2+0 E-Band...................................................................
3.3 Site configuration 3 direction 2+0 E-Band..............................................................................
3.4 Site configuration 1 direction tail site 2+2 CA.........................................................................
3.4.1 configuration 1 direction tail site 2+2 CA .............................................................................
3.5 Site configuration 2 direction site 2+2 CA...............................................................................
3.5.1 Site configuration 2 direction site 2+2 CA.............................................................................
3.6 Site configuration 3 directions: 2+2/2+0/2+0……………………………………………………………………..
3.6.1 Site configuration 3 directions: 2+2/2+0/2+0…………………………………………………………………..
3.6.2 Site configuration 3 directions: 2+2/2+2/2+0…………………………………………………………………..
3.7 Site configuration 3 directions: 2+2/2+2/2+2……………………………………………………………………...

ZAIN - NOKIA MEGA Project 3


Contents

4 - Planning Topics

4.1 Data fill ...............................................................................................................................


4.2 DCN ……………………………………………………………..……………………………………………………………….
4.3 DCN Scenarios ……………………………………………..……………………………………………………………….
4.3.1 DCN Scenarios……………………………………………..……………………………………………………………..
4.3.2 DCN Scenarios ……………………………………………..……………………………………………………………..
4.3.3 DCN Scenarios ……………………………………………..……………………………………………………………..
4.3.4 DCN Scenarios ……………………………………………..……………………………………………………………..
4.3.4 DCN Scenarios ……………………………………………..……………………………………………………………..

5- Steps of installation:
5.1 Steps of installation………………………………………………………………………………………………………..
5.2 The MPT should be connected with grounding source…………………………………………………..
5.3 Some Outdoor accessories will be used based on configuration:……………………………………
5.3.1 Some Outdoor accessories will be used based on configuration:…………………………………

6 - WebEML Start.
6.1 Steps of Link Commissioning………………………………………………………………………………………….
ZAIN - NOKIA MEGA Project 4
Contents
7 - Swap Scenarios

7.1 Cold Swap Scenarios .................................................................................................................


7.1.1 Cold Swap Scenarios ..............................................................................................................
7.2 Hot Swap Scenarios ................................................................................................................
7.2.1 Hot Swap Scenarios ..............................................................................................................

ZAIN - NOKIA MEGA Project 5


1 Introduction

1.1 Nokia E-BAND WAVENECE NOKIA LINK Overview :

• E-BAND WAVENECE NOKIA LINK


Wavebece link Packet Radio Product comes to different architectures and addresses all microwave
applications with a single product family from full outdoor to split-mount system and nodal configurations.

• E-BAND WAVENECE NOKIA LINK architecture consists of two separate units:


· The Microwave Service Switch (Indoor Unit).
· The Microwave Packet Transport (Outdoor Unit).

6/24/2019 ZAIN - NOKIA MEGA Project 6


1.2 MSS-8 Version

MSS-8 (the 8 slots version) the Core-EVO is the heart of the system and provides the controller functions,
cross-connection functions, and manages different radio directions. The Core-EVO platform is based on
packet technology with a generic one Gigabit Ethernet serial interface between CorEvo and peripherals.

1.3 MSS-4 Version

MSS-4 can support Full-protected configurations, including EPS, RPS hitless, HSB and Core board protection
through a Core “Spare” (same PN of Core “Main”) that can be added to provide Control platform
redundancy and protection of aggregated data using an external switch.

Restricted external use


1.4 NOKIA Wavenece COREVO

L3/SDN
READY

10 G
RING

100 G
MATRIX

1.5 NOKIA Wavenece EAC -10G Capacity EAC-10G


- 2 x RJ45 1Gbs PoE
- 2 x SFP 1/2.5 Gbs
- 1 x SFP+ 10Gbs
- 2 x QMA

The usage of the ports [1xSFP+] and [(2xRJ45)+(2xSFP)] is mutually exclusive


1.6 NOKIA Wavenece EAC – Connection

UBT-m80

Coax cable for VDC

Ethernet Outdoor
Cable for Data only QMA connector
1.7 Next Generation MBH Router 7250 IXR-e

Dual Modular 7250 IXR-e: 14xSFP/SFP+ plus 4xGE RJ45 Replaceable


shared PSUs fan filter

Fixed form factor Line rate or oversubscribed Value-added capabilities


• Side-to-side cooled with filter • 120G to 300G FD • ETR: -40 to 65C
• AC or DC powered • Full break-out support per QSFP28 • Full SyncE and 1588
• 300mm ETSI compliant • Dual and Tri-Rate port speeds for support
easy expansion • GNSS support (future)
1.8 Wavence Full information 10Gbps

10Gb

CA uW/mmW
OFFERED
OFFERED

2+0 4+0 XPIC


mmW uW

UBT-m UBT-T
2.5G
10Gb
b
EAC 10G
20Gb 5Gb
MSS-4/8

FULL 10G SUPPORT


1.9 Nokia Wavence UBT-(UBT-T – UBT-m 80)

UBT-T UBT-m 80
Dual carrier in one box Compact E-band radio
4096 QAM (512QAM)
2 x 120 MHz 256 QAM XPIC
2.5Gbps 2 GHz
50 µs latency 10Gbps
10 µs latency

High capacity, low latency microwave transport


Confidential
1.9.1 UBT-m80 Transceiver in details
BACK

RSSI
UBT-m 80
Compact E-band radio
SP int Antenna DP int Antenna (512QAM)
256 QAM XPIC
2 GHz
10Gbps
10 µs latency
Support Configurations
- 1+0, 2+0 up to 2000MHz
- 2+0 XPIC up to 1500MHz
- 1+1 HSB

Antenna: 1ft / 2ft


-48DC
XPIC
1GE PoE Mechanics: 3,8 Kg, 240mm x 220mm x 109mm
LAG Cascade
1/2.5/10 SFP
1.9.2 UBT-T Transceiver Sub-Band Free and Shifter Free

Band (GHz) Shifter (MHz) Tx Sub-band UBT-T P/N Tx freq (MHz)


10-11 all all 3DB29210AA 10000-11705
13-15 all all 3DB29215AA 12700-15400
18 all all 3DB29218AA 17699-19701
23 all all 3DB29223AA 21198-23639
24-26 all all 3DB29225AA 24050-26980
38 all all 3DB29238AA 37050-40000
42 all all 3DB29242AA 40550-43500

Wide Shifter SubBand


Band Free Free
1.9.3 UBT-T: AIM-T in details
AIM-T comes in three types:
1. D for external ant mounting with Flex-Twist AIM does not require spare part
2. C with embedded 3dB coupler for int-antenna
100% passive / Buy it once-in-lifetime
3. O with embedded OMT for int-antenna

1 Alt-Polar 1 CCDP 1 2 Co-Polar Alt-Polar CCDP


1 1
XPIC XPIC
2 2 2 2

1 2 1 2

AIM-T-D AIM-T-C AIM-T-O


1.9.4 Nokia Wavence Wideband Transceivers

Int Antenna AIM Transceiver Description

Two Diplexers
UBT-Twin
• Two Carriers System (2+0)
• 4096 QAM
• Up to 2 x 112 MHz
• 2.5Gbps capacity
• 1G / 2.5G / 10G interfaces
• Down 50µs latency
• From 6GHz up to 42GHz
1.9.5 Modem Profiles

62,5MHz 125MHz 250MHz 500MHz 750MHz 1000MHz 1250MHz 1500MHz 2000MHz


BPSK 0,10 0,21 0,44 0,70 0,93 1,10 1,26 1,63
4QAM 0,10 0,21 0,43 0,89 1,40 1,87 2,20 2,52 3,26
16QAM 0,20 0,42 0,86 1,77 2,81 3,73 4,41 5,05 6,52
32QAM 0,25 0,52 1,08 2,22 3,51 4,67 5,51 6,31 8,15
64QAM 0,63 1,29 2,66 4,21 5,60 6,61 7,58 9,33
128QAM 1,51 3,10 4,91 6,53 7,72 8,84 9,33
256QAM 1,72 3,55 5,61 7,47 8,82 9,33
512QAM 1,94 3,99
250MHz 500MHz 750MHz 1000MHz 1250MHz 1500MHz 2000MHz
BPSK 0,21 0,44 0,70 0,93 1,10 1,26
4QAM 0,42 0,89 1,40 1,87 2,20 2,52
X 16QAM 0,83 1,77 2,81 3,73 4,41 5,05
P 32QAM 1,04 2,22 3,51 4,67 5,51 6,31
64QAM 1,25 2,66 4,21 5,60 6,61 7,58
I
128QAM 1,46 3,10 4,91 6,53 7,72 8,84
C 256QAM 1,67 3,55 5,61 7,47 8,82 9,33

No throughput degradation in XPIC


1.9.6 UBT-m80: 2+0 E-BanXPIC
Layer1 LAG Description up to 10Gbps

50% 50% 50%

50% 50% 50%


Master Slave Master Slave
Radio Load Balancing Radio Radio Load Balancing Load Balancing Radio
Load Balancing
QoS QoS QoS
QoS

50%

Cascade cable Cascade cable

100% 100%

Active Standby Active


10G port 10G port 10G port
1.9.7 UBT-m80: XPIC and OMT
1.9.8 Best in Class Outdoor Connectors

SFP Housing

RJ45 Housing

MiMo / XPIC
10G Cascade / CA
1G / 2.5G / 10G SFP

GE / PoE

DC power

Quick/Easy/Robust Cabling Adopted also by RAN


2.1 E-Band UBT-m 80 /UBT-T Carrier Aggregation Antenna

• Nokia is introducing CommScope as Antenna solution.


• Due to the unavailability of CommScope antenna, the CA links deployment will be delayed until the antenna is
available. RFS dual antenna solution will be temporarily used (1xDP antenna traditional band + 1xDP antenna E-
Band) up to 100 links.
• 2+0 E-Band will be deployed using RFS DP antenna until Commscope antenna is available.
2.2 Carrier Aggregation 2+2 deployment scenarios

H+V XPIC
UBT-T
H + V XPIC
H+V XPIC UBT-m80
UBT-T

H + V XPIC
UBT-m80

2+2 CA Commscope scenario 2+2 CA RFS scenario


2.3 Microwave Link Acceptance Criteria

• RFS Antenna
• RSL variation is ± 6 dB on 60cm antenna
• RSL variation is ± 5 dB on 30cm antenna
• XPD >= 25 dB

• CommScope Antenna
• RSL variation is ± 6 dB on 60cm antenna
• RSL variation is ± 5 dB on 30cm antenna
• XPD >= 27 dB
3.1 Site configuration 1 direction tail site 2+0 E-Band
Offered license capacity is 5Gbps

Tail 2+0 5G

Active Active
10G 10G

MSS-4 MSS-8

10G 10G
Active Active

5G

Airscale Total 10GE Used 10GE Free 10GE


MSS-4 4 3 1
MSS-8 6 2 4
Total 1GE Used 1GE Free 1GE

MSS-4 2xOpt.+4Elec. 0 2xOpt.+4Elec.


UBT-m 2+0 XPIC
Up to 1500MHz MSS-8 2xOpt.+4Elec.. 0 2xOpt.+4Elec.
3.1.1 Site configuration 1 direction tail site 2+0 E-Band
Offered license capacity is 5Gbps Tail 2+0 5G

Active Active
10G 10G

Active Active
10G 10G
MSS-4 MSS-8
CorEvo 2x10G CorEvo 2x10G
CorEvo 2x10G CorEvo 2x10G
Spare Spare
EAC 1x10G EAC 1x10G EAC 1x10G EAC 1x10G
EAC 1x10G EAC 1x10G
5G
Active Standby

Airscale
3.2 Site configuration 2 direction/Ring 2+0 E-Band
Offered license capacity is 5Gbps
2+0 2+0

Active Active Active Active


10G 10G 10G 10G

MSS-8A MSS-8B

10G 10G 10G


10G
Active Active Active
Active 5G
5G

Airscale Airscale

UBT-m 2+0 XPIC Total 10GE Used 10GE Free 10GE


Up to 1500MHz MSS-8A/B 6 5 1
Total 1GE Used 1GE Free 1GE
2 Opt.+4Elec.
MSS-8A/B .. 0 2xOpt.+4Elec..
3.2.1 Site configuration 2 direction/Ring 2+0 E-Band

Offered license capacity is 5Gbps 2+0 2+0

Active
10G 10G

Active Active
10G 10G 10G 10G
Active

Active Active
10G 10G
MSS-8A MSS-8B
CorEvo 2x10G CorEvo 10G Spare CorEvo 2x10G
CorEvo 2x10G
Spare
EAC 1x10G EAC 10G
EAC 1x10G EAC 1x10G
EAC 1x10G EAC 10G
EAC 1x10G EAC 1x10G

5G 5G

Airscale Airscale
3.3 Site configuration 3 direction 2+0 E-Band
Offered license capacity is 5Gps Tail 2+0 5G
2+0
Tail 2+0 5G

Active Active
10G 10G
UBT-m 2+0 XPIC
MSS-8A MSS-8B
Up to 1500MHz
10G 10G
Active Active

Total 10GE Used 10GE Free 10GE MSS-8D

MSS-8A/B 6 3 3
MSS-8C 6 5 1 Active
MSS-8D 6 4 2
10G 15/20G
Airscale MSS-8C
Total 1GE Used 1GE Free 1GE 5G
10G
Active
MSS- 2xOpt.+4Ele
8A/B/C/D 2Opt.+4Elec. 0 c.
3.4 Site configuration 1 direction tail site 2+2 CA
using Commscope antenna, Offered license capacity is 5Gbps

2+2 tail 5G
standby

0,4 Active
5/20G 10G 10G
MSS-8A MSS-8B Total 10GE Used 10GE Free 10GE

10G MSS-8A/B 6 3 3
Active
5G Total 1GE Used 1GE Free 1GE
2Opt.+4Elec 2Opt.+4Elec
MSS-8A/B . 0 .
Airscale

UBT-T 2+0 XPIC


400Mbps @28MHz

UBT-m 2+0 XPIC


Up to 1500MHz
3.4.1configuration 1 direction tail site 2+2 CA
using Commscope antenna, Offered license capacity is 5Gbps

2+2 tail 5G
standby

0,4 Active
5/20G 10G

10G
MSS-8A MSS-8B
Active
CorEvo 2x10G CorEvo 2x10G
CorEvo 2x10G CorEvo 2x10G
Spare Spare
EAC 10G EAC 10G EAC 10G EAC 10G
EAC 10G EAC 10G EAC 10G EAC 10G

5G standby
Active

Airscale
3.5 Site configuration 2 direction site 2+2 CA
using Commscope antenna, Offered license capacity is 5Gbps
2+2 tail 5G 2+2

standby standby

0,4 Active Active 0,4


10G 10G

MSS-8A
10G MSS-8B
10G MSS-8C

10G Active 10G


Active
5G

Airscale
Total 10GE Used 10GE Free 10GE
MSS-8A 6 3 3
UBT-T 2+0 XPIC MSS-8B 6 4 2
400Mbps @28MHz MSS-8C 6 4 2
Total 1GE Used 1GE Free 1GE
UBT-m 2+0 XPIC MSS-8A/B/C 2 Opt.+4Elec. 0 2 Opt.+4Elec.
Up to 1500MHz
3.5.1 Site configuration 2 direction site 2+2 CA
using Commscope antenna, Offered license capacity is 5Gbps

0,4 Active Active 0,4


10G 10G

Active Active
10G 10G

MSS-8A MSS-8B MSS-8C


CorEvo 2x10G CorEvo 2x10G CorEvo 2x10G
CorEvo 2x10G CorEvo 2x10G CorEvo 2x10G
Spare Spare Spare
EAC 1x10G EAC 1x10G EAC 1x10G EAC 1x10G EAC 1x10G EAC 1x10G
EAC 1x10G EAC 1x10G EAC 1x10G EAC 1x10G EAC 1x10G EAC 1x10G
5G

2+2 tail 5G 2+2 Airscale


3.6 Site configuration 3 directions: 2+2/2+0/2+0
using Commscope antenna, Offered license capacity is 5Gbps
2+0 tail 5G
2+2
2+0 tail 5G
Total 10GE Used 10GE Free 10GE
Active Active MSS-8A 6 5 1
10G 10G
MSS-8B 6 3 3
MSS-8A 7250 IXR-e 14 4 10

Total 1GE Used 1GE Free 1GE


10G 10G
Active Active
10G MSS-8A/B 2 Opt.+4Elec. 0 2Opt.+4Elec.
7250 IXR-e 4Elec. 0 4Elec.

Active
5G 10G
10G 15/20G
Airscale 7250 IXR-e MSS-8B
UBT-T 2+0 XPIC
400Mbps @28MHz 10G
Active
0,4
UBT-m 2+0 XPIC
Up to 1500MHz standby
3.6.1 Site configuration 3 directions: 2+2/2+0/2+0
using Commscope antenna, Offered license capacity is 5Gbps
2+0 tail 5G
2+2
Active 2+0 tail 5G
10G Active
10G

Active 0,4
10G
10G
Active 10G
Active
Active
MSS-8A 10G
CorEvo 2x10G
CorEvo 2x10G
Spare
EAC 1x10G EAC 1x10G MSS-8C
EAC 1x10G EAC 1x10G CorEvo 2x10G
CorEvo 2x10G
Spare
EAC 1x10G EAC 1x10G
EAC 1x10G EAC 1x10G
7250 IXR-e 14x10G
5G

Airscale
3.6.2 Site configuration 3 directions: 2+2/2+2/2+0
using Commscope antenna, Offered license capacity is 5Gbps
2+0 tail 5G
2+2
2+2 tail 5G
Active Active
10G 10G

MSS-8A
Total 10GE Used 10GE Free 10GE

10G 10G MSS-8A 6 5 1


Active Active
0,4 MSS-8B 6 3 3
10G 7250 IXR-e 14 5 9

Total 1GE Used 1GE Free 1GE


2Opt.+4Elec
MSS-8A/B/C 2 Opt.+4Elec. 0 .
standby
5G 7250 IXR-e 4Elec. 0 4Elec.
Airscale
Active
10G
10G 15/20G
UBT-T 2+0 XPIC 7250 IXR-e
MSS-8B
400Mbps @28MHz

10G
UBT-m 2+0 XPIC Active 0,4
Up to 1500MHz standby
3.7 Site configuration 3 directions: 2+2/2+2/2+2
using Commscope antenna, Offered license capacity is 5Gbps
2+2 tail 5G
2+2
Active Active
10G 10G 2+2 tail 5G

MSS-8A
Total 10GE Used 10GE Free 10GE

0,4 10G 10G MSS-8A 6 5 1


Active Active
0,4 MSS-8B 6 3 2
10G 7250 IXR-e 14 6 8

Total 1GE Used 1GE Free 1GE


2Opt.+4Elec. 2Opt.+4Elec
standby standby MSS-8A/B/C . 0 .
7250 IXR-e 4Elec. 0 4Elec.
5G
Active
Airscale 10G 15/20G
7250 IXR-e 10G
MSS-8B
UBT-T 2+0 XPIC
400Mbps @28MHz
10G
Active 0,4
UBT-m 2+0 XPIC
Up to 1500MHz standby
• 4 - Planning Topics

4.1 Data fill


New Data fill needed for below cases
site category.
TDD SITE
FTK SITE
existing site re-routed from FON to other FON incase
there is VLAN duplication
• Unique VLANs will be used for all the technology.
4.2 DCN
• In-band DCN whenever microwave links having Tagged interfaces.
• Out of band DCN for untagged Ports microwave links – Ring links.
• All NEs will have unique IP
• The Microwave cluster will be divided based on the topology.
• A separate Subnet will be assigned for each MW chain terminated on the router
• Max. Subnet size will be /28 if possible.
• OSPF will be used and each segment will be defined as stub area
• In the scenario of mixed chain between NEC link and EBAND links the visibility of NEC will remain the same with no changes in the IPs

ZAIN - NOKIA MEGA Project 37


4.3 DCN Scenarios

6/24/2019 38
<Change information classification in footer>
4.3.1 DCN Scenarios

6/24/2019 ZAIN - NOKIA MEGA Project 39


4.3.2 DCN Scenarios

<Change information classification in footer>


6/24/2019 ZAIN - NOKIA MEGA Project 40
• 4.3.3 DCN Scenarios

<Change information classification in footer>


6/24/2019 ZAIN - NOKIA MEGA Project 41
• 4.3.4 DCN Scenarios

6/24/2019 ZAIN - NOKIA MEGA Project 42


• 4.3.5 DCN Scenarios

<Change information classification in footer>


6/24/2019 ZAIN - NOKIA MEGA Project 43
5- Steps of installation:

5.1 Steps of installation:

1- team should check that all materials needed are available to start with installation for outdoor part.
2- Start to install the antenna on the required location.
3- Install the ODU directly on the integrated antenna if the configuration is 1+0 or OMT coupler with two ODUs if
the configuration is 2+0.
4-The MPT should be connected with grounding source.

6/24/2019 ZAIN - NOKIA MEGA Project 44


5.2 The MPT should be connected with grounding source

6/24/2019 ZAIN - NOKIA MEGA Project 45


5.3 Some Outdoor accessories will be used based on configuration:

6/24/2019 ZAIN - NOKIA MEGA Project 46


5.3.1 Some Outdoor accessories will be used based on configuration:

6/24/2019 ZAIN - NOKIA MEGA Project 47


6.1 Steps of Link Commissioning
LOG IN:

In a web browser, enter the IP address


10.0.1.2
User name : initial
Password :adminadmin

6/24/2019 ZAIN - NOKIA MEGA Project 48


Wavence WebCT authorization webpage / Click Accept

6/24/2019 ZAIN - NOKIA MEGA Project 49


The Wavence WebCT opens

6/24/2019 ZAIN - NOKIA MEGA Project 50


Network Element information webpage

The following fields area available to be edited:


• NE Site name
• NE Site Location
• Latitude
• Longitude

Once you finish editing the information, click Apply

6/24/2019 ZAIN - NOKIA MEGA Project 51


System Settings

To configure NE date and time

6/24/2019 ZAIN - NOKIA MEGA Project 52


License Information webpage

To can get the license we need to


collect

- RMU Serial Number


- License Key

6/24/2019 ZAIN - NOKIA MEGA Project 53


SW Package Management
Version : V0.01.0U

6/24/2019 ZAIN - NOKIA MEGA Project 54


Equipment Configuration
Drag the hardware compo
nent to the Equipment Co
nfiguration column on the
left side of
the webpage and drop th
e component in the desire
d slot

CorEvo-10G
EAC10G
EAC

6/24/2019 ZAIN - NOKIA MEGA Project 55


Port Configuration
To config the ODUs or ETH ports by the
same way Drag and Drop .

ODUs Type

UBTm 80 (80G)

UBT T (13-15 G)

6/24/2019 ZAIN - NOKIA MEGA Project 56


Power Management
Two options

• Power Over Ethernet

• QMA

We will use QAM

6/24/2019 ZAIN - NOKIA MEGA Project 57


Interfaces

Radio Interfaces

• To view the radio interfaces


• To provision fixed modulation (FCM)
• To provision adaptive modulation (ACM)
• To provision radio power settings
• To set radio channel freq .

Ethernet Interfaces

6/24/2019 ZAIN - NOKIA MEGA Project 58


Radio Interfaces

6/24/2019 ZAIN - NOKIA MEGA Project 59


Radio Interfaces
Capacity license

ZAIN - NOKIA MEGA Project


6/24/2019 60
Radio Interfaces
Modem Profile setting

6/24/2019 ZAIN - NOKIA MEGA Project 61


Radio Interfaces
Frequency setting

6/24/2019 ZAIN - NOKIA MEGA Project 62


Radio Interfaces
Power setting

6/24/2019 ZAIN - NOKIA MEGA Project 63


Monitoring & Maintenance

Radio Maintenance

-Performance Monitoring .
-Radio TX Mute .

6/24/2019 ZAIN - NOKIA MEGA Project 64


Monitoring & Maintenance

Radio dashboard (RSL )

6/24/2019 ZAIN - NOKIA MEGA Project 65


Network Configuration

6/24/2019 ZAIN - NOKIA MEGA Project 66


Static Routing Configuration

6/24/2019 ZAIN - NOKIA MEGA Project 67


7 - Swap Scenarios

• Two types of swap are planned. Cold Swap and Hot Swap. Specific mode to be apply must
be triggered from Survey result and site model type.

 7.1 Cold Swap Scenarios :

• new system is using different frequencies (no interference with existing link’s), available spaces to
install new equipment and cables(Already checked by Survey. Cold is possible if the parallel
installation of the system is ensured on both sides.

 7.2 Hot Swap Scenarios :

• No possible execute “Cold” as preferential choice. Cases of Hot Swap are for example, Antennas
reusing, No space available in infrastructure, No space in Cabinet/Rack etc…

6/24/2019 ZAIN - NOKIA MEGA Project 68


7.1.1 Cold Swap Scenarios
Day One Day Two Day Three
RFC ,Materials ,TSSR Link Installation , visibility confirmation
Cold Swap preparation Commissioning and alignment

Day four
NOTE : Confirm Power Load and incase site will Link Will Be under monitoring
over loaded after adding our new equipment's 48 hours
Nokia will add TEMP Rectifier Source
Day five
Day Eight Day Seven HO FLM Invitation
KPI’s monitoring and Traffic Shifting
confirmed

Day Ten Day Six

Dismantling and cleaning site BO Acceptance offering

PAC signing

6/24/2019 ZAIN - NOKIA MEGA Project 69


7.2.1 Hot Swap Scenarios

Call NOC and send Email Data backup of existing MW Announce the MDT and inform
HOT Swap before open the site to before starting activity from NOC for service affect.
Confirm the RFC OLD link in case will be rollback
for any.

Dismantled existing MW dishes


KPI’s monitoring and confirmed Traffic Shifting to install NOKIA new link and
removing all old cables.

Starting Installation as per LB


and planning team
confirmation
HO TO FLM after action BO Acceptance 48 hours
directly after traffic shifting
Commissioning and alignment
check visibility

PAC signing

6/24/2019 ZAIN - NOKIA MEGA Project 70


Thanks

6/24/2019 ZAIN - NOKIA MEGA Project 71