Pre-Running
TenarisHydril Wedge 563® Connection
2
Inspection
RUNNING MANUAL
TenarisHydril
3
4
TenarisHydril RUNNING MANUAL Connection Specific Running Guidelines TenarisHydril Wedge 563® Connection
Seal
up Band
Wedge 563® Casing Configuration
Assembly Make
IDM Code GDL23533/1 / March 2018
RFB Corrosion
Barrier (CB®) Option
Seal
up Band
Wedge 563® Tubing Configuration
Assembly Make
5
TenarisHydril RUNNING MANUAL Connection Specific Running Guidelines TenarisHydril Wedge 563® Connection
Thread Compound Application
TenarisHydril Wedge 563® Connection
Carbon Steel
Connection Specific Running Guidelines
Chrome Material
pin and box ensuring all threads, seal and pin nose are
completely covered. The thread form should be clearly
visible.
6
Thread Lock Application
7
TenarisHydril Wedge 563® Connection
8
Non Dopeless® pin into Dopeless® box
9
Wedge 563® Dopeless® Thread Lock
TenarisHydril Wedge 563® Connection
Torque Application
1. Set tong dump valve at optimum torque then test
on pipe body.
RUNNING MANUAL
10
3. For doped connections, apply the specified
11
10. When any doped variant is made up to a Dopeless®
TenarisHydril Wedge 563® Connection
12
TenarisHydril Wedge 563® Connection
MAX. 6800
5.1
OPT 4800
TORQUE * 1000 ft-lbs
MIN. 4000
3.8
2.6
1.3
0
0 0.20 0.40 0.60 0.80 TURNS
5.1
OPT 4800
IDM Code GDL23533/1 / March 2018
MIN. 4000
3.8
2.6
1.3
0
0 0.20 0.40 0.60 0.80 TURNS
13
Running
TenarisHydril Wedge 563® Connection
10. Walk chrome pipe all the way in to hand tight, then
RUNNING MANUAL
14
Pulling
connections.